Anda di halaman 1dari 1

October 6 - 19, 2017 West End Word | Page 9

Clayton Chouteau Greenway


Design Competition
Delay Granted In New Church Construction Seeks Submissions
in the neighboring Davis Place residents complained about limited
Central Presbyterian subdivision. access to their homes and had Great Rivers Greenway is now
given until 2020 for The second part of the expansion concerns about emergency vehicles, accepting submissions from interested
will be construction of a three-story, especially fire trucks, gaining access design teams for an international
review of new building 23,817-square-foot building for use as to their neighborhood due to vehicles design competition.
fellowship space. parked on nearby streets during The goal is to have the Choteau
by Mitch Schneider The board approved two-year church services. Greenway be a dynamic and unique St.
The Clayton Plan Commission/ extensions from March 2018 to Several members of the board said Louis experience, similar to the High
Architectural Review Board on Sept. March 2020 for the site plan and they had received letters expressing Line in New York City or the Atlanta
18 was updated on the progress of the architectural review of the new concerns about allowing more time Beltline. The process will result in
expansion of Central Presbyterian building. for the project. Some board members a conceptual plan that will connect
Church, 7700 Davis Drive at Hanley Representatives of the church said voiced their own concerns about Forest Park and Washington University
Road. more time was needed because the the projects timeline. New church to the Gateway Arch grounds.
Tim Page, the churchs executive church is conducting a search for a construction was approved in late Design teams can register to
director, said completion of the first new senior pastor. They want to give 2012, but board members said they download the competition manual at
part of the expansion, which includes a the new pastor time to settle in before understood the reasoning for allowing www.ChouteauGreenway.org and must
91-space parking garage, has helped to completion of the project. the church more time. submit their qualifications by Nov. 21 to
improve relationships with residents Prior to completion of the garage, be considered.

INSIGHTS ON INTERIOR DESIGN FROM LOCAL PROFESSIONALS

Extend your living experience Instead of an area rug, inlay a


to the outdoors. Enjoy Fall nights permanent geometric design into
watching the game on your outdoor your hardwood floor to make a bold,
entertainment system and illuminate graphic statement.
your landscape to enjoy spectacular
-Alex Verseman
colors day and night. Create a sense
Missouri Floor Company
of serenity just outside your home.
Tom Streib
Streib Electric Company

STREIB COMPANY
ELECTRIC MEDIA SECURITY

JOIN THE TRIBE & GO WITH STREIB


ELECTRIC MEDIA SECURITY CALL US FOR REFINISHING WORK TOO!
Generators Smart Home Programming Monitored Security
Custom Homes Home Theaters Systems Providing Luxurious Floors for Over 100 Years
Lighting Service Custom Audio/Video Card Access
Maintenance Lighting Control Fire/Burglary Alarm SPECIALISTS IN FLOORING SINCE 1910
Design/Build Automated Window Covering Security Cameras

Missouri Floor CoMpany


Landscape Lighting Universal Remote
Commercial Wiring Programming Service
Industrial Wiring

9225 Watson Industrial Park 314-432-2260


314.487.7474 info@streibco.com www.missourifloor.com

Anda mungkin juga menyukai