Anda di halaman 1dari 23

O-Engineers

4th issue,Nov-2017
Learning and Guiding

Overseas
Recruitment
Frauds
Page-35
Editorial Note
Contents
start understanding that
it is actually a alteration
not a termination
they start accepting
the reality of progress
and commence the
Feedback (Page-1)
adabtability process. The race between LED
We Carpediers are doing Solar Type & LED Type
same by sharing our Three Motor Diagnostics Street Lights
ideas and prospects in
Learning is the only O-Engineers, we use
Case Studies (3.3, 6.6
and 11 KV Motors)
(Page-7)
journey which never will learning by involvement (Page-2)
stop, sometimes we thought methodolgy and
that we are stuck in our you know what it is
lifelong journey of learning working, it is our fourth Industrial
Grounding of Equipments
but it is just an alteration consecutive edition and (Page-13)
Engineer's
of the way but not a stop. we are hopeful that we Advice
We all need to understand will enjoy this learning Overseas Recruitment
this alteration and move on,
(Page-29)
curve as we are right Frauds
I met many professionals now. (Page-35)
who always complained Happy Learning
they thought they are under moments Engineers....... Engineer making differences
information flood and it is (Page-39)
now difficult for them to
compete with this, but when
Book for this Month (Page-40)
the time passes and they
was still tripping
and they were soon
to run out of fuses.
Thanks a Lot. Three Motor
Engr. Asad Riaz We tested the motor
Diagnostics Case with MCA (AT5)
Feedback It is really a quite
Studies (3.3, 6.6 and and it should phase
to phase short(s).
professional and nice
11 KV Motors) Motor was sent to
magazine. Thanks for workshop which
Engr. Irfan Akhter confirmed the
the sharing.
Engr. Yuantao Hui results and motor
was rewound.
Case Study 1:
Learning is not an ending process, you and your team Lesson learnt: MCA
proving this. Motor rating: 3.3 KV, 560 KW. is a useful tool. it
Engr. FalakNaz Khan works by checking
Problem: Tripping on startup the balances of
with fuse failures winding resistance,
Great Work,keep it up impedances, phase
Qazi Tuseefuddin Investigation: Motor had 03 angles, and Current-
leads coming out. Client did to-Frequency ratio
insulation resistance testing and as well as LV Tan
results were fine. They carried delta for the motor
out winding resistance and winding. It can also
results were within limits. motor detect broken rotor
1 2
in induction motors. Its moisture so it was also and air. Complete cleaning Case Study 3:
an offline test that takes 5 mentioned that perhaps with dry ice blasting was
minutes or so. contamination is not due planned for next outage. Motor ratings: 11 KV, 8
to moisture. MW
Case Study 2: Lesson learnt:
Upon opening the Problem: Routine
Motor rating: 6.6 KV, 250 motor with our Excessive greasing is Condition Assessment
KW recommendation,motor dangerous for motors. It Tests
winding was found is a well known fact that
Problem: Routine Testing contaminated with grease more bearings fail due Test Results: The motor
in shutdown to over greasing than was found with 2% +
under greasing. It was tan delta at 0.2 PU and
Testing Results: IR/PI suspected that somebody tan delta tip greater than
values for this motor was Excessive pumped many strokes 3%. Partial Discharge
greater than 3 which was on stand still cold motor. was also higher for
good. MCA showed no greasing is Plant maintenance new machine and PD
abnormality. Tan delta tip
up was however, 8% well
dangerous for team has now bought
SDT 270 Ultrasound
inception voltage was
also equal to or less than
above the expected value motors kit for Condition based 0.5 PU which was not
of <1% for these size and lubrication. Another good. Motor was new
kind of motors and so was thing is that if service and hence we advised
the starting value of the tan from bearing (at least provider has the capability the client about poor
delta at 0.2% of Uo.It was 1/8th of the winding) and of understanding what quality of manufacturing
concluded that motor has iron rust at bottom half of the overall test results are (improper curing as most
contamination. IR being the winding.They cleaned saying, he can easily reach probable reason and poor
DC is very responsive to the motor with solvent to right conclusion. workmanship as well).
We recommended the
3 4
client to install online monitoring system on the For LV motors, consider MCA and Signature Analysis
motor asap. (ESA) for troubleshooting as well as condition
assessment.

For MV motors upto 6.3 KV, MCA, ESA with Tangent


Delta Tip up cover almost all key failure modes of the
machines.

For MV motor 6.6 KV to 11 KV (13.8 KV in North


Americas) add Partial Discharge testing to condition
assessment.

About the Author :


Engr. Irfan Akhter is our Senior
Lesson Learnt: Infant mortality was defined as most Engineering author of
something very important by Nowlan and Heap the Magazine "O-Engineers",
in their thesis for united decades ago but it still He is Asset Reliability, Risk
holds true. Many equipment fail pretty soon after Assessment, O&M and Project
being taken into service due to poor quality of Management Expert in Power/
manufacturing or installation, commissioning and Utilities.
initial maintenance. Establish baseline for new Engr. Irfan Akhter conducted multiple Technical
equipment as soon as you get an opportunity and Training in Various organizations, HE is Technical
track the performance. Director of one of renown organization of Pakistan,
Right now Prescon is operational in Pakistan, UAE
Final Suggestions for maintenance engineers: and Oman.

5 6
2015)
"Bread without Butter": The race http://www.sepco-solarlighting.com/blog/difference-
between LED Solar Type & LED Type between-a-solar-street-light-vs.-traditional-street-light
Street Lights
3) India To Switch All Its Street Lights To LED In 2
Momtaz Alsolh Years (article dated on September 8th, 2015)
Recently, I have been conducting some studies http://cleantechnica.com/2015/09/08/india-switch-
on energy saving. Sadly, there is a misconception
when it comes to energy saving. Many governments street-lights-led-2-years/
around the world believe that it is by converting all
Conventional (Traditional) Street Lights to LED Type 4) Dh3b to be Saved in 20 years with LED Street
Street lights that they would be saving billions of USD. Lighting (article written 11 months ago)

The reality needs a further study. Below are some http://ems-int.com/blog/dh3b-to-be-saved-in-20-


interesting shares that have led to my conclusions: years-with-led-street-lighting/

1) 10 California Cities Saving Money With LED 5) How Many Countries Are Popular For Solar
Street Lights (article dated on January 30th, 2012 Street Light? (article dated on June 11th, 2016)

http://www.forbes.com/sites/ http://www.solar-led-street-light.com/many-
justingerdes/2012/01/30/10-california-cities-saving- countries-popular-solar-street-light/
money-with-led-street-lights/#7c01347b1d9f
6) Solar Street Light Research (Europe) (article
2) Difference between a Solar Street Light vs. dated on February 5th, 2016)
Traditional Street Light (article dated on June 7th, http://www.solar-led-street-light.com/solar-street-
light-research-europe/
7 8
7) Advantages and disadvantages of solar street or LED Solar Types. There are still many doubts about
lights (as defined by Wikipedia) which option is more economical in the long run.
I believe that nations should conduct elaborate studies
https://en.wikipedia.org/wiki/Solar_street_light and see what suites them best and this depending on
their climate conditionsand available budgets while
8) How solar lighting works taking into consideration operational costs and all the
advantages and
http://www.solarlighting.com/how-it-works disadvantages to conduct LED Solar Type Street
such a considerable Lights require no
9) Solar powered LED lighting systems as offered by change. One thing is for electricity but require
Philips Electronics sure, time has come for all sunshine to operate
countries around the world
http://www.lighting.philips.com/main/products/solar.
html to choose one of the two options. Time has come
to call for the international ban of Conventional
If one reads the above shares, one would find out (Traditional) Type Street Lights since now there are
that there is still a lot to be done when it comes to options.
saving on the energy consumption (or energy bills) of In many developed countries around the world,
Conventional (Traditional) Type Street Lights and this they have decided that it was best to take the short
in many parts of the world. cut and go ahead with the LED Solar Type Street
Still nations are hesitant even though there are billions Lights without wasting time and money on LED
of USD that could be saved on energy consumption Type Street Lights. It is to be noted that the reason
and energy bills! The question is why? for this decision is based on the fact that LED Type
According to me, it is due to the fact that many Street Lights require electricity to operate them even
nations are hesitant to invest billions of USD at though they are much more economical than the
this moment in time to upgrade their existing Conventional (Traditional) Street Lights while the
Conventional(Traditional) Street Lights to LED Types LED Solar Type Street Lights require no electricity
9 10
but require sunshine to operate. honest and as such an urgent change of technologies is
Concerning the GCC region, I believe that it would required at this moment in time).
be wise to go ahead directly with the conversion of There is no doubt that renewable energy shall lead the
all Conventional (Traditional) Street Lights with LED future.
Solar Type Street Lights and this to save billions of For those that care to know where the origins of the
USD on energy consumption and energy bills and title "Bread without Butter" came from:
to help with Climate Change, to reduce the Carbon
Footprint and to go Green as well. https://www.linkedin.com/pulse/bread-without-
So much time has already been wasted in so many butter-introduction-momtaz-alsolh
countries around the world. Yet, some developed
countries around the world have taken the lead Important hope: I am still praying to almighty Allah
already to show that the conversion to LED Solar Type (God) to see the light of the fair and just 2018 Labor
Street Lights is possible and is the best solution in the Law in all GCC countries.
long run.
Let us see who will show interest in saving planet
earth and our dear environment and who shall lead Momtaz Alsolh is
in such a vital race noting that the highest energy bills Writer, Philanthropist
come from Conventional (Traditional) Street Lights and Consultant from
due to the extremely large quantity that is being used Saudi Arabia,
on all the roads and highways.
I hope to see the day when I would be travelling on
any road on planet earth and the only thing that I
would see is LED Solar Type Street Lights and no
other types of Street Lights.
This is my way of sharing my interest in our
environment (it is to be noted that our environment
and our climate is not doing so good if I must be
11 12
Grounding of
Equipments
Engr.Qazi Arsalan hamid

A conducting
connection, whether
intentional or accidental,
between an electrical
circuit or equipment and
the earth, or to some
conducting body that
serves in place of the earth.

Why do we Apply
ground?
To Protect Ourselves and
Equipment from Fault
Currents
13
Electricity will always follow the least resistance What do we gain from Grounding?
path to ground. Proper circuit grounding will keep
electricity from using your body to get to the ground. Grounding,
1. Provides personal safety
Grounded Circuit Requirements: 2. Provides a stable signal reference for instrument
1. Path is continuous and permanent accuracy
2. Ample capacity 3. Controls Radio Frequency emissions &
3. Low Resistance Electromagnetic Interferences (EMIs)
4. Circuit parts are bonded together 4. Provides a discharge path for short circuits and
lightning strikes
5. is to stabilize voltage in relation to the earth or
to another body that serves as the earth so that the
voltage measured between an ungrounded and
grounded object is always at the same potential.

Grounding is protection against direct and indirect


contact

14 15
Graphical description of ELectrical Shocks What determines the severity of electric shock?

The severity of an electric shock is dependent on the


current flowing through the body, which is impacted
by the electromotive force (E) measured in volts and
the contact resistance (R) measured in ohms, using
the formula is I = E/R.

Electric Shock Values

Current of 1mA is generally recognized as the


threshold of perception.
Currents of 1-6 mA often termed let-go currents,
through unpleasant to sustain.
Researchers has established 10.5 ma for women and 16
mA for men.
A 9-25mA range will be pain full.
A range of 60-100mA is in tolerable
Time of exposure to current is 0.06-.3s
Safe current is 9mA.
Voltages were, hand to hand 21.0V,hand to feet 10.2V
Human body resistance range is 500-3000 ohms. On
average it is taken as 1000 ohms.

16 17
Characteristic property of earthing system System grounding:
Materials used for earthing should have following A system ground refers to the point in an electrical
properties. circuit that is connected to earth.
This connection point is typically at the electrical
It must have low electric resistance. neutral.
It must have good resistance to corrosion. The purpose of the system ground is to protect
It must be able to dissipate high fault current equipment as well as the person working on that
repeatedly. equipment.
This ensures longer insulation life of motors,
Grounding system transformers, and other system components.

Substation/ Grid station Grounding:


Equipments grounding:
Earth faults on high-voltage systems can produce
An equipment ground is a physical connection to
dangerous voltage levels on LV installations.
earth of non-current carrying metal parts.
LV consumers (and substation operating
This type of grounding is done so that all metal part
personnel) can be safeguarded against this danger by:
of the equipment that personnel can come into contact
Restricting the magnitude of HV- earth fault currents.
with are always at or near zero (0) volts with respect to
Reducing the substation earthing resistance to the
ground.
lowest possible value.
Typical items (equipment) to be grounded are
Creating equipotential at the substation and at the
Electrical motor frames
consumers installation.
Outlet boxes
Breaker panels
Types of System Ground:
Metal Conduit
Low Resistance Grounded System
Support structure
This kind of earthing is performed for power
Cable tray and etc
transformers.
18 19
The low resistance grounded system is one that has 3. The current through the body will be lowered with
the neutral connected to ground through a small the addition of surface material.
resistance that limits the fault current.
Limits transient overvoltage during ground faults. Why testing is important for grounding system?
Ground fault current typically in the 100 600 Amp 1. Over time, corrosive soils with high moisture
range. content, high salt content, and high temperatures
can degrade ground rods/connecting wires and their
High resistance grounding: connections.
1. The high resistance grounded system is one that has 2. Initially installed the ground system had low
the neutral connected to ground through a resistive earth ground resistance values, the resistance of the
impedance whose resistance is selected to allow a grounding system can increase if the ground rods are
ground fault current through the resistor eaten away.
3. It is highly recommended to check all grounds and
2. High resistance grounding is typically applied to ground connections at least annually as a part of your
situations where it is essential to prevent unplanned normal Preventive Maintenance plan.
outages. 4. During these periodic checks, if an increase
in resistance of more than 20 % is measured, the
Effect of thin layer of surface material technician should investigate the source of the
1. A 3 to 6 inches layer of high resistivity material, problem, and make the correction to lower the
such as gravel ,is often spread on earth surface above resistance, by replacing or adding ground rods to the
the ground grid to increase the contact resistance ground system.
between soil and feet of person.
What affects the grounding system
2. If the surface material has a lower resistivity then There are four variables that affect the ground
the surface voltage will be the same as that of without resistance of a ground system:
material.
20 21
1. Length/depth of the ground electrode Factors affecting soil resistivity
2. Diameter of the ground electrode
3. Number of ground electrodes
4. Ground system design

Soil resistivity
1. Soil Resistivity is most necessary when
determining the design of the grounding system for
new installations to meet your ground resistance
requirements.
2. Poor soil conditions can be overcome with more
elaborate grounding systems.

22 23
Earthing electrode can be divided into three categories:
The Earthing electrode passes static charges into the 1. The point-type clamps equipped with flexible leads
soil. used for temporary bonding of portable containers to
This may be a device installed solely for grounding the building grounding system.
purposes, such as a driven rod (copper clad) or buried 2. The fixed grounding cables and bus bars used to
plate, or it may be an underground metal water pipe. connect the flexible leads and fixed equipment to
ground.
3. The earthing electrode itself.
Earth electrode and its visit plate
Flexible Leads
1. The flexible leads are subject to mechanical damage
therefore should be inspected frequently.
2. This inspection should evaluate:
*. Cleanliness and sharpness of the clamp points.
*. Stiffness of the clamp springs.
*. Evidence of broken strands in the cables, and
solidity of cable attachments.
3. Using an intrinsically-safe ohmmeter to test ohmic
resistance and continuity.
Grounding System Maintenance 4. The fixed leads and the bus bars are not usually
1. An effective inspection and maintenance program is as subject to injury as the temporary connectors.
needed to ensure continuity adequacy of the system. Checked with an ohmmeter on an annual basis.
2. At the time of installation a resistance test is needed (Resistance should < 1)
to confirm electrical continuity to ground. 5. Conductive hoses should be checked regularly for
electrical continuity and resistance.
In evaluating maintenance requirements, the bonding
24 25
Grounding Verification Control System: *. Properly bonded systems are at the same electrical
1. Yet we rely on a visual means to confirm that potential as the grounding portion of the electrical
a ground clamp and lead are in place for proper system.
grounding or bonding, with periodic confirmation via *. Bonded systems are neither designed nor intended
resistance meters. to carry current as part of the electrical system but
2. Newer electronic verification systems are the they must be able to safely do so in the event that
verification systems offer a continuous means of current is imposed on them.
visual/electronic confirmation of ground to a high- *. The bonding of conductive systems minimizes the
integrity ground point (ground bus). voltage differential between the different components
3. Through interlock functions in the system under both normal and atypical
they can control pumps, valves operating conditions.
, motors, etc. or interface with Direct Bond :
a PLC or DCS control system An electrical connection utilizing continuous
to ensure that nothing metal-to-metal contact between the members being
happens until a good ground joined.
is achieved. Indirect Bond :
An electrical connection employing an intermediate
Bonding: electrical conductor between the bonded members.
Bonding/bonded means connected to establish
electrical continuity and conductivity. Bonding jumpers:
*. It is the permanent joining of metallic parts to form A conductor installed to
an electrically conductive path that ensures both assure electrical conductivity
electrical continuity and the capacity to safely conduct between metal parts required
any current likely to be imposed on such metallic to be electrically connected.
parts.

26 27
To understand the concept of bonding and grounding Pakhtunkhwa (GoKP),
for safety, the installer must know that for normal
load current, short circuit current, or ground-fault Industrial being cognizant of Oil &
Gas reserves established
current to flow, there must be a continuous circuit or
path and a difference of potential. Engineer's Khyber Pakhtunkhwa
Oil and Gas Company

Criteria:
Advice Limited (KPOGCL)
in 2013 - a landmark
The ground-fault current path must be complete and achievement of the
Engr. Waseem Sajjad present Government
meet three important criteria:
The path for ground-fault current must be electrically KPOGCL, while
continuous and reliable. being actually KPK
It must have adequate current-carrying capacity to
conduct safely (both in magnitude and duration) any
I have done my
Government sponsored/
patronized, thus can very
bachelor degree in conveniently act as an
fault likely to be imposed on it.
Industrial Engineering Interface between the
It must be of low impedance to facilitate the
& Management from E&P Companies and all
instantaneous operation of the over current device in
Dawood University of the other Government
the ground-fault current path.
Engineering & Technology Related Agencies thereby
Karachi followed by actually performing the
MS in Manufacturing role of 'One Window
System Design from UET Operations'.
Peshawar. It is also the Provincial
Currently working in Holding Company (PHC)
KPOGCL as an Assistant under the Petroleum
Engineer since 2015. Policy 2012.KPOGCL
Government of Khyber is, in fact, a facilitator
28 29
to E&P companies, to With ownership of its KPOGCL with the
facilitate oil and gas oil and gas reserves Government of Khyber
A distinguishing
feature of the industrial
production in Province of as per article 172(3), Pakhtunkhwa, determined
engineering discipline
Khyber Pakhtunkhwa has KPOGCL has planned to to boost up the province's
is the integration of
also decided to develop increase oil production economy, has already
humans, machines,
a new Petroleum policy from 55,320 bbl/ day taken a step forward by
materials, and
and PetroleumRules 2016. to 200,000 bbl/day and improving communication
information to optimize
In this Policy, KPOGCL gas production from infrastructure, unearthing
the performance of such
intends to provide fiscal 443 MMCFD to 2000 the province's hidden
systems using available
and regulatory incentives MMCFD by the year treasure of huge reserves
resources in the most
2025. of Oil and Gas initially
efficient way, but without
The Company promotes through the province's
degrading social and
All ultimately all E&P activities indigenous institutions.
physical environments.
aimed at generating throughout KPK by Being an Industrial
investing in Exploration Engineer, article on
revenue Blocks and procurement Industrial engineering
Industrial engineering
training should provide
of heavy equipment (i.e. which is concerned with
that would enhance future practitioners with
Rig and Seismic Data the design,installation,
and facilitate E&P the set of competencies
Acquisition Recorder) improvement, evaluation,
companies in accelerating that are required to
- all ultimately aimed at and control of socio-
their exploration and create and maintain
generating revenue and technical systems in
development Programs flexible organizations,
of course fulfilling the virtually all sectors,
in order to maximize which in turn are able to
direly needed energy including manufacturing,
domestic oil and gas adapt continuously to the
requirements of not only distribution, government,
production in the coming dynamic environment.
KPK Province but the energy, healthcare, and
years. whole country. finance.
30 31
INFORMATION Designing information technologies,management physiology, particularly
ENGINEERING OPTION: systems to suit the of information the nervous system, leads
The industrial engineer needs of particular technologies, and to fascinating discoveries
strives to make people organizations. integrated systems. The concerning reaction
more efficient and effective Positioning latter topics address to stimuli, sensory
by ensuring that they information technology in the unique qualities perception, human
have easy access to the the strategic development of integrated systems performance at operator
right information at the of a corporation. within a particular class tasks, and people's ability
right time.A systems view of organization, such as to process information.
of an organization must manufacturing, business, These principles are
necessarily address the People's behavior in work and health. applied to the design
following issues: organizations is examined of human-machine
from the point of view HUMAN FACTORS AND systems, with particular
Providing access to of individual and social ERGONOMICS OPTION attention to problems
data and distributing psychology Industrial engineers also of information
relevant data to all who improve productivity and display, control layout,
need it. In addressing these efficiency by studying compensatory controls
Reducing large volumes issues, a distinction and improving the systems, and the design
of data into information is drawn between actual physical work of work environments.
that is useful to the computing and system environment. Human People's behavior in
management process. technologies, which factors engineering is the work organizations is
Coordinating the are clearly relevant to study of people as workers examined from the point
decision-making processes every engineer,and and as managers, both of view of individual
of people and computers the more specialized from the physiological and and social psychology.
in the organization. industrial engineering psychological points of These studies lead to
topics such as integration view. The study of human important conclusions
32 33
concerning managerial and leadership styles, identified himself
organizational goals and incentives, employee
relations, and the implementation of planned change. Overseas as Haider Zaidi and
informed Sulman

CAREERS IN INDUSTRIAL ENGINEERING Recruitment that he is selected for


the post of Electrical
Industrial engineers develop processes and systems
that improve quality and productivity. Industrial Frauds Engineer in one
reputable firm of Saudi
engineers make significant contributions to their Arabia, Haider asked
employers by saving money while making the him to visit his office
workplace better for other workers. As such, they can Engr. Qazi Arsalan Hamid so details of process
find work in any organization that values these goals. will discuss. Sulman
visited Zaidi brothers,
Sulman after finishing Haider informed him
his bachelor in Electrical that Sulman had to
Engineering hired in one submit his medical
of the manufacturing firms certificates and degrees
of Karachi, Sulman applied copies so his visa will be
on many positions on processed. For medical
recruitment sites like rozee. his expenditures are
pk and mustakbil.com, on 5000 rupees, and he
the third month of his job needs to do it from
he received call from Zaidi one of the branches of
Brothers, Zaidi brothers was agha khan laboratories,
a recruitment firm operated Haider asked one
from Malir Karachi, Caller of his employees to
accompany Sulman
34 35
Sulman for medical in nearby branch of agha khan is some problem with Saudi government but do not
laboratory, Sulman was happy that everything is quite worry these things happened in these type of works,
ok and Haider told him that within 2 weeks of medical but 2 months passed and no news from Zaidi brothers,
and paper submission he would have received visa after complete exhaustion Sulman visited Zaidi
from Saudi Arabia, but one thing is irritating Sulman brothers office, he was shocked to see that office was
that Haider asked 1 lac rupees for this visa and he gone and now one cloth shop was there in place of
does not have that money, only he could arrange is 25 recruitment agency.
thousand rupees. This whole story of victim is telling what is going
Haider said this wrong in recruitment agency, in many big recruitment
amount is ok for now agencies middle management asked money for visa,
but he has to submit although this must be noted that visa is always free
Within 2 to 3 weeks and from client and there are no charges of visa from
rest of the money
before going to Saudi you will receive visa candidates, but in Pakistan many agencies asked visa
Arabia. Sulman was ok fees from candidates, I am myself victim of this visa
fees, when alsada recruitment agency located near AG
with this arrangement .two weeks passed but no news office Karachi asked me to submit 75000 rupees for
from Zaidi brothers, during this whole tenure one of visa, me and my friend realized that man is con, and
Sulman friend Kaleem went to Saudia for job purpose we retreated from that agency and never went there
after paying 2 lac rupees to one renown recruitment again. Many engineers think that it is ok to buy a free
firm Dahalvi recruitment agency (currently still and come to foreign land for job hunting actually this
operational in Tariq road, Karachi), so Sulman was ok is not going to work nowadays in many middle eastern
that this money charging is normal in all recruitment countries due to nationalization,and the only job you
agencies. Month passed and no news from Zaidi will get is lowest paid and with fewer benefits. On the
brothers, when he visited Haider, Haider informed other hand, some recruitment agencies are doing well
that within 2 to 3 weeks you will receive visa as there in terms of transparency like McPack and PPA

36 37
but their process is lowest in all over Pakistan, some
agencies status is ambiguous like Allied Services, their Engineer Making
process is complicated and inefficient. Some clients
also played with these agencies like Dar Engineering Differences
and alfanar, persons who came for interviews are not
professionals and shed their time on the experience of
candidates but not on talent. We, engineers, need to be
vigilant while providing any person or company our
services or time.
Please note no Middle Eastern or Gulf-based company
Muhammad
Gabr is testing
ask money from any candidate for hiring purpose, engineer,
this is all the drama of local recruitment agencies or serving
middleman. nowadays in
Saudi Arabia
We will continue this topic in next few edition as we as Testing and
are receiving multiple articles from different engineers Protection
who were the victims of this fraudulent practices, we Engineer,
will bring the stories of these victims in front of our
readers so they will be aware of these fake recruiters.
Muhammad Developed one excellent website for
Electrical Engineers who are interesting in Protection
Engineering Field, this website helps you in learning
basic and advanced Protection Techniques.
Web address is www.myprotectionguide.com

38 39
Book
for this
month

Learn all the skills you need to pass Level 3 and


4 Vehicle Diagnostic courses from IMI, City and
Guilds and BTEC, as well as higher levels, ASE,
AUR andother qualifications. Advanced Automotive
Fault Diagnosis explains the fundamentals of vehicle enpak2017@gmail.com
systems and components and examines diagnostic
principles as well as the latest techniques employed in
effective vehicle maintenance and repair. Diagnostics,
or fault finding, is an essential part of an automotive
technician's work, and as automotive systems become
increasingly complex there is a greater need for good
diagnostics skills.

40

Anda mungkin juga menyukai