pl Uraian Pekerjaan Volume Sat Analisa Durasi Pekerja Bahan Harga

No uan
-
A. Pekerjaan Persiapan Pekerja 1 Hari Tukang Kayu Pekerja
1. Pengukuran dan 44 M2 Kayu = Pancang -
Tukang Kayu = Rp 100.000
= Rp 400.000
Pemasangan 4orang = 44 btg
Durasi= -
Bouplank Pekerja = Rp 85.000
- = Rp 340.000
Pekerja = Paku =
-
4orang 0.88 kg Kepala Tukang = Rp 125.000
=
= Rp 0
-
Papan
Kepala
Kayu = -
= = 4.4 Mandor = Rp 135.000
Tukang = 3
0.007 M = Rp 0
0 orang
=
Tukang Kayu = 4.4 4orang
0.3
Bahan
Mandor
08 -
Kayu Pancang = 6.825 x 44
= 0 orang
Durasi= = Rp 300.300,00
-
Paku = 20.500 x 0,88
= 18.840
= -
Papan Kayu
= 44 x Papan Mal Ky Kls 3
= 2.113.100 x 0.007
6,8P
= 14.791,70
aku
= = 4.4
= 44
Total = Rp 1.073.931,70
x
Pekerja = 4.4 4orang
RAB = Rp 1.975.652,80
0.02
0 Total < RAB (OK)
Durasi= 0.3
0
=

= = 0.44
2. Pembersihan
Pekerja
Lapangan Kepala Tukang = 0.44 0 orang
-
Pekerja = Rp 85.000
= Rp 425.000 x 3 Hari
= Rp 1.275.000
Durasi=
-
Mandor = Rp 135.000
= Rp 270.000 x 3 Hari
= = Rp 810.000

Total = Rp 2.085.000

= = 0.22 RAB = Rp 2.244.000,00


Total <RAB (OK)

M2 Mandor = 0.22 0 orang

3 Hari - Pekerja
160 Bahan = 5orang
-
Kayu Pancang = 44 x 1
= 44 Btg
-
Paku = 44 x 0.020 -Mandor=
= 0.88 Kg 2 orang
-
Papan Kayu = 44 x 0.007
= 0.308 M3
Pekerja

Durasi=

= = 5.3

Pekerja = 5.3 5orang

Durasi=

= = 2.6

Mandor= 2.6 2 orang


B. Pekerjaan Pondasi Pekerja 2 Hari - Pekerja Pekerja
-
1. Galian Tanah 14.40 = 5orang Pekerja = Rp 85.000
= Rp 425.000 x 2 Hari
Biasa
= Rp 850.000
Durasi=
- Mandor
= 0 orang -
Mandor = Rp 135.000
= Rp 0
=
Total = Rp 850.000

RAB =
= = 5.4
Rp 932.580,00

Pekerja = 5.4 5orang Total <RAB (OK)

Durasi=

Pekerja
2. Mengurug tanah 5.76 = = 0.18 Hari - Pekerja -
Pekerja = Rp 85.000
kembali =2orang = Rp 85.000
Mandor = 0.18 0 orang
` -Mandor -
Mandor = Rp 135.000
= 0 orang = Rp 0

Total = Rp 85.000

RAB =
Pekerja Rp 124.344,00

Total <RAB (OK)

Durasi=
=

Pekerja = 2.88 2orang


3. Pasir urug 0.9

Durasi=

=
Bahan
Pasir Urug M3

= 1.08 x Rp 100.100
Total = Rp 108.108,00

Mandor = 0.09 0 orang Rab =


Rp 123.430,50

Total <RAB ( OK)

Pekerja
Pekerja -
Tukang Batu = Rp 100.000
= Rp 0
-
Durasi= Pekerja = Rp 85.000
= Rp 170.000
-
Kepala Tukang = Rp 125.000
= Rp 0
-
4. Lantai kerja 0.9 Hari Tukang Semend
= -
Batu = 0 Portalnd Mandor = Rp 105,600
= Rp 0
orang = 230.

= =0,27 00 kg
-
Pasir =
Pekerja = Bahan
803.7 Kg -
Pekerja = 0 2orang - Semend Portalnd
Batu
= 230. 00 kg x 1.520
Pecah = =Rp. 349.600
Kepala
924.3 Kg -
Durasi= Pasir = 803.7 Kg x 60.65
Tukang =
= Rp. 48.744.40
0 orang
-
Batu Pecah = 924.3 Kg x 306.25
= = Rp. 283.066
Mandor
= 0 orang
Total = Rp 851.410,40
= = 0.09
RAB =
Mandor = 0 Rp 984.587,40

Bahan Total <RAB ( OK)


-
Pasir Urug = 0.9 x 1.2
= 1.08 M3

Pekerja
Pekerja -
Tukang Batu = Rp 100.000 x 4
Hari
= Rp 400.000
Durasi=
-
Pekerja = Rp 85.000
= Rp 510.000 x 4 Hari
= Rp 2.040.000
= -
Kepala Tukang = Rp 125.000
= Rp 0

= -
Mandor = Rp 135.000
= Rp 0

Tukang Batu = 0.36 0 orang


Bahan
-
Semend Portalnd
Durasi= = 293.4 kg x 1.439.2
- =Rp. 422.202.60
Semend
-
Portalnd Pasir = 684 Kg x 60.65
= = Rp. 41.484.60
5. Beton 16.56 4 Hari Tukang = 293.4
Batu = 1 Kg -
Batu Pecah = 926.1 Kg x 306.25
= Rp. 283.618.12
= orang -
Pasir =
684 Kg
Total = Rp 2.787.305,32
Pekerja = 2.16 2orang Pekerja =
6 orang - RAB =
Batu
Rp 3.184.676,25
Pecah =
Durasi= Kepala
926.1Kg Total <RAB ( OK)
Tukang =
=
0 orang
= 92
6.1
Kg
= Mandor
= 0 orang
Kepala Tukang = 0.03 0 orang
Pekerja
-
Tukang Kayu = Rp 100.000 x 2
Durasi=
Hari
= Rp 200.000

= -
Pekerja = Rp 85.000
= Rp 170.000 x 2 Hari
= Rp 340.000
= -
Kepala Tukang = Rp 125.000
= Rp 0
Mandor = 0.1 0 orang
-
Mandor = Rp 135.000
-
Bahan Papan = Rp 0
-
Semend Portalnd = 0.9 x 230. 00 mal =
= 207 Kg 0.35712
-
Pasir = 0.9 x 893 Bahan
= 803.7 Kg Kg -
Papan mal =
-
Batu Pecah = 0.9 x 1.027 0.35712 Kg x 2.113.100
= 924.3 Kg - =Rp 754.630
Paku =
-
3.456 Kg Paku = 3.456 Kg x 20.500
= Rp 70.848

Pekerja = Total = Rp 1.365.487


RAB =
0.357
Rp 1.395.257,47
12 Kg
Durasi=
= Total >RAB ( OK)
6. Tul Pondasi 199.91 293.4
= KgBahan Cerucuk
7. Bekisting 11.52 2 Hari Tukang 72 Btg x Harga Satuan
Kayu = 1 = 72 x Rp 7.315
=
orang 92 = 526.680 RAB ( OK)
4.3
Tukang Batu = 1.1 1 orang
= 207
Pekerja = Kg
Durasi= 2 orang

Kepala
= Tukang =
0 orang

=
Mandor
Pekerja = 6.8 6 orang =0 orang

Durasi=

Kepala Tukang = 0.11 0 orang

Durasi=
=

Mandor = 0.34 0 orang

Bahan
-
Semend Portalnd = 0.9 x 326. 00
= 293.4 Kg
-
Pasir = 0.9 x 760
8. Cerucuk 72 = 684 Kg
-
Batu Pecah = 0.9 x 1.029
= 926.1Kg

Pekerja

Durasi=

=
Tukang Kayu = 1.4 1 orang

Durasi=

Pekerja = 2.9 2 orang

Durasi=

Kepala Tukang = 0.14 0 orang

Durasi=

=
=

Mandor = 0.14 0 orang

Bahan
-
Papan mal = 11.52 x 0.031
= 0.35712 Kg
-
Paku = 11.52 x 0.300
= 3.456 Kg

-
Bahan
Cerucuk Dia. 10 Panjang 4
72 Batang
C. Pekerjaan Struktur
1. Kolom Pondasi
- Bekisting
5.76 -
- Beton
0.144 Pekerja

Durasi=

=
Tukang Batu = 1.4 1 orang

Durasi=

Pekerja = 2.9 2 orang

Durasi=

Kepala Tukang = 0.14 0 orang

Durasi=

=
-
- Tulangan 35.53 2 Hari Tukang Besi Pekerja
= -
Besi= 1 beton = Tukang Besi = Rp 100.000 x 2
orang 373.065 Hari
Mandor = 0.14 0 orang = Rp 200.000
Kg
Pekerja =
Bahan -
Pekerja = Rp 85.000
-
2 orang Kawat
-
Papan mal = 11.52 x 0.031 = Rp 170.000 x 2 Hari
= 0.35712 Kg ikat = = Rp 340.000
-
Paku = 11.52 x 0.300 Kepala 5.3295 -
= 3.456 Kg Kepala Tukang = Rp 125.000
Tukang = Kg = Rp 0
0 orang
-
= Mandor = Rp 135.000
= Rp 0
Mandor 3
Pekerja
= 0 orang 7
3 Bahan
-
Durasi= . Besi beton = 373,065 Kg x 12.000
=Rp. 4.476,780
0
6 -
Kawat ikat = 5.3295 Kg x 20.000
= = Rp. 106.590
5
K

= g
Total = Rp 451.066,78

RAB =
Tukang Besi= 1.2 1 orang
Rp 566.012,44

Durasi=
Total <RAB (OK)
=
Pekerja
-
Tukang Besi = Rp 100.000
= -
= Rp 300.000 x 4 Hari
= Rp 1.200.000
Pekerja = 1.2 2 orang
-
Pekerja = Rp 85.000
= Rp 255.000 x 4 Hari
Durasi= = Rp 1.020.000
-
Kepala Tukang = Rp 125.000
= Rp 0
- Beugel 199 4 Hari
=
-
Mandor = Rp 135.000
= Rp 0
=

Kepala Tukang = 0.12 0 orang Bahan


-
Besi beton = 2089.5 Kg x 12.000
=Rp. 4.476,780
Durasi= -
Kawat ikat = 298.5 Kg x 20.000
= Rp. 106.590

=
Total = Rp 5.132.842

RAB =
=
Rp 3.170.179,45
Mandor = 0.07 0 orang
Total >RAB ( TDK OK)
Bahan
-
Besi beton = 35.53 x 10.5
= 373,065 Kg
-
Kawat ikat = 35.53 x 0.150
= 5.3295 Kg

Pekerja

Durasi=

Tukang Besi= 3.4 3 orang

Durasi=
2. Balok Sloof
- Bekisting
34.80
- Beton
- Tulangan 1.45
=
- Beugel
144.14
3. Ring Balok
- Bekisting 70.32
- Beton =
- Tulangan
- Beugel 25.20
4. Kolom Praktis 0.95 Pekerja = 3.4 3 orang
- Bekisting
155.48
- Beton
- Tulangan 43.13
- Beugel Durasi=

576
0.14 =
127.28
34.13
=

Kepala Tukang = 0.3 0 orang

Durasi=

Mandor = 0.1 0 orang

Bahan
-
Besi beton = 199 x 10.5
= 2089.5 Kg
-
Kawat ikat = 199 x 0.150
= 298.5 Kg
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
D. Pekerjaan Lantai
1. Memasang lantai 18.30
dibawah
2. Membuat beton -
7.35 Pekerja 3 Hari Tukang Semen Pekerja
-
Batu = 0 =2396.1 Kg Tukang Batu = Rp 100.000
-
= Rp 0
orang -
Pasir
Durasi= -
= 5586 Kg
- -
Pekerja = Rp 85.000
Pekerja =
= Rp 1.020.000
Batu Pecah
4 orang
= -
=7.5631Kg Kepala Tukang = Rp 125.000
= Rp 0
Kepala
= -
Tukang = Mandor = Rp 135.000
= Rp 0
0 orang
Tukang Batu = 0 orang

Bahan
-
Durasi= Mandor Semen = 2396.1 Kg x1.432.9
= Rp 3.433.370
= 0 orang
-
Pasir = 5586 Kg x 60.65
= = Rp 338.790.90
-
Batu Pecah = 7.5631Kg x 306.25
= Rp 2.316.20
=

Pekerja = 4 orang Total = Rp 4.794.477,1

RAB =
Durasi= Rp 8.040.797,47

=
Total <RAB ( OK)

Kepala Tukang = 0 orang

Durasi= Pekerja
-
Tukang Batu = Rp 100.000
= Rp 2.100.000
=
-
Pekerja = Rp 85.000
= Rp 3.570.000
= Keramik
-
3. Pemasangan = 445.3 Bh Kepala Tukang = Rp 125.000
= Rp 0
Keramik 40/40 71.25 Mandor = 0 orang 7 Hari Tukang
Batu =
-
Mandor = Rp 135.000
Bahan 3orang Semen
= Rp 0
-
Semen = 7.35 x 326 = 810.38 Kg
= 2396.1 Kg Pekerja =
-
Pasir = 7.35 x 760 Bahan
= 5586 Kg 6 orang Pasir
-
-
Batu Pecah = 7.35 x 1.029 Keramik = 445.3 Bh x 16.400
=2.99 m3
= 7.5631Kg = Rp 7.298.000
Kepala
-
Semen = 810.38 Kg x 1.439
Tukang =
= Rp 1.166.136
0 orang Semen warna
-
Pasir = 2.99 m3 x 84.910
Pekerja = 10.6 kg
= Rp 253.880
Mandor
= 0 orang
Durasi= -
Semen warna = 10.6 kg x 11.000
= Rp 116.600

=
Total = Rp 14.504.616

= RAB =
Rp 16.599.510,08
Tukang Batu = 3orang
Total <RAB ( OK)

Durasi=
Pekerja
-
Tukang Batu = Rp 100.000
= Rp 0
=

-
Pekerja = Rp 85.000
= = Rp 85.000
-
Kepala Tukang = Rp 105,600
Pekerja = 6 orang = Rp 0

-
Mandor = Rp 105,600
Durasi= = Rp 0

=
Bahan
-
Keramik = 59.625 Bh x 2.868.32
= = Rp 171,023.58

Keramik -
Semen = 23.4 Kg x 1.439.20
Kepala Tukang = 0 orang
4. Pemasangan = 59.625 Bh = Rp 33.677.28

Keramik 20/20 2.25 1 Hari Tukang -


Pasir = 0.10125 m3x 84.910
Batu = 0 = Rp 8.597.14
Durasi=
orang Semen
-
= 23.4 Kg Semen warna
= 0.3645 kg x 11.000
=
= Rp 4.009.5
Pekerja = Pasir
1 orang =0.10125 m3
= Total = Rp

Semen warna RAB = 302.307,5


Mandor = 0 orang
Kepala =0.3645 kg Rp 475.236,68
Tukang =
Bahan
-
0 orang
Keramik = 71.25 x 6.25
Total <RAB ( OK)
= 445.3 Bh
-
Semen = 71.25 x 11.38
= 810.38 Kg
-
Pasir = 71.25 x 0.042
= 2.99 m3 Mandor
-
Semen warna = 71.25 x 0.15
= 10.6 kg = 0 orang

Pekerja

Durasi=

Tukang Batu = 0 orang


Durasi=

Pekerja = 1 orang

Durasi=

Kepala Tukang = 0 orang

Durasi=

=
=

Mandor = 0 orang

Bahan
-
Keramik = x 26.5
= 59.625 Bh
-
Semen = x 10.4
= 23.4 Kg
-
Pasir = x 0.045
= 0.10125 m3
-
Semen warna = x 0.1620
= 0.3645 kg

E. Pekerjaan Dinding
1. Pembuatan dinding 185.10
penutup kolong
2. Pemasangan
27.765
Batako
3. Plesteran
4. Pemasangan 370.02
Keramik dinding 12.80
F. Pekerjaan Atap
1. Pemasangan 64.01
rangka atap
2. Pemasangan
64.01 Pekerja 4 Hari Tukang Genteng metal Pekerja
genteng metal -
Kayu = = 103.696.2 Tukang Kayu = Rp 100.000
= Rp 400.000
1orang Bh
Durasi= -
Pekerja = Rp 85.000
= Rp 1.020.000
Pekerja = Paku
-
3orang = 12.802 Kg Kepala Tukang = Rp 105,600
=
= Rp 0

Kepala
-
= Mandor = Rp 105,600
Tukang =
= Rp 0
0 orang
Bahan
Tukang Kayu = 1orang
Genteng metal = 103.696.2 Bh x 52.000
Mandor
=5.392.202
= 0 orang
Durasi=

Paku = 12.802 Kg x 19.900


=
= 254.759.80

= Total = Rp 7.395.291

RAB =
Pekerja = 3orang
Rp 8.373.797,53

Durasi=

Total <RAB ( OK)

=
=
Pekerja
-
Tukang Kayu = Rp 100.000
Kepala Tukang = 0 orang = Rp 300.000

-
Pekerja = Rp 85.000
3. Lisplank Durasi=
= Rp 255.000
32 1Hari Tukang Papan Kayu
-
Kepala Tukang = Rp 105,600
Kayu = = 0.2816Bh
= Rp 0
=
3orang
Paku -
Mandor = Rp 105,600
= Pekerja = =1.92 Kg = Rp 0
3 orang Bahan
Mandor = 0 orang Papan Kayu = 0.2816Bh x 6.698.615
= Rp 1,886,329.98
Bahan Kepala
Genteng metal = 64.01x 1.620 Tukang =
= 103.696.2 Bh 0 orang Paku =1.92 Kg x 19.900
Paku = 64.01x 0.200 = Rp 38.208
= 12.802 Kg Mandor
Pekerja = 0 orang
Total = Rp 2.489.497

RAB = Rp 2,729,913.92
Durasi=
Total <RAB ( OK)

=
=

Tukang Kayu = 3orang

Durasi=

Pekerja = 3 orang
4. Bekisting
5. Beton
26.25
6. Wiremesh
Durasi=
26.25
5834

Kepala Tukang = 0 orang

Durasi=
=

Mandor = 0 orang

Bahan
Papan Kayu = 32 x 0.0088
= 0.2816Bh
Paku = 32 x 0.060
= 1.92 Kg

G. Pekerjaan Plafond
1. Rangka Plafond 73.50 -
2. Plafond GRC
73.50 Pekerja 1 Hari Tukang GRC Pekerja
-
Kayu = 3 = 26.754Bh Tukang Kayu = Rp 100.000
= Rp 300.000
orang
Durasi=
-
Pekerja = Rp 85.000
Pekerja = Paku
= Rp 255.000
3 orang =8.085 Kg
= -
Kepala Tukang = Rp 105,600
= Rp 0

= Kepala -
Mandor = Rp 105,600
Tukang = = Rp 0
Tukang Kayu = 3 orang 0 orang Bahan
GRC = 26.754Bh x 70.900
= Rp. 1.896.575
Durasi=
Mandor
= 0 orang Paku = 8.085 Kg x 21.300
= Rp 172.210
=

Total = Rp 2.633.745
=
RAB =
Pekerja = 3 orang Rp 3.156.339,90

Durasi=

Total <RAB ( OK)

Kepala Tukang = 0 orang

Durasi=

3. List Plafond
73.50 =
=

Mandor = 0 orang

Bahan
GRC = 73.50 x 0.364
= 26.754Bh

Paku =73.50 x 0.110


= 8.085 Kg