DIMENSI
NO URAIAN PEKERJAAN VOLUME SAT PANJANG LEBAR
(m) (m)
1 Beton 3.09 m3
39.64 0.25
11.00 0.25
15.90 0.35

2 Bekisting 23.43 m2 39.64


11.00
15.90

3 Pembesian 237.99 kg Panjang (m) tekuk & kait (m)


besi D 10 Horizontal 39.64 0.20
Stek vertikal 0.30 0.10
Horizontal 11.00 0.20
Stek vertikal 0.30 0.10
Horizontal 15.90 0.20
Stek vertikal 0.20 0.10

4 Mozaik 17.43 m2
39.64
11.00
59.89
planter 8.74

5 Plester aci 14.73 m2


39.64
11.00
0.25

6 Andesit copping 66.53 m


PERHITUNGAN
TINGGI LUAS PEN. JML ITEM TOTAL
(m) (m2) (bh)

0.20 1.98 1.00 1.98


0.20 0.55 1.00 0.55
0.10 0.56 1.00 0.56

0.20 7.93 2.00 15.85


0.20 2.20 2.00 4.40
0.10 1.59 2.00 3.18

berat (kg/m) Volume (kg) jml Total (kg)


0.617 24.57 2.00 49.14
0.617 0.25 398.00 98.19
0.617 6.91 2.00 13.81
0.617 0.25 111.00 27.39
0.617 9.93 2.00 19.85
0.617 0.19 160.00 29.61

0.20 7.93 1.00 7.93


0.20 2.20 1.00 2.20
0.10 5.99 1.00 5.99
0.15 1.31 1.00 1.31

0.20 7.93 1.00 7.93


0.20 2.20 1.00 2.20
0.20 0.05 92.00 4.60
No : 128/DGL-PBP/SI/SAP-NPCC/X/20
NAVAPARK COUNTRY CLUB II, BSD CITY, TANGERANG Paket Pekerjaa : Structure, Arsitecture & Plumbing
Uraian : Mozaik gutter lap.pool

Uraian Volume Harga Satuan Jumlah


No. Sat Selisih
Kontrak Perubahan Kontrak Perubahan Kontrak Perubahan
a b c d e f g h = dxf I = exg j = i-h

I Mozaik gutter lap.pool

1 Beton m3 3.09 1,106,061 - 3,415,378 3,415,378

2 Bekisting m2 23.43 144,765 - 3,392,047 3,392,047

3 General reinforcement bars kg 237.99 8,737 - 2,079,387 2,079,387

Supply and Install Ceramic Tiles, glazed finish, including cutting to


size ,laid on screed, bedded and jointed in drymortar and adhesive
pointed with colouring grouting; as described to :-

4 Floor; TL-01; 50x50x5mm thick kg 17.43 541,207 - 9,431,181 9,431,181

Plaster of dry mortar system trowelled smooth finish as described

5 12,5mm thick; to masonry walls concrete m2 - 14.73 86,657 - 1,276,129 1,276,129

6 Water proofing m2 - 17.43 75,000 - 1,306,965 1,306,965

7 Andesit stone (ST-01);In slabs 600mm long x300mm wide m2 19.96 - 354,802 - 7,081,067 - (7,081,067)
Total Summary 7,081,067 20,901,087 13,820,020

Disetujui oleh, Diperiksa oleh, Dibuat oleh,


Pemberi Tugas Konsultan QS Kontraktor Pelaksana
PT. Bumi Parama Wisesa PT. Reynolds Partnership PT. Duta Graha Living

Firdaus Husnul Anoro Tokoh


Project Manager Konsultan QS Project Manager