RENCANA ANGGARAN BIAYAPROYEK PEMBANGUNAN MESJID

PESANTRENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMM

HARGA
NO ANALISA ANALISA SATUAN VOLUME JUMLAH HARGA Rp
SATUAN Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembongkaran Bangunan Lama Dihitung LS 1 15,000,000.00 15,000,000.00
2 Pek. Pengukuran Dihitung M 66.95 1,000.00 66,950.00
3 Pek. Pas. Bouplank Dihitung M 200 20,500.00 4,100,000.00
4 Penyediaan Alat Bantu Dihitung LS 1 2,000,000.00 2,000,000.00
5 Penyediaan Air Dihitung LS 1 1,000,000.00 1,000,000.00
6 Mobilisasi Alat Dihitung LS 1 2,500,000.00 2,500,000.00
SUB TOTAL I 24,666,950.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi B001 M 39.92 33,200.00 1,325,344.00
2 Urugan Bekas Galian B009 M 18.75 11,000.00 206,250.00
3 Urugan Pening Lantai B017 M 17.43 49,300.00 859,299.00
4 Urugan Pasir Bawah Lantai B016 M 2.91 115,300.00 335,523.00
SUB TOTAL II 2,726,416.00

III PEKERJAAN PONDASI


1 Pas. Bet. Cakar Ayam 80 x 80 x 30 CM D036 M 2.76 4,264,700.00 11,770,572.00
2 Urugan Pasir Dipadatkan B016 M 2.275 115,300.00 262,307.50
3 Pas. Aanstamping C006 M 1.07 216,900.00 232,083.00
4 Pas. Batu Belah Ad. 1 : 5 C003 M 2.64 448,800.00 1,184,832.00
5 Pas. Rollag Bata Ad. 1 : 5 E010 M 0.92 72,100.00 66,332.00
SUB TOTAL III 13,516,126.50

IV PEKERJAAN BETON
1 Pas. Beton Sloof 15/20 K-175 D034 M 1.11 4,259,900.00 4,728,489.00
2 Pas. Beton Sloof 15/25 K-175 D036.a M 1.72 5,280,800.00 9,082,976.00
3 Pas. Beton Kolom Praktis 15/20 K-175 D036.a M 3.39 5,280,800.00 17,901,912.00
4 Pas. Beton Kolom Selasar 20/25 K-175 D036.a M 2.3 5,280,800.00 12,145,840.00
5 Pas. Beton Kolom Tengah 40/40 K-175 D036.a M 0.65 5,280,800.00 3,432,520.00
6 Pas. Beton Ring Balk 15/25 K-175 D038 M 2.5 3,867,100.00 9,667,750.00
7 Pas. Beton Ring Balk Gantung Selasar 15/25 K-175 D038 M 1.2 3,867,100.00 4,640,520.00
8 Pas. Beton Balk Gantung Tengah 20/40 K-175 D036.a M 2.56 5,280,800.00 13,518,848.00
SUB TOTAL IV 75,118,855.00

V PEKERJAAN DINDING
1 Pek. Pasangan Bata 1 : 5 E010 M 213.28 72,100.00 15,377,488.00
2 Pek. Plesteran dan Acian Dinding 1 : 5 F005 M 419.84 30,900.00 12,973,056.00
3 Pek. Plesteran dan Acian Beton 1 : 2 F003 M 29.05 42,500.00 1,234,625.00
4 Pek. Dinding Interior Kramik 40x60 J.054 M 20.5 129,600.00 2,656,800.00
5 Pek. Ekterior Batu 20x40 J.055 M 5.5 168,200.00 925,100.00
6 Pek. Lapisan Pilar Batu 20x40 J.055 M 4.8 168,200.00 807,360.00
7 Pek. Dinding WC Kramik 20x25 J.054 M 13 129,600.00 1,684,800.00
RENCANA ANGGARAN BIAYAPROYEK PEMBANGUNAN MESJID
PESANTRENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMM

8 Pek. Dinding Tempat Wudhu Kramik 20x25 J.054 M 3.5 129,600.00 453,600.00
9 Pek. Pasangan Glass Box 20x20 Dihitung Buah 48 25,000.00 1,200,000.00
SUB TOTAL V 37,312,829.00
HARGA JUMLAH HARGA
NO ANALISA ANALISA SATUAN VOLUME SATUAN Rp RP
1 2 3 4 5 6
VI PEKERJAAN KUSEN
1 Pek. Kusen Pintu Kayu Jati Dihitung Unit 2 325,000.00 650,000.00
2 Pek. Kusen Jendela Kayu Jati Dihitung Unit 4 650,000.00 2,600,000.00
3 Pek. Bouvenligt Dihitung Unit 12 250,000.00 3,000,000.00
4 Pek. Pintu Panel Ganda Jati Dihitung Unit 1 1,800,000.00 1,800,000.00
5 Pek. Pintu Servis Jati Dihitung Unit 1 1,200,000.00 1,200,000.00
6 Pek. Pintu Aluminium WC Dihitung Unit 1 750,000.00 750,000.00
7 Pek. Daun Jendela Jati Dihitung Unit 4 175,000.00 700,000.00
8 Pek. Kaca Hitam 5 mm L.018 M 20 300,000.00 6,000,000.00
9 Pek. Pas. Engsel Pintu L.005 Set 12 17,100.00 205,200.00
10 Pek. Pas. Engsel Jendela L.006 Set 16 13,100.00 209,600.00
11 Pek. Pas. Kunci Pintu Utama + Handle L.001 Set 1 210,000.00 210,000.00
12 Pek. Pas. Kunci Pintu Servis L.002 Set 1 121,200.00 121,200.00
13 Pek. Pas. Hak Angin + Slot Jendela L.009 Set 4 28,000.00 112,000.00
SUB TOTAL VI 17,558,000.00

VII PEKERJAAN ATAP


1 Pek. Atap Dak Selasar Tbl. 12 cm K-175 D036.a M 13.2 5,280,800.00 69,706,560.00

5 Pas. Atap Dak Beto Kubah Tb. 10 Cm K-175 D036.a M 1.69 5,280,800.00 8,924,552.00
6 Pas. Kubah Beton Tebal 12 cm 3,6 m K-225 Dihitung Unit 1 8,725,000.00 8,725,000.00
7 Pek. Ban / Sabuk Listplang F003 M 199.24 63,250.00 12,601,930.00
8 Pek. Listplang Beton K-175 D036 M 2.49 5,280,800.00 13,149,192.00
SUB TOTAL VII 113,107,234.00

VIII PEKERJAAN PLAFOUND


1 Pek. Pas. Rangka Plafound Kayu Bagian Dalam G019.a M 58.1 76,300.00 4,433,030.00
2 Pek. Pas Plafound GRC H007.a M 240 26,400.00 6,336,000.00
3 Pas. List Plafoun Gifsum Pinggir Dihitung M 85 7,500.00 637,500.00
4 Pas. Ornamen Gifsim Dihitung Buah 6 75,000.00 450,000.00
SUB TOTAL VIII 11,856,530.00

IX PEKERJAAN LANTAI
1 Pas. Kramik Warna 60 x 60 cm J.036 M 58.1 223,400.00 12,979,540.00
2 Pas. Kramik Warna T. Wudhu 40 x 40 cm J.035.a M 2 124,300.00 248,600.00
3 Pas. Kramik Warna WC 20 x 20 cm J.054 M 3 129,600.00 388,800.00
4 Pas. Saluran Grevel 1/2 20 cn O.001 M 30 115,500.00 3,465,000.00
5 Pas. Rabat Beton Tumbuk Ad. 1:3:5 D002 M 36 727,600.00 26,193,600.00
RENCANA ANGGARAN BIAYAPROYEK PEMBANGUNAN MESJID
PESANTRENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMM

SUB TOTAL IX 43,275,540.00

HARGA JUMLAH HARGA


NO ANALISA ANALISA SATUAN VOLUME SATUAN Rp RP
1 2 3 4 5 6
X PEKERJAAN ELEKTRIKAL
1 Pas. Ins Paralon kabel dan T Box Dihitung Unit 6 15,000.00 90,000.00
2 Pas. Instalasi Kabel Dan Titik Lampu Dihitung Unit 6 110,000.00 660,000.00
3 Pas. Stop Kontak Brocco Dihitung Unit 4 90,000.00 360,000.00
4 Pas. Saklar Brocco Dihitung Unit 2 30,000.00 60,000.00
5 Pas. Lampu SL Philips 45 Wat Dihitung Buah 6 65,000.00 390,000.00
6 Pas. Lampu Hias Gantung Dihitung Buah 1 2,500,000.00 2,500,000.00
7 Pas. Lampu Charger Dihitung Buah 1 1,500,000.00 1,500,000.00
8 Pas. Instalasi KWH Dihitung Paket 1 3,000,000.00 3,000,000.00
SUB TOTAL X 8,560,000.00

XI PEKERJAAN FINISHING
1 Pek. Cat Dinding Exs Vinilex M014 M 468.65 13,900.00 6,514,235.00
2 Pek. Cat Plafound Exs. Vinilek M014 M 58.1 13,900.00 807,590.00
3 Pek. Cat Listplang dan Kubah Exs. Dulux M016 M 105.3 37,500.00 3,948,750.00
4 Pek. Cat Melamine Kusen M009 M 13.53 45,200.00 611,556.00
5 Pek. Cat Melamine Pintu M009 M 16.95 45,200.00 766,140.00
SUB TOTAL XI 12,648,271.00

XII PEKERJAAN TAMBAHAN


1 Pek. Plumbing Dihitung Paket 1 1,200,000.00 1,200,000.00
2 Pek. Septiktank Dihitung Paket 1 4,750,000.00 4,750,000.00
SUB TOTAL XII 5,950,000.00

JUMLAH SUB TOTAL RP. 366,296,751.50


RENCANA ANGGARAN BIAYAPROYEK PEMBANGUNAN MESJID
PESANTRENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMMMM

REKAPITULASI

NO URAIAN PEKERJAAN JUMLAH HARGA Rp.


I PEKERJAAN PERSIAPAN 24,666,950.00
II PEKERJAAN TANAH 2,726,416.00
III PEKERJAAN PONDASI 13,516,126.50
IV PEKERJAAN BETON 75,118,855.00
V PEKERJAAN DINDING 37,312,829.00
VI PEKERJAAN KUSEN 17,558,000.00
VII PEKERJAAN ATAP 113,107,234.00
VIII PEKERJAAN PLAPOUND 11,856,530.00
IX PEKERJAAN LANTAI 43,275,540.00
X PEKERJAAN ELEKTRIKAL 8,560,000.00
XI PEKERJAAN FINISHING 12,648,271.00
XII PEKERJAAN TAMBAHAN 5,950,000.00
JUMLAH TOTAL Rp. 366,296,751.50
DIBULATKAN Rp. 366,296,700.00
Terbilang : ( Tiga Ratus Enam Puluh Enam Juta Dua Ratus Sembilan Puluh Enam Ribu Tujuh Ratus Rupiah )

Malausma, 15 afebruari 2014


Panitia Pembangunan Mushola / Majlis Ta'lim
" BABUSSALAM ''

Ketua Sekertaris

Iskandar, S.Pd. Agus Mulyadin