MATERIALES

ITM DESIGNACION UNIDAD

1 PISTON NEUMATICO pza


2 VALVULA NEUMATICA MFH-5-1/4 pza
3 VALVULA ESTRANGULADORA DE CAUDAL UNIDIRECCIONAL pza
4 SENSOR DE PROXIMIDAD pza
5 PULSADOR INDUSTRIAL pza
6 TEMPORIZADOR DE 10s 220VAC pza
7 PORTA TEMPORIZADOR pza
8 RELE DE 220VAC OMRON pza
9 PORTA RELE pza
10 MANGUERA NEUMATICA TRANSPARENTE DE 6mm mts
11 CINTA AISLANTE 3M pza
12 FUENTE 220VAC A 24VDC pza
13 TRANSFORMADOR 220VAC A 110VDC pza
14 LLAVE TERMOMAGNETICA BIPOLAR pza
15 CABLE 3 X18 AWG pza
16 CABLE 18AWG mts
17 RIEL DIN mts
18 MULTIMETRO pza
19 ESPRAY pza
20 ENCHUFE 220 pza
21 SOLDADURA pza
22 PLANCHA METALICA 20X5 pza
23 ESTRUCTURA METALICA pza
24 SACABOCADO 1/2 pza
25 TABLERO 30X25cm pza
26 RELE DE 24VDC pza
27 CANALETA 24X24mm pza
TOTAL

MANO DE OBRA
ITM DESIGNACION Hr

1 INSTALACION ELECTRICA 16
2 SUPERVISION GENERAL 4
3 MONTAJE DEL TABLERO ELECTRICO 24
4 INSTALACION POZO A TIERRA 2
TOTAL
RESUMEN COSTO DEL PROYECTO
MATERIALES S/. 1,530.5
MANO DE OBRA S/. 1,048.0
COSTO TOTAL DEL PROYECTO S/. 2,578.5

AHORROS Y MEJORAS AL MES

ITM DESIGNACION Actual

1 Ahorro de energia electrica KWH 1788


2 Aumento de la produccion en 5% 4000
3 Ahorro Mano de Obra Hrs / Hb 4000
4 Ahorro GLP 600

COSTO PROYECTO S/. 2,578.5


AHORRO AO S/. 7,843.2
AHORRO MENSUAL S/. 653.6
RECUPERACION EN MESES 3.9
PRECIO PRECIO
CANTIDAD UNITARIO TOTAL
2 S/. 150.0 S/. 300.0
2 S/. 140.0 S/. 280.0
1 S/. 30.0 S/. 30.0
1 S/. 90.0 S/. 90.0
2 S/. 4.0 S/. 8.0
1 S/. 45.0 S/. 45.0
1 S/. 5.0 S/. 5.0
3 S/. 50.0 S/. 150.0
1 S/. 5.0 S/. 5.0
5 S/. 4.0 S/. 20.0
1 S/. 3.0 S/. 3.0
1 S/. 75.0 S/. 75.0
1 S/. 45.0 S/. 45.0
1 S/. 47.0 S/. 47.0
3 S/. 3.5 S/. 10.5
30 S/. 0.4 S/. 12.0
4 S/. 6.0 S/. 24.0
1 S/. 45.0 S/. 45.0
1 S/. 20.0 S/. 20.0
1 S/. 2.0 S/. 2.0
4 S/. 12.0 S/. 48.0
1 S/. 30.0 S/. 30.0
1 S/. 180.0 S/. 180.0
1 S/. 6.0 S/. 6.0
1 S/. 50.0 S/. 50.0
1 S/. 50.0 S/. 50.0
1 S/. 7.0 S/. 7.0
TOTAL S/. 1,530.5

PRECIO PRECIO
Hb UNITARIO TOTAL
4 S/. 8.0 S/. 512.0
1 S/. 20.0 S/. 80.0
1 S/. 17.0 S/. 408.0
2 S/. 12.0 S/. 48.0
TOTAL S/. 1,048.0
TEMAS
Costo Total PROYECTO FINAL
Proyectado Diferencia Unitario SELECCIN DEL PROYECTO
1500 S/. 288.0 S/. 0.5 S/. 129.6 RECOPILACION DE IMFORMACION
4200 S/. 200.0 S/. 1.0 S/. 200.0 PLANTEAMIENTO DEL PROBLEMA
3400 S/. 12.0 S/. 12.0 S/. 144.0 MARCO TEORICO
498 S/. 12.0 S/. 15.0 S/. 180.0 INSTALACION
TOTAL ahorro mes S/. 653.6 CABLEADO ELECTRICO
INSTALACION NEUMATICA
TOTAL ahorro ao S/. 7,843.20 ARMADO MECANICO
PRUEBAS FINALES
PRESENTACION DE IMFORME
CRONOGRAMA DE ACTIVIDADES
6 DE FEBRERO
MARZO ABRIL MAYO
DURACION L M V D L M V D L M V D L M V D
16 SEMANAS
3 SEMANAS
3 SEMANAS
1 SEMANA
1 SEMANA
1 SEMANA
1 SEMANA
1 SEMANA
2 SEMANAS
2 SEMANAS
1SEMANA