No uan
-
A. Pekerjaan Persiapan Pekerja 1 Hari Tukang Kayu Pekerja
1. Pengukuran dan 44 M2 Kayu = Pancang -
Tukang Kayu = Rp 100.000
= Rp 400.000
Pemasangan 4orang = 44 btg
Durasi= -
Bouplank Pekerja = Rp 85.000
- = Rp 340.000
Pekerja = Paku =
-
4orang 0.88 kg Kepala Tukang = Rp 125.000
=
= Rp 0
-
Papan
Kepala
Kayu = -
= = 4.4 Mandor = Rp 135.000
Tukang = 3
0.007 M = Rp 0
0 orang
=
Tukang Kayu = 4.4 4orang
0.3
Bahan
Mandor
08 -
Kayu Pancang = 6.825 x 44
= 0 orang
Durasi= = Rp 300.300,00
-
Paku = 20.500 x 0,88
= 18.840
= -
Papan Kayu
= 44 x Papan Mal Ky Kls 3
= 2.113.100 x 0.007
6,8P
= 14.791,70
aku
= = 4.4
= 44
Total = Rp 1.073.931,70
x
Pekerja = 4.4 4orang
RAB = Rp 1.975.652,80
0.02
0 Total < RAB (OK)
Durasi= 0.3
0
=
= = 0.44
2. Pembersihan
Pekerja
Lapangan Kepala Tukang = 0.44 0 orang
-
Pekerja = Rp 85.000
= Rp 425.000 x 3 Hari
= Rp 1.275.000
Durasi=
-
Mandor = Rp 135.000
= Rp 270.000 x 3 Hari
= = Rp 810.000
Total = Rp 2.085.000
3 Hari - Pekerja
160 Bahan = 5orang
-
Kayu Pancang = 44 x 1
= 44 Btg
-
Paku = 44 x 0.020 -Mandor=
= 0.88 Kg 2 orang
-
Papan Kayu = 44 x 0.007
= 0.308 M3
Pekerja
Durasi=
= = 5.3
Durasi=
= = 2.6
RAB =
= = 5.4
Rp 932.580,00
Durasi=
Pekerja
2. Mengurug tanah 5.76 = = 0.18 Hari - Pekerja -
Pekerja = Rp 85.000
kembali =2orang = Rp 85.000
Mandor = 0.18 0 orang
` -Mandor -
Mandor = Rp 135.000
= 0 orang = Rp 0
Total = Rp 85.000
RAB =
Pekerja Rp 124.344,00
Durasi=
=
Durasi=
=
Bahan
Pasir Urug M3
= 1.08 x Rp 100.100
Total = Rp 108.108,00
Pekerja
Pekerja -
Tukang Batu = Rp 100.000
= Rp 0
-
Durasi= Pekerja = Rp 85.000
= Rp 170.000
-
Kepala Tukang = Rp 125.000
= Rp 0
-
4. Lantai kerja 0.9 Hari Tukang Semend
= -
Batu = 0 Portalnd Mandor = Rp 105,600
= Rp 0
orang = 230.
= =0,27 00 kg
-
Pasir =
Pekerja = Bahan
803.7 Kg -
Pekerja = 0 2orang - Semend Portalnd
Batu
= 230. 00 kg x 1.520
Pecah = =Rp. 349.600
Kepala
924.3 Kg -
Durasi= Pasir = 803.7 Kg x 60.65
Tukang =
= Rp. 48.744.40
0 orang
-
Batu Pecah = 924.3 Kg x 306.25
= = Rp. 283.066
Mandor
= 0 orang
Total = Rp 851.410,40
= = 0.09
RAB =
Mandor = 0 Rp 984.587,40
Pekerja
Pekerja -
Tukang Batu = Rp 100.000 x 4
Hari
= Rp 400.000
Durasi=
-
Pekerja = Rp 85.000
= Rp 510.000 x 4 Hari
= Rp 2.040.000
= -
Kepala Tukang = Rp 125.000
= Rp 0
= -
Mandor = Rp 135.000
= Rp 0
= -
Pekerja = Rp 85.000
= Rp 170.000 x 2 Hari
= Rp 340.000
= -
Kepala Tukang = Rp 125.000
= Rp 0
Mandor = 0.1 0 orang
-
Mandor = Rp 135.000
-
Bahan Papan = Rp 0
-
Semend Portalnd = 0.9 x 230. 00 mal =
= 207 Kg 0.35712
-
Pasir = 0.9 x 893 Bahan
= 803.7 Kg Kg -
Papan mal =
-
Batu Pecah = 0.9 x 1.027 0.35712 Kg x 2.113.100
= 924.3 Kg - =Rp 754.630
Paku =
-
3.456 Kg Paku = 3.456 Kg x 20.500
= Rp 70.848
Kepala
= Tukang =
0 orang
=
Mandor
Pekerja = 6.8 6 orang =0 orang
Durasi=
Durasi=
=
Bahan
-
Semend Portalnd = 0.9 x 326. 00
= 293.4 Kg
-
Pasir = 0.9 x 760
8. Cerucuk 72 = 684 Kg
-
Batu Pecah = 0.9 x 1.029
= 926.1Kg
Pekerja
Durasi=
=
Tukang Kayu = 1.4 1 orang
Durasi=
Durasi=
Durasi=
=
=
Bahan
-
Papan mal = 11.52 x 0.031
= 0.35712 Kg
-
Paku = 11.52 x 0.300
= 3.456 Kg
-
Bahan
Cerucuk Dia. 10 Panjang 4
72 Batang
C. Pekerjaan Struktur
1. Kolom Pondasi
- Bekisting
5.76 -
- Beton
0.144 Pekerja
Durasi=
=
Tukang Batu = 1.4 1 orang
Durasi=
Durasi=
Durasi=
=
-
- Tulangan 35.53 2 Hari Tukang Besi Pekerja
= -
Besi= 1 beton = Tukang Besi = Rp 100.000 x 2
orang 373.065 Hari
Mandor = 0.14 0 orang = Rp 200.000
Kg
Pekerja =
Bahan -
Pekerja = Rp 85.000
-
2 orang Kawat
-
Papan mal = 11.52 x 0.031 = Rp 170.000 x 2 Hari
= 0.35712 Kg ikat = = Rp 340.000
-
Paku = 11.52 x 0.300 Kepala 5.3295 -
= 3.456 Kg Kepala Tukang = Rp 125.000
Tukang = Kg = Rp 0
0 orang
-
= Mandor = Rp 135.000
= Rp 0
Mandor 3
Pekerja
= 0 orang 7
3 Bahan
-
Durasi= . Besi beton = 373,065 Kg x 12.000
=Rp. 4.476,780
0
6 -
Kawat ikat = 5.3295 Kg x 20.000
= = Rp. 106.590
5
K
= g
Total = Rp 451.066,78
RAB =
Tukang Besi= 1.2 1 orang
Rp 566.012,44
Durasi=
Total <RAB (OK)
=
Pekerja
-
Tukang Besi = Rp 100.000
= -
= Rp 300.000 x 4 Hari
= Rp 1.200.000
Pekerja = 1.2 2 orang
-
Pekerja = Rp 85.000
= Rp 255.000 x 4 Hari
Durasi= = Rp 1.020.000
-
Kepala Tukang = Rp 125.000
= Rp 0
- Beugel 199 4 Hari
=
-
Mandor = Rp 135.000
= Rp 0
=
=
Total = Rp 5.132.842
RAB =
=
Rp 3.170.179,45
Mandor = 0.07 0 orang
Total >RAB ( TDK OK)
Bahan
-
Besi beton = 35.53 x 10.5
= 373,065 Kg
-
Kawat ikat = 35.53 x 0.150
= 5.3295 Kg
Pekerja
Durasi=
Durasi=
2. Balok Sloof
- Bekisting
34.80
- Beton
- Tulangan 1.45
=
- Beugel
144.14
3. Ring Balok
- Bekisting 70.32
- Beton =
- Tulangan
- Beugel 25.20
4. Kolom Praktis 0.95 Pekerja = 3.4 3 orang
- Bekisting
155.48
- Beton
- Tulangan 43.13
- Beugel Durasi=
576
0.14 =
127.28
34.13
=
Durasi=
Bahan
-
Besi beton = 199 x 10.5
= 2089.5 Kg
-
Kawat ikat = 199 x 0.150
= 298.5 Kg
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
D. Pekerjaan Lantai
1. Memasang lantai 18.30
dibawah
2. Membuat beton -
7.35 Pekerja 3 Hari Tukang Semen Pekerja
-
Batu = 0 =2396.1 Kg Tukang Batu = Rp 100.000
-
= Rp 0
orang -
Pasir
Durasi= -
= 5586 Kg
- -
Pekerja = Rp 85.000
Pekerja =
= Rp 1.020.000
Batu Pecah
4 orang
= -
=7.5631Kg Kepala Tukang = Rp 125.000
= Rp 0
Kepala
= -
Tukang = Mandor = Rp 135.000
= Rp 0
0 orang
Tukang Batu = 0 orang
Bahan
-
Durasi= Mandor Semen = 2396.1 Kg x1.432.9
= Rp 3.433.370
= 0 orang
-
Pasir = 5586 Kg x 60.65
= = Rp 338.790.90
-
Batu Pecah = 7.5631Kg x 306.25
= Rp 2.316.20
=
RAB =
Durasi= Rp 8.040.797,47
=
Total <RAB ( OK)
Durasi= Pekerja
-
Tukang Batu = Rp 100.000
= Rp 2.100.000
=
-
Pekerja = Rp 85.000
= Rp 3.570.000
= Keramik
-
3. Pemasangan = 445.3 Bh Kepala Tukang = Rp 125.000
= Rp 0
Keramik 40/40 71.25 Mandor = 0 orang 7 Hari Tukang
Batu =
-
Mandor = Rp 135.000
Bahan 3orang Semen
= Rp 0
-
Semen = 7.35 x 326 = 810.38 Kg
= 2396.1 Kg Pekerja =
-
Pasir = 7.35 x 760 Bahan
= 5586 Kg 6 orang Pasir
-
-
Batu Pecah = 7.35 x 1.029 Keramik = 445.3 Bh x 16.400
=2.99 m3
= 7.5631Kg = Rp 7.298.000
Kepala
-
Semen = 810.38 Kg x 1.439
Tukang =
= Rp 1.166.136
0 orang Semen warna
-
Pasir = 2.99 m3 x 84.910
Pekerja = 10.6 kg
= Rp 253.880
Mandor
= 0 orang
Durasi= -
Semen warna = 10.6 kg x 11.000
= Rp 116.600
=
Total = Rp 14.504.616
= RAB =
Rp 16.599.510,08
Tukang Batu = 3orang
Total <RAB ( OK)
Durasi=
Pekerja
-
Tukang Batu = Rp 100.000
= Rp 0
=
-
Pekerja = Rp 85.000
= = Rp 85.000
-
Kepala Tukang = Rp 105,600
Pekerja = 6 orang = Rp 0
-
Mandor = Rp 105,600
Durasi= = Rp 0
=
Bahan
-
Keramik = 59.625 Bh x 2.868.32
= = Rp 171,023.58
Keramik -
Semen = 23.4 Kg x 1.439.20
Kepala Tukang = 0 orang
4. Pemasangan = 59.625 Bh = Rp 33.677.28
Pekerja
Durasi=
Pekerja = 1 orang
Durasi=
Durasi=
=
=
Mandor = 0 orang
Bahan
-
Keramik = x 26.5
= 59.625 Bh
-
Semen = x 10.4
= 23.4 Kg
-
Pasir = x 0.045
= 0.10125 m3
-
Semen warna = x 0.1620
= 0.3645 kg
E. Pekerjaan Dinding
1. Pembuatan dinding 185.10
penutup kolong
2. Pemasangan
27.765
Batako
3. Plesteran
4. Pemasangan 370.02
Keramik dinding 12.80
F. Pekerjaan Atap
1. Pemasangan 64.01
rangka atap
2. Pemasangan
64.01 Pekerja 4 Hari Tukang Genteng metal Pekerja
genteng metal -
Kayu = = 103.696.2 Tukang Kayu = Rp 100.000
= Rp 400.000
1orang Bh
Durasi= -
Pekerja = Rp 85.000
= Rp 1.020.000
Pekerja = Paku
-
3orang = 12.802 Kg Kepala Tukang = Rp 105,600
=
= Rp 0
Kepala
-
= Mandor = Rp 105,600
Tukang =
= Rp 0
0 orang
Bahan
Tukang Kayu = 1orang
Genteng metal = 103.696.2 Bh x 52.000
Mandor
=5.392.202
= 0 orang
Durasi=
= Total = Rp 7.395.291
RAB =
Pekerja = 3orang
Rp 8.373.797,53
Durasi=
=
=
Pekerja
-
Tukang Kayu = Rp 100.000
Kepala Tukang = 0 orang = Rp 300.000
-
Pekerja = Rp 85.000
3. Lisplank Durasi=
= Rp 255.000
32 1Hari Tukang Papan Kayu
-
Kepala Tukang = Rp 105,600
Kayu = = 0.2816Bh
= Rp 0
=
3orang
Paku -
Mandor = Rp 105,600
= Pekerja = =1.92 Kg = Rp 0
3 orang Bahan
Mandor = 0 orang Papan Kayu = 0.2816Bh x 6.698.615
= Rp 1,886,329.98
Bahan Kepala
Genteng metal = 64.01x 1.620 Tukang =
= 103.696.2 Bh 0 orang Paku =1.92 Kg x 19.900
Paku = 64.01x 0.200 = Rp 38.208
= 12.802 Kg Mandor
Pekerja = 0 orang
Total = Rp 2.489.497
RAB = Rp 2,729,913.92
Durasi=
Total <RAB ( OK)
=
=
Durasi=
Pekerja = 3 orang
4. Bekisting
5. Beton
26.25
6. Wiremesh
Durasi=
26.25
5834
Durasi=
=
Mandor = 0 orang
Bahan
Papan Kayu = 32 x 0.0088
= 0.2816Bh
Paku = 32 x 0.060
= 1.92 Kg
G. Pekerjaan Plafond
1. Rangka Plafond 73.50 -
2. Plafond GRC
73.50 Pekerja 1 Hari Tukang GRC Pekerja
-
Kayu = 3 = 26.754Bh Tukang Kayu = Rp 100.000
= Rp 300.000
orang
Durasi=
-
Pekerja = Rp 85.000
Pekerja = Paku
= Rp 255.000
3 orang =8.085 Kg
= -
Kepala Tukang = Rp 105,600
= Rp 0
= Kepala -
Mandor = Rp 105,600
Tukang = = Rp 0
Tukang Kayu = 3 orang 0 orang Bahan
GRC = 26.754Bh x 70.900
= Rp. 1.896.575
Durasi=
Mandor
= 0 orang Paku = 8.085 Kg x 21.300
= Rp 172.210
=
Total = Rp 2.633.745
=
RAB =
Pekerja = 3 orang Rp 3.156.339,90
Durasi=
Durasi=
3. List Plafond
73.50 =
=
Mandor = 0 orang
Bahan
GRC = 73.50 x 0.364
= 26.754Bh