Anda di halaman 1dari 44

REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

A. TEST TO BE PERFORMED :
Item No. Description Unit Quantity Min. Test Requirements
PART A. FACILITIES FOR THE ENGINEERS
A.1.1 (8) Provision of Field Office for the Engineer mo. 13.00 P.E. Certificate
(Rental Basis)
Provision of Furnitures/Fixtures, Equipment &
A.1.1 (11) Appliances for the Field Office for the l.s. 1.00 P.E. Certificate
Engineer
A.1.2.(2) Provision of 4x4 pick-up Type Service Vehicle mo. 13.00 P.E. Certificate
for the Engineer on Bare Rental Basis
PART B. OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard pcs. 3.00 P.E. Certificate
B.7 Occupational Safety and Health Program mo. 13.00 P.E. Certificate
B.8 Traffic Management mo. 13.00 P.E. Certificate
B.9 Mobilization/Demobilization l.s. 1.00 P.E. Certificate
B.18.1 Craneway l.s. 1.00 P.E. Certificate
II. BRIDGE CONSTRUCTION
PART F. BRIDGE STRUCTURES
Bored Piles (1.5m dia.) (4000 psi @ 28 days) m. 1053.00
a. Cement bags 24513.84 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 1021.41 Included in Item 405(1)b3(b)
400(23)a8 c. Coarse Aggregates cu.m. 2042.82 Included in Item 405(1)b3(c)
d.RSB kgs. 568756.89 1-QT for every 10,000kgs for each size

e.Concrete cu.m. 2042.82 1-set of conc. cylinder sample for each


day's pouring but not more than 75 cum.
400(24)h1 Permanent Steel Casing (1.5 m. dia., t=10mm) m. 192.00 1-QT for every 10,000kgs for each size
400(27)b Pile Integrity Testing (Low Strain) each 16.00 Result
400(28) High Strain Dynamic Testing (P.D.A) each 8.00 Result
Concret Railing (Standard) (3000 psi @ 28 days) m. 432.00
a. Cement bags 480.17 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 25.27 Included in Item 405(1)b3(b)
c. Coarse Aggregates cu.m. 50.54 Included in Item 405(1)b3(c)
401(2)a
REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
401(2)a
d. Curing Compound lit. 50.54 Included in Item 311(1)c1(e)
e.RSB kgs. 7303.09 1-QT for every 10,000kgs for each size
f.Concrete cu.m. 50.54 1-set of conc. cylinder sample for each
day's pouring but not more than 75 cum.
403(4) Structural Steel, furnished and fabricated kgs. 10870.89 1-QT for each size
404(1)a Reinforcing Steel (Grade 40) kgs. 148056.50 1-QT for every 10,000kgs for each size
404(1)b Reinforcing Steel (Grade 60) kgs. 101631.52 1-QT for every 10,000kgs for each size
REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

Structural Concrete Class "A", f'c=27.58 Mpa 1035.22


(Bridge) (4000 psi @ 28 days) cu.m.
a. Cement bags 12422.64 21 - QT
b. Fine Aggregates cu.m. 517.61 2 - QT , 23 - G
405(1)b3 c. Coarse Aggregates cu.m. 1035.22 3 - QT , 45 - G
d. Curing Compound lit. 1035.22 Included in Item 311(1)c1(e)

e.Concrete cu.m. 1086.98 1-set of conc. cylinder sample for each


day's pouring but not more than 75 cum.
Structural Concrete Class "A", f'c=27.58 Mpa 144.00
(Approach Slab) (4000 psi @ 14 days) cu.m.
a. Cement bags 1965.60 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 75.60 Included in Item 405(1)b3(b)
c. Coarse Aggregates cu.m. 151.20 Included in Item 405(1)b3(c)
405(1)b2
d. Curing Compound lit. 151.20 Included in Item 311(1)c1(e)
e. Asphalt Sealant lit. 90.72 Included in Item 311(1)c1(f)

1-set of conc. cylinder sample for each


f.Concrete cu.m. 151.20 day's pouring but not more than 75 cum.

Prestressed Structural Concrete Member 60.00


(Type IV) each
a. Cement bags 780.00 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 30.00 Included in Item 405(1)b3(b)
c. Coarse Aggregates cu.m. 60.00 Included in Item 405(1)b3(c)
406(1)d4
d. RSB kg. 73519.48 Included in Item 404(1)a & 404(1)b
e. Wire Strand tons 3.01 1 - QT

1-set of conc. cylinder sample for each


f.Concrete cu.m. 60.00 day's pouring but not more than 75 cum.

Lean Concrete cu.m. 1.94


a. Cement bags 13.58 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 0.97 Included in Item 405(1)b3(b)
REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

407(8) c. Coarse Aggregates cu.m. 1.94 Included in Item 405(1)b3(c)

1-set of conc. cylinder sample for each


d. Concrete cu.m. 1.94 day's pouring but not more than 75 cum.

412(1) Elastomeric Bearing Pad (600x600x40mm) ea 120.00 1-QT


REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES


509(2)a Sheet Pile (Slope Protection) m 1,080.00 2 - QT
509(2)b Sheet Pile (CofferDamming) m 1,020.00 Included in Item 509(2)a
Concrete Slope Protection cu.m. 9.60
a. Cement bags 80.64 Included in Item 405(1)b3(a)
b. Fine Aggregates cu.m. 4.80 Included in Item 405(1)b3(b)
510(2) c. Coarse Aggregates cu.m. 9.60 Included in Item 405(1)b3(c)
d. Curing Compound lit. 9.60 Included in Item 311(1)c1(e)
1-set of conc. cylinder sample for each
e.Concrete cu.m. 9.60 day's pouring but not more than 75 cum.

B. INSPECTION :
Continuous quality control inspection on all item of work should be done as construction work progresses. Inspection report to be submitted as required.

C. COMPUTATION, BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST :


1. Q.C. Cost(Direct-Cost Sub-Total) x 1% (Q.C. Chart)
2. Breakdown of Cost (Per Regional Memoranda dtd. 12-12-73 & 7-17-74) 3. Apportionment (For Admin. Proj.)-for Dist./City
a) Serv./Filed Test (65%)(C-1) Proj. Lab. (C-1) _____________
b) Q. Test (15%)(C-1) Regional Lab. (43%)(C-1) _____________
c) Misc. & other (20%)(C-1) Total _____________.
d) Total Cost

Prepared by: Checked by: Submitted by:

FRANCISCO C. BERIN III SEAN BERNARD G. DE LEON ALBERT G. SALAC


Contractor's Materials Engineer Project Materials Engineer Project Engineer
M.E. I Accre. No. 4760
REVISED QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent Bridges to
More Than 2 lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac
1st Legislative District, Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

Recommending Approval: Approved by:

WILFREDO J. FAJARDO ANTONIO V. MOLANO, JR. CESO III


CHIEF, Q.A.H.D. Director IV
QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

A. TEST TO BE PERFORMED :
Item No. Description Unit Quantity
PART A. FACILITIES FOR THE ENGINEERS
A.1.1 (8) mo. 13.00
Provision of Field Office for the Engineer (Rental Basis)

A.1.1 (11) Provision of Furnitures/Fixtures, Equipment & l.s. 1.00


Appliances for the Field Office for the Engineer

A.1.2.(2) Provision of 4x4 pick-up Type Service Vehicle for the mo. 13.00
Engineer on Bare Rental Basis

PART B. OTHER GENERAL REQUIREMENTS


B.5 Project Billboard/Signboard pcs. 3.00
B.7 Occupational Safety and Health Program mo. 13.00
B.8 Traffic Management mo. 13.00
B.9 Mobilization/Demobilization l.s. 1.00
B.18.1 Craneway l.s. 1.00

I. APPROACHES

PART C. EARTHWORKS
104(1)a Embankment from Roadway Excavation (Common Soil) cu.m. 198.00
104(2)a Embankment from Borrow (Common Soil) cu.m. 1476.00
105(1) Subgrade Preparation (Common Material) sq.m 714.00
PART D. SUB-BASE AND BASE COURSE
200(1) Aggregate Subbase Course cu.m. 134.00
PART E. SURFACE COURSE
PCCP (Unreinforced) ( t=230mm) sq.m 120.00
a. Cement bags 262.20
b. Fine Aggregates cu.m. 14.90
c. Coarse Aggregates cu.m. 18.77
QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

d. RSB kgs. 11.87


311(1)c1
e. Curing Compound lit. 8.00
f. Asphalt Sealant lit. 3.31

g.Concrete cu.m. 27.60

h. Pavement sq.m 120.00


QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

PCCP (Unreinforced) ( t=280mm) sq.m 522.00

a. Cement bags 1388.52


b. Fine Aggregates cu.m. 78.93
c. Coarse Aggregates cu.m. 99.39

311(1)e1 d. RSB kgs. 73.08


e. Curing Compound lit. 42.39
f. Asphalt Sealant lit. 24.85

g.Concrete cu.m. 146.16

h. Pavement sq.m 522.00


PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES
Grouted Riprap cu.m. 505.00

a. Cement bags 3030.00


505(2)a
b.Fine Aggregates cu.m. 126.25

c.Boulders cu.m. 530.25

II. BRIDGE
PART C. EARTHWORKS
101(1) Removal of Structures and Obstruction l.s. 1.00

PART E. SURFACE COURSE


302(1)c Bituminous Tack Coat - RC Cutback Asphalt (Grade 800) sq.m. 2464.65
Bituminous Concrete Surface Course, Hot-Laid (50 mm. Thk.)
sq.m. 2464.65

a. Aggregates cu.m. 123.23

b. Bituminous Materials m.t. 15.51


c. Mix m.t. 287.13
310(1)a3
QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION
310(1)a3
d. Hydrated Lime m.t. 2.87
e. Mineral Filler cu.m. 15.51

f. Compacted Material sq.m. 2464.65

PART F. BRIDGE STRUCTURES


Bored Piles (1.5m dia.) (4000 psi @ 28 days) m. 1044.00

a. Cement bags 24304.32

b. Fine Aggregates cu.m. 1012.68


400(23)a8 2025.36
c. Coarse Aggregates cu.m.
d.RSB kgs. 563895.72

e.Concrete cu.m. 2025.36


QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

400(24)h1 Permanent Steel Casing (1.5 m. dia., t=10mm) m. 192.00


400(27)b Pile Integrity Testing (Low Strain) each 16.00
400(28) High Strain Dynamic Testing (P.D.A) each 8.00
Concret Railing (Standard) (3000 psi @ 28 days) m. 324.00
a. Cement bags 360.13
b. Fine Aggregates cu.m. 18.95
c. Coarse Aggregates cu.m. 37.91
401(2)a
d. Curing Compound lit. 37.91
e.RSB kgs. 1153.54
f.Concrete cu.m. 37.91
403(4) Structural Steel, furnished and fabricated kgs. 12400.50
404(1)a Reinforcing Steel (Grade 40) kgs. 92449.29
404(1)b Reinforcing Steel (Grade 60) kgs. 89781.97
Structural Concrete Class "A", f'c=27.58 Mpa (Bridge) 925.91
(4000 psi @ 28 days) cu.m.
a. Cement bags 11110.92
b. Fine Aggregates cu.m. 462.96
405(1)b3
c. Coarse Aggregates cu.m. 925.91
d. Curing Compound lit. 925.91

e.Concrete cu.m. 972.21

Structural Concrete Class "A", f'c=27.58 Mpa (Approach 121.64


Slab) (4000 psi @ 14 days) cu.m.
a. Cement bags 1660.39
b. Fine Aggregates cu.m. 63.86
405(1)b2 c. Coarse Aggregates cu.m. 127.72
d. Curing Compound lit. 127.72
e. Asphalt Sealant lit. 76.63

f.Concrete cu.m. 127.72


QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

Prestressed Structural Concrete Member (Type IV) each 30.00

a. Cement bags 330.00


b. Fine Aggregates cu.m. 15.00
406(1)d4 c. Coarse Aggregates cu.m. 30.00
d. RSB kg. 36759.74
e. Wire Strand tons 1.50

f.Concrete cu.m. 30.00


QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

Lean Concrete cu.m. 3.00

a. Cement bags 21.00

b. Fine Aggregates cu.m. 1.50


407(8)
c. Coarse Aggregates cu.m. 3.00

d. Concrete cu.m. 3.00

411 (1) Paint l.s. 1.00


412(1) Elastomeric Bearing Pad (600x600x40mm) ea 60.00
SPL1 Water Proofing (Rubberized Membrane Type) sq.m. 2464.64

PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES


509(2)a Sheet Pile (Slope Protection) m 1,377.00
509(2)b Sheet Pile (CofferDamming) m 510.00
Concrete Slope Protection cu.m. 50.64
a. Cement bags 425.38

b. Fine Aggregates cu.m. 25.32


510(2) 50.64
c. Coarse Aggregates cu.m.
d. Curing Compound lit. 50.64

e.Concrete cu.m. 50.64

Gabions cu.m. 432.00


511(1) a. Gabion Wire Mesh pcs. 216.00
b. Boulders cu.m. 453.60
511(3) Filter Cloth sq.m. 432.00
QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

PART H. MISCELLANEOUS STRUCTURES


612(1) Reflectorized Thermoplastic Pavement Markings (White) sq.m. 67.34
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) sq.m. 33.67

B. INSPECTION :

Continuous quality control inspection on all item of work should be done as construction work progre
be submitted as required.
QUALITY CONTROL PROGRAM

Project :
Construction and Maintenance of Bridges along National Roads Widening of Permanent
lanes Barangobong Bridge 1 (BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1
Province of Tarlac
Limits : Approach "A" : Sta 151+287.00 to Sta 151+347.00=60.00 lm
Approach Slab "A" : Sta 151+347.00 to Sta 151+353.00 =6.00 lm
Bridge: Sta 151+353.00 to Sta 151+677.70 =324.70 l.m.
Approach Slab "B" : Sta 151+677.70 to Sta 151+683.70 = 6.00 lm
Approach "B" : Sta 151+683.70 to Sta 151+743.70 = 60.00 lm
Location : Province of Tarlac
Appropiation : P 178,200,000.00
Contractor : GVDPM CONSTRUCTION CORPORATION

C. COMPUTATION, BREAKDOWN AND APPORTIONMENT OF QUALITY CONTROL COST :


1. Q.C. Cost(Direct-Cost Sub-Total)
2. Breakdown of Cost (Per Regional Memoranda dtd. 12-12-73 & 7-17-74)
a) Serv./Filed Test (65%)(C-1)
b) Q. Test (15%)(C-1)
c) Misc. & other (20%)(C-1)
d) Total Cost

Checked by:

FRANCISCO C. BERIN III SEAN BERNARD G. DE LEON


Contractor's Materials Engineer Project Materials Engineer
M.E. I Accre. No. 4760

Recommending Approval: Approved:

WILFREDO J. FAJARDO ANTONIO V. MOLANO, JR. CES


CHIEF, Q.A.H.D. Director IV
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

Min. Test Requirements

P.E. Certificate

P.E. Certificate

P.E. Certificate

P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate

1 - GPC , 6 - FDT
1 - GPC , 45 - FDT
1 - GPC , 6 - FDT

1-QT , 1-GP , 1-C , 6-FDT , 1-CBR

1 - QT
1 - QT , 2 - G
1 - QT , 2 - G
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

1-QT for every 10,000kgs for each size


1-QT
1-QT
1-set of conc. beam sample for each day's
pouring but not more than 75 cum.
5-holes per km.per lane
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

Included in Item 311(1)c1(a)


Included in Item 311(1)c1(b)
Included in Item 311(1)c1(c)
Included in Item 311(1)c1(d)
Included in Item 311(1)c1(e)
Included in Item 311(1)c1(f)
1-set of conc. beam sample for each day's
pouring but not more than 75 cum.

5-holes per km.per lane


N STRUCTURES

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
1-Sp. Gr. / I.R.

P.E. Certificate

1-QT

1 - QT , 2 - GP , 1 -FF
1 - QT
4 - G , 4 - EXT , 4 - C , 4 - STY
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

1 - QT
1-QT
T&D Determination every 100 L.m per lane or

one but not more than three sample per day paving

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
1-QT for every 10,000kgs for each size

1-set of conc. cylinder sample for each day's


pouring but not more than 75 cum.
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

1-QT for every 10,000kgs for each size


Result
Result

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
Included in Item 311(1)c1(e)
1-QT for every 10,000kgs for each size
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.
1-QT for each size
1-QT for every 10,000kgs for each size
1-QT for every 10,000kgs for each size

21 - QT
2 - QT , 24 - G
3 - QT , 50 - G
Included in Item 311(1)c1(e)
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
Included in Item 311(1)c1(e)
Included in Item 311(1)c1(f)
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
Included in Item 404(1)a & 404(1)b
1 - QT
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.
1-QT
1-QT
1-QT

N STRUCTURES
2 - QT
Included in Item 509(2)a

Included in Item 405(1)b3(a)


Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
Included in Item 311(1)c1(e)
1-set of conc. cylinder sample for each day's
pouring but not more than 75 cum.

1-QT
Included in Item 505(2)a
1-QT
ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

1 - QT
1 - QT

item of work should be done as construction work progresses. Inspection report to


ALITY CONTROL PROGRAM

of Bridges along National Roads Widening of Permanent Bridges to More Than 2


(BO1364LZ) along Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac

RATION

x 1% (Q.C. Chart)
3. Apportionment (For Admin. Proj.)-for Dist./City
Proj. Lab. (C-1) _______________
Regional Lab. (43%)(C-1) _____________
Total _______________.

Submitted by:

ALBERT G. SALAC
Project Engineer

ANTONIO V. MOLANO, JR. CESO III


Director IV
BORED PILE (PIER , ABUT A)
KG PER BP # OF BP TOTAL
36 14132.08 30 423962.4 11 155452.88 16
25 1138.07 30 34142.1 3.41421 11 12518.77 2
16 1899.54 30 56986.2 11 20894.94 3
17169.69
BORED PILE (ABUT B)
KG PER BP # OF BP TOTAL
36 11380.78 2 22761.56 QT
25 1066.94 2 2133.88 36 453376.52 46
16 2386.18 2 4772.36 32 49785.48 5
14833.9 28 19446.84 2
ABUTMENT A 25 66628.04 7
COPING 20 31305.33 4
36 215.76 1.5M-18PCS 16 61758.56 7
32 2393.14
25 153.08 16 185438.69 19
16 1702.16 12 52298.86 6
BACKWALL 10 4072.2 1
20 922.28 97
16 428.86 924110.52
WINGWALL
20 332.91
16 312.64
12 590.7
APPROACH RAILING
12 173.03
APPROACH SIDEWALK
16 116.19
12 74.59
SHEAR BLOCK
12 71.13
ABUTMENT B
COPING
36 107.88 1.5M-9PCS
32 2393.14
25 153.08
16 1702.16
BACKWALL
20 922.28
16 428.86
WINGWALL
20 332.91
16 312.64
12 590.7
APPROACH RAILING
12 173.03
APPROACH SIDEWALK
16 116.19
12 74.59
SHEAR BLOCK
12 81.15
PIER (FIXED)
COPING KG/PIER # OF PIER TOTAL
36 383.57 12 4602.84 2M-24PCS
32 2249.96 12 26999.52
25 149.54 12 1794.48
16 1709.41 12 20512.92
SHEAR BLOCK
12 129.83 12 1557.96
PIER (5,10)
COPING KG/PIER # OF PIER TOTAL
36 215.76 8 1726.08 2M-24PCS
32 2249.96 8 17999.68
25 149.54 8 1196.32
16 1709.41 8 13675.28
SHEAR BLOCK
12 129.83 2 259.66
GIRDER(2-14) KG/SPAN # OF SPAN TOTAL
28 48.44 52 2518.88
20 102.58 52 5334.16
16 400.75 52 20839
12 672.2 52 34954.4
GIRDER(1,15) KG/SPAN # OF SPAN TOTAL 73519.48
28 48.44 8 387.52
20 112.45 8 899.6
16 401.04 8 3208.32
12 672.2 8 5377.6
SUPERSTRUCTURE
SLAB KG/SPAN # OF SPAN TOTAL
25 13527.55 2 27055.1
20 8498.45 2 16996.9
16 50624.74 2 101249.48 10.124948
INT. DIAPHRAGMS
28 2049.19 3 6147.57
12 485.91 3 1457.73
EXPANSION DIAPHRAGMS
28 659.87 3 1979.61
16 246.32 3 738.96
FIXED DIAPHRAGMS
28 2513.16 3 7539.48
16 795.82 3 2387.46
ABUT. DIAPHRAGMS
28 291.26 3 873.78
16 123.16 3 369.48
POST, RAILING, SIDEWALK
POST
20 6486.57
10 1303.1
RAILING
16 8185.54
10 2769.1 10954.64
SIDEWALK
16 9152.55
12 7035.62
SUMMARY REPORT OF FIEL
For the Month of July, 2016

Construction and Maintenance of Bridges along National Roads, Widening of Perm


Name of Project and Locat :
Jose-Mayantoc-Malacampa Road, Tarlac 2nd Legislative Distric, Province of Tarla

Implementing Office : DPWH - R-III


Project Duration 360 C.D.
a.) Date Started : June 30,2016
b.) Target Completion Date:
Quantity Specs
Original Source of
Lab. No. Kind of Materials Represente Kind of Test Item
Materials No.
d
(1) (2) (3) (4) (5) (6)
RL-E-4698 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4699 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4700 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4701 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4702 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4703 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4704 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4705 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4706 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4707 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4708 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4709 -16 RSB 10000 kg. Jobsite QT 404 A.DR

Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)

Prepared by: Certified Correct: Attested by

ALBERTO DR. MEDINA SEAN BERNARD G. DE LEON


Project Materials Engineer Project Materials Engineer
CONTRACTOR, Accd. ME I- 0219 DPWH - R - III
SUMMARY REPORT OF FIEL
For the Month of June, 2016

Name of Project and Locat :

Implementing Office : DPWH - R-III


Project Duration 360 C.D.
a.) Date Started : June 30,2016
b.) Target Completion Date:
Quantity Specs
Original Source of
Lab. No. Kind of Materials Represente Kind of Test Item
Materials No.
d
(1) (2) (3) (4) (5) (6)
RL-E-4559 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4560 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4561 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4559 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4560 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4561 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4559 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4560 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4561 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4559 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4560 -16 RSB 10000 kg. Jobsite QT 404 A.DR
RL-E-4561 -16 RSB 10000 kg. Jobsite QT 404 A.DR

Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)

Prepared by: Certified Correct: Attested by

MICHAEL D. DAVID SEAN BERNARD G. DE LEON


Project Materials Engineer Project Materials Engineer
CONTRACTOR, Accd. ME II- 2973 DPWH - R - III
SUMMARY REPORT OF FIEL
For the Month of June, 2016

Name of Project and Locat :

Implementing Office : DPWH - R-III


Project Duration 360 C.D.
a.) Date Started : June 30,2016
b.) Target Completion Date:
Quantity Specs
Original Source of
Lab. No. Kind of Materials Represente Kind of Test Item
Materials No.
d
(1) (2) (3) (4) (5) (6)
4559 -16 RSB 10000 kg. Jobsite QT 404 A.DR
4560 -16 RSB 10000 kg. Jobsite QT 404 A.DR
4561 -16 RSB 10000 kg. Jobsite QT 404 A.DR
2381-2383 -16 Subgrade 1500 cu. m. Jobsite GPC 105 A.DR
2376-2380 -16 Subbase 2500 cu. m. Jobsite QT/CBR 200 A.DR
2372-2375 -16 Coarse Aggregates 1500 cu. m. Jobsite QT 311 A.DR
2369-2371 -16 Fine Aggregates 1500 cu. m. Jobsite QT 311 A.DR
Damico Const. &
B-1171 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1172 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies

Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)

Prepared by: Certified Correct: Attested by

MICHAEL D. DAVID SEAN BERNARD G. DE LEON


Project Materials Engineer Project Materials Engineer
CONTRACTOR, Accd. ME II- 2973 DPWH - R - III
SUMMARY REPORT OF FIEL
For the Month of December, 20

Name of Project and Locat :

Implementing Office : DPWH - R-III


Project Duration 360 C.D.
a.) Date Started : June 30,2016
b.) Target Completion Date:
Quantity Specs
Original Source of
Lab. No. Kind of Materials Represente Kind of Test Item
Materials No.
d
(1) (2) (3) (4) (5) (6)
Damico Const. &
B-1173 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1174 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1175 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1176 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1177 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1178 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1179 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1180 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1181 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1182 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1183 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1184 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1185 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies
Damico Const. &
B-1186 -16 Concrete Beam 75 cu.m. Flexural Test 311 A.DR
Supplies

Note: 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to
2. Indicate the name of testing laboratories on the sample tested to Column (11)

Prepared by: Certified Correct: Attested by

MICHAEL D. DAVID SEAN BERNARD G. DE LEON


Project Materials Engineer Project Materials Engineer
CONTRACTOR, Accd. ME II- 2973 DPWH - R - III
RT OF FIELD TESTS
nth of July, 2016

Widening of Permanent Bridges from 1 to 2 Lanes Lubigan Bridge (BO3428LZ) Along Capas-San
Province of Tarlac

Name of Contractor : CHRISTIAN IAN CONSTRUCTON CORPORATION

DPWH Project Inspector :


Project Accomplishment :
Project Cost : 84,602,150.58
Sampled Tested
Remarks
By Date By Date At
(7) (8) (9) (10) (11) (12)
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED
A.DR.ALBERTO 7/1/16 J. P. SUNDIANG 7/4/16 R. OFFICE PASSED

tuminous mix to Column (4)

Attested by: Submitted by:

WILFREDO J. FAJARDO ROMEO P. GUECO


Chief, QAHD Project Engineer
DPWH - R - III DPWH - R - III
RT OF FIELD TESTS
th of June, 2016

Name of Contractor : CHRISTIAN IAN CONSTRUCTON CORPORATION

DPWH Project Inspector :


Project Accomplishment :
Project Cost : 84,602,150.58
Sampled Tested
Remarks
By Date By Date At
(7) (8) (9) (10) (11) (12)
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/16/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/17/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/18/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/16/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/17/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/18/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/16/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/17/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/18/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/16/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/17/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/18/16 R. OFFICE PASSED

tuminous mix to Column (4)

Attested by: Submitted by:

WILFREDO J. FAJARDO ROMEO P. GUECO


Chief, QAHD Project Engineer
DPWH - R - III DPWH - R - III
RT OF FIELD TESTS
th of June, 2016

Name of Contractor : CHRISTIAN IAN CONSTRUCTON CORPORATION

DPWH Project Inspector :


Project Accomplishment :
Project Cost : 84,602,150.58
Sampled Tested
Remarks
By Date By Date At
(7) (8) (9) (10) (11) (12)
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/16/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/17/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/18/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/20/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/20/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/20/16 R. OFFICE PASSED
A.DR.ALBERTO 6/16/16 J. P. SUNDIANG 6/20/16 R. OFFICE PASSED
A.DR.ALBERTO 6/15/16 C. J. TIONGSON 6/22/16 R. OFFICE PASSED
A.DR.ALBERTO 6/15/16 C. J. TIONGSON 6/29/16 R. OFFICE PASSED

tuminous mix to Column (4)

Attested by: Submitted by:

WILFREDO J. FAJARDO ROMEO P. GUECO


Chief, QAHD Project Engineer
DPWH - R - III DPWH - R - III
RT OF FIELD TESTS
of December, 2016

Name of Contractor : CHRISTIAN IAN CONSTRUCTON CORPORATION

DPWH Project Inspector :


Project Accomplishment :
Project Cost : 84,602,150.58
Sampled Tested
Remarks
By Date By Date At
(7) (8) (9) (10) (11) (12)
A.DR.ALBERTO 11/25/16 B.Q. LAGMAN 12/2/16 R. OFFICE PASSED
A.DR.ALBERTO 11/26/16 B.Q. LAGMAN 12/3/16 R. OFFICE PASSED
A.DR.ALBERTO 11/28/16 B.Q. LAGMAN 12/5/16 R. OFFICE PASSED
A.DR.ALBERTO 11/29/16 B.Q. LAGMAN 12/6/16 R. OFFICE PASSED
A.DR.ALBERTO 11/30/16 B.Q. LAGMAN 12/7/16 R. OFFICE PASSED
A.DR.ALBERTO 12/1/16 B.Q. LAGMAN 12/8/16 R. OFFICE PASSED
A.DR.ALBERTO 12/2/16 B.Q. LAGMAN 12/9/16 R. OFFICE PASSED
A.DR.ALBERTO 12/3/16 B.Q. LAGMAN 12/10/16 R. OFFICE PASSED
A.DR.ALBERTO 12/5/16 B.Q. LAGMAN 12/12/16 R. OFFICE PASSED
A.DR.ALBERTO 12/6/16 B.Q. LAGMAN 12/13/16 R. OFFICE PASSED
A.DR.ALBERTO 12/7/16 B.Q. LAGMAN 12/14/16 R. OFFICE PASSED
A.DR.ALBERTO 12/8/16 B.Q. LAGMAN 12/15/16 R. OFFICE PASSED
A.DR.ALBERTO 12/9/16 B.Q. LAGMAN 12/16/16 R. OFFICE PASSED
A.DR.ALBERTO 12/13/16 B.Q. LAGMAN 12/20/16 R. OFFICE PASSED

tuminous mix to Column (4)

Attested by: Submitted by:

WILFREDO J. FAJARDO ROMEO P. GUECO


Chief, QAHD Project Engineer
DPWH - R - III DPWH - R - III
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
Region III, Sindalan, City of San Fernando, Pampanga

STATUS OF QUALITY CONTROL TESTS


As of April, 2016

Region: III
District:
Project Network Development - Off- Carriageway Improvement Including Drainage, Secondary Roads, Paniqui-Camiling-Wawa Road, Tarlac
Location: Province of Tarlac
Contractor: GVDPM CONSTRUCTION CORPORATION
ITEM NO. MATERIALS UNIT QUANTITY

PART A. FACILITIES FOR THE ENGINEERS


Provision of Field Office for the Engineer (Rental Basis)
A.1.1 (8) mo. 13.00
Err:509
Provision of Furnitures/Fixtures, Equipment & Appliances for the Field
A.1.1 (11) l.s. 1.00
Err:509
Provision of 4x4 pick-up Type Service Vehicle for the Engineer on Ba
A.1.2.(2) mo. 13.00
Err:509
PART B. OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard pcs. 3
Err:509 Err:509 Err:509 Err:509
B.7 Occupational Safety and Health Program mo. 13
B.8 Traffic Management mo. 13
B.18.1 Craneway l.s. 1
PART C. EARTHWORKS 0 0
Err:509 Err:509 Err:509 Err:509
101(1) Removal of Structures and Obstruction l.s. 1
Err:509 Err:509 Err:509 Err:509
104(1)a Embankment from Roadway Excavation (Common Soil) cu.m. 198
104(2)a Embankment from Borrow (Common Soil) cu.m. 1476
105(1) Subgrade Preparation (Common Material) sq.m 714
PART D. SUB-BASE AND BASE COURSE 0 0
200(1) Aggregate Subbase Course cu.m. 134
PART E. SURFACE COURSE 0 0
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
311(1)c1 PCCP (Unreinforced) ( t=230mm) sq.m 120
0 a. Cement bags 262.2
0 b. Fine Aggregates cu.m. 14.904
0 c. Coarse Aggregates cu.m. 18.768
0 d. RSB kgs. 11.868
0 g.Concrete cu.m. 27.6
Err:509 Err:509 Err:509 Err:509
0 h. Pavement sq.m 120
311(1)e1 PCCP (Unreinforced) ( t=280mm) sq.m 522
0 a. Cement bags 1388.52
0 b. Fine Aggregates cu.m. 78.9264
0 c. Coarse Aggregates cu.m. 99.3888
0 d. RSB kgs. 73.08
0 g.Concrete cu.m. 146.16
Err:509 Err:509 Err:509 Err:509
0 h. Pavement sq.m 522
PART F. BRIDGE STRUCTURES 0 0
400(23)a8 Bored Piles (1.5m dia.) (4000 psi @ 28 days) m. 1053
0 a. Cement bags 24513.84
0 b. Fine Aggregates cu.m. 1021.41
0 c. Coarse Aggregates cu.m. 2042.82
0 e.Concrete cu.m. 2042.82
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
400(28) High Strain Dynamic Testing (P.D.A) each 8
400(27)b Pile Integrity Testing (Low Strain) each 16
401(2)a Concret Railing (Standard) (3000 psi @ 28 days) m. 432
403(4) Structural Steel, furnished and fabricated kgs. 10870.89
Err:509 Err:509 Err:509 Err:509
404(1)a Reinforcing Steel (Grade 40) kgs. 148056.5
404(1)b Reinforcing Steel (Grade 60) kgs. 101631.52
405(1)b3 Structural Concrete Class "A", f'c=27.58 Mpa (Bridge) (4000 psi @ 2 cu.m. 1035.22
0 a. Cement bags 12422.64
0 b. Fine Aggregates cu.m. 517.61
0 c. Coarse Aggregates cu.m. 1035.22
0 e.Concrete cu.m. 1086.981
Err:509 Err:509 Err:509 Err:509
407(8) Lean Concrete cu.m. 1.94
0 a. Cement bags 13.58
0 b. Fine Aggregates cu.m. 0.97
0 c. Coarse Aggregates cu.m. 1.94
0 d. Concrete cu.m. 1.94
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

NOTE: The number of tests indicated is based on the Minimum Testing Requirements for one source. If materials is taken from more than one (1)
source, each materials should be on the same basis as in Minimum Testing Requirements.

Prepared by: Verified by:

SEAN BERNARD G. DE LEON ALBERT G. SALAC


Project Materials Engineer Project Materials Engineer
of the Philippines
LIC WORKS AND HIGHWAYS
REGIONAL DIRECTOR
y of San Fernando, Pampanga

LITY CONTROL TESTS


April, 2016

Roads, Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District

Sheet No. 1 of 2
MINIMUM NO. OF NUMBER OF TEST %OF WORK
TEST REQUIRED ON FILE BALANCE ACCOMP.

P.E. Certificate

P.E. Certificate

P.E. Certificate

P.E. Certificate
Err:509
P.E. Certificate
P.E. Certificate
P.E. Certificate
0
Err:509
P.E. Certificate
Err:509
1 - GPC , 6 - FDT
1 - GPC , 45 - FDT
1 - GPC , 6 - FDT
0
1-QT , 1-GP , 1-C , 6-FDT , 1-CBR NOTE:
0
Err:509
Err:509
Err:509 Prepared by:
Err:509
Err:509
Err:509
Err:509 SEAN BERNARD
Err:509 Project Materials Engineer
Err:509
0
1 - QT DE
1 - QT , 2 - G
1 - QT , 2 - G Re
1-QT for every 10,000kgs for each size
set of conc. beam sample for each day's pouring but not more than 75 cum.
Err:509
5-holes per km.per lane
0 Region:
Included in Item 311(1)c1(a) District:
Included in Item 311(1)c1(b) Project
Included in Item 311(1)c1(c) Location:

Included in Item 311(1)c1(d) Contractor:


set of conc. beam sample for each day's pouring but not more than 75 cum. ITEM NO.

Err:509
5-holes per km.per lane
0
0
Included in Item 405(1)b3(a)
Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Result
Result
0
1-QT for each size
Err:509
1-QT for every 10,000kgs for each size
1-QT for every 10,000kgs for each size
0
21 - QT
2 - QT , 23 - G
3 - QT , 45 - G
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
0
Included in Item 405(1)b3(a)
Included in Item 405(1)b3(b)
Included in Item 405(1)b3(c)
et of conc. cylinder sample for each day's pouring but not more than 75 cum.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

. If materials is taken from more than one (1)

Submitted by:

RT G. SALAC JESUS O. OBORDO


t Materials Engineer Chief, Construction Division

Anda mungkin juga menyukai