Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
A. TEST TO BE PERFORMED :
Item No. Description Unit Quantity Min. Test Requirements
PART A. FACILITIES FOR THE ENGINEERS
A.1.1 (8) Provision of Field Office for the Engineer mo. 13.00 P.E. Certificate
(Rental Basis)
Provision of Furnitures/Fixtures, Equipment &
A.1.1 (11) Appliances for the Field Office for the l.s. 1.00 P.E. Certificate
Engineer
A.1.2.(2) Provision of 4x4 pick-up Type Service Vehicle mo. 13.00 P.E. Certificate
for the Engineer on Bare Rental Basis
PART B. OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard pcs. 3.00 P.E. Certificate
B.7 Occupational Safety and Health Program mo. 13.00 P.E. Certificate
B.8 Traffic Management mo. 13.00 P.E. Certificate
B.9 Mobilization/Demobilization l.s. 1.00 P.E. Certificate
B.18.1 Craneway l.s. 1.00 P.E. Certificate
II. BRIDGE CONSTRUCTION
PART F. BRIDGE STRUCTURES
Bored Piles (1.5m dia.) (4000 psi @ 28 days) m. 1053.00
a. Cement bags 24513.84 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 1021.41 Included in Item 405(1)b3(b)
400(23)a8 c. Coarse Aggregates cu.m. 2042.82 Included in Item 405(1)b3(c)
d.RSB kgs. 568756.89 1-QT for every 10,000kgs for each size
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
401(2)a
d. Curing Compound lit. 50.54 Included in Item 311(1)c1(e)
e.RSB kgs. 7303.09 1-QT for every 10,000kgs for each size
f.Concrete cu.m. 50.54 1-set of conc. cylinder sample for each
day's pouring but not more than 75 cum.
403(4) Structural Steel, furnished and fabricated kgs. 10870.89 1-QT for each size
404(1)a Reinforcing Steel (Grade 40) kgs. 148056.50 1-QT for every 10,000kgs for each size
404(1)b Reinforcing Steel (Grade 60) kgs. 101631.52 1-QT for every 10,000kgs for each size
REVISED QUALITY CONTROL PROGRAM
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
B. INSPECTION :
Continuous quality control inspection on all item of work should be done as construction work progresses. Inspection report to be submitted as required.
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
A. TEST TO BE PERFORMED :
Item No. Description Unit Quantity
PART A. FACILITIES FOR THE ENGINEERS
A.1.1 (8) mo. 13.00
Provision of Field Office for the Engineer (Rental Basis)
A.1.2.(2) Provision of 4x4 pick-up Type Service Vehicle for the mo. 13.00
Engineer on Bare Rental Basis
I. APPROACHES
PART C. EARTHWORKS
104(1)a Embankment from Roadway Excavation (Common Soil) cu.m. 198.00
104(2)a Embankment from Borrow (Common Soil) cu.m. 1476.00
105(1) Subgrade Preparation (Common Material) sq.m 714.00
PART D. SUB-BASE AND BASE COURSE
200(1) Aggregate Subbase Course cu.m. 134.00
PART E. SURFACE COURSE
PCCP (Unreinforced) ( t=230mm) sq.m 120.00
a. Cement bags 262.20
b. Fine Aggregates cu.m. 14.90
c. Coarse Aggregates cu.m. 18.77
QUALITY CONTROL PROGRAM
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
II. BRIDGE
PART C. EARTHWORKS
101(1) Removal of Structures and Obstruction l.s. 1.00
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
310(1)a3
d. Hydrated Lime m.t. 2.87
e. Mineral Filler cu.m. 15.51
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
B. INSPECTION :
Continuous quality control inspection on all item of work should be done as construction work progre
be submitted as required.
QUALITY CONTROL PROGRAM
Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
Checked by:
RATION
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
1 - GPC , 6 - FDT
1 - GPC , 45 - FDT
1 - GPC , 6 - FDT
1 - QT
1 - QT , 2 - G
1 - QT , 2 - G
ALITY CONTROL PROGRAM
RATION
RATION
P.E. Certificate
1-QT
1 - QT , 2 - GP , 1 -FF
1 - QT
4 - G , 4 - EXT , 4 - C , 4 - STY
ALITY CONTROL PROGRAM
RATION
1 - QT
1-QT
T&D Determination every 100 L.m per lane or
one but not more than three sample per day paving
RATION
21 - QT
2 - QT , 24 - G
3 - QT , 50 - G
Included in Item 311(1)c1(e)
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.
RATION
RATION
N STRUCTURES
2 - QT
Included in Item 509(2)a
1-QT
Included in Item 505(2)a
1-QT
ALITY CONTROL PROGRAM
RATION
1 - QT
1 - QT
RATION
x 1% (Q.C. Chart)
3. Apportionment (For Admin. Proj.)-for Dist./City
Proj. Lab. (C-1) _______________
Regional Lab. (43%)(C-1) _____________
Total _______________.
Submitted by:
ALBERT G. SALAC
Project Engineer
Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Widening of Permanent Bridges from 1 to 2 Lanes Lubigan Bridge (BO3428LZ) Along Capas-San
Province of Tarlac
Region: III
District:
Project Network Development - Off- Carriageway Improvement Including Drainage, Secondary Roads, Paniqui-Camiling-Wawa Road, Tarlac
Location: Province of Tarlac
Contractor: GVDPM CONSTRUCTION CORPORATION
ITEM NO. MATERIALS UNIT QUANTITY
NOTE: The number of tests indicated is based on the Minimum Testing Requirements for one source. If materials is taken from more than one (1)
source, each materials should be on the same basis as in Minimum Testing Requirements.
Sheet No. 1 of 2
MINIMUM NO. OF NUMBER OF TEST %OF WORK
TEST REQUIRED ON FILE BALANCE ACCOMP.
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
Err:509
P.E. Certificate
P.E. Certificate
P.E. Certificate
0
Err:509
P.E. Certificate
Err:509
1 - GPC , 6 - FDT
1 - GPC , 45 - FDT
1 - GPC , 6 - FDT
0
1-QT , 1-GP , 1-C , 6-FDT , 1-CBR NOTE:
0
Err:509
Err:509
Err:509 Prepared by:
Err:509
Err:509
Err:509
Err:509 SEAN BERNARD
Err:509 Project Materials Engineer
Err:509
0
1 - QT DE
1 - QT , 2 - G
1 - QT , 2 - G Re
1-QT for every 10,000kgs for each size
set of conc. beam sample for each day's pouring but not more than 75 cum.
Err:509
5-holes per km.per lane
0 Region:
Included in Item 311(1)c1(a) District:
Included in Item 311(1)c1(b) Project
Included in Item 311(1)c1(c) Location:
Err:509
5-holes per km.per lane
0
0
Included in Item 405(1)b3(a)
Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Result
Result
0
1-QT for each size
Err:509
1-QT for every 10,000kgs for each size
1-QT for every 10,000kgs for each size
0
21 - QT
2 - QT , 23 - G
3 - QT , 45 - G
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
0
Included in Item 405(1)b3(a)
Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Submitted by: