01.- DADO LAS PARTIDAS QUE SE INDICAN(EDT). DETERMINE:


A) LA CANTIDAD DE INSUMOS POR ACTIVIDAD.
B) LA PLANIFICACIN DEL PROYECTO.
C) CALENDARIO DE ADQUISICIN DE MATERIALES.

ITEM DESCRIPCIN UND. CANT.


1.00 CONCRETO ARMADO
1.01 COLUMNAS
1.01.01 CONCRETO F`C=210 KG/CM2. M3. 27.00
1.01.02 ENCOF.-DESENCOF. M2. 56.00
1.01.03 ACERO FY=4200 KG/CM2. KG. 720.00
1.02 VIGAS
1.02.01 CONCRETO F`C=210 KG/CM2. M3. 18.00 NOTA.-
1.02.02 ENCOF.-DESENCOF. M2. 48.00 SISTEMA DE ESTRUCTURACIN: ALBAIL
1.02.03 ACERO FY=4200 KG/CM2. KG. 540.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F`C=210 KG/CM2. M3. 12.00
1.03.02 ENCOF.-DESENCOF. M2. 120.00
1.03.03 ACERO FY=4200 KG/CM2. KG. 750.00
1.03.04 LADRILLO 0.15X 0.30X0.30 UND. 1,000.00
2.00 MUROS
2.01 LADRILLO KK 18 HCOS. MAQ. CABEZA M2. 60.00
E ESTRUCTURACIN: ALBAILERA CONFINADA.
1.- Dado las partidas que se indican (edt). Determine:
A.- La cantidad de insumos por actividad
B.- La planificacion del proyecto.

ITEM DESCRIPCION UNID. CANT. Ru Tu. Tp.


1.00 CONCRETO ARMADO
1.01 COLUMNAS
1.01.01 CONCRETO F'C=210 KG/CM2 M3 27.00 6 4.5 2
1.01.02 ENCOF.-DESENCOF. M2 56.00 12 4.7 2
1.01.03 ACERO FY=4200 KG/CM2 KG 720.00 240 3.0 2
1.02 VIGAS
1.02.01 CONCRETO F'C=210 KG/CM2 M3 18.00 7 2.6 1
1.02.02 ENCOF.-DESENCOF. M2 48.00 10 4.8 3
1.02.03 ACERO FY=4200 KG/CM2 KG 540.00 240 2.3 2
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F'C=210 KG/CM2 M3 12.00 12.5 1.0 1
1.03.02 ENCOF.-DESENCOF. M2 120.00 15 8.0 6
1.03.03 ACERO FY=4200 KG/CM2 KG 750.00 240 3.1 2
1.03.04 LADRILLO 0.15X 0.30X0.30 UND. 1000.00 160 6.3 3
2.00 MUROS
2.01 LADRILLO KK 10 HCOS. MAQ, CABEZA M2 60.00 7 8.6 4

REGLAMENTO DE CONTRATACION DEL ESTADO PB= PRESUPUESTO


LEY 30225 Y SUS MODIFICATORIAS. FR= FACTOR DE REL
f= factor que esta en
T= tiempode ejecuc
Mmax= multa maxim

M. max=

Pb. 800,000
Fpb Set
Fr 0.98754 "=Po/Pb=0.ABCDE"
Po 790,032.00
TIEMPO DE EJECUCION 100 dias
CONTRATISTA TERMINO LA OBRA 105 dias

SOLUCION

PxD= 0.10X800,000X0.98754 = 79,003.20 = 5,266.88


100X105 15

Pt= 5,266.88x5 = 26,334.40 + IGV


NOTA
SISTEMA DE ESTRUCTURACIN: ALBAILERA CONFINADA
DIAGRAMA DE GANNT
S-1 S-2 S-3 S-4
L M MI J V S L M MI J V S L M MI J V S L M MI J V S

PB= PRESUPUESTO BASE


FR= FACTOR DE RELACION cuando el tiempo es menor a 60 dias F=0.40
f= factor que esta en funcion al tiempo cuando el tiempo es mayor a 60 dias F=0.15
T= tiempode ejecucion de la obra
Mmax= multa maxima

M. max= 0.10xPbxFr

Pb=0.ABCDE"

5,266.88
0.10xPbxFr
Pxd=
TxF
C A.G. P.CH. AGUA MAD.
ITEM DESCRIPCION UNID. CANT. BLS. M3. M3. M3. P2.
1.00 CONCRETO ARMADO
1.01 COLUMNAS
1.01.01 CONCRETO F'C=210 KG/CM2 M3 27.00 262.98 11.34 22.95 4.97
1.01.02 ENCOF.-DESENCOF. M2 56.00 250.88
1.01.03 ACERO FY=4200 KG/CM2 KG 720.00
1.02 VIGAS
1.02.01 CONCRETO F'C=210 KG/CM2 M3 18.00 175.32 7.56 15.3 3.31
1.02.02 ENCOF.-DESENCOF. M2 48.00 221.76
1.02.03 ACERO FY=4200 KG/CM2 KG 540.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F'C=210 KG/CM2 M3 12.00 116.88 5.04 10.2 2.21
1.03.02 ENCOF.-DESENCOF. M2 120.00 427.2
1.03.03 ACERO FY=4200 KG/CM2 KG 750.00
1.03.04 LADRILLO 0.15X 0.30X0.30 UND. 1,000.00
2.00 MUROS
2.01 LADRILLO KK 10 HCOS. MAQ, CABE M2 60.00 24.00 3.48 19.80
579.18 27.42 48.45 10.49 919.64
MATERIALES MANO DE OBRA
ALAMB. 8 CLV. FE ALMB.16 LAD. TECHO LAD. KK CAP. OP. OFIC.
KG. KG. KG. KG. UND. UND. H-H H-H H-H

3.59 35.99 35.99


11.20 11.20 3.74 37.34 37.34
770.4 18.00 7.20 23.98 23.98

2.06 38.57 10.29


4.80 8.64 3.84 38.40 38.40
577.80 13.50 5.40 17.98 17.98

1.54 11.52 7.68


12.00 12.00 6.40 63.96 63.96
802.5 18.75 7.50 24.98 24.98
1,090.00 5.00

0.66 4,080.00 6.86 68.57


28.00 32.50 2,150.70 50.25 1,090.00 4,080.00 53.13 361.29 260.60
MAQUINARIA
PE. MEZCLA. VIBRAD. WINCH.
H-H H-M H-M H-M

180.00 18.09 18.09

102.86 7.20 7.20

49.92 3.84 3.84 3.84

50.00

54.86
437.64 29.13 29.13 3.84
MATERIALES DE LA S-1
C A.G. P.CH. AGUA
ITEM DESCRIPCION UNID. CANT. BLS. M3. M3. M3.
1.00 CONCRETO ARMADO
1.01 COLUMNAS
1.01.01 CONCRETO F'C=210 KG/CM2 M3 13.50 131.49 5.67 11.48 2.49
1.01.02 ENCOF.-DESENCOF. M2 56.00
1.01.03 ACERO FY=4200 KG/CM2 KG 720.00
2.00 MUROS
2.01 LADRILLO KK 10 HCOS. MAQ, CABEZ M2 60.00 24.00 3.48
155.49 9.15 11.48 2.49

MATERIALES UND. CANT.


CEMENTO PORTLAND T-I BLS. 155.49
ARENA GRUESA M3. 9.15
PIEDRA CHANCADA 1/2" M3. 11.48
AGUA M3. 2.49
MADERA TORNILLO P2. 270.68
ALAMBRE NEGRO"8 KG. 11.20
CLAVO KG. 11.86
ACERO CORRUGADO KG. 770.40
ALAMBRE NEGRO"16 KG. 18.00
LADRILLO KK MAQ. 9X13X23CM. UND. 4,080.00
MAD. ALAMB. 8 CLV. FE ALMB.16 LAD. KK
P2. KG. KG. KG. KG. UND.

250.88 11.20 11.20


770.40 18.00

19.80 0.66 4,080.00


270.68 11.20 11.86 770.40 18.00 4,080.00
MATERIALES S-2
C A.G. PCH. AGUA MAD.
ITEM DESCRIPCION UNID. CANT. BLS. M3. M3. M3. P2.
1.00 CONCRETO ARMADO
1.01 COLUMNAS
1.01.01 CONCRETO F'C=210 KG/CM2 M3 13.50 131.50 5.67 11.48 2.49
1.02 VIGAS
1.02.02 ENCOF.-DESENCOF. M2 32.00 147.84
1.03 LOSA ALIGERADA
1.03.02 ENCOF.-DESENCOF. M2 100.00 356.00
1.03.04 LADRILLO 0.15X 0.30X0.30 UND. 333.33
131.50 5.67 11.48 2.49 503.84

MATERIALES UND. CANT.


CEMENTO PORTLAND T-I BLS. 131.50
ARENA GRUESA M3. 5.67
PIEDRA CHANCADA 1/2" M3. 11.48
AGUA M3. 2.49
MADERA TORNILLO P2. 503.84
ALAMBRE NEGRO"8 KG. 13.20
CLAVO KG. 15.76
LADRILLO 0.15X0.30X0.30 UND. 363.33
ALAMB.8 CLV. LAD. TECH.
KG. KG. UND.

3.20 5.76

10.00 10.00
363.33
13.20 15.76 363.33
MATERIALES S-3
C A.G. PCH. AGUA MAD.
ITEM DESCRIPCION UNID. CANT. BLS. M3. M3. M3. P2.
1.00 CONCRETO ARMADO
1.02 VIGAS
1.02.01 CONCRETO F'C=210 KG/CM2 M3 18.00 175.32 7.56 15.30 3.31
1.02.02 ENCOF.-DESENCOF. M2 16.00 73.92
1.02.03 ACERO FY=4200 KG/CM2 KG 540.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO F'C=210 KG/CM2 M3 12.00 116.88 5.04 10.20 2.21
1.03.02 ENCOF.-DESENCOF. M2 20.00 71.20
1.03.03 ACERO FY=4200 KG/CM2 KG 750.00
1.03.04 LADRILLO 0.15X 0.30X0.30 UND. 666.67
292.20 12.60 25.50 5.52 145.12

MATERIALES UND. CANT.


CEMENTO PORTLAND T-I BLS. 292.20
ARENA GRUESA M3. 12.60
PIEDRA CHANCADA 1/2" M3. 25.50
AGUA M3. 5.52
MADERA TORNILLO P2. 145.12
ALAMB. 8 KG. 3.60
CLAVO KG. 4.88
ACERO CORRUG. KG. 1,380.30
ALAMB. 16 KG. 32.25
LADRILLO 0.15X0.30X0.30 UND. 726.67
ALAMB.8 CLV. FE ALMB.16 LAD. TECH.
KG. KG. KG. KG. UND.

1.60 2.88
577.80 13.50

2.00 2.00
802.50 18.75
726.67
3.60 4.88 1,380.30 32.25 726.67