Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 NK Murali Nair Projects Manager 11-Oct-18 20-Jun-19 n/a
2 Sujith Kumar Project Manager 2-Feb-18 29-Jan-19 n/a
3 Sameer Samad Shaikh Electrical Engineer 28-Oct-17 20-Jun-19 n/a
4 Shijil P Electrical Engineer 21-Sep-17 20-Jun-19 n/a
Vivan Mathew Electrical Engineer
RK Kannan QA/ QC Engineer
5 Thamir Said Electrical Engineer 11-Oct-18 1-Jan-20 n/a
6 Midhun Narendranath QA/ QC Engineer 11-Oct-18 1-Jan-20 n/a n/a n/a
7 Prabhu Chandran Electrical Engineer 15-Jun-19 20-Aug-18 n/a n/a n/a
8 Kingsten David Electrical Engineer 23-May-19 20-Aug-18 n/a n/a n/a
9 Manish Electrical Engineer 5-Jun-18 20-Jun-19 n/a n/a n/a
11 Rajamohan Civil Engineer 23-Jan-18 n/a n/a n/a n/a n/a
12 Ravi Civil Engineer 4-Jun-18 n/a n/a n/a n/a n/a
13 Cyril John Site Engineer 26-Aug-18 8-Sep-17 n/a n/a n/a
14 Sreekanth KB Electrical Engineer 21-Sep-17 20-Jun-19 n/a n/a n/a
17 Hisham HSE Manager 3-Feb-18 29-Jan-19
18 Rajeev S HSE Officer 8-Sep-17
19 Sriram B HSE Officer 11-Oct-18 8-Sep-17
20 Manikandan HSE Officer 14-Oct-17 29-Jan-18
21 Jenish Arul HSE Officer 9-Sep-17
22 Nagarajan AR HSE Officer 5-Jun-18 14-May-19
23 Toufeeq Ahmed Draughtsman 13-Oct-17 n/a n/a n/a n/a n/a n/a
24 Rajendra Prasad Cable Jointer 21-Sep-17 20-Jun-19 n/a n/a n/a
28 Pg Unni Krishnan Lineman 29-Aug-18 9-Sep-17 n/a n/a n/a
29 Shyam Lal Jaiswar Lineman 21-Sep-17 20-Jun-19 n/a n/a n/a
39 Madhavan Perumal Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a
44 Kaibul Hossain Helper 12-Jul-17 n/a n/a n/a n/a n/a n/a
48 Prasad PS Welder 13-Oct-17 n/a n/a n/a n/a n/a n/a
Chavhan Welder
Dhanajayan Welder
50 K Velayudhan Chandran Electrician 9-Sep-17 n/a n/a n/a n/a n/a
51 Fernandes Remet Juje Electrician 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a
52 Muralidharan Pillai Electrician 16-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a
53 Ajith Kumar Electrician 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a
55 Mahafuzur Rehman Electrician 12-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a
57 Sundararaj Thangavel Electrician 14-Jul-17 20-Aug-18 n/a n/a n/a n/a n/a
58 Easter Sunil Electrician 14-Jul-17 20-Aug-18 n/a n/a n/a n/a n/a
59 Bipad Banjan Bala Electrician 21-Sep-17 20-Aug-18 n/a n/a n/a n/a n/a
64 Radhakrishnan Electrican Helper 1-Feb-18 n/a n/a n/a n/a n/a n/a
66 Ravindeeran P Electrician 4-Jun-18 14-May-19 n/a n/a n/a n/a n/a
Kadher Mechanic 7-Aug-19 n/a
Masom Ahmed Helper 7-Aug-19 n/a
69 Govardhan Ram Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a
70 Hridey Chandran Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a
72 Raghavan Yesodharan Helper n/a n/a n/a n/a n/a n/a
73 Narasya Helper 14-Jul-17 n/a n/a n/a n/a n/a n/a
74 Chandraiah Helper 14-Jul-17 n/a n/a n/a n/a n/a n/a
77 Suhail Miah Helper 12-Jul-17 n/a n/a n/a n/a n/a n/a
78 Mallaya Helper 21-Sep-17 n/a n/a n/a n/a n/a n/a
79 Laxman K Helper 21-Sep-17 n/a n/a n/a n/a n/a n/a
80 Ravinder P Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a
81 Abdul Gaffar Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a
82 Ramesh Driver n/a n/a n/a n/a n/a n/a
83 Binu Driver n/a n/a n/a n/a n/a n/a
84 Mahad Driver n/a n/a n/a n/a n/a n/a
85 Kamiz Driver n/a n/a n/a n/a n/a n/a
86 Krishnasami P & M Operator n/a n/a n/a n/a n/a n/a
87 Faizal P & M Operator n/a n/a n/a n/a n/a n/a
88 Akthar P & M Operator n/a n/a n/a n/a n/a n/a
89 Balwinder Singh P & M Operator n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Defensive Driving
P&M Operators training by DPC
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
31-Jul-19
hofar Power Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Foreman
Site Engineer
31-Jul-19 Electrical Engineer
Lineman Medical Fitness Certificate (6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
Training & Competence Matrix as on (07/ MAY /2017)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP License Grade:
PTW Procedures
Work at height
p Excavation and cable laying
Safe Usage of ladders
Road safety
Chemical awareness
Environmental awareness
Banksmen and riggers awareness
till *
31-Jul-19
till *
31-Jul-19 HSE officer n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a
n/a 31-Jul-19 Draughtsman n/a n/a n/a n/a
n/a 31-Jul-19 Cable Jointer n/a n/a n/a n/a
n/a n/a n/a 9-Jun-17 n/a n/a n/a
n/a 31-Jul-19 AC062/2016 9-Jun-17 n/a n/a n/a
n/a 31-Jul-19 Helper n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a
Manager/Project Manager
NK MURALI NAIR
7-May-17
Competent Electrical Person (CEP)/
n/a
n/a
n/a
n/a
n/a
n/a
n/a
CEP
CEP
CEP
CEP
Competent Supervisor (CS)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
21-Jun-17
21-Jun-17
CEP 27-Oct-17
20-Sep-17
13-Sep-17
CEP 20-Sep-17
n/a n/a
n/a n/a
n/a n/a
n/a n/a
CS 12-Jul-17
CS 8-Sep-17
CS 12-Jul-17
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
n/a n/a
Dhofar Power C
Contractor: Shariakat Fanniya Omaniya LLC
Project: : Emergency and Maintenance/ Houskeeping Services for 33/11KV Primary Substation
Valid
Risk Assessment
Designation
Manage Safety
HSE Induction
Emp. No
Name
valid till *
S.N
till *
1 Biju P Narayanan Electrical Supervisor 21-Sep-17 18-Jun-19 n/a
2 Amal Dev NA Electrical Supervisor 25-Sep-18 9-Sep-17 n/a
3 Arun V Nair Electrical Supervisor 12-Oct-18 9-Sep-17 n/a
4 Jayakumar Narayanan Houskeeping Supervisor 15-Jun-19 20-Aug-18 n/a n/a
5 Sriram B HSE Officer 11-Oct-18 8-Sep-17
6 Mujeeb MP Senior Technician 22-Jun-17 15-Sep-18 n/a n/a n/a
7 Rehman ( Backup) Electrical Technician 22-Jun-17 15-Sep-18 n/a n/a n/a
8 Arif hassan ( Backup) Electrical Technician 8-Jul-19 20-Aug-18 n/a n/a n/a
9 Binu Sivan Kutty Electrical Technician 8-Jul-19 15-Sep-18 n/a n/a n/a
10 Rajan Pappu Senior Technician 14-Jul-17 15-Sep-18 n/a n/a n/a
11 Shaju PK Electrical Technician 22-Jun-17 15-Sep-18 n/a n/a n/a
12 Rajesh TR Electrical Technician 21-Sep-17 18-Jun-19 n/a n/a n/a
13 Rajesh P Electrical Technician 22-Jun-17 15-Sep-18 n/a n/a n/a
14 Shibu Kumar Senior Technician/ Cable Jointer n/a n/a n/a
15 Sarath Chandran Relay Technician n/a n/a n/a
16 Syed Gani AC Mechanic n/a n/a n/a
17 John KK Senior Technician 21-Sep-17 15-Sep-18 n/a n/a n/a
18 Anjaiah M Cleaner 11-Jul-17 n/a n/a n/a n/a
19 Chandraiah Cleaner 8-Jul-19 n/a n/a n/a n/a
20 Sathish Cleaner 21-Sep-17 n/a n/a n/a n/a
21 Nasib Light Vehicle Driver n/a n/a n/a n/a
22 Mohammed Mukthahil Light Vehicle Driver n/a n/a n/a n/a
23 Ali Umer Ali Light Vehicle Driver n/a n/a n/a n/a
24 Mohammed Light Vehicle Driver n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Signature:
Date: 5-Sep-17
g Courses
Incident Investigation & reporting
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Fire Warden
n/a
n/a
n/a
n/a
n/a
n/a
OSHAS 18001 & ISO 1400
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
P&M Operators training by DPC
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Dhofar Power Company S.A.O.C
31-Jul-19
31-Jul-19
31-Jul-19
Designation as per DCRP Card
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Foreman
Supervisor
HSE officer
E Training & Competence Matrix as on (5/September /2017)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Electrical Safety
&
PTW Procedures
Work at height
Validity:
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
*
31/07/2019
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a
5-Sep-17
Plant & Machinery Operator Card Valid till
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
*
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
CEP
CEP
CEP
CEP
Competent Supervisor (CS)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
9-Sep-17
9-Nov-17
1-Aug-18
13-Sep-17
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
n/a n/a n/a
Not Applicable
Dhofar Power Company S.A
Contractor: Shariakat Fanniya Omaniya LLC
Project Name : Emergency and Mainteance of the 33KV Systems (Other than the 33/11KV Primary Substations ) for Zone -3
Appendix L - HSE Training & Competence Matrix
DCRP Training Courses
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Sreekanth KB Electrical Engineer 21-Sep-17 20-Jun-19 n/a n/a n/a n/a
2 Anumanthan Sampath Lineman 12-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
3 Perumal Boovendiran Lineman 28-Oct-17 13-Nov-18 n/a n/a n/a n/a n/a n/a
4 Thiruvalluran Veergan Lineman 12-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
5 Jahirul Islam Lineman 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
6 Shekhar P P Lineman 16-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
7 Palni Murugan Lineman 16-Jul-17 20-Aug-18 n/a n/a n/a n/a n/a n/a
8 Ananth R Lineman 16-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
9 Gunasekaran Samannan Lineman 16-Jul-19 13-Nov-18 n/a n/a n/a n/a n/a n/a
10 Govindaraji Chennu Lineman 14-Jun-20 n/a n/a n/a n/a n/a n/a
11 Vartharaja Perumal Lineman 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
12 Anumanthan Vediyappan Lineman 12-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
13 Saravanan Ramasamy Lineman 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
14 Periamuthu Kumar Lineman/ Electrician 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
15 Perumal VG Lineman/ Electrician 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
16 Jose A D Lineman/ Electrician 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
17 Subi T Samuel Lineman/ Electrician 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
18 Kumar K Lineman/ Electrician 13-Oct-17 01 Aug 19 n/a n/a n/a n/a n/a n/a
19 C Muniyapillai Lineman/ Electrician 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
20 Sudalai Murugan Manuvel Lineman/ Electrician 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
21 Rajan P P Lineman/ Electrician n/a n/a n/a n/a n/a n/a
22 Velmurugan K Cable Jointer 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
23 Maharaja Velsamy Cable Jointer 16-Jul-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
24 Chennapa Ramesh Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
25 Anandan Raji Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
26 Mani T Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
27 M.D. All Amin Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
28 Lawerence Joseph Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
29 Vadivel Raja Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
30 Murugan Pandi Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
31 Pandiyan Murugesan Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
32 Suresh Samudi Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
33 Gopi Senkuttan Samaraj Helper 16-Jun-19 14-Jun-20 n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Signature:
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
31-Jul-19
31-Jul-19
Designation as per DCRP Card
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Helper
Helper
Foreman
Power Company S.A.O.C
n/a
months validity) Valid till *
16-Dec-17
16-Dec-17
16-Dec-17
16-Dec-17
16-Dec-17
16-Dec-17
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
& Competence Matrix as on (01/ September /2017)
DCRP License Grade:
PTW Procedures
Work at height( Usage of Wooden Poles )
till *
till *
Valid till *
CEP 20-Sep-17
n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
31-Jul-19 Helper 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
31-Jul-19 Helper 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
n/a n/a 16-Dec-17 n/a n/a n/a n/a n/a
nager/Project Manager
SUDERSHAN SINGH
1-Sep-17
Dhofar Power Compa
Contractor: Shariakat Fanniya Omaniya LLC
Project Name : CONSTRUCTION OF 2X20MVA, 33/11Kv PRIMARY SUBSTATION DESIGINATED AS JARZIZ
Appendix L - HSE Training & Competence M
DCRP Training Courses
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Rethinam Bose Project Manager 21-Sep-17 20-Jun-19 n/a
1 Shijil P Site Manager 21-Sep-17 20-Jun-19 n/a
2 V. Mathew Ele. Engineer 14-Sep-18 13-May-20 n/a n/a n/a n/a
3 RK Kannan QA/ QC Engineer 17-Jul-19 n/a n/a n/a n/a
4 Rajeev.s Hse Officer 17-Jul-19 8-Sep-17
5 Mallayya Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
6 Yesodharan Helper 17-Jul-19 n/a
7 Suhail miah Helper 17-Jul-19 n/a
8 Devan Prj.Manager(SP) 28-Mar-19 20-Jun-19 n/a n/a n/a n/a n/a
9 ThiruMurukan CvilEng(SP) 28-Mar-19 1-Nov-18 n/a n/a n/a n/a n/a
10 AndiVelakkadan Foreman 17-Jul-19 n/a n/a n/a n/a n/a n/a
11 Nazeer Ahamad Chargehand 17-Jul-19 n/a n/a n/a n/a n/a n/a
12 Abdul Mannan Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
13 Narasayya Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
14 SuryaReddy Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
15 Bachu Mia Carpenter 17-Jul-19 n/a n/a n/a n/a n/a n/a
16 Billu Ram Carpenter 17-Jul-19 n/a n/a n/a n/a n/a n/a
17 Dilwar Ahamad Helper n/a n/a n/a n/a n/a n/a
18 Gorang Chandra Carpenter 17-Jul-19 n/a n/a n/a n/a n/a n/a
19 Rahimuddin Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
20 SankaraAiha S.F 17-Jul-19 n/a n/a n/a n/a n/a n/a
21 Saju Mia S.F n/a n/a n/a n/a n/a n/a
22 Alibur Rahman S.F 17-Jul-19 n/a n/a n/a n/a n/a n/a
23 Mohamad Rayhan Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
24 Mohiyuddin S.F 17-Jul-19 n/a n/a n/a n/a n/a n/a
25 Kannai lal Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
26 Ranmeswar lal C.P 17-Jul-19 n/a n/a n/a n/a n/a n/a
27 Rathan saha Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
28 ZafarIqbql Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
29 Rojan Mia Helper n/a n/a n/a n/a n/a n/a
30 K. Narasimloo Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
31 Thanveer Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
32 Pichai S,F 17-Jul-19 n/a n/a n/a n/a n/a n/a
33 Vayyapuri S,F 17-Jul-19 n/a n/a n/a n/a n/a n/a
34 Sathya moorthi S,F 17-Jul-19 n/a n/a n/a n/a n/a n/a
35 vijayakanth S,F 17-Jul-19 n/a n/a n/a n/a n/a n/a
36 Shaik Musthafa Mason n/a n/a n/a n/a n/a n/a
37 Raisuddin Mason n/a n/a n/a n/a n/a n/a
38 Mehabur Rahman Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
39 Kamaluddin Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
40 Mallayya Mason 17-Jul-19 n/a n/a n/a n/a n/a n/a
41 Wajid Hussain Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
42 Mohamad Arif Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
43 Liaqat Ali Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
44 Mohamad shabbir Helper 17-Jul-19 n/a n/a n/a n/a n/a n/a
50 K Velayudhan Chandran Electrician 17-Jul-19 9-Sep-17 n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Signature:
Date: 5-Sep-17 5-Se
es
OSHAS 18001 & ISO 14001
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Defensive Driving
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a n/a
n/a
n/a
n/a
n/a
P&M Operators training by DPC
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
ofar Power Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19 Electrical Engineer
Lineman Medical Fitness Certificate (6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
ng & Competence Matrix as on (05/ SEPTEMBER /2017)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP License Grade:
Use of PPE
Electrical Safety
&
PTW Procedures
Work at height
Validity:
till *
31-Jul-19
till *
5-Sep-17
Competent Electrical Person (CEP)/
Competent Supervisor (CS) Authorization
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
20-Sep-17
20-Sep-17
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Dhofar Power Company
Contractor: Shariakat Fanniya Omaniya LLC
Project Name : CONSTRUCTION OF 2X20MVA, 33/11Kv PRIMARY SUBSTATION DESIGINATED AS KHOR AL QURM ( AWQAD - II )
Appendix L - HSE Training & Competence Matri
DCRP Training Courses
Defensive Driving
Risk Assessment
Designation
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 NK Murali Nair Projects Manager 11-Oct-18 20-Jun-19 n/a n/a
2 Midhun Narendranath QA/ QC Engineer 11-Oct-18 n/a n/a n/a n/a n/a
3 Prabhu Chandran Site Manager 22-Jun-17 20-Aug-18 n/a n/a n/a n/a
4 Cyril John Site Engineer 26-Aug-18 8-Sep-17 n/a n/a n/a n/a
5 Vishn P HSE Officer 7-Jul-19 n/a n/a
6 Jenish Arul HSE Officer 9-Sep-17 n/a
7 Devan Projects Manager 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
8 Kannan Civil Engineer n/a n/a n/a n/a n/a n/a n/a n/a
9 Alex Pandian Ele.Supervisor n/a n/a n/a n/a n/a n/a n/a
10 Govardhan Ram Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
11 Hridey Chandran Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
12 Balwinder Singh P & M Operator n/a n/a n/a n/a n/a n/a n/a n/a
13 Akthar Excava.Operator n/a n/a n/a n/a n/a n/a n/a n/a
14 Raja Lineman n/a n/a n/a n/a n/a n/a n/a n/a
15 Gunasekaran Lineman n/a n/a n/a n/a n/a n/a n/a n/a
16 Narasya Helper 14-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
17 Laxman K Helper 21-Sep-17 n/a n/a n/a n/a n/a n/a n/a n/a
18 Suhail Miah Helper 12-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
19 K Velayudhan Chandran Electrician n/a n/a n/a n/a n/a n/a n/a n/a
20 Masum Ahmed Electrician Helper n/a n/a n/a n/a n/a n/a n/a n/a
21 Md Imran Islam Din Foreman 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
22 Kannan Ayyaru Foreman 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
23 Razu Miah Manik Miah Carpenter 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
24 Mony Biswas Carpenter 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
25 Jalal Din Nawab Win Mason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
26 Asif Md Abdul Aziz Painter 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
27 Gnanasegaran MylvaganamMason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
28 Dulal Miah Carpenter n/a n/a n/a n/a n/a n/a n/a n/a
29 M.D Kamal Ahmed Helper 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
30 Mohammed Akbor Ali Helper 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
31 Md Nazrul Islam Mason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
32 Mitar Miah Soab Ali Mason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
33 Md Mohi Uddin Steel Fixer 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
34 Muhammed Yousuf Steel Fixer 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
35 Arif Hussain Steel Fixer 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
Narasaya Narsimloo
36 Mason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
Kodipalli
37 Olak Dev Carpenter n/a n/a n/a n/a n/a n/a n/a n/a
38 Shahbaz Ahmed Md Khan Mason 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
39 Mirza MD Ashraf Steel Fixer 28-Mar-19 n/a n/a n/a n/a n/a n/a n/a n/a
40 Bulu ram Carpenter n/a n/a n/a n/a n/a n/a n/a n/a
41 Monu deb Helper n/a n/a n/a n/a n/a n/a n/a n/a
42 Nand lal Steel Fixer n/a n/a n/a n/a n/a n/a n/a n/a
43 Sujit Deb Carpenter n/a n/a n/a n/a n/a n/a n/a n/a
Mahtabur rahman monir
44 Helper n/a n/a n/a n/a n/a n/a n/a n/a
ali
45 Jamal ahmad Steel Fixer n/a n/a n/a n/a n/a n/a n/a n/a
46 Ali hussan Steel Fixer n/a n/a n/a n/a n/a n/a n/a n/a
47 MD rahim uddin talukder Helper n/a n/a n/a n/a n/a n/a n/a n/a
48 Sajlu miah Mason n/a n/a n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Signature:
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
Designation as per DCRP Card
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
r Power Company S.A.O.C
Site Engineer
Lineman Medical Fitness Certificate (6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
& Competence Matrix as on (05/ SEPTEMBER/2017)
DCRP License Grade:
till *
31-Jul-19
till *
CEP
CEP
Project Manager
PRABHU CHANDRAN
5-Sep-17
Competent Electrical Person (CEP)/
Competent Supervisor (CS) Authorization
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
21-Jun-17
13-Sep-17
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Dhofar Power Company S
Project Name : Unit Rate Contract and ABP Jobs
Contractor: Shariakat Fanniya Omaniya LLC
Appendix L - HSE Training & Competence Matrix
DCRP Training Courses
Defensive Driving
Risk Assessment
Designation
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Manish Electrical Engineer 5-Jun-18 20-Jun-19 n/a n/a n/a n/a
2 Pg Unni Krishnan Lineman 29-Aug-18 9-Sep-17 n/a n/a n/a n/a n/a
3 Madhavan Perumal Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a n/a n/a
4 Kaibul Hossain Helper 12-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
5 Chandramouli Helper 12-Jul-17 n/a n/a n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
n/a
n/a
n/a
Project Manager
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
31-Jul-19
SUDERSHAN SINGH
Power Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
9-Jun-17
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
Competence Matrix as on (05/ SEPTEMVER /2017)
DCRP License Grade:
Scheduled
PTW Procedures
Work at height
Validity:
till *
31-Jul-19
till *
n/a
n/a
n/a
Valid till *
8-Sep-17
21-Jun-18
Dhofar Power Co
Contractor: Shariakat Fanniya Omaniya LLC
Project Name : CONSTRUCTION OF 2X20MVA, 33/11Kv PRIMARY SUBSTATION DESIGINATED AS AL SAHANOOTH -II
Appendix L - HSE Training & Com
DCRP Training Courses
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Sujith Kumar Project Manager 2-Feb-18 29-Jan-19 n/a
2 Sameer Samad Shaikh Site Manager 28-Oct-17 20-Jun-19 n/a
3 Manikandan HSE Officer 14-Oct-17 29-Jan-18
4 Midhun Narendranath QA/ QC Engineer 11-Oct-18 n/a n/a n/a
5 Govindan Murugan Lineman 16-Jun-19 14-Jun-20 n/a n/a n/a n/a
6 Jokkinraja Lineman 16-Jun-19 14-Jun-20 n/a n/a n/a n/a
7 Anbalagan Lineman 16-Jun-19 14-Jun-20 n/a n/a n/a n/a
8 Fernandes Remet Juje Electrician 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a
9 Easter Sunil Electrician 14-Jul-17 20-Aug-18 n/a n/a n/a n/a n/a
10 Radhakrishnan Electrican Helper 1-Feb-18 n/a n/a n/a n/a n/a n/a
11 Remesh odiyanna Electrician 13-Oct-17 13-Nov-18 n/a n/a n/a n/a n/a
12 Prasad PS Welder 13-Oct-17 n/a n/a n/a n/a n/a n/a
13 Chavhan Welder 5-May-19 n/a n/a n/a n/a n/a n/a
14 Dhanjayan Welder 5-May-19 n/a n/a n/a n/a n/a n/a
15 Radhakrishnan Electrician 12-Jul-17 13-Nov-18 n/a n/a n/a n/a n/a
16 Shyam Lal Jaiswar Lineman 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a
17 Parasuramalu Helper n/a n/a n/a n/a n/a n/a
18 Kumaresan Electrician n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Defensive Driving
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a n/a n/a
P&M Operators training by DPC
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
31-Jul-19
Designation as per DCRP Card
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Dhofar Power Company S.A.O.C
Lineman
Lineman
Lineman Medical Fitness Certificate (6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
SE Training & Competence Matrix as on (05/SEP/2017)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
n/a
n/a
n/a
DCRP License Grade:
Chemical awareness
Environmental awareness
till *
n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a
Manager/Project Manager
SUJIT KUMAR
1-Sep-17
Plant & Machinery Operator Card Valid
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
till *
CS
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
CEP
Competent Supervisor (CS)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
12-Jul-17
27-Oct-17
n/a n/a n/a
n/a n/a n/a
Not Applicable
Dhofar Power Company S
Project Name : Load/ Non Load Network Improvement Works 2017
Contractor: Shariakat Fanniya Omaniya LLC
Appendix L - HSE Training & Competence Ma
DCRP Training Courses
Defensive Driving
Risk Assessment
Designation
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Sudan Dhyanoba Kendre Electrical Engineer 2-Mar-19 n/a n/a n/a n/a
2 Shajan Electrical Supervisor 8-Nov-18 20-Jun-19 n/a n/a n/a n/a
3 Balwinder Signh Electrician 14-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a
4 Suresh kumar MS Electrician 14-Jul-17 15-Sep-18 n/a n/a n/a n/a n/a n/a
5 Biju Alex Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a n/a
66 Ravindeeran P Electrician 4-Jun-18 14-May-19 n/a n/a n/a n/a n/a n/a
7 Wahab Khan P & M Operator n/a n/a n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Project Manager
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
SUDHERSHAN SINGH
Power Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
ng & Competence Matrix as on (01/ JULY/2017)
n/a
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
n/a
DCRP License Grade:
Scheduled
PTW Procedures
Work at height
Validity:
till *
31-Jul-19
till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
Dhofar Power Compa
Contractor: Shariakat Fanniya Omaniya LLC and Shanfari and Partners LLC
Appendix L - HSE Training & Competenc
DCRP Training Courses
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Sreekanth KB Electrical Engineer 21-Sep-17 20-Jun-19 n/a n/a n/a
2 Vivan Mathew Site Engineer 14-Sep-14 13-May-20 n/a n/a n/a n/a
3 Balvinder Singh JCB Operator 3-Mar-19 n/a n/a n/a n/a
4 Hridey Chandran Helper 16-Jul-17 n/a n/a n/a n/a n/a n/a
5 Krishnasami P & M Operator 9-May-19 n/a n/a n/a n/a n/a n/a
6 Faizal P & M Operator 9-May-19 n/a n/a n/a n/a n/a n/a
7 Akthar P & M Operator 9-May-19 n/a n/a n/a n/a n/a n/a
8 Balwinder Singh P & M Operator 9-May-19 n/a n/a n/a n/a n/a n/a
9 Govindaraj Lineman 13-May-20 n/a n/a n/a n/a n/a
10 Parasuram Helper n/a n/a n/a n/a n/a n/a
11 Kannan Civil Engineer 12-Jul-19 n/a n/a n/a n/a n/a n/a
12 KANNAN AYYARU Foreman 31-Mar-19 n/a n/a n/a n/a n/a n/a
13 SHAHBAZ AHMED MD KHAN Helper 31-Mar-19 n/a n/a n/a n/a n/a n/a
14 RAZU MIAH MANIK MIAH Carpenter 31-Mar-19 n/a n/a n/a n/a n/a n/a
15 ASIF MD ABDUL AZIZ Painter 31-Mar-19 n/a n/a n/a n/a n/a n/a
16 GNANASEGARAN MYLVAGANAM Mason 31-Mar-19 n/a n/a n/a n/a n/a n/a
17 POTAL DAS Carpenter 31-Mar-19 n/a n/a n/a n/a n/a n/a
18 M.D KAMAL AHMED Helper 31-Mar-19 n/a n/a n/a n/a n/a n/a
19 MIRZA MOHAMMES ASHRAF Steel Fixer 31-Mar-19 n/a n/a n/a n/a n/a n/a
20 ARIF HUSSEIN Steel Fixer 31-Mar-19 n/a n/a n/a n/a n/a n/a
21 DULAL MIAH Carpenter n/a n/a n/a n/a n/a n/a
22 SUJITH DEB Carpenter n/a n/a n/a n/a n/a n/a
23 BULLOO RAM Carpenter n/a n/a n/a n/a n/a n/a
24 OLAK DEB Carpenter n/a n/a n/a n/a n/a n/a
25 BACHCHU MIAH MD FARUK MIAH Carpenter n/a n/a n/a n/a n/a n/a
26 ABDUL AZIZ KHALID Mason n/a n/a n/a n/a n/a n/a
27 KUMAWAT RAMESHWAR LAL Mason n/a n/a n/a n/a n/a n/a
28 NORULHOQUE Mason n/a n/a n/a n/a n/a n/a
29 TANVEER HUSSAIN MD SHARIF Mason n/a n/a n/a n/a n/a n/a
30 KANAI LAL DEB Mason n/a n/a n/a n/a n/a n/a
31 SHYBUR RAHMAN Mason n/a n/a n/a n/a n/a n/a
32 ABDUL HAMID NAZIR ALI Mason n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Defensive Driving
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
P&M Operators training by DPC
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
DCRP Card -Valid till *
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31-Jul-19
far Power Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Foreman
Lineman Medical Fitness Certificate (6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
aining & Competence Matrix as on (17/ MAY /2017)
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
n/a
n/a
DCRP License Grade:
PTW Procedures
Work at height
Excavation and cable laying
Safe Usage of ladders
Road safety
Chemical awareness
Environmental awareness
Banksmen and riggers awareness
till *
31-Jul-19
till *
Manager/Project Manager
NK MURALI NAIR
17-05-2017
Competent Electrical Person (CEP)/
Competent Supervisor (CS) Authorization
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Valid till *
20-Sep-17
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Dhofar Power Company S.
Contractor: Shariakat Fanniya Omaniya LLC
Appendix L - HSE Training & Competence Matri
DCRP Training Courses
Defensive Driving
validity) valid till *
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Manish Electrical Engineer 5-Jun-18 20-Jun-19 n/a n/a n/a n/a
2 Rajendra Prasad Cable Jointer 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a
3 Pg Unni Krishnan Lineman 29-Aug-18 9-Sep-17 n/a n/a n/a n/a n/a
4 Madhavan Perumal Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
28-Aug-17
DCRP Card -Valid till *
n/a
n/a
31-Jul-19
31-Jul-19
SUDERSHAN SINGH
wer Company S.A.O.C
n/a
n/a
n/a
n/a
n/a
months validity) Valid till *
9-Jun-17
Competence Matrix as on (28/ AUGUST /2017)
n/a
n/a
Cable Jointer Certificate - Valid till *
n/a
n/a
DCRP License Grade:
Scheduled
PTW Procedures
Work at height
Excavation and cable laying
Safe Usage of ladders
Road safety
Chemical awareness
Environmental awareness
Banksmen and riggers awareness
till *
31-Jul-19
till *
Valid till *
8-Sep-17
Dhofar Power Company S.A.O.C
Contractor: Shariakat Fanniya Omaniya LLC DCRP License Grade: A &
Appendix L - HSE Training & Competence Matrix as on (02/ AUGUST /2017)
DCRP Training Courses Internal Train
Defensive Driving
validity) valid till *
PTW Procedures
Risk Assessment
Designation
Electrical Safety
First Aid (2 years validity)
Manage Safety
HSE Induction
Serial No.
Work at height
Emp. No
Name
Valid till *
1 Manish Electrical Engineer 5-Jun-18 20-Jun-19 n/a n/a n/a n/a n/a n/a n/a n/a
2 Ajith Kumar Electrician 21-Sep-17 20-Jun-19 n/a n/a n/a n/a n/a n/a 31-Jul-19 Electrician n/a n/a
3 Muralidharan Pillai Electrician 16-Jul-17 1-Nov-18 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
4 Ravi Mani Electrician n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
5 Ravinder P Electrician Helper n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
6 Romeo Electrician Helper 13-Oct-17 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
7 Venkatapathi Electrician Helper n/a n/a n/a n/a
n/a n/a n/a n/a
Note: 1. Contractor needs to ensure all employees under the contract shall comply with the trainings as per DCRP HSE requirements.
2. Updated training matrix of all employees under the contract shall be submitted to DPC every month.
3. * - Expiry date shall be mentioned in training matrix.
Road safety
Chemical awareness
Environmental awareness
Banksmen and riggers awareness
n/a
n/a
n/a
n/a
till *
31-Jul-19
n/a
n/a
n/a
n/a
till *
n/a
n/a
n/a
n/a
Valid till *
Contractor: Shariakat Fanniya Omaniya LLC
Appendix L - HSE Training & Competence Matrix as on (28/AUGUST /2017)
DCRP Training Courses
Manage Safety
HSE Induction
Serial No.
Emp. No
Name
Valid till *
1 Sameer Samad Shaikh Project Manager n/a n/a n/a
2 Alex Pandian Site Electrical Engineer n/a n/a n/a
3 Vishnu HSE Officer n/a
4 Rajendra Prasad Cable Jointer n/a n/a n/a n/a 31-Jul-19
5 Pg Unni Krishnan Lineman n/a n/a n/a n/a
6 Shyam Lal Jaiswar Lineman n/a n/a n/a 31-Jul-19
7 A Sampath Lineman n/a n/a n/a n/a n/a n/a
8 A. Vediyappan Lineman n/a n/a n/a n/a n/a n/a
9 ChandranSekaran Lineman n/a n/a n/a n/a n/a n/a
10 Shekar PP Lineman n/a n/a n/a n/a n/a n/a
11 Madhavan Perumal Helper n/a n/a n/a n/a n/a 31-Jul-19
12 Kaibul Hossain Helper n/a n/a n/a n/a n/a n/a
13 Narasya Helper n/a n/a n/a n/a n/a n/a
14 Chandraiah Helper n/a n/a n/a n/a n/a 31-Jul-19
15 Nuruddin bablu Fabricator n/a n/a n/a n/a n/a n/a
16 Abdul ahad Mia Helper n/a n/a n/a n/a n/a n/a
17 Suhail Miah Helper n/a n/a n/a n/a n/a n/a
18 Mallaya Helper n/a n/a n/a n/a n/a n/a
19 Laxman K Helper n/a n/a n/a n/a n/a 31-Jul-19
20 Ravinder P Helper n/a n/a n/a n/a n/a n/a
21 Abdul Gaffar Helper n/a n/a n/a n/a n/a n/a
22 Binu Driver n/a n/a n/a n/a n/a n/a
23 Mahad Driver n/a n/a n/a n/a n/a n/a
24 Akthar P & M Operator n/a n/a n/a n/a n/a n/a
25 Balwinder Singh P & M Operator n/a n/a n/a n/a n/a n/a
Colour Coding: Course/Training Completed Not Completed
8/AUGUST /2017)
Designation as per DCRP Card
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Helper
Helper
Cable Jointer
AC062/2016
Emergency response and evacuation
Electrical Safety
PTW Procedures
Work at height
Excavation and cable laying
Safe Usage of ladders
FR COVERALL ISSUED
Designation
Serial No.
Name
6 Shekhar P P Lineman
8 Ananth R Lineman
Page 71 of 76
12 Anumanthan Vediyappan Lineman
26 Mani T Helper
Page 72 of 76
28 Lawerence Joseph Helper
Page 73 of 76
SAFETY GOGLES ISSUED ( CLEAR AND
BLACK )
HI VIS JACKET
Page 74 of 76
LINE MAN TOOL BAG
33KV Systems (Other than the 33/11KV Primary Substations ) for Zone -3
DCRP License Grade: A
SIGNATURE
Page 75 of 76
Page 76 of 76