Anda di halaman 1dari 6
. a iid JAS-ANZ_ ES ee muss an anes BE An ISO 9001 :2008 Certified Company oe Jobs Noo CECH/BBMPAW. No. 12/IKRUDL/GSB-1/GR/2012-43 Date : 04.04.2013 GRADATION FOR GSB (CLOSE GRADED) Client : Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore Agency : Technical Manager (West), KRIDL, Bangalore Name of work: Improvements to Road at Chikkabanavar Railway Station to Geleyarabalaga Ganesha Temple in Ward No.12, BMP, Bangalore. Reference : BBMP/AEE/SSD/DZ/PR/2012.13 Date of Testing : (4.04.2013 Sample Source: GSB Mix Plant Bangalore Oven Dry Wt (gm) : 12 Is Sieve Size in | Weight Retained Orica Cumulative % of [Cumulative | Specified mm (gm) a Retained —_|% of Passing | Limits é 0.00 0 100 1.82 el 98.18 80-100 2366 18.90 | 81.10 55-90 5263 42.04 | 57.96 35-65, 8073 64.48 | 35.52 25-55 _ [96 76.97 | 23.03 2040 Wis 88.78 11.22 10-25 12010, 95.93, 4.0. Towle] 192520 coe oe aie . 2 Rms jafi6X MORTH Specifications as per Table 400-1, Gradin enantion is furnished by the Agency ? Note: Lhe repost shall not be | without the written approval o! 2 2. The results indicated above are based on the tests carried out on the samples re« produced, except i he laboratory ived in the laboratory 3. Any Query regarding the report must be reported within 15 days from the dace of testing wiPbetreesdln, AEnginees # 23114, Tin Cross, 310 Stage, tin Biock, Shakini Ganapathi Nagare. Bosaveshwaranagor. Bangolore - 560379 #23114, 7th Cross, 3rd Stage, 4th Block, Shakthi Ganapathi Nagara, Basaveshwaranagara, Bangalore-79. Tele fax : 23223227, Cell : 93428 39190, Website : www.civiltechconsultants.com ‘e-mail: vishwanath.ia@civiltechconsultants.com | info@civiltechconsultants.com CIVIL-TECH CONSULTANTS AND ENGINEERS 4 S Building & Highway Material Testing Laboratory i809 REGISTERED al An ISO 9001:2008 Certified Company Job No: CTCE/BBMP/W-No.12/KRIDL/WAIM/Gradation/2012-13 04.04.2013 GRADATION FOR WMM MORTH TABLE-400-11 Client : Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore. Agency : Technical Manager (West), KRIDL, Bangalore. Name of Work : Improvements to Road at Chikkabanavar Railway Station to Gi in Ward No.12, BBMP, Bangalore. jeyarabalaga Ganesha Temple Reference : BBMP/AEE/SSD/DZ/PR/2012-13 Date of Testing + 04.04.2013 Material WWMM Sample Location : WMM Mix Plant Oven Dry We (gm) 10866 Is ee a in nett Cae Cumulative 6 | Cumuative % of | 5 ined (2) | pegrinea (amy | oFRetained Passing 53 - 0 0 0 100 100 45 : 365 365 34 96.6 95-100 22.4 1790 2155 19.8 80.2 60-80 11.2 3165 5320 49.0 51.0 40-60, 475 1658 6978 642 358 2.36 1563, 8541 i 78.6 214 0.600 1125, 9666 89.0 11.0 8-22 10571 oe 27 port shall not be reproduced, except in full, without the written approval of the laboratory 2. The results indicated above are based on the tests cattied out on the samples received in the laboratory 3. Any Query regarding the report must be reported within 15 days from the date of testing. Mit, Libcricnel Engineen, # 23/14, 7 Cross. Sret Siang 4th Block, Snoxthi Gane Basaveshwarcro, Bangalore - 5 #23114, 7th Cross, 3rd Stage, 4th Block, Shakthi Ganapathi Nagara, Basaveshwaranagare, Bangalore-79, Tole fax : 23223227, Cell: 93428 39190, Website : www.civltechconsultants.com ‘email: vishwanath.ia@civltechconsultants.com | info@civiltechconsultants.com CIVIL-TECH CONSULTANTS AND ENGINEERS GS Building & Highway Material Testing Laborator [ 5 An ISO 9001:2008 Certified Company SB] Leeemeccsrene Job Nos CTCE/BBMP/W.No.12/KRIDL/BM/Bitumen/2012-13 . 25.04.2013 BITUMEN CONTENT DETERMINATION OF BITUMINOUS MACADAM MIX AASHTO T 164 & AASHTO T 30 CLIENT |Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore. |JAGENCY [Technical Manager (West), KRIDL, Bangalore. INAME OF THE WORK __|Improvements to Road at Chikkabanavar Railway Station to Geleyarabalaga |Ganesha Temple in Ward No.12, BBMP, Bangalore. REFERENCE BBMP/AEE/SSD/DZ/PR/2012-13 SAMPLE I/D. Roads from Chikkabanavara Railway Station to Geleyara balaga Ward No.12 DATE OF TESTING 25.04.2013 BITUMEN CONTENT DETERMINATION Description Trail 4 Trail 2 1. Weight of Mixture before Test, g 500 500 2. Weight of Mixture after Test, g 482 4825 3. Weight of Asphalt and Mineral matter Extracted, g - - l4. Weight of Mineral Matter, : 5. Weight of Ash, g |6. Weight of Bitumen Extracted, g (corrected) 18 17.50 7. Bitumen content in % 3.60 3.50 le. Average 3.55 Information is furnished by the A, Note: This test report should not be reproduced except in full, without written approval of the faboratory b The results indicated above are based on the tests carried out on the samples received in the laboratory BP Any Query regarding the report must be reported within 15 days from date of testing, APD f f eM M/s. CME Ponsulertt® Paniseges #2BNE TOY 4mm Bloc, She 9 423/14, 7th Cross, 3rd Stage, 4th Block, Shakthi Ganapathi Nagara, Basaveshwaranagara, Bangalore-79. Tele fax : 23223227, Cell : 93428 39190, Website : www.civiltechconsultants.com ‘email : vishwanath.ia@civiltechconsultants.com | info@civiltechconsultants.com CIVIL-TECH CONSULTANTS AND ENGINEERS |) Job Nos CTCE/BBMP/W.No.12/KRIDL/BM/Bitumen/2012-13 Building & Highway Material Testing Laborato An ISO 9001:2008 Certified Company BITUMEN CONTENT DETERMINATION OF BITUMINOUS MACADAM MIX TAS) ANE Ea G 130 9001 REGISTERED 25.04.2013 AASHTO T 164 & AASHTO T 30 CLIENT Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore |AGENCY | Technical Manager (West), KRIDL, Bangalore INAME OF THE WORK __|improvements to Road at Chikkabanavar Railway Station to IGeleyarabalaga Ganesha Temple in Ward No.12, BBMP, Bai REFERENCE BBMP/AEE/SSD/DZ/PR/2012-13 SAMPLE I/D Roads from Chikkabanavara Railway Station to Geleyara balaga Ward DATE OF TESTING 25.04.2013 GRADATION AFTER EXTRACTK Trail 1 Specified Limits as Sieve Size in » per MORTH mm Weight % Retained | WCummulative |», passing | specification table Retained, gm Retained 500-04 (Grading-2) 26.5 oO oO 0 100 100 19 26.3 5.46 5.46 94.54 90-100 13.2 88.5 18.36 23.82 76.18 56-88 4.75 261.53 54.26 78.08 21.92 16-36 2.36 73.25 15.20 93.27 6.73 4-19 03 16.2 3.36 96.63 3.37 2-10 0.075 48 1.00 97.63 2.37 0-8 aieaili2 Specified Limits as Sieve Size in y per MORTH a 7 Weight % Retained Ree % Passing | specification table etained, gm etaine 500-04 (Grading-2) [265 0 0 0 100 700 = 5.60 5.60 94.40 90-100 132 95.87 1987 25.47 74.53 | 475 253.4 52.52 77.98 22.02 | 2.36 60.8 12.60 90.58 942 o3 26.9 558 96.16 3.84 0.075 52 1.08 97.24 2.76 Information is furnished by the Agency Thiet cepart shoyléinot be teproduced except in ful, without weitten approval of the laboratory B The fesyfs indigateaove are based on the tests carried out on the samples received in the laboratory BP Any Query regarding the report must be reported within 15 days from the da of testing, vn Cloucbecce ee tognoon #2514 THD ‘tra Stage, gin Bles Sos Gonanaininegaia 423114, Tth Cross, 3d Stage, 4th Block, Shakthi Ganapathi Nagara, Basaveshwardnits, Bangalore’ 13223227, Cell : 93428 39190, Website : www.civiltechconsultants.com : vishwanath.ia@civiltechconsultants.com | info@civiltechconsultants.com 9 Building & Highway Material Testing Laborator GY CIVIL-TECH CONSULTANTS AND ENGINEERS i G Job Nos CICE/BBMP/W.No.12/KRIDL/SDBC/Bit/2012-13 An ISO 9001:2008 Certified Company BITUMEN CONTENT DETERMINATION OF SEMI DENSE BITUMINOUS CONCRETE MIX AASHTO T 164 & AASHTO T 30 CLIENT AGENCY Technical Managet (West), KRIDL, Bangalore. INAME OF THE WORK __|Improvemenis to Road at Chikkabanavar Railway (Ganesha Temple in Ward No.12, BBMP, Bangalore. REFERENCE BBMP/AEB/SSD/DZ/PR/2012.13 SAMPLE I/D Roads from Chikkabanavara Railway Station to Geleyara ba DATE OF TESTING 27.04.2013, |Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore. | ation to Geleyarabalaga iga Ward No.12 BITUMEN CONTENT DETERMINATION Description Trail 4 Trail 2 1. Weight of Mixture before Test, g 500 500 12. Weight of Mixture after Test, g 4745 475 3. Weight of Asphalt and Mineral matter Extracted, g : 4. Weight of Mineral Matter, - - 5. Weight of Ash, g 6. Weight of Bitumen Extracted, g. (corrected) 255 25.00 7. Bitumen content in % ; 5.10 5.00 8 Average 5.05 spa Information is furnished by the Agency Note: & P This test report should not be reproduced except in fall, without written approval of the laboratory b The results indicated above are based on the tests carried out on the samples received in the laboratory P Any Query regarding the report must be reported within 15 days from the date of testing wi lbocbiraae ules & Engineers # 23/14, 7th Cross, 31d Stage, 4th Block, Shak’ Rosewestens © i Geranamni Nagara, #23/14, 7th Cross, 3rd Stage, 4th Block, Shakthi Ganapat Tele fax : 23223227, Cel e-mail : vishwanath.ia@civiltechconsultants.com | info@civiltechconsultants.com lagara, Basaveshwaranagara, Bangalore-79 13428 39190, Website: www.ciitechconsuitants.com 1309004 REGISTERED « CIVIL-TECH CONSULTANTS AND ENGINEERS Building & Highway Material Testing Laboratom An ISO 9001:2008 Certified Company job Nox CTCE/BBMP/W.No.12/KRIDL/SDBC/Bit/2012-13 27.04.2013 BITUMEN CONTENT AFTER GRADATION DETERMINATION OF SEMI DENSE BITUMINOUS CONCRETE MIX AASHTO T 164 & AASHTO T 30 CLIENT Asst. Executive Engineer, Shettyhalli Sub Division, BBMP, Bangalore. |AGENCY | Technical Manager (West), KRIDL, Bangalore. [NAME OF THE WORK _ [Improvements to Road at Chikkabanavar Railway Station to JGeleyarabalaga Ganesha Temple in Ward No.12, BBMP, Bangalore REFERENCE BBMP/ABE/SSD/DZ/PR/2012-13 SAMPLE 1/D Roads from Chikkabanavara Railway Station to Geleyara balaga Ward DATE OF TESTING 27.04.2013, ] GRADATION AFTER EXTRACTION a Trail 1 Specified Limits as ieve Size in = 5 per MORTH Weight ‘%Cummutative i mm % 7 _| retained, gm | 7 Retained Rae % Passing | specification table 132 0 0 | 0 100 100 95 23.4 487 : 487 95.13 90-100 478 255 $374 | 58.61 41.39 35-51 2.36 55.42 11.68 70.29 2971 24-39 1.18 40.36 851 78.79 21.21 15.30 | 03 358 7.54 86.34 13.66, 9-19 L__o07s 3291 6.94 i 93.28 672 . 38 Trail 2 ‘Specified Limits as Sieve Size in per MORTH | cam reat m | Retained ee % Passing | specification table ea e 500-4 (Grading-2) 13.2 0 0 0 100 100 9s 315 663 663 93.37 90-100 478 265.3 55.85 62.48 37.52 35-51 236 55.3 11.64 74.43 2587 24-39 lee a 31.24 6.58 80.70 19.30 | 03 ery) 571 86.41 13.69 L__oo7s 38 8.00 94.41 559 Information is furnished by the Age Note: D This test report should not be reproduced except in full, without written approval of the laboratory 2” rhe results indicated above are based on the tests carried out on the samples received in the laboratory w- Query regardirig the report must be reported within 15 days from the date of testing se Me Mit. Kilhetosns fants & Engineers # 23/14, 7th Cross, 31d Stage, ath Broek, Snaktni Gancoaini Nagaro 423/14, 7th Cross, 3rd Stage, 4th Block, Shakthi Ganapathi Nagara, Basaveshwaranagara, Bangalore-79. Tele fax : 23223227, Cell : 93428 39190, Website : www.civiltechconsultants.com e-mail : vishwanath.ia@civiltechconsultants.com | info@civiltechconsultants.com

Anda mungkin juga menyukai