c. Installation Details.
d. Connections by other services.
e. Wiring and Control Diagrams.
f. Accessories Available Indicating Those Included.
g. System Diagrams.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General

1. The pipework shall be as specified in Section 15060. Seamless black steel,


schedule 40.

2. Condensate runs from drip trays under cooling coils shall be of pressure
UPVC when concealed above false ceiling.

B. Valves shall be as specified in Section 15100.

C. Insulation shall be complete with vapor barrier as specified in Section 15250.

2.2 PUMPS

A. General

1. As specified in Section 15140.

2.03 CHEMICAL FEEDER POT

The unit shall be of a quality construction with dished ends for safe operation at pressure
and shall be supplied complete with all valves and funnels all factory assembled. The feeder unit
shall be supplied with a stand and shall be pressure tested with a certificate from the factory.

2.04 EXPANSION TANK

1. Provide compression tank ( expansion tank) as shown on the drawings, constructed for
930 Kpa working pressure for chilled water system and 1500 KPA for condenser water
system, stamped with U symbol and supplied with National Board From U-1
denoting compliance with ASME boiler and pressure vessel code. Provide fittings and
connections to related equipment in accordance with tanks manufacturers
recommendations. Tank shall be insulated externally. Insulation shall be same type
used for exposed ductwork, specified hereinbefore. Tank diaphragm shall withstand 10
deg. C up to 120 deg C suitable for heating water systems.

2. Refer to drawings for tank support.

2.5 CHILLED & CONDENSER WATER TREATMENT

Contractor shall assign a chemical specialist to execute all chemical treatment works subject