Anda di halaman 1dari 1

Master Plan

Buildings Schedule is updated, and some of the buildings cant be located (Administration
Building, Cafeteria, Mosque)
There is no legend clarifying the type/application of the building.

Mechanical Concept Report

4.0 Mechanical Outstanding Issues: Designer clarified outstanding issues affecting his design in
section 4.0
6.3.1 Central Chilled Water Plant: Designer stated central seawater cooled chillers provide
the most energy efficient air-conditioning system for the new development.

Anda mungkin juga menyukai