SIDE LETTER TO
THE PROTOCOL OF PROVISIONAL ACCEPTANCE IN FRANCE FOR
THE SHIP, ON BOARD SPARE PARTS, TOOLS AND
DOCUMENTATION DATED 17 OCTOBER 2015
Ref. Contract Number: TRAK/810/PLN/VIII/2012/AL between Ministry of Defence
of the Republic of Indonesia with OCEA S.A. France dated
1 August 2012
We, hereby acknowledge that even though the Provisional Acceptance Protocol for
Ship No.2 has been signed by both Parties on 17 October 2015, OCEA still has to
fulfill its obligations according to the Contract until ship No.2 (KRI Spica-934) leaving
France.
The obligations (including works, sea acceptance tests/trial, Integrated Logistic
‘Support which are not finished yet) are as follows:
Life firing test 20mm canon
Coring equipment (to reach 1000m depth if weather permit)
CTD equipment (to reach 1000m depth if weather permit)
ROV equipment (to reach 1000m depth if weather permit)
UHF Communication
Documentation
Load the Spare Parts and Tools on board vessel
Other works which are mentioned in the Minutes of Meetings and Satgas
input, as follows:
a. MoMof Military Worthiness Team dated 2 October 2015
b. MoM of Commodore Inspection Team dated 8 October 2015
c. MoMs and Input of MoD Delegates (Satgas) dated 15 October 2015
(Copy of the list with the outstanding items is attached)
PNOVEREN>
In this regards, OCEA will be responsible to arrange the permit/clearance from
French Authority to do the sea testitrial for some scientific equipment and 20mm sea
firing,
This side letter is meant as goodwill to avoid any misunderstanding during the
process of OSV Procurement.
Done at Les Sables d'Olonne
On 17" OCTOBER 2015
ON BEHALF OF THE BUYER ON BEHALF OF THE SELLER
MINISTRY OF DEFENCE OF OCEA S.A.
THE Ri SIA PROJECT MAI R
BUDI PURWAI
KOLONEL LAUT(P) NRP.9577/P
LUC U