DDUGJY PALAMU
SURVEY PROGRESS REP
Survey report till Dt. 29.09.2017
No. of Name of
PKG No. of villages Name of villages
Sl No. Name of Block Habitaion Habitation
Completed Completed Completed Completed
5 6
1 Bishrampur 2
19 29
2 Lesliganj 3
1
12 Chama 11
3 Medini Nagar 4
36 47
URVEY PROGRESS REPORT Pkg-2,3&4
10 16 25 63 100 200
16 1 1 5
3.3
30 1
26.45
2
2 1
4 2
10.73
10 1
0 0 64 2 1 0 9 40.48
73
1825
126
100
2051
Length of 11 Length of Length of
LT LT Line No. of APL No. of BPL Total no. of
KV Proposed reconduc connection connection consumers
reconductorin New toring s(Nos.) s (Nos.) meters
g Line(Km) Line(Km) (Km)