Anda di halaman 1dari 10

Test Report 66690/NU/51329 Page 1 of 10

kiwa CMT Testing


Client: Belper School and Sixth Form Centre Unit 5 Prime Park Way
John OGaunts Way Prime Enterprise Park
Derby
Belper
Derbyshire DE1 3QB
Derbyshire
DE56 0DA Tel. +44 (0)1332 383333
Fax +44(0)1332 602607
th
cmtenquiries@kiwa.co.uk
Date: 13 April 2016 www.kiwa.co.uk

Lab Ref: 51329

Originator: Sandra Russell

Order Ref: AMG015905

Site: As client

Requirements:
th
Attend the above site on 29 March 2016 in order to diamond drill 4No 150mm diameter
bituminous cores and carry out 8No. 150mm diameter Plate Bearing tests to evaluate the
modulus of sub-grade reaction k and estimate the equivalent CBR percentage.

Results:

The individual result sheets and location plan may be viewed on pages 2 to 10 of this report.

Kiwa CMT Testing

Signed: D E Spencer
Laboratory Supervisor

Checked & Approved: Richard Cartlidge


Departmental Manager

Kiwa ltd. Registered in England & Wales 3473056 Registered Office: Kiwa House, Malvern View Business Park, Stella Way, Bishops Cleeve, Cheltenham, GL52 7DQ
Test Report 66690/NU/51329 Page 2 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Crushed stone
Centre

Site: Belper School and Sixth Form Test No.: 1


Centre
John O'Gaunts Way Test Location: 1
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.10
200 0.28
300 0.41
400 0.54
500 0.63
0 0.12
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-base, tarmac depth approximately 70mm (broke up whist drilling)
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 3 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Orange clayey SANDSTONE
Centre

Site: Belper School and Sixth Form Test No.: 2


Centre
John O'Gaunts Way Test Location: 1
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.12
200 0.22
300 0.37
400 0.50
500 0.62
0 0.09
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-grade, sub-base thickness approximately 340mm
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 4 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Crushed stone
Centre

Site: Belper School and Sixth Form Test No.: 3


Centre
John O'Gaunts Way Test Location: 2
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.18
200 0.39
300 0.67
400 0.85
500 1.02
0 0.17
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-base, tarmac depth approximately 80mm (broke up whist drilling)
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 5 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Orange clayey SANDSTONE
Centre

Site: Belper School and Sixth Form Test No.: 4


Centre
John O'Gaunts Way Test Location: 2
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.13
200 0.22
300 0.32
400 0.52
500 0.62
0 0.13
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-grade, sub-base thickness approximately 335mm
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 6 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Crushed stone
Centre

Site: Belper School and Sixth Form Test No.: 5


Centre
John O'Gaunts Way Test Location: 3
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.14
200 0.23
300 0.34
400 0.44
500 0.53
0 0.14
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-base, tarmac depth approximately 105mm (broke up whist drilling)
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 7 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Orange clayey SANDSTONE
Centre

Site: Belper School and Sixth Form Test No.: 6


Centre
John O'Gaunts Way Test Location: 3
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.25
200 0.47
300 0.62
400 0.76
500 0.84
0 0.09
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-grade, sub-base thickness approximately 310mm
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 8 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Crushed stone
Centre

Site: Belper School and Sixth Form Test No.: 7


Centre
John O'Gaunts Way Test Location: 4
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.14
200 0.21
300 0.36
400 0.48
500 0.55
0 0.11
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-base, tarmac depth approximately 60mm (broke up whist drilling)
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 9 of 10

150 mm Diameter Plate Test

Client: Belper School and Sixth Form Material Type: Orange clayey SANDSTONE
Centre

Site: Belper School and Sixth Form Test No.: 8


Centre
John O'Gaunts Way Test Location: 4
Belper
Lab Ref.: 51329 Date of Test: 29-Mar-16

Pressure (kN/m2) Settlement (mm)


0 0.00
100 0.21
200 0.38
300 0.48
400 0.63
500 0.75
0 0.07
550
1.25mm
500

450

400

350

300
Load (kN/m2)

250

200

150

100

50

0
0.00 0.50 1.00 1.50
Settlement (mm)

Test Method: generally in accordance with Interim Advice Note (IAN) 73/06 Revision 1 (2009)
Comments: Test carried out on sub-grade, sub-base thickness approximately 340mm
Modulus of Sub grade Reaction k762 (kN/m2/m): > 104140
Equivalent CBR %: > 30.3

Signed by:D E Spencer


Laboratory Supervisor
Test Report 66690/NU/51329 Page 10 of 10