ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN KOEF. SAT

1 Ketrik slab m'

Material
Alat bantu 1.00 ls

Upah
Tukang batu 1 org ### hari 0.50 orang/hari
Pekerja 2 org ### hari 1.00 orang/hari
Mandor 1 org 0.1 hari 0.10 orang/hari

7.5 m
HARGA SATUAN PEKERJAAN

HARGA
MATERIAL JUMLAH
Rp. Rp.

78,750 78,750

80,000 40,000
60,000 60,000
125,000 12,500
Sub Total 191,250
Fee 3% 5,738
subTotal 196,988
PPN 10% 19,699
Total 216,686
No
NAVAPARK COUNTRY CLUB II, BSD CITY, TANGERANG Paket Pekerjaan
Uraian

Uraian Volume Harga Satuan Jumla


No. Sat
Kontrak Perubahan Kontrak Perubahan Kontrak
a b c d e f g h = dxf

1 Ketrik slab m' - 7.50 216,686 -

Plaster in cement and sand mortar (1:4) trowelled


smooth finish described

2 12,5mm thick, to blockwork walls m2 - 3.00 86,657 -

3 Angle Section; L 30x30x3 kg - 20.40 16,932 -

4 Allow for connection plates, stiffener plates, bolts, nuts, etc. as Item - 1 - 47,374 -
described

5 Andesit 30x30 (di lubangi & di bentuk) m' - 7.50 1,064,406 -

Total Summary -

Disetujui oleh, Diperiksa oleh,


Pemberi Tugas Konsultan QS
PT. Bumi Parama Wisesa PT. Reynolds Partnership
Firdaus Husnul
Project Manager Konsultan QS
: 052/BPW/LANDSCAPE/V/2017
: Structure, Arsitecture & Plumbing
: Pekerjaan Cut off drain free form pool

Jumlah
Selisih Keterangan
Perubahan
I = exg j = i-h k

1,625,147 1,625,147

259,971 259,971

345,413 345,413

47,374 47,374

7,983,045 7,983,045

10,260,950 10,260,950

Dibuat oleh,
Kontraktor Pelaksana
PT. Duta Graha Living
Anoro Tokoh
Project Manager
HITUNGAN CUT OF DRAIN FREE FORM POOL
NPCC 2

DIMENSI
NO URAIAN PEKERJAAN VOLUME SAT PANJANG LEBAR
(m) (m)
1 Plesteran & aci 3.00 m2 7.50 0.40

2 Andesit 30x30 7.50 m'

3 Besi siku 30x30x3mm 20.40 kg Panjang (m) berat (kg/


7.50
DIMENSI PERHITUNGAN
TINGGI LUAS PEN. JML ITEM TOTAL
(m) (m2) (bh)
3.00 1.00 3.00

berat (kg/m) Volume (kg) jml Total (kg)


1.360 10.20 2.00 20.40