Appraisal of Flood

5 Management and Anti-


Erosion Schemes
5.1 Appraisal of schemes by GFCC- Scope

Techno-economic appraisal of flood management and anti-erosion schemes


received from the Ganga basin States is an important activity of GFCC. As per
revised guidelines issued by the Planning Commission on 29th June 2012, schemes
estimated to cost between Rs. 12.5 crore (earlier Rs. 7.5 crore) and Rs. 25 crore
(earlier Rs. 15 crore) are examined by GFCC for their techno-economic viability
and, if found acceptable, are cleared by GFCC itself and recommended to the
Planning Commission for investment clearance.

Schemes costing less than Rs. 12.5 crore are cleared at the State level by
the State Flood Control Boards.

Schemes costing above Rs. 25 crore, if found acceptable after appraising


them for their techno-economic viability, are recommended by GFCC to the
Advisory Committee of the Ministry of Water Resources for Irrigation, Flood
Control and Multi Purpose Projects for clearance.

Normally, GFCC does not examine schemes costing less than Rs. 12.5
crore. However, in special cases, such as schemes on emergent flood protection
works in the Eastern Sector on common / border rivers with Bangladesh, Ministry
of Water Resources, Government of India issued an instruction that GFCC would
scrutinize such schemes on the common / border rivers with Bangladesh and make
recommendations to MoWR for release of funds. In addition, all Central sector
schemes in Ganga Basin irrespective of cost are, however, examined from techno-
economic aspect in GFCC.

5.2 Appraisal of schemes during 2014-15

The details of schemes appraised during 2014-15 and their status are given
below in Table 5.1:-

Ganga Flood Control Commission: Annual Report 2014-15 Page 21


Table 5.1

S. Name of Scheme Estimated Status


No Cost in
Rs. Lakh
Bihar
1 Restoration of spur no.1,7,8,9 , construction 9630 Cleared by
of new spur between spur no. 4&5 , GFCC but TAC
construction of bed bar d/s of spur no. dropped scheme
1,2,3,4,7,9 and u/s of spur no.1, maintenance pending model
of approach road, service road and activation study on
of Chaurasidhar 16.10.2014.
2 Anti Erosion Work to be executed before 6798.88 Cleared by
flood 2014 near Khairpur, Raghopur, GFCC but TAC
Akidatpur & Shankarpur village on the left dropped scheme
bank of river Ganga. pending model
study on
16.10.2014.
3 Ani erosion work at Mangalpur near Rahua 7571 Cleared by
Nala at Ratanmala and near Poorhouse in GFCC on
West Champaran district (Bagaha Town 9.7.2014. TAC
Protection Scheme Phase-III) cleared scheme
on 16.10.14.
4 Revised Bagaha Town Protection Scheme 9085 Tech viability of
(Phase-1) GFCC sent to
GoB. Cleared
by TAC on
16.10.14.
5 Revised Detailed Project Report for 13420.193 Tech viability of
Construction of embankments on Left and GFCC sent to
right side of river Jhim, Banke, Jamura GoB. TAC is to
(Adhwara group) in Sitamarhi district approve.
6 Revised scheme for raising and 2200 Scheme cleared
strengthening of Lalbakaiya left and right by GFCC.
embankment, Bairgania ring bund and Doab
embankment in East Champaran Distt
7 Anti Erosion Work before 2015 flood on the 2386.606 Scheme cleared
right bank o9f river gandak in between 0.21 by GFCC.
km of old BRL to km 1.00 of old BRL and
km 0.00 to km 0.56 of new BRL of Pipra-
Piprasi Embankment.
8 Bagmati Flood Management Scheme 91245.83 Tech viability of
Phase- III (a) GFCC sent to
GoB. TAC is to
approve.

Ganga Flood Control Commission: Annual Report 2014-15 Page 22


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
9 Mahananda Flood Management Scheme 56955.2 Returned to
Phase- II State Govt. on
5.2.15 as the
scheme is not
found viable.
10 Tagging of left& right Kamla Balan 851 Scheme cleared
embankment of Indian Territory to both by GFCC.
Kamla embankments of Nepali Territory
11 Anti erosion work for protection of 2456.5 Scheme cleared
Valmikinagar forest on the left bank of by GFCC.
Gandak river in West Champaran district of
Bihar d/s of barrage
12 Revised Bagmati Flood Management 1283.5 Tech viability of
Scheme (Phase-II) BR 48 GFCC sent to
GoB. TAC is to
approve.
13 Anti Erosion work near Khairpur, Raghopur, 7068.24 Tech viability of
Akidatpur and Shankarpur village on left GFCC sent to
bank of River Ganga. Restoration of spur GoB. TAC is to
and maintenance of service road and approve.
approach road.
14 Anti Erosion Works at Madrauni/Sahore 2460.19 Scheme cleared
village on right bank of river Kosi in by GFCC.
Bhagalpur distt of Bihar
15 Extension of left Kamla Balan embankment 2492 Scheme
from km 102.38 to km 105.35(up to Western examined &
Kosi embankment) with provision of 3 Nos observations
Anti-flood sluice and protection work of the sent to State
new embankment Government.
16 A E work for Protection of Left bank of 4250 Scheme
Gandak river in u/s of Gandak barrage in examined &
West Champaran district observations
sent to State
Government.
17 Costruction of Left and Right embankment 10984 Scheme
on river Rato (Rato river flood management examined &
scheme) observations
sent to State
Government.
18 Construction of Earthen Bund from 5070.01 Scheme
Ashraulidan (UP) Bund to Guide Bund of examined &
Bettiah-Gopalganj bridge under FC Divn., observations
Thakaraha Camp, Gopalganj District. sent to State
Government.

Ganga Flood Control Commission: Annual Report 2014-15 Page 23


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
19 DPR for protection and Restoration of Km 38297 Scheme
0.00 to Km 28.20 of Eastern Kosi examined &
Embankment (EKE) under Bihar Kosi observations
Recovery Flood Project (BKFRP Phase-I) sent to State
and proposed Bihar Kosi Basin Development Government.
Project (BKBDP Phase-II)
20 Anti erosion work from Hardeo Tola to 11395.67 Scheme
Khatti examined &
observations
sent to State
Government.
21 A.E. Work in b/w km 0.00 km to 7.80 km of 6189.35 Scheme
left bank of river Ganga near Mathar Diara examined &
(Munger Ghat to Tikarampur) observations
sent to State
Government.
22 Bagmati Flood Management Scheme 72084 Under
Phase- III (b) Examination
23 Protection work for village patther Tola to 11225.47 Under
Kamla Kani near U/S of spur no. 12. Examination
24 Revised Project Estimate for construction of 57842 Under
Bituminour road and Restoration of structure Examination
of Eastern Kosi Embankment (Km. 1.00 to
Km. 125.00) & Western Kosi Embankment.
25 Revised Detailed Project Report for Raising, 36667.6 Under
Strengthening & Extension of Existing Examination
left/right embankment in Chandan River
System in Bhagalpur & Banka district.
Jharkhand
1 Anti-erosion Work on the right bank of river 3168.67 Scheme
Ganga from Rafatola to Srighar 10 no.s in examined &
Sahibganj Disstt. observations
sent to State
Government.
West Bengal
1. Master Plan and DPR for Ghatal and 119243.00 Scheme under
adjoining area examination
2 Resectioning of river Ichamati for better 2972.00 Dropped on the
drainage & flood protection in the reach request of State
from BSF Bridge at 140.415 Km to Tipi at Government.
152.315 Km in the District of North 24-
Parganas

Ganga Flood Control Commission: Annual Report 2014-15 Page 24


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
3 Improvement and extension of Banikantha 1399.00 Dropped on the
Khal up to the existing lead channel linking request of State
to river Sunti under Barasat-II Block, District Government.
North 24-Parganas
4 Protection to the right bank of river Nagar 221.00 Scheme
from erosion near Khunti BOP Camp and examined &
border fencing along the Indo-Bangladesh observations
Border in PS Islampur, District Uttar sent to State
Dinajpur (Length - 575m) Government.
5 Protection to the right bank of river Nagar 201.00 Scheme
from erosion near Moraghati BOP Camp and examined &
border fencing along the Indo-Bangladesh observations
Border in PS Islampur, District Uttar sent to State
Dinajpur (Length - 520m) Government.
6 Protection to the right bank of river Nagar 212.00 Scheme
from erosion near Hatkhola BOP Camp and examined &
border fencing along the Indo-Bangladesh observations
Border in PS Islampur, District Uttar sent to State
Dinajpur (Length - 480m) Government
7 Protection to the right bank of river Nagar 221.00 Scheme
from erosion near Fatepur BOP Camp and examined &
border fencing along the Indo-Bangladesh observations
Border in PS Islampur, District Uttar sent to State
Dinajpur (Length - 450m) Government.
8 Protection to the right bank of river Nagar 203.00 Scheme
from erosion near Sonamati BOP Camp and examined &
border fencing along the Indo-Bangladesh observations
Border in PS Islampur, District Uttar sent to State
Dinajpur (Length - 500m) Government.
9 Protection to the left bank of river Tangon 415.00 Scheme
from erosion near Padmakumari and examined &
Chandgaon BOP Camp in PS Kaliaganj, observations
District - Uttar Dinajpur (Length - 900m) sent to State
Government.
Uttar Pradesh
1 Scheme for increasing drainage capacity of 1726 Scheme cleared
Bakulahi river in the districts of Pratap Garh by GFCC.
and Chhatrapati Shahuji Maharaj Nagar
2 Scheme for construction of 12.70 km long 2489 Scheme cleared
embankment from Bhagwanpur to by GFCC.
Rukumpur on right bank of river Ramganga
in Bareilly district.

Ganga Flood Control Commission: Annual Report 2014-15 Page 25


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
3 Project for construction of Aile Persauli 4355 Tech viability of
Lolpur bund on the left bank of river GFCC sent to
Ghaghra/Saryu in Gonda district of Uttar state Govt.
Pradesh TAC is to
approve.
4 Project for protection of Bakulaha Sansar 1701 Scheme cleared
Tola bund and village group of by GFCC.
Imbrahimabad. Naubrar between km 5.175
to km 6.500 of B S T bund on the right bank
of river Ghaghra in Ballia dikstrict of Uttar
Pradesh
5 Project for construction of anti-erosion 2141 Scheme cleared
works to protect village group of Sherpur- by GFCC.
Shemra on the left bank of river Ganga in
Ghazipur district of Uttar Pradesh.
6 Project for construction of anti-erosion 1791 Scheme cleared
workson left bank of river Yamuna from km by GFCC.
21.100 to km 21.700 of Hindon Yamuna
Doab bund near village Kamnagar in
Gautambudh Nagar of Uttar Pradesh.
7 Revised scheme for construction of Marginal 9674 Tech viability of
bund from Amar Shahid Path to Goamati GFCC sent to
Aquaduct on right bank of river Gomati in state Govt.
Lucknow district TAC is to
approve.
8 Revised scheme for construction of Marginal 7886 Tech viability of
bund from Lucknow-Sultanpur Road to GFCC sent to
Amar Shahid Path on right bank of river state Govt.
Gomati in Lucknow district. TAC is to
approve.
9 Revised scheme for construction of Marginal 15176 Tech viability of
bund from Amar Shahid Path to Gomati GFCC sent to
Aquaduct on left bank of river Gomati in state Govt.
Luck now district. TAC is to
approve.
10 Project for construction of Afflux bund from 2278 Scheme cleared
km 0.500 to km 1.675 in downstream of by GFCC.
Sharda Barrage at Banbasa on left bank of
river Sharda in Champawat district of
Uttrakhand maintained by Uttar Pradesh.
11 Project for protection of Karmaini-Belauli 1463 Scheme cleared
Bund from km 9.000 to km 9.410 & km by GFCC.
9.430 to km 10.010 along right bank of river
Rapti in Sant Kabir Nagar District of Uttar
Pradesh

Ganga Flood Control Commission: Annual Report 2014-15 Page 26


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
12 Project for construction of anti-erosion 2169 Scheme cleared
works between end of M G Bund and by GFCC.
Muktidham Gauri Shankar Ghat at
Doharighat town in District Mau of Uttar
Pradesh
13 Project for construction of embankment from 2145 Scheme cleared
village Munta Nagla to Sareli (from km by GFCC.
0.000 to km 13.500) on left bank of river
Ganga in Badaun/Kasganj District of Uttar
Pradesh
14 Revised scheme for construction of Parsa 1431 Scheme cleared
Deharia Tilakpur Marginal bund on left bank by GFCC.
of river Rapti in Shrawasti district
15 Project for construction of embankment from 1413 Scheme cleared
village Kaithola to Shahpura (from km 0.000 by GFCC.
to km 7.400) on right bank of river Kosi in
Rampur District of Uttar Pradesh
16 Project for construction of embankment from 6663 Tech viability of
village Joulpur to Patwayee (from km 0.000 GFCC sent to
to km 28.5000) on left bank of river Kosi in state Govt.
Rampur District of Uttar Pradesh TAC is to
approve.
17 River training Works on Right and Left Bank 2375.27 Scheme cleared
of Sharda River from Indo Nepal Border to by GFCC.
Kamboj Nagar (Left Bank) & Naujalh,
Naktaha (right Bank)
18 Scheme for construction of cunnette in river 1225 Scheme
Sharda to maintain proper river flow at D/S examined &
of Sharda Barrage, Banbasa from Km 0.050 observations
to Km 1.350 in Champawat district sent to State
Government
19 Project for protection of village group of 1577 Scheme
Sangapour Kakarghata at T S bund between examined &
km 39.800 to km 41.600 on the right bank of observations
river Ghaghra in Ballia district of Uttar sent to State
Pradesh. Government
20 Scheme for construction of Hastinapur 13288 Scheme
embankment from km 0.000 to km 10.975 on examined &
right bank of river Ganga in Meerut district observations
sent to State
Government
Uttarakhand

Ganga Flood Control Commission: Annual Report 2014-15 Page 27


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
1 Project for construction of studs and 3890.00 Techno-
marginal bund for protection population and economically
agricultural land from Banjarewala to cleared by TAC
Alwalpur, villages situated at banks of river of MoWR on
Solani in District Haridwar 16-10-2014.
2 Flood Protection work for villages 3125.00 Techno-
Shekhuwala and Prateetpur in channel economically
originated from Shivalik Mountain series in cleared by TAC
Distt. Dehradun under Development Block of MoWR on
Vikashnagar 16-10-2014
3 Shaspur-Sabhawala Culvert to village 5774.00 Techno-
Kunjagrant (including villages between economically
them) Flood Protection scheme from River cleared by TAC
Aasan of MoWR on
16-10-2014
4 Flood Protection scheme from Yamuna river, 7735.00 Techno-
Dak Pathar Barrage to National Highway-72 economically
Kulhala-Pawata Sahibpur (Left bank Gramo) cleared by TAC
in Distt. Dehradun under Vakash Nagar of MoWR on
Development Block 16-10-2014
5 Flood Protection scheme of village Matak- 1794.00 Techno-
Mazri to Pratitpur and village Kalyanpur to economically
Signiwala from channel originating from cleared by
Shivwalik Mountain in Distt. Dehradun, GFCC on 26-9-
Block-Vikashnagar (Revised) 2014
6 Anti-Erosion and Drainage scheme of village 3405.00 Techno-
Khera-Pachuwa to village-Fatehpur (Aasan economically
River) in Distt. Dehradun under Block cleared by
Vikash Nagar. Advisory
Committee of
MoWR on 16-
10-2014
7 Flood Protection scheme of Gram Chanura to 1344.00 Techno-
gram Bhawri between Koshi Uttarakhand economically
State Reconstruction, Distt. Almora, Block cleared by
Taluka under Someshwar Area GFCC on 30-
09-2014.
8 Flood Protection scheme of vollage Langha 1665.00 Techno-
to Jamanlhata near NH72 from Gayana economically
Khadd & Sheetla river in Vikashnagar block, cleared by
Distt. Dehradun (Revised) GFCC on 25-
09-2014.

Ganga Flood Control Commission: Annual Report 2014-15 Page 28


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
9 Flood Protection work along Tons River & 1455.00 Techno-
its Tributories in Mori Block of Dist. economically
Uttarkashi (under centrally funded flood cleared by
protection scheme) (Revised) GFCC on 26-
09-2014.
10 DPR on river training works incuding Misc. 7671.00 Techno-
associated works on both banks of river economically
Bhagirathis as per requirement from Jhulapul cleared by TAC
to Tiloth bridge including prposed works on of MoWR on
left from Tiloth bridge to switchyard 16-10-2014.
Uttarkashi
12 DPR on protection work of both banks of 4881.00 Techno-
river Bhagirathi at Uttarkashi economically
cleared by TAC
of MoWR on
16-10-2014.
13 Project for flood protection works in 1493.00 Scheme cleared
Nelchami Gard for Tharti to Dhela, Bhaso to techno-
MUYAL village and Bhilangana river to economically.
Dhanshali city in bhalangana Block, Distt.
Tihri Gardwal.
14 Project for flood protection and anti erosion 8090 Scheme
work along both banks of Dhela, Phika and examined &
Levra rivers (tributaries of Ramganga river) observations
in Ramnagar, Kashipur, Jaspur, and Bazpur sent to State
blocks, District- Nainital and Udhamsingh Government.
Nagar (Revised)
(Priority No. 2)
15 Changa Mazri village in Distt. Haridwar 1306 Scheme
under Development Block Bhagwanpur anti- examined &
erosion scheme from Solan River observations
sent to State
Government.
16 SSB and Kedar village Flood Protection 2493 Scheme
scheme in Shrinagar from River Alaknanda examined &
in Distt.Pawri Garhwal observations
sent to State
Government.
17 ITI and Lower Bhakhtiyana in Shrinagar 2488 Scheme
Distt. Pauri Garhwal flood protection scheme examined &
from river Alaknanda. observations
sent to State
Government.

Ganga Flood Control Commission: Annual Report 2014-15 Page 29


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
18 Tiwari Mohalla and New Bus Stand in 2496 Scheme
Shrinagar flood protection scheme fromd examined &
River Alaknanda in Distt. Pawri Garhwal observations
(Priority No. 6) sent to State
Government.
19 Shri Kot Phase-I in Shrinagar, Distt. Pawri 2495 Scheme
flood protection scheme from river examined &
Alaknanda observations
(Priority No. 14) sent to State
Government.
20 Shri Kot Phase-2 in Shrinagar, Distt. Pawri 2124 Scheme
flood protection scheme from river examined &
Alaknanda observations
(Priority No. 16) sent to State
Government.
21 Flood Protection scheme on river Kamal 2442 Scheme
(from Gundiyad to Sundali), (Dhawra to examined &
Purola) and old P.W.D colony to Sunara observations
Chhani) in Distt. Uttarakashi under Block sent to State
Purola Government.
22 Flood Protection works on both sides of 2469 Scheme
River Yamuna from Janki Chatee to Damta examined &
in Distt. Uttarkashi under Block Naugaon observations
(Priority No. 11) sent to State
Government.
23 Flood Protection scheme Kumola Khadd, 1319 Scheme
Chhara Khadd, Malgar Khadd in Distt. examined &
Uttarakashi, Block-Purola under C,M observations
Proclaimation No. 255/2013 sent to State
(Priority No. 17) Government.
24 Flood Protection scheme Uttarakhand State 2345 Scheme
Reconstruction Distt.Almora, Block- examined &
Chaukhutia and Syalde from River observations
Ramganga and tributaries sent to State
Government.
25 Flood Protection works for Tejam, Rasiya 2416 Scheme
bagad and Nachni villages on the left bank of examined &
Ramganga river in Block Munsyari District observations
Pithoragarh under Uttarakhand State sent to State
Reconstruction Government.

Ganga Flood Control Commission: Annual Report 2014-15 Page 30


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
26 Flood protection Scheme of Malan River in 2410 Scheme
Block Dugadda, District Pauri Garhwal examined &
observations
sent to State
Government.
27 Flood Protection Scheme and Channelization 2362 Scheme
of Sukhro River in Block Dugadda, District examined &
Pauri Garhwal observations
sent to State
Government.
28 Flood Protection Scheme of Khoh River 1544 Scheme
from Grastanganj Bridge to Lalpani in Block examined &
Dugadda, District Pauri Garhwal observations
sent to State
Government.
29 Flood Protection Scheme for Dabli, 1378 Scheme
Ghildiyal and Jakhani villages in Block examined &
Kirtinagar, District Tehri Garhwal observations
sent to State
Government.
30 Flood Protection Work for villages Ukauli, 1312 Scheme
Nakulia, Khairana, Kaudha, Ashraf and examined &
Kaundha Ratan on river Kailash in tehsil observations
Sitarganj, District Udhamsinghnagar sent to State
Government.
31 Flood Protection Work for villages 2487 Scheme
Meharvan nagar, Ulani, Sunpahar, examined &
Mohammadpur Bhuria, Mohammadganj and observations
Khamaria on Dehva river in Tehsil Khatima sent to State
and Sitarganj in District Government.
UdhamsinghnagarUkauli, Nakulia, Khairana,
Kaudha, Ashraf and Kaundha Ratan on river
Kailash in tehsil Sitarganj, District
Udhamsinghnagar
Rajasthan
1 Flood Protection Scheme for Baran City 5616.00 Under
examination
2 Flood Protection Scheme for Bharatpur 6768 Under
district under Flood Management examination
Programme 2012-17
Himachal Pradesh

Ganga Flood Control Commission: Annual Report 2014-15 Page 31


S. Name of Scheme Estimated Status
No Cost in
Rs. Lakh
1 Detailed Project Report for channelisation of 19082 Scheme cleared
River Pabber from Tikkari to Hatkoli in techno-
Tehsil Rohroo District Shimla economically

5.3 Summary of status of Appraisal of Schemes (State-wise)

State-wise status of appraisal of schemes is given in table below:


Table 5.2

State Scheme Schemes Schemes Schemes under


received cleared examined & examination
observations
communicated to
State Government
Bihar 25 14 7 4
Jharkhand 1 - 1 -
West Bengal 7 - 6 1
Uttar Pradesh 20 17 3 -
Uttarakhand 31 13 18 -
Himachal Pradesh 1 1 - -
Rajasthan 2 - - 2
Total 87 45 35 7

*****

Ganga Flood Control Commission: Annual Report 2014-15 Page 32


Geobag Pitching & Launching Apron with Procupines filled with jhankar on right bank
of river Sarda in Village Ratuli, Uttar Pradesh

Anti-Erosion Works in Mohammadganj, Uttarakhand