For 8 (eight) hours operation in a day, volume of water required for two and half hours
262
storage, = x 2.5 = 81.875 M3 , Say 82 M3
8
Inner diameter of dry sump for installation of 2 (two) number of Centrifugal Pumps
= 4.0 meters. Assuming thickness of inner circular partition wall = 150 mm and
82
Depth of water = = 3.0 meters. Provide 3.70 meters depth of water.
27.33
Storage capacity of the wet sump(excluding dead storage) = 27.33 x (3.7-0.65) = 83.36 M3
> 82 M3 (O.K)
Overall depth of well including 0.5 meter free board = 3.70 + 0.50 = 4.20 meters
Dead Load:
196.5
ii) Wt. Roof Treatment = 0.05 = 78.5 KN (40 mm thick roof treatment & 10 mm
0.125
ceiling plaster etc.)
iii) Wt. of Roof Beam and 250 mm RSJ = 2.25257.24 (0.375-.125)+ 2.25257.1
(0.375-.125)+2.25257.24 (0.425-.125)+ 2.25257.1 (0.425-.125) +2.7=102 KN
v) Wt. Floor Slab(less opening) = (7.85 8 0.15 25 ) (3. 4 2 0.15 25) = 210 KN
Page 1 of 25
vi) Wt. of chhajas =3 1.2.09.7525 + 1 2.09125=11 KN
ix) Wt. of RCC inner wall of Pump Sump = (4.32 42 ) 4.2 25 = 206 KN
4
x) Self wt. of foundation slab = 7.952 0.55 25 + 4 (9.32 7.952 )
4
0.475 25 = 900 KN
xi) Floor finish, plaster, door, windows, pumps, motors, piping, valves etc. = 10.00 KN
xii) Wt. of 8no.RCC Columns of Pump House = 8 0.3 0.3 4.4 25+8 0.3 0.3 4.2
25 8 0.3 0.25 4.2 25 = 92.4 KN
xiii) Live load @ 5 KN/M2 on Electrical floor = [(6.9 7) (3. 4 2)] 5 = 208 KN
(Less opening)
xiv) Live load @ 1 KN/M2 on Roof slab = 7.85 8 1.5 = 94 KN
(Less opening)
xv) Wt. of soil over the extended part of base slab = (9.32 7.952 ) 3.7 18 = 1218.3 KN
4
xvi) Wt of parapet wall on roof =2 (7.85 + 8) .125 .3 20 = 24
----------------------------------------------------
Total vertical Load = 4555 KN
4555
Factor of safety = = 2887 = 1.58 > 1.2 (Hence safe)
Case 1: Tank is empty and outside saturated soil (assuming total submergence of soil)
Intensity of saturated soil pressure at the base of the tank wall, Assuming phi=30 degree
Page 2 of 25
p = [Yw H + Ka (Ys- Yw) H] = (10 3.7) + 1/3 (18-10) 3.7 = 35 + 9.33 = 46.8 KN/M2
Thickness of outer circular wall, t = (30H +50) = (30 3.7 + 50) = 161 mm
2 3.72
= = 7.5
7.3 0.25
2
For this range of ,maximum hooptension occurs at 0.6H from top
Thickness of wall at this level =260mm
Now,
2 3.72
= = 6.7
7.3 0.28
2
Max. Hoop tension in cylindrical walls fixed at base and free at top for = 6.7 at a depth
2 2
of 0.6 H from top is given by for = 8 , K1= (+) 0.575 and for = 6, K1 = (+) 0.514
2
Hence, for the value of = 6.7, K1 = 0.535
Maximum hoop tension at 0.6 x H ie. at 0.6 x 3.7 = 2.22 meters from top of water surface
7.3
So, Tmax = K1 p = 0.535 46.8 = 91.45 KN/M
2 2
Area of steel (for un cracked section) = ( 91.45 1000 )/130 = 703 mm2
Provide 10 mm dia circular hoop reinforcement @ 200 mm c/c at both face of the wall.
Maximum hoop tension at 0.4 x H ie. at 0.4 x 3.7 = 1.48 meters from top of water surface
7.3
So, Tmax = K1 p = 0.441 46.8 = 75 KN/M
2 2
Provide 10 mm dia circular hoop reinforcement @ 250 mm c/c at both face of the wall.
Page 3 of 25
Area of steel provided = 628 mm2 > 576 mm2 (OK), Ast min required =312mm2 on both
faces
Maximum BM ( which is ve i.e. tension on the inner face of the wall ) occurs at the base.
Moment coefficient in cylindrical walls fixed at base and free at top from the table of
2
= 6, K3 = (-) 0.197
2
For = 5, K2 = (-) 0.213
2
By interpolation, Shear coefficient for = 5.77, from table of I.S code is K3 = 0.2
Weight of the wall per meter of periphery = 1 0.25 4.2 25 = 26.25 KN/Metre
Page 4 of 25
12.5 106
Effective depth, d = = 93 mm
1000 1.466
Over all depth = t = 93 + 40 = 133 mm < 300 mm (OK) (Effective cover = 40 mm)
12.5 106
Now Vertical reinforcement = = 385 mm2
130 0.89 280
Shear consideration:
Max. S.F. at the junction of vertical wall with base slab at the edge = Vmax = 33.62 KN
Nominal Shear stress = (33.62 1000)/(1000 300) = 0.11 N/mm2 < 0.28 N/mm2 (O.K)
predominant.
2
For upto 12, cantilever action at or 1 (one) meter whichever is higher will occur.
3
3.7
Here, = = 1.233 M or 1 M whichever is higher
3 3
Hence, cantilever action will take place at 1.233 meters from bottom of vertical wall
Maximum ring tension at that level, T = p x (H -1.233)
2
Here, saturated soil pressure at (H-1.233) Metre depth from bottom of the wall, considering
1
p' = 10 (2.7 1.233) + (18 10) (3.7 1.233) = 13.33 + 6.22 = 21.24 KN/M2
3
7.3
Max. Hoop Tension , T = 21.24 = 77.53 KN/M
2
Page 5 of 25
1 3.71.233
Max. B.M. at (H 1.233) Metre depth = 21.24 (3.7 1.233) ( )
2 3
= 21.54 KNM/M
Provide overall thickness of outer wall the C.W.R = 325 mm at bottom and 200 mm at top
Effective cover = 40 mm
Effective depth of outer wall at 1.233 M above floor level = 283 40 = 243 mm
Weight of the wall per meter of periphery = 1 0.25 4.2 25 = 26.25 KN/Metre
6
Now, = Stress in concrete due to Bending Tension = 2
77.53 1000
= = 0.274 N/mm2 < 1.5 N/mm2 (OK)
1000 283
1.52 0.274
2
+
1.5
=
2
+
1.5
= 0.94 < 1 (Hence safe)
77.531000
Ast for ring Tension at (H- 1.233) M depth = = = 596.4 mm2
130
Provide 10 mm horizontal rings @ 250 mm c/c upto 1.20 M from bottom on both face
Ast provided = 628 mm2 > 596.4 mm2
Vertical reinforcement Ast =
21.54 106
Ast = [ = 283 40 = 243 ]
130 0.861 (28340)
= 792 mm2
Page 6 of 25
Case 2 : Tank is full of water and outside there is no soil
2 3.72
= = 6.7
7.3 0.28
From table, the maximum hoop tension occurs at 0.6 H meter height of the tank wall
2
For = 6.7, K1 = Coeff. of Hoop tension = (+)0.535
2
For = 5.77, K2 = Coeff. of B.M. = (-)0.0192
2
For = 5.77, K3 = Coefficient of SF = 0.199
Provide 10 mm dia @ 280mm c/c hoop steel circular bars at both face of wall
Provide 10 mm dia vertical reinforcement @ 200 mm c/c at the inner face of the wall
Page 7 of 25
Shear consideration:
Nominal shear stress, Tv = (26.78 1000)/(1000 325) = 0.08 N/mm2 < 0.28 N/mm2 (OK)
Earthquake load
Zone-III, Importance factor =1.5, Response reduction factor =5, depth of member =7.24m
With infill panel and medum soil condition , Sa/g =1.503,Ah =.036
50 3.952
centre = (-) = (-) 98 KNM/M (Water face)
8
Page 8 of 25
50 3.952
Maximum radial Moment at edge = (+) qR^2/16=(+) = (+) 49 KNM/M (Opposite
16
water face)
6 6 50 106
Uncracked D = = = 542 mm say 550
2 1000
Effective depth required for cracked section at opposite water face, for M20 concrete and
Fe415 steel, =190N/MM2, =1.466
49 106
d (required) = 1.466 1000= 182 mm
Case II Considering joint as fixed
Maximum circumferential Moment at centre = (-) qR^2/16 = Maximum radial Moment at
50 3.952
centre = (-) = (-) 49 KNM/M (Water face)
16
50 3.952
Maximum radial Moment at edge = (+) qR^2/8=(+) = (+) 98 KNM/M (Opposite
8
water face)
6 6 49 106
Uncracked D = = = 383 mm
2 1000
Effective depth required for cracked section at opposite water face, for M20 concrete and
Fe415 steel, =190N/MM2, =1.466
98 106
d (required) = 1.466 1000= 259 mm
Effective cover = 40 mm
98 106
Area of steel at top, Ast = 130 0.861510 = 1717 mm2
Provide 16 mm dia bars @ 110 mm c/c in the form of mesh at top layer.=1828MM2 on top
face bothways
Minimum area of steel Ast = (0.35/100) x 1000 x 250 = 875 mm2 < 1828 mm2 ,okk
49 3.952
Maximum radial Moment at edge from both case = (+) qR^2/8=(+) = (+) 98
8
KNM/M (Opposite water face)
Ast required= 98x10^6/(.861 x510 x190) =1174MM2
Provide 16 mm dia bars @ 150 mm c/c in the form of mesh at bottom layer.
5.Design of circular partition wall between Wet Sump and Dry Sump
Page 9 of 25
Case I : - Wet Sump full of water and dry sump is empty
For a deep water tank with small diameter, the forces carried by hoop action action is much
more predominant using carpenter method,
FwH^3=.0079.813.7^3=3.48KNm
2
For = 21.2, K3 = .127(max)
Maximum Shear force at base of the wall = K3 w H^2 = 0.127 10 3.72 = 17.4 KN
Design:
Page 10 of 25
Effective depth, d = 150 40 = 110 mm
Provide 10 mm dia bars @ 250 mm c/c vertically. Ast provided = 392.75 mm2 > 282 mm2
(OK)
Shear Consideration
Effective Span
i) End Span
Thickness of the floor slab adopted = 150 mm (as it is cover slab of CWR)
Le = 2.436 M
Page 11 of 25
The floor slab is designed as one way slab
Le = 2.75 M
From the limit state of serviceability, effective depth is given by = = 26 for
continuous slab
and = 20 for simply supported beam.
1
For end span,
= 2 (26 + 20) = 23
For balanced section percentage of steel for M25 grade concrete and Fe-415 grade of
Steel = Pt = 0.35%
From graph modification factor = 1.2 for Fe 415 grade steel and pt = 0.35%
3.15 1000
For end span = d = 23 1.2 = = 100.96 101
23 1.2
2.17 1000
For middle span d = 26 1.2 = = 69.55 70
26 1.2
Provide overall thickness of floor slab = 150 mm considering extra cover for water
vapour.
8
Hence, effective depth = 150 25 - 2 = 121 mm > 101 mm (OK)
Grade of concrete = M 25
Ru = 0.36
(1 0.416
)
Load calculation :
Page 12 of 25
Dead Load (per square metre of floor slab):
ii) Weight of floor finish and ceiling plaster = 0.05 25 = 1.25 KN/M2
(40 mm + 10 mm = 50 mm)
__________________
Total = 5 KN/M2
Calculation of moment:
2 2
Moment at the centre = M1c = +
12 10
2 2
Moment at the centre = M2c = +
24 12
Page 13 of 25
11.0 106
Effective depth = = 3.456 1000 = 58
But effective depth as per limit state of servicibility = 150 25 4 = 121 mm and
Design of Reinforcement:
1) End Span
0.5 4.6
Area of steel Astc1 =
[1 1 2 ]
0.525 4.68.11106
= 1000 121 [1 1 251000(121)2 ]
415
= 191 mm2
b) At support
4.69.35106
Area of steel at support = Asts1 = 3644.58 [1 1 251000(121)2 ]
Page 14 of 25
Hence 8 mm dia bar are to be provided @ 200 c/c
2) Middle Span:
4.67.1106
Area of steel at centre = Astc2 = 3644.58 [1 1 251000(121)2 ]
= 166 mm2
Provide 8 mm dia @ 200 mm c/c. Ast provided = 251.35 mm2 > 247.83 mm2
At interior support
4.611.0106
Asts2 = 3644.58 [1 1 251000(121)2 ]
= 261 mm2
Provide 8 mm dia @ 200 mm c/c. Ast provided = 251.35 mm2 and additionl 8mm
dia 400mm c/c total bar provided =375mm
Distribution reinforcement:
0.12
Astd = 1000 150 = 180 mm2
100
Provide 8 mm dia bars @ 250 mm c/c as distribution steel (along the longer
direction).
= 2 9.45 = 16.85 KN
Page 15 of 25
25.271000
Nominal shear stress = 1000121
= 0.209 N/mm2 < 0.3 N/mm2
This is less than permissible shear stress = 0.3 N/mm2 (Hence Safe)
Effective Span
Corner span(S1)
Thickness of the floor slab adopted = 125 mm, effective depth d=125-25=100mm
assume
2.35
= 2.32 = 1.01 < 2
Edge Span1(S2)
Lex = 1.924 M
Page 16 of 25
2.17
= 1.924 = < 1.13
Edge Span2(S3)
Lex = 2.35 M
Centre span(S4)
Lex =1.924 M
2.45
= 1.924 = 1.27 < 2
Page 17 of 25
So effective depth required for corner slab considering serviceability requirement
=2320/(1.6*20)=72.5mm
Similarly for edge slab effective depth =2320/(1.6*23)=63mm
For central span depth required =1924/(1.6*26)=46
Considering 25mm effective cover and 8mm dia bar total depth D =72.5+25+4=101.5
hence provided 125mm total depth of slab.
Load calculation :
Moment Calculation:
Effective length,m S1 S2 S3 S4
PANEL S1 S2 S3 S4
Effective short
span,m 2.195 1.949 2.375 1.949
Nature of moment - + - + - + - +
Short Coeff 0.052 0.041 0.046 0.030 0.034 0.034 0.048 0.034
span
Moment 2.214 1.732 1.534 1.002 1.683 1.668 1.622 1.137
Long Coeff 0.047 0.035 0.037 0.028 0.037 0.028 0.032 0.024
span
Moment 1.996 1.486 1.239 0.937 1.839 1.392 1.071 0.803
Page 18 of 25
Area of steel Ast required for maximum moment
0.5 4.6
= [1 1 ]
2
= 61mm2
Minimum reinforcement required as per code =150mm2
Provide 8mm dia bars @ 200mm C/c on bothways in middle strip.
Development length required for Fe415 and M25 concrete and 8mm dia bar =322mm
3.3125 0.752
BM at support M = 2
= 2
= 0.932 KNM/M
Page 19 of 25
Mu = 1.5 0.932 = 1.397 KNM
750
= 7 1.4 or , d = 71.4
= 7 1.4
= 76.5 mm
8
Overall depth = (76.5 + 15 + 2) = 95.5 mm < 100 mm (OK)
1.397 106
Effective depth = = 3.456 1000 = 23.2 mm < 81 mm (OK)
0.5 4.6
Ast = [1 1 2 ]
0.525 4.61.397106
or, Ast = [1 1 ] 1000 81
415 251000812
= 2439.75 [1 (1 0.0522)]
Transverse reinforcement:
0.12 0.12
Ast = = 1000 81 = 97.2 mm2
100 100
Page 20 of 25
Ast provided = 201 mm2 > 97.2 mm2 (OK)
13971000
1.3 + = 1.3 3726.50
+ 204 = 691.35 mm
4.825 12
BM at support M = = = 2.4125 KNM/M
2 2
Page 21 of 25
Minimum thickness of slab is based on servicibility limit state criteria of deflection.
1000
= 7 1.4 or , d = 71.4
= 7 1.4
= 102 mm
8
Overall depth = (102 + 15 + 2) = 121 mm < 125 mm (OK)
3.6 106
Effective depth = = 3.456 1000 = 32.3 mm <106 mm (OK)
0.5 4.6
Ast = [1 1 2 ]
0.525 4.63.6106
or, Ast = [1 1 2510001062 ] 1000 106
415
= 962
0.15
Ast (minimum) = 1000 90 = 135 mm2
100
Transverse reinforcement:
0.12 0.12
Ast = = 1000 106 = 127 mm2
100 100
50 1000
Spacing = = 393 mm provide250 mm
127
Page 22 of 25
Check for shear:
36001000
1.3 + = 1.3 4800
+ 204 = 1179 mm
Since load is small design it as cantilever beam such that no strut action can take place
Page 23 of 25
From graph for Fe 415 grade of steel, modification factor = 1.4
350
= 7 1.4 or , d = 71.4
= 7 1.4
= 36 mm
3.75 106
Effective depth = = 3.456 300 = 60 mm <250 mm (OK)
0.5 4.6
Ast = [1 1 2 ]
0.525 4.63.75106
or, Ast = [1 1 253002502 ] 1000 250
415
= 402
0.15
Ast (minimum) = 300 250 = 112 mm2
100
Transverse reinforcement:
0.12 0.12
Ast = = 300 250 = 90 mm2
100 100
Page 24 of 25
Provide tension reinforcement an insertion of 600mm inside column by bending it through 90
degrees
Page 25 of 25