AB 1 Pondasi 80x80x20
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 112.00 kg 99,960.00 1,173,480.00
Bekisting 2x pakai 50% 4.00 m2 94,900.00 149,600.00
Jumlah 305,585.00 2,174,488.33
AB 2 Sloof 15x20
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 171.27 kg 152,855.50 1,794,446.50
Bekisting 2x pakai 50% 13.33 m2 316,333.33 555,333.33
Jumlah 579,913.83 3,201,188.17
AB 3 Sloof 15x25
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 192.19 kg 171,526.60 2,013,635.80
Bekisting 2x pakai 50% 13.33 m2 316,333.33 555,333.33
Jumlah 598,584.93 3,420,377.47
AB 4 Kolom 12x12
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 257.25 kg 229,595.63 2,695,336.88
Bekisting 2x pakai 50% 16.67 m2 501,875.00 866,250.00
Jumlah 842,195.63 4,412,995.21
AB 5 Kolom 30x40
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 135.10 kg 120,576.75 1,415,510.25
Bekisting 2x pakai 50% 11.67 m2 351,312.50 606,375.00
Jumlah 582,614.25 2,873,293.58
AB 6 Kolom 25x25
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 163.30 kg 145,741.68 1,710,933.84
Bekisting 2x pakai 50% 16.00 m2 481,800.00 831,600.00
Jumlah 738,266.68 3,393,942.17
AB 7 Kolom 15x20
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 173.60 kg 154,938.00 1,818,894.00
Bekisting 2x pakai 50% 23.33 m2 702,625.00 1,212,750.00
Jumlah 968,288.00 3,883,052.33
AB 8 Balok 15x30
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 211.40 kg 188,674.50 2,214,943.50
Bekisting 2x pakai 50% 16.67 m2 501,875.00 908,750.00
Jumlah 801,274.50 3,975,101.83
AB 9 Balok 15x35
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 164.80 kg 147,084.00 1,726,692.00
Bekisting 2x pakai 50% 14.29 m2 430,178.57 778,928.57
Jumlah 687,987.57 3,357,028.90
AB 10 Balok 30x55
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 123.45 kg 110,183.18 1,293,495.00
Bekisting 2x pakai 8.48 m2 255,500.00 462,636.36
Jumlah 476,408.18 2,607,539.70
AB 11 Balok 20x35
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 153.30 kg 136,820.25 1,606,200.75
Bekisting 2x pakai 12.86 m2 387,160.71 701,035.71
Jumlah 634,705.96 3,158,644.80
AB 12 Balok 15x20
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 173.60 kg 154,938.00 1,818,894.00
Bekisting 2x pakai 50% 18.33 m2 552,062.50 999,625.00
Jumlah 817,725.50 3,669,927.33
AB 13 Balok 15x25
Beton Sitemix K-175 1.00 m3 110,725.00 851,408.33
Besi beton 144.48 kg 128,948.40 1,513,789.20
Bekisting 2x pakai 50% 17.33 m2 521,950.00 945,100.00
Jumlah 761,623.40 3,310,297.53
- 962,133.33
- 1,273,440.00
- 244,500.00
- 2,480,073.33
- 962,133.33
- 1,947,302.00
- 871,666.67
- 3,781,102.00
- 962,133.33
- 2,185,162.40
- 871,666.67
- 4,018,962.40
- 962,133.33
- 2,924,932.50
- 1,368,125.00
- 5,255,190.83
- 962,133.33
- 1,536,087.00
- 957,687.50
- 3,455,907.83
- 962,133.33
- 1,856,675.52
- 1,313,400.00
- 4,132,208.85
- 962,133.33
- 1,973,832.00
- 1,915,375.00
- 4,851,340.33
- 962,133.33
- 2,403,618.00
- 1,410,625.00
- 4,776,376.33
- 962,133.33
- 1,873,776.00
- 1,209,107.14
- 4,045,016.48
- 962,133.33
- 1,403,678.18
- 718,136.36
- 3,083,947.88
- 962,133.33
- 1,743,021.00
- 1,088,196.43
- 3,793,350.76
- 962,133.33
- 1,973,832.00
- 1,551,687.50
- 4,487,652.83
- 962,133.33
- 1,642,737.60
- 1,467,050.00
- 4,071,920.93
- 962,133.33
- 2,407,597.50
- 1,410,625.00
- 4,780,355.83
- 962,133.33
- 2,948,809.50
- 2,398,062.50
- 6,309,005.33
- 962,133.33
- 1,233,645.00
- 1,100,729.17
- 3,296,507.50
- 962,133.33
- 962,243.10
- 1,320,875.00
- 3,245,251.43
- 962,133.33
- 1,191,190.00
- 1,099,560.00
- 503,996.63
- 3,756,879.96
PERHITUNGAN BERAT BESI BETON DALAM 1 M3
Berat Besi
Kg / m1
0.62
1.04
1.58
2.23
2.98
3.85
5.19
6.31
7.99
m2
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg
kg/m3
m1
kg
kg/m3
m1
kg
kg/m3
DAFTAR HARGA DASAR SATUAN BAHAN, UPAH & PERALATAN
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! 2016
Bahan Kaca
1 Kaca Polos t=5mm
2 Kaca Cermin 5 mm t=5mm
3 Sealent Kaca
Bahan Perpipaan
1 Pipa Listrik PVC dia 5/4"
2 Pipa PVC wavin type AW 1/2" dia.1/2"
3 Pipa PVC wavin type AW 3/4" dia.3/4"
4 Pipa PVC wavin type AW 1" dia.1"
5 Pipa PVC wavin type AW 1 1/4" dia.1 1/4"
6 Pipa PVC wavin type AW 1 1/2" dia.1 1/2"
7 Pipa PVC wavin type AW 2" dia.2"
8 Pipa PVC wavin type AW 2 1/2" dia.2 1/2"
9 Pipa PVC wavin type AW 3" dia. 3"
10 Pipa PVC wavin type AW 4" dia.4"
11 Pipa GIP 1 1/4" dia.1 1/4"
12 Lem paralon
13 Lamella, pvc
14 Sealtape
Bahan Sanitair
1 floor drain stainless (Standar) stainless steel
2 Kitchenzink + accesoriess (bak cuci stainlees) stainlees steel (single)
3 Kran air stainless (Standar) stainless steel 1/2"
4 Tempat sabun stainlees steel
5 Wastafel lengkap standar putih TOTO
6 Closet jongkok Sekualitas TOTO
7 Urinoir lengkap TOTO U57MU/F + T60P White
8 Bak fiber 60x60 cm
9 Pintu KM/WC PVC
Bahan Penutup Atap
1 Thermal and Noise Insulation Alumunium Foil
2 Genteng metal Sekualitas Global
3 Nok atas metal Sekualitas Global
6 Genteng palentong ex. Jatiwangi
7 Genteng bubung palentong ex. Jatiwangi
10 Listplank GRC 2500x200x8 mm
Bahan Elektrikal
1 Kabel NYM 3x2,5 setara eterna
2 Kabel NYM 2x1,5 setara eterna
3 Kabel NYY 2x1,5 setara eterna
4 Kabel NYY 2x2,5 setara eterna
5 Saklar Tunggal setara Broco standar
6 Saklar Seri setara Broco standar
NO URAIAN SPESIFIKASI/ MERK
(1) (2) (3)
7 Stop kontak setara Broco standar
14 Armateur Lampu Downlight PL
15 Lampu PL philip 14 W
18 Lampu SL philip 8-11 W
19 Lampu SL philip 18-20 W
20 Lampu TL 1x18 watt lengkap
Upah Pekerja
1 Pekerja
2 Tukang Batu
3 Kepala Tukang Batu
4 Tukang Kayu
5 Kepala Tukang Kayu
6 Tukang Cat/Plitur
7 Kepala Tukang Cat/Plitur
8 Tukang Besi Beton
9 Kepala Tukang Besi Beton
10 Tukang Besi Profil
11 Kepala Tukang Besi Profil
12 Mandor
13 Tukang Listrik
14 Kepala Tukang Listrik
untuk mandor
SATUAN HARGA SATUAN (Rp.)
(4) (5)
Ltr 500.00
m3 60,000.00
m3 120,000.00
m3 180,000.00
m3 210,000.00
m3 200,000.00
m3 265,000.00
m3 275,000.00
m3 275,000.00
m3 225,000.00
m3 200,000.00
bh 550.00
m2 55,000.00
kg 1,450.00
kg 3,166.67
kg 12,666.67
m3 172,500.00
kg 12,500.00
kg 86,000.00
kg 55,000.00
kg 25,000.00
bh 28,000.00
bh 8,000
ltr 20,250.00
lbr 2,500.00
kg 26,000.00
kg 67,000.00
liter 50,000.00
liter 60,000.00
kg 14,300.00
kg 45,000.00
ltr 23,000.00
kg 27,000.00
kg 23,000.00
kg 10,870.00
kg 65,125.00
ltr 37,500.00
bh 10,000.00
ltr 48,500.00
kg 28,600.00
SATUAN HARGA SATUAN (Rp.)
btg 25,000.00
m1 4,500.00
m3 2,100,000.00
m3 2,100,000.00
m3 1,700,000.00
m3 1,700,000.00
m3 1,700,000.00
m3 3,100,000.00
m3 3,100,000.00
btg 11,000.00
kg 13,850.00
lbr 66,000.00
lbr 22,000.00
m1 15,000.00
m2 154,200.00
lbr 61,500.00
lbr 74,000.00
lbr 105,000.00
lbr 157,500.00
lbr 90,000.00
lbr 125,000.00
lbr 90,000.00
lbr 75,000.00
m2 48,000.00
m2 49,500.00
m2 47,000.00
m2 55,000.00
bh 38,000.00
kg 9,750.00
m2 130,000.00
m2 120,000.00
kg 16,500.00
kg 16,000.00
m1 75,000.00
bh 450,000.00
m1 115,000.00
m1 145,000.00
m1 11,000.00
m2 350,000.00
m2 350,000.00
m1 27,000.00
m' 48,000.00
m' 13,000.00
m' 6,600.00
bh 500.00
bh 450.00
bh 1,500.00
m2 575,000.00
SATUAN HARGA SATUAN (Rp.)
(4) (5)
m2 120,000.00
m2 125,000.00
tube 32,500.00
kg 20,000.00
kg 15,000.00
kg 15,000.00
kg 19,500.00
bh 12,000.00
bh 6,600.00
bh 1,000.00
kg 45,000.00
bh 500.00
kg 25,000.00
btg 12,000.00
btg 18,700.00
btg 24,700.00
btg 33,500.00
btg 45,000.00
btg 58,700.00
btg 73,700.00
btg 105,000.00
btg 144,700.00
btg 237,000.00
btg 225,000.00
tube 7,600.00
lot 1,130,000.00
bh 5,000.00
bh 58,500.00
bh 150,000.00
bh 45,000.00
bh 50,050.00
unit 430,000.00
unit 237,500.00
unit 1,752,000.00
bh 250,000.00
Set 212,500.00
m2 6,500.00
m2 75,000.00
m' 45,000.00
bh 2,500.00
bh 4,800.00
m' 23,000.00
m' 9,700.00
m' 5,300.00
m' 6,500.00
m' 10,900.00
bh 9,000.00
bh 12,000.00
SATUAN HARGA SATUAN (Rp.)
(4) (5)
bh 10,000.00
bh 55,000.00
bh 35,000.00
bh 27,500.00
bh 34,000.00
bh 75,000.00
bh 110,000.00
bh 150,000.00
bh 10,000.00
bh 10,000.00
bh 30,000.00
bh 20,000.00
bh 16,750.00
bh 655,000.00
liter 500.00
unit 1,500,000.00
unit 3,500,000.00
ls 750,000.00
OH 55,000.00
OH 65,000.00
OH 75,000.00
OH 65,000.00
OH 75,000.00
OH 65,000.00
OH 75,000.00
OH 65,000.00
OH 75,000.00
OH 65,000.00
OH 75,000.00
OH -
OH 65,000.00
OH 75,000.00
85,000.00
ANALISA HARGA SATUAN PEKERJAAN
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
#REF! 2016
D Jumlah (A+B+C)
4 Penggalian tanah biasa 1 m3
A.2.3.1.2 Kedalaman Hingga 2 m
A TENAGA
Pekerja L.01 OH 0.900
Mandor L.04 - 0.045
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
5 Penggalian tanah keras 1 m3
A.2.3.1.4 Kedalaman Hingga 1 m
A TENAGA
Pekerja L.01 OH 1.000
Mandor L.04 - 0.032
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
13 1 m3 beton mutu, f'c= 14,5 Mpa (K 175), slump (122) cm, w/c=0,66
A.4.1.1.5
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
PC/ Portland Cement kg 326.000
PB/ Pasir Beton m3 0.543
Kr/ Krikil m3 0.572
Air L 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.250
Kepala Tukang L.03 OH 0.025
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
PC/ Portland Cement kg 218.000
PB/ Pasir Beton m3 0.520
Kr/ Krikil m3 0.870
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.250
Kepala Tukang L.03 OH 0.025
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
PC/ Portland Cement kg 323.000
PB/ Pasir Beton m3 0.543
Kr/ Krikil m3 0.572
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
18 Pemasangan bekisting untuk Pondasi 1 m2
A.4.1.1.20S
A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang Kayu L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Albasia m3 0.040
Paku biasa kg 0.300
Minyak Bekisting ltr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
23 Pasang Rangka Plafon Kayu Albasia 1 m2
A.4.2.1.22S Kayu Albasia
A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.300
Kepala Tukang Kayu L.03 OH 0.030
Mandor L.04 - 0.075
JUMLAH TENAGA KERJA
B BAHAN
Kayu Albasia m3 0.015
Paku kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
D Jumlah (A+B+C)
25 Pasangan Bata Merah ad. 1 SP : 5 PP 1 m2
A.4.4.1.10
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 - 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bakar kg 70.000
Semen PC m3 9.680
Pasir Pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
26 Pasang Plesteran Bata/beton + acian 1 m2
A.4.4.2.5S ad. 1 SP : 5 PP
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 - 0.013
JUMLAH TENAGA KERJA
B BAHAN
Semen PC kg 7.290
Pasir Pasang m3 0.028
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
27 Pasang Acian 1 m2
A.4.4.2.6S Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 - 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
35 Pasang Talang miring seng zingcalum 1 m1
A.4.2.1.18
A TENAGA
Pekerja OH 0.200
Tukang Kayu OH 0.200
Kepala Tukang Kayu OH 0.020
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Seng plat zingcalum bjls 28 l = 90 cm m, 1.050
Paku biasa 1/2"- 1" kg 0.015
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
A TENAGA
Pekerja OH 0.070
Tukang Kayu OH 0.200
Kepala Tukang Kayu OH 0.020
Mandor OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
GRC 20 x 240 m' 1.100
Paku biasa 2"-5" kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
D Jumlah (A+B+C)
39 Pasang Genteng Metal 1 m2
A.4.5.2.32 Sakura Roof
A TENAGA
Pekerja OH 0.200
Tukang Kayu OH 0.100
Kepala Tukang Kayu OH 0.010
Mandor OH 0.001
JUMLAH TENAGA KERJA
DIBULATKAN
B BAHAN
Genteng metal m2 1.020
Paku genteng metal kg 0.200
JUMLAH TENAGA KERJA
DIBULATKAN
C PERALATAN
D Jumlah (A+B+C)
40 Pasang nok genteng metal 1 m1
A.4.5.2.36
A TENAGA
Pekerja OH 0.250
Tukang Kayu OH 0.150
Kepala Tukang Kayu OH 0.015
Mandor OH 0.013
JUMLAH TENAGA KERJA
DIBULATKAN
B BAHAN
Nok genteng metal bh 1.100
Paku genteng metal kg 0.050
JUMLAH TENAGA KERJA
DIBULATKAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
41 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu
A.4.6.1.2
A TENAGA
Pekerja OH 6.000
Tukang Kayu OH 18.000
Kepala Tukang Kayu OH 1.800
Mandor OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200
Paku 10 cm kg 1.250
Lem kayu kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
45 Pembuatan 1 m2 Jalusi kusen kayu klas II
A.4.6.1.9
A TENAGA
Pekerja OH 0.670
Tukang Kayu OH 2.000
Kepala Tukang Kayu OH 0.200
Mandor OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan kls II m3 0.060
Paku 1 s/d 2,5 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
46 Pembuatan dan pemasangan 1 m3 kuda-kuda kayu kelas II
A.4.6.1.10
A TENAGA
Pekerja OH 4.000
Tukang Kayu OH 12.000
Kepala Tukang Kayu OH 1.200
Mandor OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok kls II m3 1.100
Besi strip kg 15.000
Paku kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
50 Pemasangan 1 buah engsel pintu
A.4.6.2.5
A TENAGA
Pekerja OH 0.015
Tukang Kayu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel Pintu Alumunium bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
54 Pemasangan 1 buah grendel pintu
A.4.6.2.9
A TENAGA
Pekerja OH 0.015
Tukang Kayu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Grendel pintu bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
57 Pengecatan dinding sekualitas Catilax 1 m2
A.4.7.1.10S
A TENAGA
Pekerja OH 0.028
Tukang Cat OH 0.042
Kepala tukang OH 0.004
Mandor OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Dasar kg 0.120
Cat Penutup kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
58 Pengecatan Plafond sekualitas catylac 1 m2
A.4.7.1.11S Aklirik Emulsi
A TENAGA
Pekerja OH 0.028
Tukang Cat/Plitur OH 0.042
Kepala Tukang Cat/Plitur OH 0.004
Mandor OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Dasar Plafon kg 0.120
Cat Plafon kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu (35 % dari Harga Bahan) % 0.350
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 1.450
Kepala Tukang Batu L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel lengkap unit 1.000
Semen PC kg 6.000
Pasir Pasang m3 0.010
Perlengkapan (12 % harga wastafel) Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 1.450
Kepala Tukang Batu L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Urinoir lengkap unit 1.000
Semen PC kg 6.000
Pasir Pasang m3 0.010
Perlengkapan (12 % harga urinoir) Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
68 Pemasangan 1 m pipa PVC tipe AW diameter 3
A.5.1.1 31
A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 0.135
Kepala tukang L.03 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3 M 1.200
Perlengkapan 35 % dari harga bahan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
NO URAIAN KODE SAT KOEF
D Jumlah (A+B+C)
D Jumlah (A+B+C)
A TENAGA
Pekerja OH 0.2500
Tukang batu OH 0.5000
Kepala tukang batu OH 0.0250
Mandor OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Paving block m2 1.0100
Pasir beton m3 0.1000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
D Jumlah (A+B+C)
D Jumlah (A+B+C)
136,760.00 34,190.00
H TENAGA KERJA 34,190.00
1,700,000.00 30,260.00
15,000.00 3,750.00
74,000.00 27,750.00
75,000.00 75,000.00
H HARGA BAHAN 136,760.00
AH HARGA ALAT
170,950.00
55,000.00 5,500.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 12,750.00
1,700,000.00 20,400.00
15,000.00 300.00
1,700,000.00 11,900.00
H HARGA BAHAN 32,600.00
AH HARGA ALAT
45,350.00
60,200.00
55,000.00 41,250.00
- -
H TENAGA KERJA 41,250.00
H HARGA BAHAN
AH HARGA ALAT
41,250.00
73,700.00
55,000.00 49,500.00
- -
H TENAGA KERJA 49,500.00
H HARGA BAHAN
AH HARGA ALAT
49,500.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
80,100.00
55,000.00 55,000.00
- -
H TENAGA KERJA 55,000.00
H HARGA BAHAN
AH HARGA ALAT
55,000.00
26,400.00
55,000.00 18,150.00
- -
H TENAGA KERJA 18,150.00
H HARGA BAHAN
AH HARGA ALAT
18,150.00
43,400.00
55,000.00 27,500.00
- -
H TENAGA KERJA 27,500.00
H HARGA BAHAN
AH HARGA ALAT
27,500.00
55,000.00 27,500.00
- -
H TENAGA KERJA 27,500.00
H HARGA BAHAN
AH HARGA ALAT
27,500.00
55,000.00 16,500.00
- -
H TENAGA KERJA 16,500.00
120,000.00 144,000.00
H HARGA BAHAN 144,000.00
AH HARGA ALAT
160,500.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 11,000.00
- -
H TENAGA KERJA 11,000.00
60,000.00 72,000.00
H HARGA BAHAN 72,000.00
AH HARGA ALAT
83,000.00
829,000.00
55,000.00 82,500.00
65,000.00 48,750.00
75,000.00 5,625.00
- -
H TENAGA KERJA 136,875.00
200,000.00 240,000.00
1,450.00 197,200.00
180,000.00 97,920.00
H HARGA BAHAN 535,120.00
AH HARGA ALAT
671,995.00
55,000.00 42,900.00
65,000.00 25,350.00
75,000.00 2,925.00
- -
H TENAGA KERJA 71,175.00
200,000.00 240,000.00
120,000.00 51,840.00
H HARGA BAHAN 291,840.00
AH HARGA ALAT
363,015.00
55,000.00 90,750.00
65,000.00 17,875.00
75,000.00 2,100.00
- -
H TENAGA KERJA 110,725.00
1,450.00 472,700.00
210,000.00 114,000.00
275,000.00 157,208.33
500.00 107,500.00
H HARGA BAHAN 851,408.33
AH HARGA ALAT
962,133.33
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 90,750.00
65,000.00 17,875.00
75,000.00 2,100.00
- -
H TENAGA KERJA 110,725.00
1,450.00 537,950.00
210,000.00 104,700.00
275,000.00 159,958.33
500.00 107,500.00
H HARGA BAHAN 910,108.33
AH HARGA ALAT
1,020,833.33
55,000.00 90,750.00
65,000.00 16,250.00
75,000.00 1,875.00
- -
H TENAGA KERJA 108,875.00
1,450.00 316,100.00
210,000.00 109,200.00
275,000.00 239,250.00
H HARGA BAHAN 664,550.00
AH HARGA ALAT
773,425.00
55,000.00 90,750.00
65,000.00 16,250.00
75,000.00 1,875.00
75,000.00 6,000.00
H TENAGA KERJA 114,875.00
1,450.00 468,350.00
210,000.00 114,000.00
275,000.00 157,208.33
H HARGA BAHAN 739,558.33
AH HARGA ALAT
854,433.33
16,000.00
55,000.00 385.00
65,000.00 455.00
75,000.00 52.50
- -
H TENAGA KERJA 892.50
9,750.00 10,237.50
16,000.00 240.00
H HARGA BAHAN 10,477.50
AH HARGA ALAT -
11,370.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
120,000.00
55,000.00 28,600.00
65,000.00 16,900.00
75,000.00 1,950.00
- -
H TENAGA KERJA 47,450.00
1,700,000.00 68,000.00
15,000.00 4,500.00
23,000.00 2,300.00
H HARGA BAHAN 74,800.00
AH HARGA ALAT
122,250.00
126,700.00
55,000.00 28,600.00
65,000.00 16,900.00
75,000.00 1,950.00
- -
H TENAGA KERJA 47,450.00
1,700,000.00 76,500.00
15,000.00 4,500.00
23,000.00 2,300.00
H HARGA BAHAN 83,300.00
AH HARGA ALAT
130,750.00
55,000.00 36,300.00
65,000.00 21,450.00
75,000.00 2,475.00
- -
H TENAGA KERJA 60,225.00
15,000.00 6,000.00
23,000.00 4,600.00
1,700,000.00 25,500.00
1,700,000.00 17,850.00
25,000.00 50,000.00
H HARGA BAHAN 103,950.00
AH HARGA ALAT
164,175.00
55,000.00 36,300.00
65,000.00 21,450.00
75,000.00 2,475.00
- -
H TENAGA KERJA 60,225.00
15,000.00 6,000.00
23,000.00 4,600.00
1,700,000.00 30,600.00
1,700,000.00 17,850.00
25,000.00 50,000.00
H HARGA BAHAN 109,050.00
AH HARGA ALAT
169,275.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 36,300.00
65,000.00 21,450.00
75,000.00 2,475.00
- -
H TENAGA KERJA 60,225.00
15,000.00 6,000.00
23,000.00 4,600.00
1,700,000.00 25,500.00
1,700,000.00 17,850.00
25,000.00 150,000.00
H HARGA BAHAN 203,950.00
AH HARGA ALAT
264,175.00
93,200.00
55,000.00 8,250.00
65,000.00 19,500.00
75,000.00 2,250.00
- -
H TENAGA KERJA 30,000.00
1,700,000.00 26,180.00
15,000.00 3,000.00
H HARGA BAHAN 29,180.00
AH HARGA ALAT
59,180.00
28,600.00
55,000.00 2,750.00
65,000.00 3,250.00
75,000.00 375.00
- -
H TENAGA KERJA 6,375.00
4,500.00 4,725.00
15,000.00 150.00
H HARGA BAHAN 4,875.00
AH HARGA ALAT
11,250.00
55,000.00 16,500.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 23,750.00
550.00 38,500.00
1,450.00 14,036.00
180,000.00 8,100.00
H HARGA BAHAN 60,636.00
AH HARGA ALAT
84,386.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
56,700.00
55,000.00 13,750.00
65,000.00 13,000.00
75,000.00 1,500.00
- -
H TENAGA KERJA 28,250.00
1,450.00 10,570.50
180,000.00 5,040.00
H HARGA BAHAN 15,610.50
AH HARGA ALAT
43,860.50
56,700.00
55,000.00 11,000.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 18,250.00
1,450.00 4,712.50
H HARGA BAHAN 4,712.50
AH HARGA ALAT
22,962.50
55,000.00 34,100.00
65,000.00 22,750.00
75,000.00 2,625.00
- -
H TENAGA KERJA 59,475.00
8,295.63 51,847.66
1,450.00 14,210.00
180,000.00 8,100.00
12,666.67 16,466.67
H HARGA BAHAN 90,624.33
AH HARGA ALAT
150,099.33
55,000.00 34,100.00
65,000.00 22,750.00
75,000.00 2,625.00
- -
H TENAGA KERJA 59,475.00
4,272.73 47,000.00
1,450.00 14,500.00
180,000.00 8,100.00
12,666.67 19,000.00
H HARGA BAHAN 88,600.00
AH HARGA ALAT
148,075.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 34,100.00
65,000.00 22,750.00
75,000.00 2,625.00
- -
H TENAGA KERJA 59,475.00
1,920.00 48,000.00
1,450.00 15,080.00
180,000.00 8,100.00
12,666.67 19,000.00
H HARGA BAHAN 90,180.00
AH HARGA ALAT
149,655.00
154,900.00
55,000.00 33,000.00
65,000.00 6,500.00
75,000.00 2,625.00
- -
H TENAGA KERJA 42,125.00
2,475.00 49,500.00
1,450.00 13,485.00
180,000.00 3,240.00
12,666.67 19,000.00
H HARGA BAHAN 85,225.00
AH HARGA ALAT
127,350.00
44,900.00
55,000.00 5,500.00
65,000.00 3,250.00
75,000.00 375.00
- -
H TENAGA KERJA 9,125.00
22,000.00 22,000.00
45,000.00 4,950.00
H HARGA BAHAN 26,950.00
AH HARGA ALAT
36,075.00
44,900.00
55,000.00 5,500.00
65,000.00 3,250.00
75,000.00 375.00
- -
H TENAGA KERJA 9,125.00
61,500.00 21,340.50
45,000.00 4,950.00
H HARGA BAHAN 26,290.50
AH HARGA ALAT
35,415.50
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
172,700.00
55,000.00 13,585.00
65,000.00 11,440.00
75,000.00 8,775.00
- -
H TENAGA KERJA 33,800.00
33,800.00
9,500.00 9,500.00
13,000.00 36,400.00
6,600.00 33,660.00
500.00 12,500.00
450.00 15,750.00
1,500.00 1,500.00
H TENAGA KERJA 109,310.00
109,300.00
6,300.00 6,300.00
4,800.00 4,800.00
AH HARGA ALAT 11,100.00
154,200.00
95,700.00
55,000.00 11,000.00
65,000.00 13,000.00
75,000.00 1,500.00
- -
H TENAGA KERJA 25,500.00
48,000.00 50,400.00
20,000.00 300.00
H HARGA BAHAN 50,700.00
AH HARGA ALAT
76,200.00
95,700.00
55,000.00 3,850.00
65,000.00 13,000.00
75,000.00 1,500.00
- -
H TENAGA KERJA 18,350.00
23,000.00 25,300.00
15,000.00 150.00
H HARGA BAHAN 25,450.00
AH HARGA ALAT
43,800.00
95,700.00
55,000.00 8,250.00
65,000.00 4,875.00
75,000.00 562.50
- -
H TENAGA KERJA 13,687.50
2,500.00 62,500.00
H HARGA BAHAN 62,500.00
AH HARGA ALAT
76,187.50
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
95,700.00
55,000.00 22,000.00
65,000.00 13,000.00
75,000.00 1,500.00
- -
H TENAGA KERJA 36,500.00
4,800.00 24,000.00
1,450.00 11,600.00
180,000.00 5,760.00
H HARGA BAHAN 41,360.00
AH HARGA ALAT
77,860.00
95,700.00
55,000.00 11,000.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 18,250.00
18,200.00
75,000.00 76,500.00
25,000.00 5,000.00
H TENAGA KERJA 81,500.00
81,500.00
AH HARGA ALAT
99,700.00
95,700.00
55,000.00 13,750.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 24,625.00
24,600.00
45,000.00 49,500.00
25,000.00 1,250.00
H TENAGA KERJA 50,750.00
50,700.00
AH HARGA ALAT
75,300.00
95,700.00
55,000.00 330,000.00
65,000.00 1,170,000.00
75,000.00 135,000.00
- -
H TENAGA KERJA 1,635,000.00
3,100,000.00 3,720,000.00
15,000.00 18,750.00
45,000.00 45,000.00
H HARGA BAHAN 3,783,750.00
AH HARGA ALAT
5,418,750.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
95,700.00
55,000.00 55,000.00
65,000.00 195,000.00
75,000.00 22,500.00
- -
H TENAGA KERJA 272,500.00
3,100,000.00 124,000.00
45,000.00 22,500.00
H HARGA BAHAN 146,500.00
AH HARGA ALAT
419,000.00
95,700.00
55,000.00 44,000.00
65,000.00 156,000.00
75,000.00 18,000.00
- -
H TENAGA KERJA 218,000.00
3,100,000.00 74,400.00
45,000.00 13,500.00
H HARGA BAHAN 87,900.00
AH HARGA ALAT
305,900.00
95,700.00
55,000.00 38,500.00
65,000.00 136,500.00
75,000.00 15,750.00
- -
H TENAGA KERJA 190,750.00
3,100,000.00 77,500.00
90,000.00 65,625.00
20,000.00 600.00
45,000.00 22,500.00
H HARGA BAHAN 166,225.00
AH HARGA ALAT
356,975.00
95,700.00
55,000.00 36,850.00
65,000.00 130,000.00
75,000.00 15,000.00
- -
H TENAGA KERJA 181,850.00
3,100,000.00 186,000.00
20,000.00 3,000.00
H HARGA BAHAN 189,000.00
AH HARGA ALAT
370,850.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
95,700.00
55,000.00 220,000.00
65,000.00 780,000.00
75,000.00 90,000.00
- -
H TENAGA KERJA 1,090,000.00
3,100,000.00 3,410,000.00
16,500.00 247,500.00
15,000.00 84,000.00
H HARGA BAHAN 3,741,500.00
AH HARGA ALAT
4,831,500.00
95,700.00
55,000.00 132,000.00
65,000.00 468,000.00
75,000.00 54,000.00
- -
H TENAGA KERJA 654,000.00
3,100,000.00 3,410,000.00
16,500.00 247,500.00
15,000.00 45,000.00
H HARGA BAHAN 3,702,500.00
AH HARGA ALAT
4,356,500.00
95,700.00
55,000.00 5,500.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 12,750.00
3,100,000.00 43,400.00
3,100,000.00 22,320.00
15,000.00 3,750.00
H HARGA BAHAN 69,470.00
AH HARGA ALAT
82,220.00
55,000.00 550.00
65,000.00 32,500.00
75,000.00 3,750.00
- -
H TENAGA KERJA 36,800.00
110,000.00 110,000.00
H HARGA BAHAN 110,000.00
AH HARGA ALAT
146,800.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
20,000.00 20,000.00
H HARGA BAHAN 20,000.00
AH HARGA ALAT
31,700.00
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
16,750.00 16,750.00
H HARGA BAHAN 16,750.00
AH HARGA ALAT
28,450.00
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
10,000.00 10,000.00
H HARGA BAHAN 10,000.00
AH HARGA ALAT
21,700.00
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
10,000.00 10,000.00
H HARGA BAHAN 10,000.00
AH HARGA ALAT
21,700.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
30,000.00 30,000.00
H HARGA BAHAN 30,000.00
AH HARGA ALAT
41,700.00
55,000.00 825.00
65,000.00 9,750.00
75,000.00 1,125.00
- -
H TENAGA KERJA 11,700.00
120,000.00 132,000.00
H HARGA BAHAN 132,000.00
AH HARGA ALAT
143,700.00
55,000.00 1,540.00
65,000.00 2,730.00
75,000.00 315.00
- -
H TENAGA KERJA 4,585.00
86,000.00 10,320.00
86,000.00 15,480.00
H HARGA BAHAN 25,800.00
AH HARGA ALAT
30,385.00
55,000.00 1,540.00
65,000.00 2,730.00
75,000.00 315.00
- -
H TENAGA KERJA 4,585.00
27,000.00 3,240.00
27,000.00 4,860.00
H HARGA BAHAN 8,100.00
AH HARGA ALAT
12,685.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
13,000.00
55,000.00 1,540.00
65,000.00 2,730.00
75,000.00 315.00
- -
H TENAGA KERJA 4,585.00
27,000.00 3,240.00
23,000.00 4,140.00
H HARGA BAHAN 7,380.00
7,380.00 2,583.00
AH HARGA ALAT 2,583.00
14,548.00
13,000.00
55,000.00 1,100.00
65,000.00 4,095.00
75,000.00 472.50
- -
H TENAGA KERJA 5,667.50
26,000.00 5,200.00
50,000.00 8,500.00
50,000.00 13,000.00
8,000.00 80.00
20,250.00 607.50
H HARGA BAHAN 27,387.50
-
AH HARGA ALAT -
33,055.00
511,300.00
55,000.00 55,000.00
65,000.00 97,500.00
75,000.00 11,250.00
- -
H TENAGA KERJA 163,750.00
237,500.00 237,500.00
1,450.00 8,700.00
180,000.00 1,800.00
H HARGA BAHAN 248,000.00
AH HARGA ALAT
411,750.00
730,900.00
55,000.00 66,000.00
65,000.00 94,250.00
75,000.00 11,250.00
- -
H TENAGA KERJA 171,500.00
430,000.00 430,000.00
1,450.00 8,700.00
180,000.00 1,800.00
430,000.00 51,600.00
H HARGA BAHAN 492,100.00
AH HARGA ALAT
663,600.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
730,900.00
55,000.00 66,000.00
65,000.00 94,250.00
75,000.00 11,250.00
- -
H TENAGA KERJA 171,500.00
1,752,000.00 1,752,000.00
1,450.00 8,700.00
180,000.00 1,800.00
1,752,000.00 210,240.00
H HARGA BAHAN 1,972,740.00
AH HARGA ALAT
2,144,240.00
55,000.00 1,980.00
65,000.00 3,900.00
75,000.00 450.00
- -
H TENAGA KERJA 6,330.00
4,675.00 5,610.00
5,610.00 1,963.50
H HARGA BAHAN 7,573.50
AH HARGA ALAT
13,903.50
55,000.00 1,980.00
65,000.00 3,900.00
75,000.00 450.00
- -
H TENAGA KERJA 6,330.00
6,175.00 7,410.00
7,410.00 2,593.50
H HARGA BAHAN 10,003.50
AH HARGA ALAT
16,333.50
55,000.00 2,970.00
65,000.00 5,850.00
75,000.00 675.00
- -
H TENAGA KERJA 9,495.00
18,425.00 22,110.00
22,110.00 7,738.50
H HARGA BAHAN 29,848.50
AH HARGA ALAT
39,343.50
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 4,455.00
65,000.00 8,775.00
75,000.00 1,012.50
- -
H TENAGA KERJA 14,242.50
36,175.00 43,410.00
43,410.00 15,193.50
H HARGA BAHAN 58,603.50
AH HARGA ALAT
72,846.00
55,000.00 4,455.00
65,000.00 8,775.00
75,000.00 1,012.50
- -
H TENAGA KERJA 14,242.50
59,250.00 71,100.00
71,100.00 24,885.00
H HARGA BAHAN 95,985.00
AH HARGA ALAT
110,227.50
75,300.00
55,000.00 550.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 7,800.00
58,500.00 58,500.00
H HARGA BAHAN 58,500.00
AH HARGA ALAT
66,300.00
60,600.00
55,000.00 550.00
65,000.00 6,500.00
75,000.00 750.00
- -
H TENAGA KERJA 7,800.00
45,000.00 45,000.00
5,000.00 125.00
H HARGA BAHAN 45,125.00
AH HARGA ALAT
52,925.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
55,000.00 16,500.00
65,000.00 84,500.00
75,000.00 9,750.00
- -
H TENAGA KERJA 110,750.00
212,500.00 212,500.00
H HARGA BAHAN 212,500.00
AH HARGA ALAT
323,250.00
55,000.00 12,980.00
65,000.00 7,800.00
75,000.00 1,050.00
- -
H TENAGA KERJA 21,830.00
550.00 29,150.00
1,450.00 23,635.00
180,000.00 12,780.00
H HARGA BAHAN 65,565.00
AH HARGA ALAT
87,395.00
150,000.00
55,000.00 13,750.00
65,000.00 32,500.00
75,000.00 1,875.00
- -
H TENAGA KERJA 48,125.00
55,000.00 55,550.00
210,000.00 21,000.00
H HARGA BAHAN 76,550.00
AH HARGA ALAT -
124,675.00
182,000.00
55,000.00 16,500.00
65,000.00 19,500.00
75,000.00 4,500.00
- -
H TENAGA KERJA 40,500.00
12,000.00 12,000.00
9,700.00 97,000.00
3,000.00 3,000.00
H HARGA BAHAN 112,000.00
AH HARGA ALAT
152,500.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
37,400.00
55,000.00 550.00
65,000.00 650.00
75,000.00 150.00
H TENAGA KERJA 1,350.00
-
12,000.00 12,000.00
H HARGA BAHAN 12,000.00
AH HARGA ALAT
13,350.00
26,700.00
55,000.00 550.00
65,000.00 650.00
75,000.00 150.00
H TENAGA KERJA 1,350.00
9,000.00 9,000.00
H HARGA BAHAN 9,000.00
AH HARGA ALAT
10,350.00
41,400.00
55,000.00 550.00
65,000.00 650.00
75,000.00 150.00
H TENAGA KERJA 1,350.00
10,000.00 10,000.00
H HARGA BAHAN 10,000.00
AH HARGA ALAT
11,350.00
41,400.00
55,000.00 550.00
65,000.00 650.00
75,000.00 150.00
H TENAGA KERJA 1,350.00
75,000.00 75,000.00
H HARGA BAHAN 75,000.00
AH HARGA ALAT
76,350.00
76,300.00
41,400.00
55,000.00 550.00
65,000.00 650.00
75,000.00 150.00
H TENAGA KERJA 1,350.00
35,000.00 35,000.00
H HARGA BAHAN 35,000.00
AH HARGA ALAT
36,350.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
4,417,000.00
3,157,246.08 631,449.22
H TENAGA KERJA 631,449.22
631,400.00
75,000.00 657,000.00
120,000.00 109,200.00
145,000.00 1,696,500.00
36,435.00 73,744.44
33,055.00 133,806.64
150,000.00 150,000.00
20,000.00 120,000.00
30,000.00 60,000.00
11,000.00 128,700.00
1,000.00 6,000.00
32,500.00 22,295.00
H HARGA BAHAN 3,157,246.08
3,157,200.00
AH HARGA ALAT
3,788,600.00
4,417,000.00
1,819,506.00 363,901.20
H TENAGA KERJA 363,901.20
363,900.00
75,000.00 861,000.00
101,500.00 499,380.00
120,000.00 283,536.00
16,750.00 33,500.00
10,000.00 20,000.00
10,000.00 40,000.00
11,000.00 54,120.00
1,000.00 6,000.00
32,500.00 21,970.00
H HARGA BAHAN 1,819,506.00
1,819,500.00
AH HARGA ALAT
2,183,400.00
4,417,000.00
1,462,141.00 292,428.20
H TENAGA KERJA 292,428.20
292,400.00
75,000.00 612,000.00
101,500.00 499,380.00
120,000.00 179,136.00
16,750.00 33,500.00
10,000.00 20,000.00
10,000.00 40,000.00
11,000.00 54,120.00
1,000.00 6,000.00
32,500.00 18,005.00
H HARGA BAHAN 1,462,141.00
1,462,100.00
AH HARGA ALAT
1,754,500.00
HARGA HARGA JUMLAH HARGA
SATUAN (Rp.) (Rp.)
4,417,000.00
647,660.00 129,532.00
H TENAGA KERJA 129,532.00
129,500.00
75,000.00 474,000.00
120,000.00 151,200.00
1,000.00 4,000.00
32,500.00 18,460.00
H HARGA BAHAN 647,660.00
647,600.00
AH HARGA ALAT
777,100.00
DAFTAR HARGA SATUAN PEKERJAAN (DHSP)
### #REF!
### #REF!
### #REF!
### #REF!
### 2016