No. Uraian Pekerjaan Sat Qty Harga Satuan (Rp) Total Harga (Rp) Bobot
Pekerjaan
I Pekerjaan Persiapan
1 Pembersihan m2 35.00 - #DIV/0!
2 Mobilisasi - demobilisasi ls 1.00 - #DIV/0!
3 Fasilitas kerja ,air & listrik ls 1.00 - #DIV/0!
4 Bouwplank m1 28.00 - #DIV/0!
5 Gudang material / bedeng bh 1.00 - #DIV/0!
Sub Total I - #DIV/0!
XI PEKERJAAN SANITASI
1 Kloset jongkok ex KIA / setara bh 1.00
2 Septictank & resapan bh 1.00 - #DIV/0!
3 Pasang saluran air kotor dia 3" ex wavin / setara m1 12.00 - #DIV/0!
4 Pasang saluran air kotor dia 4" ex wavin / setara m1 12.00 - #DIV/0!
5 Pasang saluran air bersih dia 3/4" ex wavin / setara m1 12.00 - #DIV/0!
7 Keran air ex lokal bh 1.00 - #DIV/0!
8 Floor drain ex lokal bh 1.00 -
8 Bak air fiber bh 1.00 - #DIV/0!
Sub Total XI - #DIV/0!
Grand Total #REF!
#DIV/0!