Anda di halaman 1dari 1

TABLE

OF
CONTENTS

ARCHITECTURAL:
A1/3- PERSPECTIVE VIEW
A2/3- GROUND FLOOR PLAN
LEFT ELEVATION VIEW
RIGHT ELEVATION VIEW
A3/3- FRONT ELEVATION VIEW
SCHEDULE OF DOORS AND
WINDOWS

STRUCTURAL:
S1/4- FOUNDATION PLAN
SPOT DETAIL
HALF TRUSS 1 DIAGRAM
S2/4- HALF TRUSS 2 DIAGRAM
FULL TRUSS DIAGRAM
ROOF FRAMING PLAN
S3/4- COLUMN/FOOTING DETAIL
WALL/ FOOTING DETAIL
S4/4- OIL PIT SEPARATOR

ELECTRICAL:
E1/1- ELECTRICAL LAYOUT PLAN
SINGLE LINE DIAGRAM
SCHEDULE OF LOADS
SPECIFICATION
LEGEND OF SYMBOLS

PERSPECTIVE VIEW
SCALE: N.D.T.S.

PROJECT TITLE PREPARED BY: APPROVED BY: SHEET NO.

V.M.JHEK BUILDERS
SOONG ROAD, BRGY. POB., BACUAG CONSTRUCTION OF 1 UNIT PAINTING SHELTER A
SURIGAO CITY
LOCATION: CLAVER, SURIGAO DEL NORTE 13

Anda mungkin juga menyukai