1. DATOS PREVIOS
(
Reacciones debido a:
gconcreto= 2.40 Ton/m3 R(DC)= 86.41 Ton
gm= 1.80 Ton/m3 R(DW)= 5.12 Ton
f= 22.5 R(LL)= 34.73 Ton
(1) A= 0.30 R(PL)= 19.00 Ton
(2) % Impacto= 33.00%
(3) q= 0.96 Ton/m

2. PESO PROPIO (DC) Y DEL SUELO (EV):

CALCULO DE DC
N VOL. (m3) DC (Ton) x (m) DC*x (Ton*m)
1 6.40 15.36 4.00 61.44
2 1.56 3.73 2.35 8.77
3 1.07 2.56 2.05 5.24
N VOL. (m3) DC (Ton) x (m) DC*x (Ton*m)
4 0.05 0.11 2.13 0.23
5 0.05 0.11 2.57 0.28
6 0.11 0.25 2.35 0.59
7 0.30 0.72 2.60 1.87
S -- 22.84 -- 78.42
CALCULO DE EV
N VOL. (m3) EV (Ton) x (m) EV*x (Ton*m)
8 0.99 1.79 2.60 4.64
4

9 36.22 65.20 5.35 348.80


S -- 66.98 -- 353.44

DC= 22.84 Ton EV= 66.98 Ton


x= 3.43 m x= 5.28 m

3. PESO PROPIO PROVENIENTE DE LA SUPERESTRUCTURA (DC):

DC= 21.08 Ton/m


x= 2.25 m

4. CARGA MUERTA PROVENIENTE DE LA SUPERESTRUCTURA (DW):

DW= 1.25 Ton/m


x= 2.25 m

5. PRESION ESTATICA DEL SUELO (EH Y EV):

d=f/2= 11.25
gm= 1.80 g/cm3
(4) Ka= 0.4052
kh=A/2= 0.15
q= 8.53
(5) Ke= 0.5333

Empuje esttico: Empuje dinmico:


E= 21.25 Ton Ee= 27.97 Ton
EH= 20.84 Ton EHe= 27.43 Ton
EV= 4.15 Ton EVe= 5.46 Ton
y= 2.54 m DEe= 6.72 Ton
x= 8.00 m (6) y= 3.03 m
x= 8.00 m
5

6. CARGA VIVA PROVENIENTE DE LA SUPERESTRUCTURA (LL):

LL= 8.47 Ton/m


x= 2.25 m

7. CARGA DE IMPACTO (IM):

IM= 2.80 Ton/m


x= 2.25 m

8. FUERZA DE FRENADO Y ACELERACION (BR):

BR=5%LL= 0.42 Ton


(7) hBR= 1.80 m
y= 9.43 m

9. SOBRECARGA PEATONAL PROVENIENTE DE LA SUPERESTRUCTURA

PL= 4.63 Ton/m


x= 2.25 m

10. SOBRECARGA SUPERFICIAL Y DE TRAFICO (LS):

pH= 0.39 Ton/m


LSH= 2.97 Ton LSV= 5.28 Ton
y= 3.82 m x= 5.25 m

11. SUBPRESION DE AGUA (WA):

WA= -7.78 Ton


x= 4.00 m

12. FUERZA SISMICA (EQ):

EQ=10%DC= 2.11 Ton


y= 6.88 m
6

13. COMBINACION DE CARGAS

LL
IM
ESTADO DC DW EH EV BR WA EQ n
PL
LS
RESISTENCIA 1 0.90 0.65 1.50 1.35 1.75 1.00 0.00 1.05
RESISTENCIA 1 0.90 1.50 1.50 1.35 1.75 1.00 0.00 1.05
RESISTENCIA 1 1.25 0.65 1.50 1.35 1.75 1.00 0.00 1.05
RESISTENCIA 1 1.25 1.50 1.50 1.35 1.75 1.00 0.00 1.05
EV. EXTREMO 1 0.90 0.65 1.50 1.35 0.5 1.00 1.00 1.00
EV. EXTREMO 1 0.90 1.50 1.50 1.35 0.5 1.00 1.00 1.00
EV. EXTREMO 1 1.25 0.65 1.50 1.35 0.5 1.00 1.00 1.00
EV. EXTREMO 1 1.25 1.50 1.50 1.35 0.5 1.00 1.00 1.00
7

1. DATOS PREVIOS

F.S.D.= 1.50 m= 0.50


F.S.V.= 2.00 st= 3.19 Kg/cm2

2. FUERZAS Y MOMENTOS ACTUANTES FACTORADOS

FUERZAS ACTUANTES (Ton)


COMBINACIN EH LSH BR EQ nSF
RESISTENCIA 1 31.26 5.20 0.74 0.00 39.06
RESISTENCIA 1 31.26 5.20 0.74 0.00 39.06
RESISTENCIA 1 31.26 5.20 0.74 0.00 39.06
RESISTENCIA 1 31.26 5.20 0.74 0.00 39.06
EV. EXTREMO 1 41.15 1.48 0.21 2.11 44.96
EV. EXTREMO 1 41.15 1.48 0.21 2.11 44.96
EV. EXTREMO 1 41.15 1.48 0.21 2.11 44.96
EV. EXTREMO 1 41.15 1.48 0.21 2.11 44.96

MOMENTOS ACTUANTES (Ton-m)


COMBINACIN EH LSH BR EQ nSM
RESISTENCIA 1 79.56 19.83 6.99 0.00 111.70
RESISTENCIA 1 79.56 19.83 6.99 0.00 111.70
RESISTENCIA 1 79.56 19.83 6.99 0.00 111.70
RESISTENCIA 1 79.56 19.83 6.99 0.00 111.70
EV. EXTREMO 1 124.84 5.67 2.00 14.51 147.02
EV. EXTREMO 1 124.84 5.67 2.00 14.51 147.02
EV. EXTREMO 1 124.84 5.67 2.00 14.51 147.02
EV. EXTREMO 1 124.84 5.67 2.00 14.51 147.02

3. FUERZAS Y MOMENTOS RESISTENTES FACTORADOS:

FUERZAS RESISTENTES (Ton)


COMBINACIN DC DW LL IM PL EV LSV WA nSF
RESISTENCIA 1 39.52 0.81 14.82 4.89 8.11 96.02 9.24 -7.78 173.92
RESISTENCIA 1 39.52 1.87 14.82 4.89 8.11 96.02 9.24 -7.78 175.04
RESISTENCIA 1 54.89 0.81 14.82 4.89 8.11 96.02 9.24 -7.78 190.06
RESISTENCIA 1 54.89 1.87 14.82 4.89 8.11 96.02 9.24 -7.78 191.17
EV. EXTREMO 1 39.52 0.81 4.24 1.40 2.32 97.79 2.64 -7.78 140.93
EV. EXTREMO 1 39.52 1.87 4.24 1.40 2.32 97.79 2.64 -7.78 142.00
EV. EXTREMO 1 54.89 0.81 4.24 1.40 2.32 97.79 2.64 -7.78 156.30
EV. EXTREMO 1 54.89 1.87 4.24 1.40 2.32 97.79 2.64 -7.78 157.37

MOMENTOS RESISTENTES (Ton-m)


COMBINACIN DC DW LL IM PL EV LSV WA nSM
RESISTENCIA 1 113.26 1.83 33.35 11.01 18.25 521.92 48.51 -31.13 752.85
RESISTENCIA 1 113.26 4.22 33.35 11.01 18.25 521.92 48.51 -31.13 755.36
RESISTENCIA 1 157.31 1.83 33.35 11.01 18.25 521.92 48.51 -31.13 799.09
RESISTENCIA 1 157.31 4.22 33.35 11.01 18.25 521.92 48.51 -31.13 801.60
EV. EXTREMO 1 113.26 1.83 9.53 3.14 5.21 536.08 13.86 -31.13 651.79
8

EV. EXTREMO 1 113.26 4.22 9.53 3.14 5.21 536.08 13.86 -31.13 654.18
EV. EXTREMO 1 157.31 1.83 9.53 3.14 5.21 536.08 13.86 -31.13 695.83
EV. EXTREMO 1 157.31 4.22 9.53 3.14 5.21 536.08 13.86 -31.13 698.22

4. ESTABILIDAD AL DESLIZAMIENTO

COMBINACION mSFV/SFH
RESISTENCIA 1 2.226 OK!
RESISTENCIA 1 2.241 OK!
RESISTENCIA 1 2.433 OK!
RESISTENCIA 1 2.447 OK!
EV. EXTREMO 1 1.567 OK!
EV. EXTREMO 1 1.579 OK!
EV. EXTREMO 1 1.738 OK!
EV. EXTREMO 1 1.750 OK!

5. ESTABILIDAD AL VOLTEO

COMBINACION SMR/SMA
RESISTENCIA 1 6.740 OK!
RESISTENCIA 1 6.762 OK!
RESISTENCIA 1 7.154 OK!
RESISTENCIA 1 7.176 OK!
EV. EXTREMO 1 4.433 OK!
EV. EXTREMO 1 4.450 OK!
EV. EXTREMO 1 4.733 OK!
EV. EXTREMO 1 4.749 OK!
9

6. PRESIONES SOBRE EL SUELO

B/6= 1.33 m

COMBINACIN x (m) e (m) qmax (Ton/m) qmin (Ton/m)


RESISTENCIA 1 3.686 0.314 OK! 26.85 OK! 16.63 OK!
RESISTENCIA 1 3.677 0.323 OK! 27.18 OK! 16.58 OK!
RESISTENCIA 1 3.617 0.383 OK! 30.59 OK! 16.93 OK!
RESISTENCIA 1 3.609 0.391 OK! 30.91 OK! 16.88 OK!
EV. EXTREMO 1 3.582 0.418 OK! 23.14 OK! 12.09 OK!
EV. EXTREMO 1 3.572 0.428 OK! 23.45 OK! 12.05 OK!
EV. EXTREMO 1 3.511 0.489 OK! 26.70 OK! 12.38 OK!
EV. EXTREMO 1 3.503 0.497 OK! 27.01 OK! 12.33 OK!
10

1. CALCULO DEL CORTANTE Y MOMENTO DE DISEO (EN LA BASE


DE LA PANTALLA)

y= 6.83 m

CORTANTE Vd (Ton) - A "d" DE LA CARA


COMBINACIN
EH LSH BR EQ nSVd
RESISTENCIA 1 24.69 4.62 0.74 0.00 31.55
RESISTENCIA 1 24.69 4.62 0.74 0.00 31.55
RESISTENCIA 1 24.69 4.62 0.74 0.00 31.55
RESISTENCIA 1 24.69 4.62 0.74 0.00 31.55
EV. EXTREMO 1 32.50 1.32 0.21 2.11 36.14
EV. EXTREMO 1 32.50 1.32 0.21 2.11 36.14
EV. EXTREMO 1 32.50 1.32 0.21 2.11 36.14
EV. EXTREMO 1 32.50 1.32 0.21 2.11 36.14

MOMENTO M (Ton-m) - MXIMO


COMBINACIN
EH LSH BR EQ nSM
RESISTENCIA 1 57.07 15.90 6.40 0.00 83.34
RESISTENCIA 1 57.07 15.90 6.40 0.00 83.34
RESISTENCIA 1 57.07 15.90 6.40 0.00 83.34
RESISTENCIA 1 57.07 15.90 6.40 0.00 83.34
EV. EXTREMO 1 89.56 4.54 1.83 11.24 107.18
EV. EXTREMO 1 89.56 4.54 1.83 11.24 107.18
EV. EXTREMO 1 89.56 4.54 1.83 11.24 107.18
EV. EXTREMO 1 89.56 4.54 1.83 11.24 107.18

(1)
2. UBICACIN DE M/2 PARA EL CORTE DEL ACERO:

y= 4.800 m
ty= 0.557 m
Mu= 107.18 Ton-m
Mu/2= 54.78 Ton-m DISMINUIR y!

MOMENTO M/2 (Ton-m)


COMBINACIN
11

COMBINACIN
EH LSH BR EQ nS(M/2)
RESISTENCIA 1 28.16 7.84 4.89 0.00 42.93
RESISTENCIA 1 28.16 7.84 4.89 0.00 42.93
RESISTENCIA 1 28.16 7.84 4.89 0.00 42.93
RESISTENCIA 1 28.16 7.84 4.89 0.00 42.93
EV. EXTREMO 1 44.18 2.24 1.40 6.96 54.78
EV. EXTREMO 1 44.18 2.24 1.40 6.96 54.78
EV. EXTREMO 1 44.18 2.24 1.40 6.96 54.78
EV. EXTREMO 1 44.18 2.24 1.40 6.96 54.78

3. CALCULO DEL CORTANTE Y MOMENTO EN LA BASE DEL


PARAPETO

CORTANTE Vdparap (Ton) - A "d" DE LA CARA


COMBINACIN
EH LSH BR EQ nSVd
RESISTENCIA 1 1.13 0.99 0.74 0.00 3.00
RESISTENCIA 1 1.13 0.99 0.74 0.00 3.00
RESISTENCIA 1 1.13 0.99 0.74 0.00 3.00
RESISTENCIA 1 1.13 0.99 0.74 0.00 3.00
EV. EXTREMO 1 1.48 0.28 0.21 2.11 4.09
EV. EXTREMO 1 1.48 0.28 0.21 2.11 4.09
EV. EXTREMO 1 1.48 0.28 0.21 2.11 4.09
EV. EXTREMO 1 1.48 0.28 0.21 2.11 4.09

MOMENTO Mparap (Ton-m) - MXIMO


COMBINACIN
EH LSH BR EQ nSM
RESISTENCIA 1 2.75 0.77 2.45 0.00 6.26
RESISTENCIA 1 2.75 0.77 2.45 0.00 6.26
RESISTENCIA 1 2.75 0.77 2.45 0.00 6.26
RESISTENCIA 1 2.75 0.77 2.45 0.00 6.26
EV. EXTREMO 1 4.31 0.22 0.70 1.58 6.81
EV. EXTREMO 1 4.31 0.22 0.70 1.58 6.81
EV. EXTREMO 1 4.31 0.22 0.70 1.58 6.81
EV. EXTREMO 1 4.31 0.22 0.70 1.58 6.81
12

4. CALCULO DEL CORTANTE Y MOMENTO EN EL TALON DE LA


ZAPATA

qcara CORTANTE Vd (Ton) - A "d" DE LA CARA


COMBINACIN
(Ton/m) DC LSv EV Q nSVd
RESISTENCIA 1 23.658 -9.42 -9.24 -90.43 137.64 29.99
RESISTENCIA 1 23.866 -9.42 -9.24 -90.43 139.09 31.50
RESISTENCIA 1 26.318 -13.08 -9.24 -90.43 155.07 44.44
RESISTENCIA 1 26.526 -13.08 -9.24 -90.43 156.51 45.95
EV. EXTREMO 1 19.690 -9.42 -2.64 -90.43 116.72 14.24
EV. EXTREMO 1 19.888 -9.42 -2.64 -90.43 118.10 15.62
EV. EXTREMO 1 22.224 -13.08 -2.64 -90.43 133.32 27.17
EV. EXTREMO 1 22.422 -13.08 -2.64 -90.43 134.69 28.55

qcara MOMENTO M (Ton-m) - MXIMO


COMBINACIN
(Ton/m) DC LSv EV Q nSM
RESISTENCIA 1 23.658 -26.14 -25.41 -248.67 390.04 94.32
RESISTENCIA 1 23.866 -26.14 -25.41 -248.67 394.34 98.83
RESISTENCIA 1 26.318 -36.30 -25.41 -248.67 441.10 137.26
RESISTENCIA 1 26.526 -36.30 -25.41 -248.67 445.40 141.77
EV. EXTREMO 1 19.690 -26.14 -7.26 -248.67 332.64 50.58
EV. EXTREMO 1 19.888 -26.14 -7.26 -248.67 336.74 54.67
EV. EXTREMO 1 22.224 -36.30 -7.26 -248.67 381.27 89.04
EV. EXTREMO 1 22.422 -36.30 -7.26 -248.67 385.36 93.14
13

5. CALCULO DEL CORTANTE Y MOMENTO EN LA PUNTA


DE LA ZAPATA

qcara CORTANTE Vd (Ton) - A "d" DE


COMBINACIN LA CARA
(Ton/m) DC Q nSV
RESISTENCIA 1 24.616 -2.94 43.75 42.85
RESISTENCIA 1 24.859 -2.94 44.23 43.36
RESISTENCIA 1 27.599 -4.08 49.46 47.65
RESISTENCIA 1 27.841 -4.08 49.94 48.15
EV. EXTREMO 1 20.726 -2.94 37.29 34.35
EV. EXTREMO 1 20.957 -2.94 37.75 34.81
EV. EXTREMO 1 23.567 -4.08 42.73 38.65
EV. EXTREMO 1 23.797 -4.08 43.18 39.10

qcara MOMENTO M (Ton-m) - MXIMO


COMBINACIN
(Ton/m) DC Q nSM
RESISTENCIA 1 24.616 -2.65 42.26 41.60
RESISTENCIA 1 24.859 -2.65 42.80 42.16
RESISTENCIA 1 27.599 -3.68 48.36 46.92
RESISTENCIA 1 27.841 -3.68 48.90 47.48
EV. EXTREMO 1 20.726 -2.65 36.67 34.03
EV. EXTREMO 1 20.957 -2.65 37.18 34.54
EV. EXTREMO 1 23.567 -3.68 42.48 38.81
EV. EXTREMO 1 23.797 -3.68 42.99 39.32
14

1. DATOS

f'c= 210 Kg/cm2 fy= 4200 Kg/cm2


r(pant)= 0.05 m r(zapata)= 0.075 m
f (Flexin)= 0.90 f (Corte)= 0.90

2. DISEO DE LA PANTALLA

VERIFICACION DE CORTANTE
fVc= 48.39 Ton
Vu= 36.14 Ton OK!

ACERO VERTICAL
CARA INTERIOR CARA EXTERIOR
DESC. VALOR DESC. VALOR
15

Mu 107.18 Ton-m #5 1.98 cm2


d 0.70 m Asmin 10.50 cm2
a 10.36 cm N Aceros 5.30
As 44.02 cm2 s (Calculado) 18.86 cm
r 0.0063 s (Redond.) 17.5 cm
rmin 0.0015 Asvext #5@17.5
#8 5.07 cm2 OK!
N Aceros 8.68
s (Calculado) 11.52 cm
s (Redond.) 10 cm
Asvint #8@10
Ld 0.72 m
Lcorte (calc) 2.76 m
Lcorte (redond) 2.80 m
Asvint/2 #8@20

ACERO HORIZONTAL
PARTE INFERIOR PARTE SUPERIOR
DESC. VALOR DESC. VALOR
#3 0.71 cm2 #3 0.71 cm2
r 0.0020 r 0.0020
Ash 14.00 cm2 Ash 10.13 cm2
Ash/3 4.67 cm2 Ash/3 3.38 cm2
N Aceros 6.57 N Aceros 4.76
s (Calculado) 15.21 cm s (Calculado) 21.02 cm
s (Redond.) 15 cm s (Redond.) 22.5 cm
Ashint #3@15 Ashint #3@22.5
#4 1.27 cm2 #4 1.27
2*Ash/3 9.33 cm2 2*Ash/3 6.76 cm2
N Aceros 7.35 N Aceros 5.32
s (Calculado) 13.61 cm s (Calculado) 18.80 cm
s (Redond.) 12.5 cm s (Redond.) 17.5 cm
Ashext #3@12.5 Ashext #3@17.5
16

RESUMEN: Ashint #3,1@5,19@15,r@22.5


Ashext #4,1@5,22@12.5,r@17.5

3. DISEO DEL PARAPETO

VERIFICACION DE CORTANTE
fVc= 10.37 Ton
Vu= 4.09 Ton OK!

ACERO VERTICAL INTERIOR


DESC. VALOR
Mu 6.81 Ton-m
d 0.15 m
a 3.17 cm
As 13.45 cm2
r 0.0090
rmin 0.0015
#6 2.85 cm2 OK! ACERO VERTICAL EXTERIOR
N Aceros 4.72 Asvpar-ext #3@22.5
s (Calculado) 21.18 cm
s (Redond.) 20 cm ACERO HORIZONTAL
Asvpar #6@20 Ashpar #3@22.5

4. DISEO DEL TALON DE LA ZAPATA

VERIFICACION DE CORTANTE
fVc= 51.84 Ton
Vu= 45.95 Ton OK!

ACERO LONGITUDINAL
CARA INFERIOR CARA SUPERIOR
DESC. VALOR DESC. VALOR
Mu 141.77 Ton-m #5 1.98 cm2
d 0.73 m Asmin 10.88 cm2
a 13.44 cm N Aceros 5.49
As 57.13 cm2 s (Calculado) 18.21 cm
r 0.0079 s (Redond.) 17.5 cm
rmin 0.0015 Aslsup #5@17.5
#8 5.07 cm2 OK!
N Aceros 11.27
s (Calculado) 8.87 cm
s (Redond.) 10 cm
Aslinf #8@10

ACERO TRANSVERSAL
Ast #5@17.5

5. DISEO DE LA PUNTA DE LA ZAPATA

VERIFICACION DE CORTANTE
fVc= 51.84 Ton
Vu= 48.15 Ton OK!

ACERO LONGITUDINAL
CARA INFERIOR CARA SUPERIOR
17

DESC. VALOR DESC. VALOR


Mu 47.48 Ton-m #5 1.98 cm2
d 0.73 m Asmin 10.88 cm2
a 4.21 cm N Aceros 5.49
As 17.88 cm2 s (Calculado) 18.21 cm
r 0.0025 s (Redond.) 17.5 cm
rmin 0.0015 Aslsup #5@17.5
#8 5.07 cm2 OK!
N Aceros 3.53
s (Calculado) 28.35 cm
s (Redond.) 30 cm
Aslinf #8@30

ACERO TRANSVERSAL
Ast #5@17.5