Ammonia Plant Work Procedures

Sr # Work Instructions Code # Rev.


1. Ammonia Plant startup Procedure AMM-WP-IMS-001 01
2. Ammonia Plant Shutdown Procedure AMM-WP-IMS-002 01
3. Operating Procedure of Offsite & utilities AMM-WP-IMS-003 00
4. Operating Procedure of BFW circuit AMM-WP-IMS-004 00
5. Operating Procedure of Desulphurization section AMM-WP-IMS-005 00
6. Operating Procedure of Reforming section AMM-WP-IMS-006 01
7. Operating Procedure of CataCarb section AMM-WP-IMS-007 01
8. Operating Procedure of Synthesis section AMM-WP-IMS-008 00
9. Operating Procedure of Refrigeration section AMM-WP-IMS-009 00
10. Operating Procedure of PGRU AMM-WP-IMS-010 01
11. Operating Procedure of NAST refrigeration loop AMM-WP-IMS-011 01
12. ID fan tripping AMM-WP-IMS-012 01
13. BFW pump tripping AMM-WP-IMS-013 01
14. 103 J tripping AMM-WP-IMS-014 01
15. Cooling water failure AMM-WP-IMS-015 01
16. Total Power Failure / Black out AMM-WP-IMS-016 01
17. LFA-104 AMM-WP-IMS-017 01
18. LFRA-123 AMM-WP-IMS-018 01
19. LFA-102 AMM-WP-IMS-019 01
20. Preservation of Catalyst AMM-WP-IMS-020 00
21. LLLA-108 AMM-WP-IMS-021 01
22. Instrument Air failure AMM-WP-IMS-022 01
23. Work Instructions for Methanator tripping HTIA-
AMM-WP-IMS-023 01
109/110
24. Preservation of BFW circuit AMM-WP-IMS-024 00
25. Preservation of Natural Gas circuit AMM-WP-IMS-025 00
26. Preservation of Catacarb circuit AMM-WP-IMS-026 00
27. Preservation of Refrigeration & synthesis circuit AMM-WP-IMS-027 00
28. HS steam preservation AMM-WP-IMS-028 00
29. Fire in New cooling tower( Grave Emergency) AMM-WP-IMS-029 00
30. Explosion in 103 D( Grave Emergency) AMM-WP-IMS-030 01
31. Main hot vent header bursting( Grave Emergency) AMM-WP-IMS-031 01
32. Explosion in waste heat boiler( Grave Emergency) AMM-WP-IMS-032 01
33. Synthesis Loop pipe bursting( Grave Emergency) AMM-WP-IMS-033 01
34. Explosion in 102 E( Grave Emergency) AMM-WP-IMS-034 01
35. Explosion in natural gas pre heater 103 B( Grave
AMM-WP-IMS-035 01
Emergency)
36. Ammonia Export Line Pipe bursting( Grave Emergency) AMM-WP-IMS-036 01
37. Explosion in 101 B convection / radiant zone( Grave
AMM-WP-IMS-037 01
Emergency)
38. Syn Loop flushing with BFW AMM-WP-IMS-038 00
39. Cold Box of PGRU handover Procedure AMM-WP-IMS-039 00