Tata Projects Limited

DDUGJY PALAMU
SURVEY PROGRESS REP
Survey report till Dt. 29.09.2017

No. of Name of
PKG No. of villages Name of villages
Sl No. Name of Block Habitaion Habitation
Completed Completed Completed Completed

5 6
1 Bishrampur 2

19 29
2 Lesliganj 3
1

12 Chama 11

3 Medini Nagar 4

36 47
URVEY PROGRESS REPORT Pkg-2,3&4

No. of NewProposed DTR (KVA)


Length of 11
Augumentation of KV Proposed
DTR New Line(Km)

10 16 25 63 100 200

16 1 1 5
3.3

30 1
26.45
2

2 1
4 2
10.73
10 1

0 0 64 2 1 0 9 40.48

73
1825
126
100
2051
Length of 11 Length of Length of
LT LT Line No. of APL No. of BPL Total no. of
KV Proposed reconduc connection connection consumers
reconductorin New toring s(Nos.) s (Nos.) meters
g Line(Km) Line(Km) (Km)

3.4 10.5 5.5 517 367 884

2.05 26.9 13.15 515 467 982

4.77 10.94 27.5 443 644 1087

10.22 48.34 46.15 1475 1478 2953