Anda di halaman 1dari 154

Volume Beton Pile Cap

No Item Kode P L T V 1 unit Jumlah Vtot

m m m m3 bh m3
1 Tipe Normal Pancang
6.6 4.8 1.5 47.52 87 4134.24

6.6
7,0 Pcg 12 1.33
0.71
0.987
6.45
6.85
4.65
6,85 1.2 0.71
1.3 1.80864
0.987
4.8
7,0 0.9870.1 1.33
0.71
0.71 1.0
0.05
6.45
6.85 6,85
0.71
0.987
1.34.65
0.71
0.987
6,85
6.45

49.33
K 22.8 Bkstg 34.2
h= 1.5 L 31.68 G 0,9 127.512
1 Tipe Bore Pile
7 7 1.85 90.65 3 271.95

BP 9

90.65
K 28 Bkstg 51.8
h= 1.5 L 49 G 0,9 178.112

1.584
Pile Cape Normal
Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg

D32-150 7.87 32 251.84 1589.856 21


0.71 1.33 6.45
4.65 1.3 0.71
0.1
0.71 1.0
0.05
6.45 1.34.650.71
0,706
0.71 6.45

0.71 0.71 D32-150 6.07 44 267.08 1686.065 22


4.65

D19-150 7.87 32 251.84 560.4863 21

D19-150 6.07 44 267.08 594.4039 22

2D16 22.2 2 44.4 70.07386 4

D13-600 1.43 70 100.1 104.2927 8

4605.178
5 D 19 2.4 60 144 320.4814 12

D10-100 12 12 144 88.776 12

Diameter Spiral = 0.3


Jarak Antar Spiral = 0.1 409.2574
Kll Lingkaran = 3.14 x 0.3 = 0.942
Jumlah 5014.435

Besi Pile Cap Bandara 1413.81 341.048


1754.858 kg

Pile Cape Bore Pile 102 (Portal)


Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg

D32-125 8.824 54 476.496 3008.1 40

D32-125 8.824 54 476.496 3008.1 40


0.987 0.987

6,85
D22-125 8.824 54 476.496 1421.797 40

D22-125 8.824 54 476.496 1421.797 40

2D16 27.4 2 54.8 86.48755 5

Jumlah 8946.283

Pile Cape Bore Pile 101


Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg

D32-125 8.824 54 476.496 3008.1 40

D32-125 8.824 54 476.496 3008.1 40


0.987 0.987

6,85

D19-125 8.824 54 476.496 1060.473 40

D19-125 8.824 54 476.496 1060.473 40


2D16 27.4 2 54.8 86.48755 5

Jumlah 8223.634
Total Rencana Kedepan Berat
Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang Besi
Titik m Kg Bh Titik m Kg Bh kg/m

97 24428.48 154216 2036 46 11584.64 73133.37 965 6.31296

97 25906.76 163548.3 2159 46 12285.68 77559.01 1024 6.31296

97 24428.48 54367.17 2036 46 11584.64 25782.37 965 2.225565

97 25906.76 57657.18 2159 46 12285.68 27342.58 1024 2.225565

97 4306.8 6797.164 359 46 2042.4 3223.397 170 1.57824

97 9709.7 10116.39 809 46 4604.6 4797.464 384 1.041885

446702.3
113 16272 36214.39 1356 46 6624 14742.14 552 2.225565

113 16272 10031.69 1356 46 6624 4083.696 552 0.6165

492948.3 230664

Total Berat
Jumlah Panjang Berat Batang Besi
Titik m Kg Bh kg/m

2 952.992 6016.2 79 6.31296

2 952.992 6016.2 79 6.31296


2 952.992 2843.595 79 2.98386

2 952.992 2843.595 79 2.98386

2 109.6 172.9751 9 1.57824

17892.57

Total Berat
Jumlah Panjang Berat Batang Besi
Titik m Kg Bh kg/m

1 476.496 3008.1 40 6.31296

1 476.496 3008.1 40 6.31296

1 476.496 1060.473 40 2.225565

1 476.496 1060.473 40 2.225565


1 54.8 86.48755 5 1.57824

8223.634
Pile Cape Logistik
Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg

D32-150 7.87 32 251.84 2424.177 32


0
0
0
0
0
0
0.71 0.71 D32-150 6.07 44 267.08 3333.243 44
4.65
0
0
0
0
D19-150 7.87 32 251.84 854.617 32
0
0
0
0
D19-150 6.07 44 267.08 1175.098 44
0
0
0
0
2D16 22.2 2 44.4 70.07386 4

0
0
0
0
0
0
D13-600 1.43 70 100.1 145.8639 12
0
0
0
0
0
0
0
5 D 19 2.4 60 144 400.6017 15
0
0
0
0
0
0
0
0
0
0
0
0
D10-100 12 12 144 88.776 12
0
0
0
0
0
Diameter Spiral = 0.3 0
Jarak Antar Spiral = 0.1 0
Kll Lingkaran = 3.14 x 0.3 = 0.942 0
Jumlah 8492.45
Total Rencana Kedepan Berat
Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang Besi
Titik m Kg Bh Titik m Kg Bh kg/m

90 22665.6 218175.9 2880 46 11584.64 73133.37 965 6.31296


0 0
0 0
0 0
0 0
0 0
0 0
90 24037.2 299991.9 3960 46 12285.68 77559.01 1024 6.31296
0 0
0 0
0 0
0 0
90 22665.6 76915.53 2880 46 11584.64 25782.37 965 2.225565
0 0
0 0
0 0
0 0
90 24037.2 105758.8 3960 46 12285.68 27342.58 1024 2.225565
0 0
0 0
0 0
0 0
90 3996 6306.647 333 46 2042.4 3223.397 170 1.57824

0 0
0 0
0 0
0 0
0 0
0 0
90 9009 13127.75 1050 46 4604.6 4797.464 384 1.041885
0 0
0 0
0 0
0 0
0 0
0 0
0 0
90 12960 36054.15 1350 46 6624 14742.14 552 2.225565
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
90 12960 7989.84 1080 46 6624 4083.696 552 0.6165
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
764320.5 230664
Volume Beton Pile Cap

No Item Kode P L T V 1 unit Jumlah

m m m m3 bh

2 Area Portal
I 0.28 4.8 1.5 2.02
2.26
1.13 II 3.67 2.26 1.5 12.44
I III 3.67 2.26 1.5 12.44
iii

2.54 4.8
II

Pcg 7 1.2 1.06


1.13
0.28
R 2.5268 27.95 10
K 15.747 Bkstg 23.6205
h=1.5 L 17.932 G 0,9 33.903 0.800 31.912

3 Area Bandara
i 4.565 4.8 1.5 32.87
4,565 ii 2.765 1.017 1.5 4.22
1,017
iii 2.765 1.017 1.5 4.22
i 0,73
4,8
ii

iii

Pcg 10 1.2 1.51


2,4
R 2.275 42.81 15
K 19.69 Bkstg 29.5349
h=1.5 L 27.536 G 0,9 47.856
Total 46.912
Pile Cape Bandara
Pertitik
Vtot Item Kode P
Jumlah Panjang
m3 m bh m

D32-150 8.008 5 40.04


7.9 2 15.8
7.75 2 15.5
7.6 2 15.2
7.45 2 14.9
7.3 2 14.6
7.15 2 14.3
279.54 7 2 14
6.85 2 13.7
6.7 2 13.4
6.55 2 13.1
6.4 2 12.8
6.25 2 12.5
6 2 12

2.769 2 5.538
3.369 2 6.738
3.969 2 7.938
642.17 4.569 2 9.138
5.169 2 10.338
5.769 2 11.538
642.168225 6.208 30 186.24

D19-150 8.008 5 40.04


7.9 2 15.8
7.75 2 15.5
7.6 2 15.2
7.45 2 14.9
7.3 2 14.6
7.15 2 14.3
7 2 14
6.85 2 13.7
6.7 2 13.4
6.55 2 13.1
6.4 2 12.8
6.25 2 12.5
6 2 12
2.769 2 5.538
3.369 2 6.738
3.969 2 7.938
4.569 2 9.138
5.169 2 10.338
5.769 2 11.538
6.208 30 186.24

4D16 10.198 4 40.792

D13-600 1.43 0 0

5 D 19 2.4 50 120
0.1 1.0

1.3

D10-100 12 10 120
1.3

Diameter Spiral = 0.3


Jarak Antar Spiral = 0.1
Kll Lingkaran = 3.14 x 0.3 = 0.942
Jumlah
Pertitik Total Berat
Berat Batang Jumlah Panjang Berat Batang Besi
Kg Titik m Kg Bh kg/m

252.77 3 3 120.12 758.31 10 6.31296


99.74 1 3 47.4 299.23 4
97.85 1 3 46.5 293.55 4
95.96 1 3 45.6 287.87 4
94.06 1 3 44.7 282.19 4
92.17 1 3 43.8 276.51 4
90.28 1 3 42.9 270.83 4
88.38 1 3 42 265.14 4
86.49 1 3 41.1 259.46 3
84.59 1 3 40.2 253.78 3
82.70 1 3 39.3 248.10 3
80.81 1 3 38.4 242.42 3
78.91 1 3 37.5 236.74 3
75.76 1 3 36 227.27 3

34.96 0 3 16.614 104.88 1


42.54 1 3 20.214 127.61 2
50.11 1 3 23.814 150.34 2
57.69 1 3 27.414 173.06 2
65.26 1 3 31.014 195.79 3
72.84 1 3 34.614 218.52 3
1175.73 16 3 558.72 3527.18 47

89.11 3 3 120.12 267.33 10 2.225565


35.16 1 3 47.4 105.49 4
34.50 1 3 46.5 103.49 4
33.83 1 3 45.6 101.49 4
33.16 1 3 44.7 99.48 4
32.49 1 3 43.8 97.48 4
31.83 1 3 42.9 95.48 4
31.16 1 3 42 93.47 4
30.49 1 3 41.1 91.47 3
29.82 1 3 40.2 89.47 3
29.15 1 3 39.3 87.46 3
28.49 1 3 38.4 85.46 3
27.82 1 3 37.5 83.46 3
26.71 1 3 36 80.12 3
12.33 0 3 16.614 36.98 1
15.00 1 3 20.214 44.99 2
17.67 1 3 23.814 53.00 2
20.34 1 3 27.414 61.01 2
23.01 1 3 31.014 69.02 3
25.68 1 3 34.614 77.04 3
414.49 16 3 558.72 1243.47 47

64.38 3 3 122.376 193.14 10 1.57824

0.00 0 3 0 0.00 0 1.041885

3986.19 11958.58
2.225565
267.07 10 3 360 801.20 30

0.6165
73.98 10 3 360 221.94 30

341.05
4327.24 12981.72
Pile Cape Portal
Pertitik
Item Kode P
Jumlah Panjang Berat
m bh m Kg

D32-200 6.068 13 78.884 497.99


5.278 2 10.556 66.64
4.476 2 8.952 56.51
3.677 2 7.354 46.43
2.876 2 5.752 36.31
2.075 2 4.15 26.20

6.004 1 6.004 37.90


5.916 2 11.832 74.69
5.716 2 11.432 72.17
5.515 2 11.03 69.63
5.316 2 10.632 67.12
5.116 2 10.232 64.59
4.916 2 9.832 62.07
4.716 2 9.432 59.54
4.516 2 9.032 57.02
4.316 2 8.632 54.49
4.116 2 8.232 51.97
3.916 2 7.832 49.44

D19-200 6.068 13 78.884 175.56


5.297 2 10.594 23.58
4.498 2 8.996 20.02
3.697 2 7.394 16.46
2.894 2 5.788 12.88
2.095 2 4.19 9.33

6.03 1 6.03 13.42


5.945 2 11.89 26.46
5.744 2 11.488 25.57
5.544 2 11.088 24.68
5.345 2 10.69 23.79
5.145 2 10.29 22.90
4.944 2 9.888 22.01
4.745 2 9.49 21.12
4.544 2 9.088 20.23
4.344 2 8.688 19.34
4.144 2 8.288 18.45
3.945 2 7.89 17.56

4D16 5.371 4 21.484 33.91

4D16 2.649 4 10.596 16.72

D13-600 1.324 41 54.284 56.56

2071.25

5 D 19 2.4 35 84 186.95
0.1 1.0

1.3

D10-100 12 7 84 51.79
1.3

Diameter Spiral = 0.3


Jarak Antar Spiral = 0.1 238.73
Kll Lingkaran = 3.14 x 0.3 = 0.942
Jumlah 2309.99
Total Berat
Batang Jumlah Panjang Berat Batang Besi
Titik m Kg Bh kg/m

7 3 236.652 1493.97 20 6.31296


1 3 31.668 199.92 3
1 3 26.856 169.54 2
1 3 22.062 139.28 2
0 3 17.256 108.94 1
0 3 12.45 78.60 1

1 3 18.012 113.71 2
1 3 35.496 224.08 3
1 3 34.296 216.51 3
1 3 33.09 208.90 3
1 3 31.896 201.36 3
1 3 30.696 193.78 3
1 3 29.496 186.21 2
1 3 28.296 178.63 2
1 3 27.096 171.06 2
1 3 25.896 163.48 2
1 3 24.696 155.90 2
1 3 23.496 148.33 2

7 3 236.652 526.68 20 2.225565


1 3 31.782 70.73 3
1 3 26.988 60.06 2
1 3 22.182 49.37 2
0 3 17.364 38.64 1
0 3 12.57 27.98 1

1 3 18.09 40.26 2
1 3 35.67 79.39 3
1 3 34.464 76.70 3
1 3 33.264 74.03 3
1 3 32.07 71.37 3
1 3 30.87 68.70 3
1 3 29.664 66.02 2
1 3 28.47 63.36 2
1 3 27.264 60.68 2
1 3 26.064 58.01 2
1 3 24.864 55.34 2
1 3 23.67 52.68 2

2 3 64.452 101.72 5 1.57824

1 3 31.788 50.17 3 1.57824

5 3 162.852 169.67 14 1.041885

6213.76
2.225565
7 3 252 560.84 21

0.6165
7 3 252 155.36 21

6929.96
Pekerjaan Pile Cap
Lokasi Volume IMTP 01
No Pier Sat Volume Rencana (m3)
Titik Item Pekerjaan (m3)
0+030 Beton K-350 m3 42.81 43
1

0+040 Beton K-350 ### 42.81 46.5


2

0+050 Beton K-350 ### 42.81 43


3

0+060 Beton K-350 ### 42.81 43


4

0+070 Beton K-350 ### 42.81 43


5

0+080 Beton K-350 ### 42.81 43


6

0+090 Beton K-350 ### 42.81 43


7

0+100 Beton K-350 ### 42.81 43


8

0+110 Beton K-350 ### 42.81 43


9

0+120 Beton K-350 ### 42.81 42.5


10

0+130 Beton K-350 ### 42.81 43.5


11

0+140 Beton K-350 ### 42.81 43


12

0+150 Beton K-350 ### 42.81 43


13

0+160 Beton K-350 ### 42.81 43


14

0+170 Beton K-350 ### 42.81 43


15

0+180 Beton K-350 ### 27.95 29.5


16A

Beton K-350 ### 27.95 29


16B

0+210 Beton K-350 ### 49.33 49.5


17

0+240 Beton K-345 ### 49.33


18A

Beton K-350 ### 49.33 54


18B

0+270 Beton K-350 ### 49.33


19A
Beton K-346 ### 49.33 50.5
19B

0+300 Beton K-350 ### 49.33


20

0+330 Beton K-350 ### 49.33


21A

Beton K-347 ### 49.33


21B

0+360 Beton K-350 ### 49.33


22A

Beton K-350 ### 49.33


22B

0+390 Beton K-348 ### 49.33


23

0+420 Beton K-350 ### 49.33


24

0+450 Beton K-350 ### 49.33 52.5


25

0+480 Beton K-349 ### 49.33 49.5


26

0+510 Beton K-350 ### 49.33 49.5


27

0+540 Beton K-350 ### 49.33 49.5


28

0+570 Beton K-350 ### 49.33 50


29

0+600 Beton K-350 ### 49.33 51


30

0+630 Beton K-350 ### 49.33 54.5


31

0+660 Beton K-350 ### 49.33 50


32

0+690 Beton K-350 ### 49.33 52


33

0+720 Beton K-350 ### 49.33 49.5


34

0+750 Beton K-350 ### 49.33 54.5


35

0+780 Beton K-350 ### 49.33 54.5


36

0+810 Beton K-350 ### 49.33 51.5


37

0+840 Beton K-350 ### 49.33 48.5


38

0+870 Beton K-350 ### 49.33 48.5


39
0+900 Beton K-350 ### 49.33 48.5
40

0+930 Beton K-350 ### 49.33 51


41

0+960 Beton K-350 ### 49.33 52.5


42

0+990 Beton K-350 ### 49.33 49.5


43

1+020 Beton K-350 ### 49.33 49.5


44

1+050 Beton K-350 ### 49.33 49.5


45

1+080 Beton K-350 ### 49.33 48.5


46

1+110 Beton K-350 ### 49.33 49.5


47

1+140 Beton K-350 ### 49.33 57.5


48

1+170 Beton K-350 ### 49.33 55.5


49

1+200 Beton K-350 ### 49.33 57.50


50

1+230 Beton K-350 ### 49.33 49.5


51

1+260 Beton K-350 ### 49.33 49.5


52

1+290 Beton K-350 ### 49.33 49.5


53

1+320 Beton K-350 ### 49.33 49.5


54

1+350 Beton K-350 ### 49.33 48.5


55

1+380 Beton K-350 ### 49.33 48.5


56

1+410 Beton K-350 ### 49.33 49.5


57

1+440 Beton K-350 ### 49.33 48.5


58

1+470 Beton K-350 ### 49.33 49.5


59

1+500 Beton K-350 ### 49.33 48.5


60

1+530 Beton K-350 ### 49.33 50.5


61

1+560 Beton K-350 ### 49.33 51


62

1+590 Beton K-350 ### 49.33 49.5


63
63

1+620 Beton K-350 ### 49.33 49.5


64

1+650 Beton K-350 ### 49.33 49.00


65

1+680 Beton K-350 ### 49.33 49.50


66

1+710 Beton K-350 ### 49.33 49.50


67

1+740 Beton K-350 ### 49.33 49.5


68

1+770 Beton K-350 ### 49.33 49.5


69

1+800 Beton K-350 ### 49.33 49.5


70

1+830 Beton K-350 ### 49.33 51.5


71

1+860 Beton K-350 ### 49.33 49


72

1+890 Beton K-350 ### 49.33 52


73

1+920 Beton K-350 ### 49.33 53.5


74

1+950 Beton K-350 ### 49.33 51


75

1+980 Beton K-350 ### 49.33 49.5


76

2+010 Beton K-350 ### 49.33 49.5


77

2+040 Beton K-350 ### 49.33 52


78

2+070 Beton K-350 ### 49.33 52.5


79

2+100 Beton K-350 ### 49.33 49.5


80

2+130 Beton K-350 ### 49.33 54


81

2+160 Beton K-350 ### 49.33 49.5


82

2+190 Beton K-350 ### 49.33 52


83

2+220 Beton K-350 ### 49.33 49.5


84

2+250 Beton K-350 ### 49.33 52


85

2+280 Beton K-350 ### 49.33 51


86

2+310 Beton K-350 ### 49.33 49.5


87
87

2+340 Beton K-350 ### 49.33 50.5


88

2+370 Beton K-350 ### 49.33 49.5


89

2+400 Beton K-350 ### 49.33 49.5


90

2+430 Beton K-350 ### 49.33 51.5


91

2+460 Beton K-350 ### 49.33 49.5


92

2+490 Beton K-350 ### 49.33 50


93

2+520 Beton K-350 ### 49.33 52


94

2+550 Beton K-350 ### 49.33 49.5


95

2+580 Beton K-350 ### 49.33 49.5


96

2+610 Beton K-350 ### 49.33 49.5


97

2+640 Beton K-350 ### 49.33 48.5


98

2+670 Beton K-350 ### 49.33 49.5


99

2+700 Beton K-350 ### 49.33 51


100

2+730 Beton K-350 ### 49.33


101

2+760 Beton K-350 ### 49.33


102

2+820 Beton K-350 ### 49.33 51.5


103

2+850 Beton K-350 ### 49.33 49.5


104

2+880 Beton K-350 ### 49.33 49.5


105

2+910 Beton K-350 ### 49.33 49.5


106

2+940 Beton K-350 ### 49.33 49.5


107

2+970 Beton K-350 ### 49.33 49.5


108

3+000 Beton K-350 ### 49.33 49.5


109
Tanggal

4/26/2016

4/29/2016

5/2/2016

5/5/2016

5/6/2016

5/11/2016

5/15/2016

5/17/2016

5/18/2016

5/20/2016

5/25/2016

5/29/2016

6/3/2016

6/8/2016

6/10/2016

6/2/2016

6/14/2016

6/27/2016

6/25/2016
6/25/2016

4/19/2016

4/16/2016

4/14/2016

4/8/2016

4/5/2016

3/8/2016

1/30/2016

24/02/2016

20/02/2016

15/02/2016

1/30/2016

1/29/2016

1/28/2016

1/24/2016

1/22/2016
1/20/2016

1/17/2016

1/15/2016

1/11/2016

1/5/2016

1/3/2016

1/2/2016

12/28/2016

1/18/2016

1/19/2016

1/21/2016

1/26/2016

2/2/2016

2/4/2016
2/6/2016

2/9/2016

2/16/2016

2/17/2016

2/21/2016

2/22/2016

2/26/2016

2/24/2016

2/26/2016

2/28/2016

3/1/2016

3/2/2016

3/4/2016

3/6/2016

3/8/2016

3/10/2016

3/12/2016

3/13/2016

3/15/2016

3/17/2016

3/19/2016

3/21/2016

3/23/2016
3/26/2016

3/24/2016

4/1/2016

4/10/2016

09,/04/16

4/14/2016

4/30/2016

4/15/2016

4/16/2016

4/18/2016

4/22/2016

5/13/2016

4/26/2016

6/17/2016

5/10/2016

5/7/2016

5/2/2016

5/1/2016

4/29/2016

4/27/2016
Total Besi Pile Cap Total
(m3) Lokasi (kg)
Sat Volume(m3)
Terpasang
5049.5 Titik Item Pekerjaan 507209.95
0+030 Besi Kg 4327.24

0+040 Besi Kg 4327.24

0+050 Besi Kg 4327.24

0+060 Besi Kg 4327.24

0+070 Besi Kg 4327.24

0+080 Besi Kg 4327.24

0+090 Besi Kg 4327.24

0+100 Besi Kg 4327.24

0+110 Besi Kg 4327.24

0+120 Besi Kg 4327.24

0+130 Besi Kg 4327.24

0+140 Besi Kg 4327.24

0+150 Besi Kg 4327.24

0+160 Besi Kg 4327.24

0+170 Besi Kg 4327.24

0+180 Besi Kg 4327.24

Besi Kg 4327.24

0+210 Besi Kg 4327.24

0+240 Besi Kg 4327.24

Besi Kg 4327.24

0+270 Besi Kg 4327.24


Besi Kg

0+300 Besi Kg

0+330 Besi Kg

Besi Kg

0+360 Besi Kg

Besi Kg

0+390 Besi Kg

0+420 Besi Kg

0+450 Besi Kg 5014.44

0+480 Besi Kg 5014.44

0+510 Besi Kg 5014.44

0+540 Besi Kg 5014.44

0+570 Besi Kg 5014.44

0+600 Besi Kg 5014.44

0+630 Besi Kg 5014.44

0+660 Besi Kg 5014.44

0+690 Besi Kg 5014.44

0+720 Besi Kg 5014.44

0+750 Besi Kg 5014.44

0+780 Besi Kg 5014.44

0+810 Besi Kg 5014.44

0+840 Besi Kg 5014.44

0+870 Besi Kg 5014.44


0+900 Besi Kg 5014.44

0+930 Besi Kg 5014.44

0+960 Besi Kg 5014.44

0+990 Besi Kg 5014.44

1+020 Besi Kg 5014.44

1+050 Besi Kg 5014.44

1+080 Besi Kg 5014.44

1+110 Besi Kg 5014.44

1+140 Besi Kg 5014.44

1+170 Besi Kg 5014.44

1+200 Besi Kg 5014.44

1+230 Besi Kg 5014.44

1+260 Besi Kg 5014.44

1+290 Besi Kg 5014.44

1+320 Besi Kg 5014.44

1+350 Besi Kg 5014.44

1+380 Besi Kg 5014.44

1+410 Besi Kg 5014.44

1+440 Besi Kg 5014.44

1+470 Besi Kg 5014.44

1+500 Besi Kg 5014.44

1+530 Besi Kg 5014.44

1+560 Besi Kg 5014.44

1+590 Besi Kg 5014.44


1+620 Besi Kg 5014.44

1+650 Besi Kg 5014.44

1+680 Besi Kg 5014.44

1+710 Besi Kg 5014.44

1+740 Besi Kg 5014.44

1+770 Besi Kg 5014.44

1+800 Besi Kg 5014.44

1+830 Besi Kg 5014.44

1+860 Besi Kg 5014.44

1+890 Besi Kg 5014.44

1+920 Besi Kg 5014.44 53.829

1+950 Besi Kg 5014.44

1+980 Besi Kg 5014.44

2+010 Besi Kg 5014.44

Jebol 2+040 Besi Kg 5014.44

2+070 Besi Kg 5014.44

2+100 Besi Kg 5014.44

Tambah Besi 2+130 Besi Kg 5154.21 52.929

2+160 Besi Kg 5014.44

2+190 Besi Kg 5014.44

2+220 Besi Kg 5014.44

2+250 Besi Kg 5014.44

2+280 Besi Kg 5014.44

2+310 Besi Kg 5014.44


2+340 Besi Kg 5014.44

2+370 Besi Kg 5014.44

2+400 Besi Kg 5014.44

2+430 Besi Kg 5014.44

2+460 Besi Kg 5014.44

2+490 Besi Kg 5014.44

2+520 Besi Kg 5014.44

2+550 Besi Kg 5014.44

2+580 Besi Kg 5014.44

2+610 Besi Kg 5014.44

2+640 Besi Kg 5014.44

2+670 Besi Kg 5014.44

2+700 Besi Kg 5014.44

2+730 Besi Kg

2+760 Besi Kg

2+820 Besi Kg 5014.44

2+850 Besi Kg 5014.44

2+880 Besi Kg 5014.44

2+910 Besi Kg 5014.44

2+940 Besi Kg 5014.44

2+970 Besi Kg 5014.44

3+000 Besi Kg 5014.44


Bekisting Pile Cap Total
Lokasi Volume (m2)
Sat
Titik Item Pekerjaan Terpasang (m3) 3460.33
0+030 Bekisting m2 29.53

0+040 Bekisting m2 29.53

0+050 Bekisting m2 29.53

0+060 Bekisting m2 29.53

0+070 Bekisting m2 29.53

0+080 Bekisting m2 29.53

0+090 Bekisting m2 29.53

0+100 Bekisting m2 29.53

0+110 Bekisting m2 29.53

0+120 Bekisting m2 29.53

0+130 Bekisting m2 29.53

0+140 Bekisting m2 29.53

0+150 Bekisting m2 29.53

0+160 Bekisting m2 29.53

0+170 Bekisting m2 29.53

0+180 Bekisting m2 29.53

Bekisting m2 29.53

0+210 Bekisting m2 29.53

0+240 Bekisting m2 29.53

Bekisting m2 29.53

0+270 Bekisting m2 29.53


Bekisting m2

0+300 Bekisting m2

0+330 Bekisting m2

Bekisting m2

0+360 Bekisting m2

Bekisting m2

0+390 Bekisting m2

0+420 Bekisting m2

0+450 Bekisting m2 34.20

0+480 Bekisting m2 34.20

0+510 Bekisting m2 34.20

0+540 Bekisting m2 34.20

0+570 Bekisting m2 34.20

0+600 Bekisting m2 34.20

0+630 Bekisting m2 34.20

0+660 Bekisting m2 34.20

0+690 Bekisting m2 34.20

0+720 Bekisting m2 34.20

0+750 Bekisting m2 34.20

0+780 Bekisting m2 34.20

0+810 Bekisting m2 34.20

0+840 Bekisting m2 34.20

0+870 Bekisting m2 34.20


0+900 Bekisting m2 34.20

0+930 Bekisting m2 34.20

0+960 Bekisting m2 34.20

0+990 Bekisting m2 34.20

1+020 Bekisting m2 34.20

1+050 Bekisting m2 34.20

1+080 Bekisting m2 34.20

1+110 Bekisting m2 34.20

1+140 Bekisting m2 34.20

1+170 Bekisting m2 34.20

1+200 Bekisting m2 34.20

1+230 Bekisting m2 34.20

1+260 Bekisting m2 34.20

1+290 Bekisting m2 34.20

1+320 Bekisting m2 34.20

1+350 Bekisting m2 34.20

1+380 Bekisting m2 34.20

1+410 Bekisting m2 34.20

1+440 Bekisting m2 34.20

1+470 Bekisting m2 34.20

1+500 Bekisting m2 34.20

1+530 Bekisting m2 34.20

1+560 Bekisting m2 34.20

1+590 Bekisting m2 34.20


1+620 Bekisting m2 34.20

1+650 Bekisting m2 34.20

1+680 Bekisting m2 34.20

1+710 Bekisting m2 34.20

1+740 Bekisting m2 34.20

1+770 Bekisting m2 34.20

1+800 Bekisting m2 34.20

1+830 Bekisting m2 34.20

1+860 Bekisting m2 34.20

1+890 Bekisting m2 34.20

1+920 Bekisting m2 34.20

1+950 Bekisting m2 34.20

1+980 Bekisting m2 34.20

2+010 Bekisting m2 34.20

2+040 Bekisting m2 34.20

2+070 Bekisting m2 34.20

2+100 Bekisting m2 34.20

2+130 Bekisting m2 35.70

2+160 Bekisting m2 34.20

2+190 Bekisting m2 34.20

2+220 Bekisting m2 34.20

2+250 Bekisting m2 34.20

2+280 Bekisting m2 34.20

2+310 Bekisting m2 34.20


2+340 Bekisting m2 34.20

2+370 Bekisting m2 34.20

2+400 Bekisting m2 34.20

2+430 Bekisting m2 34.20

2+460 Bekisting m2 34.20

2+490 Bekisting m2 34.20

2+520 Bekisting m2 34.20

2+550 Bekisting m2 34.20

2+580 Bekisting m2 34.20

2+610 Bekisting m2 34.20

2+640 Bekisting m2 34.20

2+670 Bekisting m2 34.20

2+700 Bekisting m2 34.20

2+730 Bekisting m2

2+760 Bekisting m2

2+820 Bekisting m2 34.20

2+850 Bekisting m2 34.20

2+880 Bekisting m2 34.20

2+910 Bekisting m2 34.20

2+940 Bekisting m2 34.20

2+970 Bekisting m2 34.20

3+000 Bekisting m2 34.20


Volume Beton Pier

Volume
STA P L H n Volume Total
m m m bh m3 m3
0+000 2 2 2.4 3 9.6 28.8
0+030 2 2 2.4 3 9.6 28.8
0+060 2 2 2.4 3 9.6 28.8
0+090 2 2 2.4 3 9.6 28.8
0+120 1.5 1.5 2.4 1 5.4 5.4
0+150 1.5 1.5 2.4 1 5.4 5.4
0+180 1.5 1.5 2.4 1 5.4 5.4
0+210 1.5 1.5 2.4 1 5.4 5.4
0+240 1.5 1.5 2.4 1 5.4 5.4
0+270 1.5 1.5 2.4 1 5.4 5.4
0+300 1.5 1.5 2.4 1 5.4 5.4
0+330 1.5 1.5 2.4 1 5.4 5.4
0+360 1.5 1.5 2.4 1 5.4 5.4
0+390 1.5 1.5 2.4 1 5.4 5.4
0+420 1.5 1.5 2.4 1 5.4 5.4
0+450 1.5 1.5 2.4 1 5.4 5.4
0+480 1.5 1.5 2.4 1 5.4 5.4
0+510 1.5 1.5 2.4 1 5.4 5.4
0+540 1.5 1.5 2.4 1 5.4 5.4
0+570 1.5 1.5 2.4 1 5.4 5.4
0+600 1.5 1.5 2.4 1 5.4 5.4
0+630 1.5 1.5 2.4 1 5.4 5.4
0+660 1.5 1.5 2.4 1 5.4 5.4
0+690 1.5 1.5 2.4 1 5.4 5.4
0+720 1.5 1.5 2.4 1 5.4 5.4
0+750 1.5 1.5 2.4 1 5.4 5.4
0+780 1.5 1.5 2.4 1 5.4 5.4
0+810 1.5 1.5 2.4 1 5.4 5.4
0+840 1.5 1.5 2.4 1 5.4 5.4
0+870 1.5 1.5 2.4 1 5.4 5.4
0+900 1.5 1.5 2.4 1 5.4 5.4
0+930 1.5 1.5 2.4 1 5.4 5.4
0+960 1.5 1.5 2.4 1 5.4 5.4
0+990 1.5 1.5 2.4 1 5.4 5.4
1+020 1.5 1.5 2.4 1 5.4 5.4
1+050 1.5 1.5 2.4 1 5.4 5.4
1+080 1.5 1.5 2.4 1 5.4 5.4
1+110 1.5 1.5 2.4 1 5.4 5.4
1+140 1.5 1.5 2.4 1 5.4 5.4
1+170 1.5 1.5 2.4 1 5.4 5.4
1+200 1.5 1.5 2.4 1 5.4 5.4
1+230 1.5 1.5 2.4 1 5.4 5.4
1+260 1.5 1.5 2.4 1 5.4 5.4
1+290 1.5 1.5 2.4 1 5.4 5.4
1+320 1.5 1.5 2.4 1 5.4 5.4
1+350 1.5 1.5 2.4 1 5.4 5.4
1+380 1.5 1.5 2.4 1 5.4 5.4
1+410 1.5 1.5 2.4 1 5.4 5.4
1+440 1.5 1.5 2.4 1 5.4 5.4
1+470 1.5 1.5 2.4 1 5.4 5.4
1+500 1.5 1.5 2.4 1 5.4 5.4
1+530 1.5 1.5 2.4 1 5.4 5.4
1+560 1.5 1.5 2.4 1 5.4 5.4
1+590 1.5 1.5 2.4 1 5.4 5.4
1+620 1.5 1.5 2.4 1 5.4 5.4
1+650 1.5 1.5 2.4 1 5.4 5.4
1+680 1.5 1.5 2.4 1 5.4 5.4
1+710 1.5 1.5 2.4 1 5.4 5.4
1+740 1.5 1.5 2.4 1 5.4 5.4
1+770 1.5 1.5 2.4 1 5.4 5.4
1+800 1.5 1.5 2.4 1 5.4 5.4
1+830 1.5 1.5 2.4 1 5.4 5.4
1+860 1.5 1.5 2.4 1 5.4 5.4
1+890 1.5 1.5 2.4 1 5.4 5.4
1+920 1.5 1.5 2.4 1 5.4 5.4
1+950 1.5 1.5 2.4 1 5.4 5.4
1+980 1.5 1.5 2.4 1 5.4 5.4
2+010 1.5 1.5 2.4 1 5.4 5.4
2+040 1.5 1.5 2.4 1 5.4 5.4
2+070 1.5 1.5 2.4 1 5.4 5.4
2+100 1.5 1.5 2.4 1 5.4 5.4
2+130 1.5 1.5 2.4 1 5.4 5.4
2+160 1.5 1.5 2.4 1 5.4 5.4
2+190 1.5 1.5 2.4 1 5.4 5.4
2+220 1.5 1.5 2.4 1 5.4 5.4
2+250 1.5 1.5 2.4 1 5.4 5.4
2+280 1.5 1.5 2.4 1 5.4 5.4
2+310 1.5 1.5 2.4 1 5.4 5.4
2+340 1.5 1.5 2.4 1 5.4 5.4
2+370 1.5 1.5 2.4 1 5.4 5.4
2+400 1.5 1.5 2.4 1 5.4 5.4
2+430 1.5 1.5 2.4 1 5.4 5.4
2+460 1.5 1.5 2.4 1 5.4 5.4
2+490 1.5 1.5 2.4 1 5.4 5.4
2+520 1.5 1.5 2.4 1 5.4 5.4
2+550 1.5 1.5 2.4 1 5.4 5.4
2+580 1.5 1.5 2.4 1 5.4 5.4
2+610 1.5 1.5 2.4 1 5.4 5.4
2+640 1.5 1.5 2.4 1 5.4 5.4
2+670 1.5 1.5 2.4 1 5.4 5.4
2+700 1.5 1.5 2.4 1 5.4 5.4
2+730 2.2 1.5 2.4 2 7.92 15.84
2+760 1.5 1.5 2.4 1 5.4 5.4
2+790 2.2 1.5 2.4 2 7.92 15.84
2+820 2.2 1.5 2.4 2 7.92 15.84
2+850 2.2 1.5 2.4 2 7.92 15.84
2+880 1.5 1.5 2.4 1 5.4 5.4
2+910 1.5 1.5 2.4 1 5.4 5.4
2+940 1.5 1.5 2.4 1 5.4 5.4
2+970 1.5 1.5 2.4 1 5.4 5.4
3+000 1.5 1.5 2.4 1 5.4 5.4
Total 680.76
Pier 2.4
Pertitik Total
Item Kode P
Jumlah Panjang Berat Batang Jumlah
m bh m Kg Titik
6 64 384 1479.6 32 113

5.5

0.5

0.07
D16-150 5.82 25 145.5 229.6339 12 113

1.42

0.07
D13-200 5.82 15 87.3 90.95656 7 113

1.42

0.2 0.07
6D16-150 3.38 150 507 800.1677 42 113
1.42

1.42 0.07
D13-200 3.38 90 304.2 316.9414 25 113
Total 2917.3
Total Total
Berat Besi
Panjang Berat Batang Jumlah Panjang Berat Batang
m Kg Bh Titik m Kg Bh kg/m
43392 167194.8 3616 49 18816 72500.4 1568 3.853125

16441.5 25948.633 1370 49 7129.5 11252.06 594 1.57824

9864.9 10278.091 822 49 4277.7 4456.871 356 1.041885

57291 90418.948 4774 49 24843 39208.22 2070 1.57824

34374.6 35814.38 2865 49 14905.8 15530.13 1242 1.041885


329654.85 142947.7
Pier 2.4
Pertitik
Item Kode P
Jumlah Panjang Berat
m bh m Kg
6 64 384 1479.6
0
0
5.5
0
0
0
0
0.5 0
0
0
0
0.07
D16-150 5.82 25 145.5 236.736
0
0
0
1.42
0
0
0
0.07
D13-200 5.82 15 87.3 93.76965
0
0
0
1.42
0
0
0
0
0.2 0.07
6D16-150 3.38 150 507 946.944
1.42 0
0
0
0
0
0
1.42 0.07
D13-200 3.38 90 304.2 375.0786
0
0
0
0
0
Total 3132.128
rtitik Total Total
Batang Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang
Titik m Kg Bh Titik m Kg Bh
32 90 34560 133164 2880 49 18816 72500.4 1568
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
13 90 13095 21306.24 1125 49 7129.5 11252.06 594
0 0
0 0
0 0
0 0
0 0
0 0
8 90 7857 8439.269 675 49 4277.7 4456.871 356
0 0
0 0
0 0
0 0
0 0
0 0
0 0
50 90 45630 85224.96 4500 49 24843 39208.22 2070
0 0
0 0
0 0
0 0
0 0
0 0
30 90 27378 33757.07 2700 49 14905.8 15530.13 1242
0 0
0 0
0 0
0 0
0 0
281891.5 142947.7
Volume Bekising Per

Jumlah Luas satu Jumlah Luas Total


Berat Besi Item Kode Panjang Lebar
satu titik titk
kg/m m m bh m2 bh m2
3.853125
6 1.5 2 18 113 2034

1.57824 6 1.476 2 17.712 113 2001.456

1.041885

4035.456

1.57824

1.041885
6

1.5

1.476
6

6
6

1.5

1.476
Pekerjaan Pier 2,4
Lokasi
Volume Rencana (m3) Volume IMTP
No Pier Sat
Titik Item Pekerjaan 01

10

11

12

13

14

15

16

0+450 Beton K-350 m3 5.40 5.5


17

18

19

20

21

22
23

24

0+450 Beton K-350 m3 5.40 5.5


25

0+480 Beton K-350 m3 5.40 5.5


26

0+510 Beton K-350 m3 5.40 5.5


27

0+540 Beton K-350 m3 5.40 5.5


28

0+570 Beton K-350 m3 5.40 5.5


29

0+600 Beton K-350 m3 5.40 5.5


30

0+630 Beton K-350 m3 5.40 5.5


31

0+660 Beton K-350 m3 5.40 5.5


32

0+690 Beton K-350 m3 5.40 5.5


33

0+720 Beton K-350 m3 5.40 6.5


34

35 0+750 Beton K-350 m3 5.40 5.0

36 0+780 Beton K-350 m3 5.40 5.5

37 0+810 Beton K-350 m3 5.40 5.5

38 0+840 Beton K-350 m3 5.40 5.5

39 0+870 Beton K-350 m3 5.40 5.5

40 0+900 Beton K-350 m3 5.40 5.5

41 0+930 Beton K-350 m3 5.40 5.5

42 0+960 Beton K-350 m3 5.40 5.5

43 0+990 Beton K-350 m3 5.40 6

44 1+020 Beton K-350 m3 5.40 5.5

45 1+050 Beton K-350 m3 5.40 5.5

46 1+080 Beton K-350 m3 5.40 5.5


47 1+110 Beton K-350 m3 5.40 6

48 1+140 Beton K-350 m3 5.40 5.5

49 1+170 Beton K-350 m3 5.40 5.5

50 1+200 Beton K-350 m3 5.40 9.50

51 1+230 Beton K-350 m3 5.40 6

52 1+260 Beton K-350 m3 5.40 6

53 1+290 Beton K-350 m3 5.40 6

54 1+320 Beton K-350 m3 5.40 7

55 1+350 Beton K-350 m3 5.40 8.5

56 1+380 Beton K-350 m3 5.40 6

57 1+410 Beton K-350 m3 5.40 6

58 1+440 Beton K-350 m3 5.40 6

59 1+470 Beton K-350 m3 5.40 7

60 1+500 Beton K-350 m3 5.40 5.5

61 1+530 Beton K-350 m3 5.40 5.5

62 1+560 Beton K-350 m3 5.40 5.5

63 1+590 Beton K-350 m3 5.40 5.5

64 1+620 Beton K-350 m3 5.40 5.5

65 1+650 Beton K-350 m3 5.40 5.5

66 1+680 Beton K-350 m3 5.40 5.5

67 1+710 Beton K-350 m3 5.40 5.5

68 1+740 Beton K-350 m3 5.40 5.5

69 1+770 Beton K-350 m3 5.40 5.5

70 1+800 Beton K-350 m3 5.40 7


71 1+830 Beton K-350 m3 5.40 5.5

72 1+860 Beton K-350 m3 5.40 5.5

73 1+890 Beton K-350 m3 5.40 5.5

74 1+920 Beton K-350 m3 5.40 5.5

75 1+950 Beton K-350 m3 5.40 5.5

76 1+980 Beton K-350 m3 5.40 5.5

77 2+010 Beton K-350 m3 5.40 4.5

78 2+040 Beton K-350 m3 5.40 7

79 2+070 Beton K-350 m3 5.40 5.5

80 2+100 Beton K-350 m3 5.40 5.5

81 2+130 Beton K-350 m3 5.40 5.5

82 2+160 Beton K-350 m3 5.40 5.5

83 2+190 Beton K-350 m3 5.40 5.5

84 2+220 Beton K-350 m3 5.40 5.5

85 2+250 Beton K-350 m3 5.40 5.5

86 2+280 Beton K-350 m3 0.00 5.5

87 2+310 Beton K-350 m3 5.40 5.5

88 2+340 Beton K-350 m3 5.40 5.5

89 2+370 Beton K-350 m3 5.40 5.5

90 2+400 Beton K-350 m3 5.40 5.5

91 2+430 Beton K-350 m3 5.40 5.5

92 2+460 Beton K-350 m3 5.40 5.5

93 2+490 Beton K-350 m3 5.40 5.5

94 2+520 Beton K-350 m3 5.40 5.5


95 2+550 Beton K-350 m3 5.40 5.5

96 2+580 Beton K-350 m3 5.40 5.5

97 2+610 Beton K-350 m3 5.40 5.5

98 2+640 Beton K-350 m3 5.40 5.5

99 2+670 Beton K-350 m3 5.40 5.5

100 2+700 Beton K-350 m3 5.40 5.5

101 2+730 Beton K-350 m3 5.40

102 2+760 Beton K-350 m3 5.40

103 2+820 Beton K-350 m3 5.40

104 2+850 Beton K-350 m3 5.40 5.5

105 2+880 Beton K-350 m3 5.40 6

106 2+910 Beton K-350 m3 5.40 5.5

107 2+940 Beton K-350 m3 5.40 5.5

108 2+970 Beton K-350 m3 5.40 6.5

109 3+000 Beton K-350 m3 5.40 5.5


Tanggal Cor

7/19/2016
4/22/2016

4/18/2016

4/16/2016

4/11/2016

4/8/2016

3/27/2016

3/31/2016

3/26/2016

3/25/2016

3/1/2016

2/25/2016

2/27/2016

2/24/2016

2/24/2016

2/23/2016

2/22/2016

2/16/2016

2/18/2016
1/14/2016

2/13/2016

2/29/2016

1/4/2016

1/3/2016

1/5/2016

1/7/2016

2/14/2016

2/1/2016

2/6/2016

2/10/2016

2/13/2016

2/21/2016

2/21/2016

2/21/2016

2/24/2016

2/24/2016

2/27/2016

2/27/2016

3/2/2016

02/03//2016
3/4/2016

3/4/2016

3/9/2016

3/9/2016

3/11/2016

3/11/2016

3/14/2016

3/14/2016

3/15/2016

3/15/2016

3/16/2016

3/19/2016

3/19/2016

3/21/2016

3/22/2016

3/23/2016

3/24/2016

3/28/2016

3/28/2016

4/5/2016

4/11/2016

4/12/2016

4/16/2016

5/3/2016
4/18/2016

4/18/2016

4/21/2016

4/25/2016

5/16/2016

4/28/2016

5/16/2016

5/10/2016

5/5/2016

5/5/2016

5/2/2016

5/2/2016
Total Besi Pier 2,4 Total
(m3) Lokasi (kg)
Sat Volume Terpasang (kg)
474.5 Titik Item Pekerjaan 242135.86

0+450 Besi Kg 2917.30


0+450 Besi Kg 2917.30

0+480 Besi Kg 2917.30

0+510 Besi Kg 2917.30

0+540 Besi Kg 2917.30

0+570 Besi Kg 2917.30

0+600 Besi Kg 2917.30

0+630 Besi Kg 2917.30

0+660 Besi Kg 2917.30

0+690 Besi Kg 2917.30

0+720 Besi Kg 2917.30

0+750 Besi Kg 2917.30

0+780 Besi Kg 2917.30

0+810 Besi Kg 2917.30

0+840 Besi Kg 2917.30

0+870 Besi Kg 2917.30

0+900 Besi Kg 2917.30

0+930 Besi Kg 2917.30

0+960 Besi Kg 2917.30

0+990 Besi Kg 2917.30

1+020 Besi Kg 2917.30

1+050 Besi Kg 2917.30

1+080 Besi Kg 2917.30


1+110 Besi Kg 2917.30

1+140 Besi Kg 2917.30

1+170 Besi Kg 2917.30

1+200 Besi Kg 2917.30

1+230 Besi Kg 2917.30

1+260 Besi Kg 2917.30

1+290 Besi Kg 2917.30

1+320 Besi Kg 2917.30

1+350 Besi Kg 2917.30

1+380 Besi Kg 2917.30

1+410 Besi Kg 2917.30

1+440 Besi Kg 2917.30

1+470 Besi Kg 2917.30

1+500 Besi Kg 2917.30

1+530 Besi Kg 2917.30

1+560 Besi Kg 2917.30

1+590 Besi Kg 2917.30

1+620 Besi Kg 2917.30

1+650 Besi Kg 2917.30

1+680 Besi Kg 2917.30

1+710 Besi Kg 2917.30

1+740 Besi Kg 2917.30

1+770 Besi Kg 2917.30

1+800 Besi Kg 2917.30


1+830 Besi Kg 2917.30

1+860 Besi Kg 2917.30

1+890 Besi Kg 2917.30

1+920 Besi Kg 2917.30

1+950 Besi Kg 2917.30

1+980 Besi Kg 2917.30

2+010 Besi Kg 2917.30

2+040 Besi Kg 2917.30

2+070 Besi Kg 2917.30

2+100 Besi Kg 2917.30

2+130 Besi Kg 2917.30

2+160 Besi Kg 2917.30

2+190 Besi Kg 2917.30

2+220 Besi Kg 2917.30

2+250 Besi Kg 2917.30

2+280 Besi Kg 2917.30

2+310 Besi Kg 2917.30

2+340 Besi Kg 2917.30

2+370 Besi Kg 2917.30

2+400 Besi Kg 2917.30

2+430 Besi Kg 2917.30

2+460 Besi Kg 2917.30

2+490 Besi Kg 2917.30

2+520 Besi Kg 2917.30


2+550 Besi Kg 2917.30

2+580 Besi Kg 2917.30

2+610 Besi Kg 2917.30

2+640 Besi Kg 2917.30

2+670 Besi Kg 2917.30

2+700 Besi Kg 2917.30

2+730 Besi Kg

2+760 Besi Kg

2+820 Besi Kg

2+850 Besi Kg 2917.30

2+880 Besi Kg 2917.30

2+910 Besi Kg 2917.30

2+940 Besi Kg 2917.30

2+970 Besi Kg 2917.30

3+000 Besi Kg 2917.30


Bekisting Pier 2,4 Total
Lokasi Volume Terpasang (m2)
Sat
Titik Item Pekerjaan (m2) 1008.00

0+450 Bekisting m2 14.40


0+450 Bekisting m2 14.40

0+480 Bekisting m2 14.40

0+510 Bekisting m2 14.40

0+540 Bekisting m2 14.40

0+570 Bekisting m2 14.40

0+600 Bekisting m2 14.40

0+630 Bekisting m2 14.40

0+660 Bekisting m2 14.40

0+690 Bekisting m2 14.40

0+720 Bekisting m2 14.40

0+750 Bekisting m2 14.40

0+780 Bekisting m2 14.40

0+810 Bekisting m2 14.40

0+840 Bekisting m2 14.40

0+870 Bekisting m2 14.40

0+900 Bekisting m2 14.40

0+930 Bekisting m2 14.40

0+960 Bekisting m2 14.40

0+990 Bekisting m2 14.40

1+020 Bekisting m2 14.40

1+050 Bekisting m2 14.40

1+080 Bekisting m2 14.40


1+110 Bekisting m2 14.40

1+140 Bekisting m2 14.40

1+170 Bekisting m2 14.40

1+200 Bekisting m2 14.40

1+230 Bekisting m2 14.40

1+260 Bekisting m2 14.40

1+290 Bekisting m2 14.40

1+320 Bekisting m2 14.40

1+350 Bekisting m2 14.40

1+380 Bekisting m2 14.40

1+410 Bekisting m2 14.40

1+440 Bekisting m2 14.40

1+470 Bekisting m2 14.40

1+500 Bekisting m2 14.40

1+530 Bekisting m2 14.40

1+560 Bekisting m2 14.40

1+590 Bekisting m2 14.40

1+620 Bekisting m2 14.40

1+650 Bekisting m2 14.40

1+680 Bekisting m2 14.40

1+710 Bekisting m2 14.40

1+740 Bekisting m2 14.40

1+770 Bekisting m2 14.40

1+800 Bekisting m2 14.40


1+830 Bekisting m2 14.40

1+860 Bekisting m2 14.40

1+890 Bekisting m2 14.40

1+920 Bekisting m2 14.40

1+950 Bekisting m2 14.40

1+980 Bekisting m2 14.40

2+010 Bekisting m2 14.40

2+040 Bekisting m2 14.40

2+070 Bekisting m2 14.40

2+100 Bekisting m2 14.40

2+130 Bekisting m2 14.40

2+160 Bekisting m2 14.40

2+190 Bekisting m2 14.40

2+220 Bekisting m2 14.40

2+250 Bekisting m2 14.40

2+280 Bekisting m2 14.40

2+310 Bekisting m2 14.40

2+340 Bekisting m2 14.40

2+370 Bekisting m2 14.40

2+400 Bekisting m2 14.40

2+430 Bekisting m2 14.40

2+460 Bekisting m2 14.40

2+490 Bekisting m2 14.40

2+520 Bekisting m2 14.40


2+550 Bekisting m2 14.40

2+580 Bekisting m2 14.40

2+610 Bekisting m2 14.40

2+640 Bekisting m2 14.40

2+670 Bekisting m2 14.40

2+700 Bekisting m2 14.40

2+730 Bekisting m2

2+760 Bekisting m2

2+820 Bekisting m2

2+850 Bekisting m2 14.40

2+880 Bekisting m2 14.40

2+910 Bekisting m2 14.40

2+940 Bekisting m2 14.40

2+970 Bekisting m2 14.40

3+000 Bekisting m2 14.40


Volume Beton Pier

Volume Volume
Pier STA P L H H-2,4 n Volume Total Pier 6
m m m m bh m3 m3 m3
Z1.P1 0+030 2 2 7.562 5.2 1 30.248 30.248 20.648
Z1.P2 0+040 2 2 7.552 5.2 1 30.208 30.208 20.608
Z1.P3 0+050 2 2 7.552 5.2 1 30.208 30.208 20.608
Z1.P4 0+060 2 2 7.562 5.2 1 30.248 30.248 20.648
Z1.P5 0+070 2 2 7.552 5.2 1 30.208 30.208 20.608
Z1.P6 0+080 2 2 7.541 5.1 1 30.164 30.164 20.564
Z1.P7 0+090 2 2 7.547 5.1 1 30.188 30.188 20.588
Z1.P8 0+100 2 2 7.578 5.2 1 30.312 30.312 20.712
Z1.P9 0+110 2 2 7.553 5.2 1 30.212 30.212 20.612
Z1.P10 0+120 2 2 7.562 5.2 1 30.248 30.248 20.648
Z1.P11 0+130 2 2 7.568 5.2 1 30.272 30.272 20.672
Z1.P12 0+140 2 2 7.592 5.2 1 30.368 30.368 20.768
Z1.P13 0+150 2 2 7.637 5.2 1 30.548 30.548 20.948
Z1.P14 0+160 2 2 7.682 5.3 1 30.728 30.728 21.128
Z1.P15 0+170 2 2 7.618 5.2 1 30.472 30.472 20.872
Z1.P16 A 0+180 1.5 1.5 6.973 4.6 1 15.68925 15.68925 10.28925
Z1.P16 B 1.5 1.5 6.866 4.5 1 15.4485 15.4485 10.0485
Z1.P17 0+210 1.5 1.5 6.502 4.1 1 14.6295 14.6295 9.2295
Z1.P18 0+240 1.5 1.5 6.004 3.6 1 13.509 13.509 8.109
Z1.P19 0+270 1.5 1.5 5.583 3.2 1 12.56175 12.56175 7.16175
Z1.P20 0+300 1.5 1.5 5.539 3.1 1 12.46275 12.46275 7.06275
Z1.P21 0+330 1.5 1.5 5.349 2.9 1 12.03525 12.03525 6.63525
Z1.P22 A 0+360 1.5 1.5 5.507 3.1 1 12.39075 12.39075 6.99075
Z1.P22 B 1.5 1.5 5.379 3.0 1 12.10275 12.10275 6.70275
Z1.P23 A 0+390 1.5 1.5 5.537 3.1 1 12.45825 12.45825 7.05825
Z1.P23 B 1.5 1.5 5.403 3.0 1 12.15675 12.15675 6.75675
Z1.P24 0+420 1.5 1.5 5.453 3.1 1 12.26925 12.26925 6.86925
Z1.P25 0+450 1.5 1.5 5.487 3.1 1 12.34575 12.34575 6.94575
Z1.P26 0+480 1.5 1.5 5.546 3.1 1 12.4785 12.4785 7.0785
Z1.P27 0+510 1.5 1.5 5.599 3.2 1 12.59775 12.59775 7.19775
Z1.P28 0+540 1.5 1.5 5.643 3.2 1 12.69675 12.69675 7.29675
Z1.P29 0+570 1.5 1.5 5.705 3.3 1 12.83625 12.83625 7.43625
Z1.P30 0+600 1.5 1.5 5.742 3.3 1 12.9195 12.9195 7.5195
Z1.P31 0+630 1.5 1.5 5.781 3.4 1 13.00725 13.00725 7.60725
Z1.P32 0+660 1.5 1.5 5.749 3.3 1 12.93525 12.93525 7.53525
Z1.P33 0+690 1.5 1.5 5.869 3.5 1 13.20525 13.20525 7.80525
Z1.P34 0+720 1.5 1.5 5.946 3.5 1 13.3785 13.3785 7.9785
Z1.P35 0+750 1.5 1.5 6.416 4.0 1 14.436 14.436 9.036
Z1.P36 0+780 1.5 1.5 6.395 4.0 1 14.38875 14.38875 8.98875
Z1.P37 0+810 1.5 1.5 6.362 4.0 1 14.3145 14.3145 8.9145
Z1.P38 0+840 1.5 1.5 6.314 3.9 1 14.2065 14.2065 8.8065
Z1.P39 0+870 1.5 1.5 6.546 4.1 1 14.7285 14.7285 9.3285
Z1.P40 0+900 1.5 1.5 6.281 3.9 1 14.13225 14.13225 8.73225
Z1.P41 0+930 1.5 1.5 6.319 3.9 1 14.21775 14.21775 8.81775
Z1.P42 0+960 1.5 1.5 6.304 3.9 1 14.184 14.184 8.784
Z1.P43 0+990 1.5 1.5 6.343 3.9 1 14.27175 14.27175 8.87175
Z1.P44 1+020 1.5 1.5 6.306 3.9 1 14.1885 14.1885 8.7885
Z1.P45 1+050 1.5 1.5 6.228 3.8 1 14.013 14.013 8.613
Z1.P46 1+080 1.5 1.5 6.23 3.8 1 14.0175 14.0175 8.6175
Z1.P47 1+110 1.5 1.5 6.213 3.8 1 13.97925 13.97925 8.57925
Z1.P48 1+140 1.5 1.5 6.177 3.8 1 13.89825 13.89825 8.49825
Z1.P49 1+170 1.5 1.5 6.121 3.7 1 13.77225 13.77225 8.37225
Z1.P50 1+200 1.5 1.5 6.087 3.7 1 13.69575 13.69575 8.29575
Z1.P51 1+230 1.5 1.5 6.066 3.7 1 13.6485 13.6485 8.2485
Z1.P52 1+260 1.5 1.5 6.071 3.7 1 13.65975 13.65975 8.25975
Z1.P53 1+290 1.5 1.5 6.01 3.6 1 13.5225 13.5225 8.1225
Z1.P54 1+320 1.5 1.5 6.063 3.7 1 13.64175 13.64175 8.24175
Z1.P55 1+350 1.5 1.5 5.915 3.5 1 13.30875 13.30875 7.90875
Z1.P56 1+380 1.5 1.5 5.907 3.5 1 13.29075 13.29075 7.89075
Z1.P57 1+410 1.5 1.5 6.352 4.0 1 14.292 14.292 8.892
Z1.P58 1+440 1.5 1.5 6.05 3.7 1 13.6125 13.6125 8.2125
Z1.P59 1+470 1.5 1.5 5.892 3.5 1 13.257 13.257 7.857
Z1.P60 1+500 1.5 1.5 5.92 3.5 1 13.32 13.32 7.92
Z1.P61 1+530 1.5 1.5 6.342 3.9 1 14.2695 14.2695 8.8695
Z1.P62 1+560 1.5 1.5 6.533 4.1 1 14.69925 14.69925 9.29925
Z1.P63 1+590 1.5 1.5 6.697 4.3 1 15.06825 15.06825 9.66825
Z1.P64 1+620 1.5 1.5 6.709 4.3 1 15.09525 15.09525 9.69525
Z1.P65 1+650 1.5 1.5 6.586 4.2 1 14.8185 14.8185 9.4185
Z1.P66 1+680 1.5 1.5 6.689 4.3 1 15.05025 15.05025 9.65025
Z1.P67 1+710 1.5 1.5 6.386 4.0 1 14.3685 14.3685 8.9685
Z1.P68 1+740 1.5 1.5 6.158 3.8 1 13.8555 13.8555 8.4555
Z1.P69 1+770 1.5 1.5 5.931 3.5 1 13.34475 13.34475 7.94475
Z1.P70 1+800 1.5 1.5 6.388 4.0 1 14.373 14.373 8.973
Z1.P71 1+830 1.5 1.5 6.455 4.1 1 14.52375 14.52375 9.12375
Z1.P72 1+860 1.5 1.5 6.503 4.1 1 14.63175 14.63175 9.23175
Z1.P73 1+890 1.5 1.5 6.52 4.1 1 14.67 14.67 9.27
Z1.P74 1+920 1.5 1.5 6.627 4.2 1 14.91075 14.91075 9.51075
Z1.P75 1+950 1.5 1.5 6.724 4.3 1 15.129 15.129 9.729
Z1.P76 1+980 1.5 1.5 6.872 4.5 1 15.462 15.462 10.062
Z1.P77 2+010 1.5 1.5 6.739 4.3 1 15.16275 15.16275 9.76275
Z1.P78 2+040 1.5 1.5 6.736 4.3 1 15.156 15.156 9.756
Z1.P79 2+070 1.5 1.5 6.873 4.5 1 15.46425 15.46425 10.06425
Z1.P80 2+100 1.5 1.5 6.661 4.3 1 14.98725 14.98725 9.58725
Z1.P81 2+130 1.5 1.5 6.288 3.9 1 14.148 14.148 8.748
Z1.P82 2+160 1.5 1.5 5.962 3.6 1 13.4145 13.4145 8.0145
Z1.P83 2+190 1.5 1.5 6.03 3.6 1 13.5675 13.5675 8.1675
Z1.P84 2+220 1.5 1.5 6.19 3.8 1 13.9275 13.9275 8.5275
Z1.P85 2+250 1.5 1.5 6.182 3.8 1 13.9095 13.9095 8.5095
Z1.P86 2+280 1.5 1.5 6.067 3.7 1 13.65075 13.65075 8.25075
Z1.P87 2+310 1.5 1.5 6 3.6 1 13.5 13.5 8.1
Z1.P88 2+340 1.5 1.5 6.005 3.6 1 13.51125 13.51125 8.11125
Z1.P89 2+370 1.5 1.5 6.051 3.7 1 13.61475 13.61475 8.21475
Z1.P90 2+400 1.5 1.5 6.091 3.7 1 13.70475 13.70475 8.30475
Z1.P91 2+430 1.5 1.5 6.017 3.6 1 13.53825 13.53825 8.13825
Z1.P92 2+460 1.5 1.5 6.095 3.7 1 13.71375 13.71375 8.31375
Z1.P93 2+490 1.5 1.5 6.57 4.2 1 14.7825 14.7825 9.3825
Z1.P94 2+520 1.5 1.5 7.038 4.6 1 15.8355 15.8355 10.4355
Z1.P95 2+550 1.5 1.5 7.505 5.1 1 16.88625 16.88625 11.48625
Z1.P96 2+580 1.5 1.5 8.085 5.7 1 18.19125 18.19125 12.79125
Z1.P97 2+610 1.5 1.5 8.488 6.1 1 19.098 19.098 13.698
Z1.P98 2+640 1.5 1.5 9.042 6.6 1 20.3445 20.3445 14.9445
Z1.P99 2+670 1.5 1.5 9.201 6.8 1 20.70225 20.70225 15.30225
Z1.P100 2+700 1.5 1.5 9.137 6.7 1 20.55825 20.55825 15.15825
Z1.P101 2+730 2.2 1.5 9.24 6.8 1 30.492 30.492 22.572
Z1.P102.A 2+760 1.5 1.5 8.927 6.5 1 20.08575 20.08575 14.68575
Z1.P102.B 2+790 2.2 1.5 8.465 6.1 1 27.9345 27.9345 20.0145
Z1.P103 2+820 2.2 1.5 8.262 5.9 1 27.2646 27.2646 19.3446
Z1.P104 2+850 2.2 1.5 7.711 5.3 1 25.4463 25.4463 17.5263
Z1.P105 2+880 1.5 1.5 7.264 4.9 1 16.344 16.344 10.944
Z1.P106 2+910 1.5 1.5 6.603 4.2 1 14.85675 14.85675 9.45675
Z1.P107 2+940 1.5 1.5 5.899 3.5 1 13.27275 13.27275 7.87275
Z1.P108 2+970 1.5 1.5 5.96 3.6 1 13.41 13.41 8.01
Z1.P109 3+000 1.5 1.5 6.263 3.9 1 14.09175 14.09175 8.69175
Total 1022.058

6.504019 4.10 9.234044 19.65496


Pier 6
Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg
6D25 7.17 64 458.88 1768.122 38

7.17

0.07
D13-200 5.82 29 168.78 175.8494 14

1.42

0.2 0.07
D13-200 3.38 174 588.12 612.7534 49

1.42

Total 2556.725

Pier Stasiun Bandara


Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg

60 D32 7.556 60 453.36 2862.044 38

6,96

0,5
0,5

60 D32 6 60 360 2272.666 30

6,00

0.1
D16-150 7.88 78 614.64 970.0494 51
1.92

1.92

0.1
0.439 D16-150 4.918 156 767.208 1210.838 64

1.92

0.1
0.316 D16-150 4.672 312 1457.664 2300.544 121

1.92

Total 9616.141
Total Total
Berat Besi
Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang
Titik m Kg Bh Titik m Kg Bh kg/m
113 51853.44 199797.79 4321 49 22485.12 86637.98 1874 3.853125

113 19072.14 19870.977 1589 49 8270.22 8616.618 689 1.041885

113 66457.56 69241.135 5538 49 28817.88 30024.92 2401 1.041885

288909.9 125279.5

Total Total
Berat Besi
Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang
Titik m Kg Bh Titik m Kg Bh kg/m

15 6800.4 42930.653 567 10 4533.6 28620.44 378 6.31296 12


15 5400 34089.984 450 10 3600 22726.66 300 6.31296

15 9219.6 14550.742 768 10 6146.4 9700.494 512 1.57824 12

15 11508.12 18162.575 959 10 7672.08 12108.38 639 1.57824

15 21864.96 34508.154 1822 10 14576.64 23005.44 1215 1.57824

144242.11 96161.41
Pier 6
Pertitik
Item Kode P
Jumlah Panjang Berat Batang
m bh m Kg
6D25 7.17 64 458.88 2959.2 64

7.17

0.07
D13-200 5.82 29 168.78 181.288 15

1.42

0.2 0.07
D13-200 3.38 174 588.12 725.152 58

1.42

Total 3865.64

75.75552
18.93888
Total Total
Berat Besi
Jumlah Panjang Berat Batang Jumlah Panjang Berat Batang
Titik m Kg Bh Titik m Kg Bh kg/m
90 41299.2 266328 5760 49 22485.12 86637.98 1874 3.853125

90 15190.2 16315.92 1305 49 8270.22 8616.618 689 1.041885

90 52930.8 65263.68 5220 49 28817.88 30024.92 2401 1.041885

347907.6 125279.5
Jumlah Luas satu Jumlah Luas Total
Item Kode Panjang Lebar
satu titik titk
m m bh m2 bh m2

6 1.5 2 18 113 2034

1.5

6 1.476 2 17.712 113 2001.456

1.476

4035.456
6

1.5

1.476
6

1.5

1.476
6

1.5

1.476
Pekerjaan Pier 6
Lokasi Volume
No Pier Sat IMTP 01 Tanggal
Titik Item Pekerjaan Rencana (m3)
0+030 Beton K-350 m3 30.40 31 5/20/2016
1
7.6
0+040 Beton K-350 m3 30.40 31 5/24/2016
2
7.6
0+050 Beton K-350 m3 30.40 31 5/26/2016
3
7.6
0+060 Beton K-350 m3 30.40 31 5/28/2016
4
7.6
0+070 Beton K-350 m3 30.40
5
7.6
0+080 Beton K-350 m3 30.40 31 6/2/2016
6
7.6
0+090 Beton K-350 m3 30.40 31 6/3/2016
7
7.6
0+100 Beton K-350 m3 30.40 31 6/5/2016
8
7.6
0+110 Beton K-350 m3 30.40 31 6/8/2016
9
7.6
0+120 Beton K-350 m3 30.40 30 6/10/2016
10
7.6
0+130 Beton K-350 m3 30.40 30.5 6/11/2016
11
7.6
0+140 Beton K-350 m3 30.40 34 6/13/2016
12
7.6
0+150 Beton K-350 m3 30.40 31 6/15/2016
13
7.6
0+160 Beton K-350 m3 30.40 31 6/16/2016
14
7.6
0+170 Beton K-350 m3 30.40 31 6/18/2016
15
7.6
0+180 Beton K-350 m3
16A

Beton K-350 m3
16B

0+210 Beton K-350 m3


17

0+240 Beton K-350 m3


18A

Beton K-350 m3
18B

0+270 Beton K-350 m3


19A
Beton K-350 m3
19B

0+300 Beton K-350 m3


20

0+330 Beton K-350 m3


21A

Beton K-350 m3
21B

0+360 Beton K-350 m3


22A

Beton K-350 m3
22B

0+390 Beton K-350 m3


23

0+420 Beton K-350 m3


24

0+450 Beton K-350 m3 9.23 7.5 4/24/2016


25

0+480 Beton K-350 m3 9.23 8 4/22/2016


26

0+510 Beton K-350 m3 9.23 9 4/19/2016


27

0+540 Beton K-350 m3 9.23 8.5 4/14/2016


28

0+570 Beton K-350 m3 9.23 8 4/11/2016


29

0+600 Beton K-350 m3 9.23 8 4/9/2016


30

0+630 Beton K-350 m3 9.23 8 4/8/2016


31

0+660 Beton K-350 m3 9.23 9 4/8/2016


32

0+690 Beton K-350 m3 9.23 8 4/7/2016


33

0+720 Beton K-350 m3 9.23 9.5 4/6/2016


34

35 0+750 Beton K-350 m3 9.23 9.5 4/6/2016

36 0+780 Beton K-350 m3 9.23 9 4/3/2016

37 0+810 Beton K-350 m3 9.23 9 4/2/2016

38 0+840 Beton K-350 m3 9.23 9 4/2/2016

39 0+870 Beton K-350 m3 9.23 9.5 4/1/2016


40 0+900 Beton K-350 m3 9.23 9 3/31/2016

41 0+930 Beton K-350 m3 9.23 9 3/30/2016

42 0+960 Beton K-350 m3 9.23 9 4/30/2016

43 0+990 Beton K-350 m3 9.23 9 3/29/2016

44 1+020 Beton K-350 m3 9.23 8.5 3/24/2016

45 1+050 Beton K-350 m3 9.23 8.5 3/24/2016

46 1+080 Beton K-350 m3 9.23 8.5 3/23/2016

47 1+110 Beton K-350 m3 9.23 8.5 3/23/2016

48 1+140 Beton K-350 m3 9.23 8.5 2/14/2016

49 1+170 Beton K-350 m3 9.23 8.5 3/21/2016

50 1+200 Beton K-350 m3 9.23 9.50 2/29/2016

51 1+230 Beton K-350 m3 9.23 8.5 3/18/2016

52 1+260 Beton K-350 m3 9.23 8.5 3/18/2016

53 1+290 Beton K-350 m3 9.23 8.5 3/14/2016

54 1+320 Beton K-350 m3 9.23 8.5 3/11/2016

55 1+350 Beton K-350 m3 9.23 8.5 3/10/2016

56 1+380 Beton K-350 m3 9.23 8.5 3/4/2016

57 1+410 Beton K-350 m3 9.23 8.5 3/5/2016

58 1+440 Beton K-350 m3 9.23 9.5 2/14/2016

59 1+470 Beton K-350 m3 9.23 5.5 2/18/2016

60 1+500 Beton K-350 m3 9.23 9

61 1+530 Beton K-350 m3 9.23 9 2/23/2016

62 1+560 Beton K-350 m3 9.23 9.5 2/25/2016

63 1+590 Beton K-350 m3 9.23 10 2/29/2016


64 1+620 Beton K-350 m3 9.23 10 3/7/2016

65 1+650 Beton K-350 m3 9.23 14 3/7/2016

66 1+680 Beton K-350 m3 9.23 10 3/9/2016

67 1+710 Beton K-350 m3 9.23 9

68 1+740 Beton K-350 m3 9.23 8.5 3/12/2016

69 1+770 Beton K-350 m3 9.23 9.5 3/13/2016

70 1+800 Beton K-350 m3 9.23 9 3/14/2016

71 1+830 Beton K-350 m3 9.23 9.5 3/15/2016

72 1+860 Beton K-350 m3 9.23 9.5 3/16/2016

73 1+890 Beton K-350 m3 9.23 9.5 3/18/2016

74 1+920 Beton K-350 m3 9.23 9.5 3/19/2016

75 1+950 Beton K-350 m3 9.23 8 3/20/2016

76 1+980 Beton K-350 m3 9.23 8.5 3/21/2016

77 2+010 Beton K-350 m3 9.23 10 3/22/2016

78 2+040 Beton K-350 m3 9.23 10 3/26/2016

79 2+070 Beton K-350 m3 9.23 10.5 3/27/2016

80 2+100 Beton K-350 m3 9.23 10 3/29/2016

81 2+130 Beton K-350 m3 9.23 9 3/30/2016

82 2+160 Beton K-350 m3 9.23 8.5 3/30/2016

83 2+190 Beton K-350 m3 9.23 8.5 3/31/2016

84 2+220 Beton K-350 m3 9.23 8.5 4/2/2016

85 2+250 Beton K-350 m3 9.23 8.5 4/2/2016

86 2+280 Beton K-350 m3 9.23 8.5 4/3/2016

87 2+310 Beton K-350 m3 9.23 8.5 4/3/2016


88 2+340 Beton K-350 m3 9.23 8.5 4/4/2016

89 2+370 Beton K-350 m3 9.23 8.5 4/5/2016

90 2+400 Beton K-350 m3 9.23 8.5 4/7/2016

91 2+430 Beton K-350 m3 9.23 8.5 4/13/2016

92 2+460 Beton K-350 m3 9.23 8.5 4/15/2016

93 2+490 Beton K-350 m3 9.23 10 4/19/2016

94 2+520 Beton K-350 m3 9.23 11 5/12/2016

95 2+550 Beton K-350 m3 9.23 12 4/21/2016

96 2+580 Beton K-350 m3 9.23 12.5 4/23/2016

97 2+610 Beton K-350 m3 9.23 14 4/25/2016

98 2+640 Beton K-350 m3 9.23 12 4/28/2016

99 2+670 Beton K-350 m3 9.23 11 5/20/2016

100 2+700 Beton K-350 m3 9.23 12.5 5/2/2016

101 2+730 Beton K-350 m3 9.23

102 2+760 Beton K-350 m3 9.23

103 2+820 Beton K-350 m3 9.23

104 2+850 Beton K-350 m3 9.23 12 5/18/2016

105 2+880 Beton K-350 m3 9.23 11 5/16/2016

106 2+910 Beton K-350 m3 9.23 9.5 5/10/2016

107 2+940 Beton K-350 m3 9.23 8 5/8/2016

108 2+970 Beton K-350 m3 9.23 8.5 5/13/2016

109 3+000 Beton K-350 m3 9.23 9 5/5/2016


8
7/18/2016
8
7/21/2016
8
7/24/2016
Total Besi Pier 6
(m3) Lokasi
Sat Volume Terpasang (kg)
1194 Titik Item Pekerjaan
0+030 Besi Kg 9616.14
7.6
0+040 Besi Kg 9616.14
7.6
0+050 Besi Kg 9616.14
7.6
0+060 Besi Kg 9616.14
7.6
0+070 Besi Kg 9616.14
7.6
0+080 Besi Kg 9616.14
7.6
0+090 Besi Kg 9616.14
7.6
0+100 Besi Kg 9616.14
7.6
0+110 Besi Kg 9616.14
7.6
0+120 Besi Kg 9616.14
7.6
0+130 Besi Kg 9616.14
7.6
0+140 Besi Kg 9616.14
7.6
0+150 Besi Kg 9616.14
7.6
0+160 Besi Kg 9616.14
7.6
0+170 Besi Kg 9616.14
7.6
0+180 Besi Kg

Besi Kg

0+210 Besi Kg

0+240 Besi Kg

Besi Kg

0+270 Besi Kg
Besi Kg

0+300 Besi Kg

0+330 Besi Kg

Besi Kg

0+360 Besi Kg

Besi Kg

0+390 Besi Kg

0+420 Besi Kg

0+450 Besi Kg 2556.72

0+480 Besi Kg 2556.72

0+510 Besi Kg 2556.72

0+540 Besi Kg 2556.72

0+570 Besi Kg 2556.72

0+600 Besi Kg 2556.72

0+630 Besi Kg 2556.72

0+660 Besi Kg 2556.72

0+690 Besi Kg 2556.72

0+720 Besi Kg 2556.72

0+750 Besi Kg 2556.72

0+780 Besi Kg 2556.72

0+810 Besi Kg 2556.72

0+840 Besi Kg 2556.72

0+870 Besi Kg 2556.72


0+900 Besi Kg 2556.72

0+930 Besi Kg 2556.72

0+960 Besi Kg 2556.72

0+990 Besi Kg 2556.72

1+020 Besi Kg 2556.72

1+050 Besi Kg 2556.72

1+080 Besi Kg 2556.72

1+110 Besi Kg 2556.72

1+140 Besi Kg 2556.72

1+170 Besi Kg 2556.72

1+200 Besi Kg 2556.72

1+230 Besi Kg 2556.72

1+260 Besi Kg 2556.72

1+290 Besi Kg 2556.72

1+320 Besi Kg 2556.72

1+350 Besi Kg 2556.72

1+380 Besi Kg 2556.72

1+410 Besi Kg 2556.72

1+440 Besi Kg 2556.72

1+470 Besi Kg 2556.72

1+500 Besi Kg 2556.72

1+530 Besi Kg 2556.72

1+560 Besi Kg 2556.72

1+590 Besi Kg 2556.72


1+620 Besi Kg 2556.72

1+650 Besi Kg 2556.72

1+680 Besi Kg 2556.72

1+710 Besi Kg 2556.72

1+740 Besi Kg 2556.72

1+770 Besi Kg 2556.72

1+800 Besi Kg 2556.72

1+830 Besi Kg 2556.72

1+860 Besi Kg 2556.72

1+890 Besi Kg 2556.72

1+920 Besi Kg 2556.72

1+950 Besi Kg 2556.72

1+980 Besi Kg 2556.72

2+010 Besi Kg 2556.72

2+040 Besi Kg 2556.72

2+070 Besi Kg 2556.72

2+100 Besi Kg 2556.72

2+130 Besi Kg 2556.72

2+160 Besi Kg 2556.72

2+190 Besi Kg 2556.72

2+220 Besi Kg 2556.72

2+250 Besi Kg 2556.72

2+280 Besi Kg 2556.72

2+310 Besi Kg 2556.72


2+340 Besi Kg 2556.72

2+370 Besi Kg 2556.72

2+400 Besi Kg 2556.72

2+430 Besi Kg 2556.72

2+460 Besi Kg 2556.72

2+490 Besi Kg 2556.72

2+520 Besi Kg 2556.72

2+550 Besi Kg 2556.72

2+580 Besi Kg 2556.72

2+610 Besi Kg 2556.72

2+640 Besi Kg 2556.72

2+670 Besi Kg 2556.72

2+700 Besi Kg 2556.72

2+730 Besi Kg

2+760 Besi Kg

2+820 Besi Kg

2+850 Besi Kg 2556.72

2+880 Besi Kg 2556.72

2+910 Besi Kg 2556.72

2+940 Besi Kg 2556.72

2+970 Besi Kg 2556.72

3+000 Besi Kg 2556.72


Total Bekisting Pier 6
(kg) Lokasi Volume Terpasang
Sat
353893.54 Titik Item Pekerjaan (m2)
0+030 Bekisting m2 30.40
7.6
0+040 Bekisting m2 30.40
7.6
0+050 Bekisting m2 30.40
7.6
0+060 Bekisting m2 30.40
7.6
0+070 Bekisting m2 30.40
7.6
0+080 Bekisting m2 30.40
7.6
0+090 Bekisting m2 30.40
7.6
0+100 Bekisting m2 30.40
7.6
0+110 Bekisting m2 30.40
7.6
0+120 Bekisting m2 30.40
7.6
0+130 Bekisting m2 30.40
7.6
0+140 Bekisting m2 30.40
7.6
0+150 Bekisting m2 30.40
7.6
0+160 Bekisting m2 30.40
7.6
0+170 Bekisting m2 30.40
7.6
0+180 Bekisting m2

Bekisting m2

0+210 Bekisting m2

0+240 Bekisting m2

Bekisting m2

0+270 Bekisting m2
Bekisting m2

0+300 Bekisting m2

0+330 Bekisting m2

Bekisting m2

0+360 Bekisting m2

Bekisting m2

0+390 Bekisting m2

0+420 Bekisting m2

0+450 Bekisting m2 24.00

0+480 Bekisting m2 24.00

0+510 Bekisting m2 24.00

0+540 Bekisting m2 24.00

0+570 Bekisting m2 24.00

0+600 Bekisting m2 24.00

0+630 Bekisting m2 24.00

0+660 Bekisting m2 24.00

0+690 Bekisting m2 24.00

0+720 Bekisting m2 24.00

0+750 Bekisting m2 24.00

0+780 Bekisting m2 24.00

0+810 Bekisting m2 24.00

0+840 Bekisting m2 24.00

0+870 Bekisting m2 24.00


0+900 Bekisting m2 24.00

0+930 Bekisting m2 24.00

0+960 Bekisting m2 24.00

0+990 Bekisting m2 24.00

1+020 Bekisting m2 24.00

1+050 Bekisting m2 24.00

1+080 Bekisting m2 24.00

1+110 Bekisting m2 24.00

1+140 Bekisting m2 24.00

1+170 Bekisting m2 24.00

1+200 Bekisting m2 24.00

1+230 Bekisting m2 24.00

1+260 Bekisting m2 24.00

1+290 Bekisting m2 24.00

1+320 Bekisting m2 24.00

1+350 Bekisting m2 24.00

1+380 Bekisting m2 24.00

1+410 Bekisting m2 24.00

1+440 Bekisting m2 24.00

1+470 Bekisting m2 24.00

1+500 Bekisting m2 24.00

1+530 Bekisting m2 24.00

1+560 Bekisting m2 24.00

1+590 Bekisting m2 24.00


1+620 Bekisting m2 24.00

1+650 Bekisting m2 24.00

1+680 Bekisting m2 24.00

1+710 Bekisting m2 24.00

1+740 Bekisting m2 24.00

1+770 Bekisting m2 24.00

1+800 Bekisting m2 24.00

1+830 Bekisting m2 24.00

1+860 Bekisting m2 24.00

1+890 Bekisting m2 24.00

1+920 Bekisting m2 24.00

1+950 Bekisting m2 24.00

1+980 Bekisting m2 24.00

2+010 Bekisting m2 24.00

2+040 Bekisting m2 24.00

2+070 Bekisting m2 24.00

2+100 Bekisting m2 24.00

2+130 Bekisting m2 24.00

2+160 Bekisting m2 24.00

2+190 Bekisting m2 24.00

2+220 Bekisting m2 24.00

2+250 Bekisting m2 24.00

2+280 Bekisting m2 24.00

2+310 Bekisting m2 24.00


2+340 Bekisting m2 24.00

2+370 Bekisting m2 24.00

2+400 Bekisting m2 24.00

2+430 Bekisting m2 24.00

2+460 Bekisting m2 24.00

2+490 Bekisting m2 24.00

2+520 Bekisting m2 24.00

2+550 Bekisting m2 24.00

2+580 Bekisting m2 24.00

2+610 Bekisting m2 24.00

2+640 Bekisting m2 24.00

2+670 Bekisting m2 24.00

2+700 Bekisting m2 24.00

2+730 Bekisting m2

2+760 Bekisting m2

2+820 Bekisting m2

2+850 Bekisting m2 24.00

2+880 Bekisting m2 24.00

2+910 Bekisting m2 24.00

2+940 Bekisting m2 24.00

2+970 Bekisting m2 24.00

3+000 Bekisting m2 24.00


Total
(m2)
2424.00
Volume Beton Pierhead

Item Luas Area Lebar Volume Jumlah Vtot

m2 m m3 bh m3

Side Form
12.061195035 1.5 18.09179 113 2044.373

Bottem Form
6.52301

Luas Area = 12.061195 37.168400069


Volume Besi Pierhead

jmlh 1 Pnjng 1 Jumlah Panjang Berat Berat Total


Item Kode Panjang titik titik Total Besi
m bh m bh m kg/m kg

5D19 3.15 113 355.95 2.22557 792.18986


2.76 113 311.88 2.22557 694.10921
2.37 113 267.81 2.22557 596.02856
1.98 113 223.74 2.22557 497.94791
1.58 113 178.54 2.22557 397.35238
11.84 2977.6279

D13-600 1.42 30 42.6 3390 4813.8 1.04189 5015.426


1.42

10D25 5.92 20 118.4 2260 13379.2 3.85313 51551.73


5.92

D19-100 1.42 60 85.2 40680 57765.6 2.22557 128561.1


1.42

8D32 5.92 30 177.6 3390 20068.8 6.31296 126693.53


22D32
5.92

8D25 3.5 8 28 904 3164 3.85313 12191.288

Total 326990.7

215.969
564.098
44.3843
1121.18
Jumlah Luas satu Jumlah Luas Total
Item Kode Panjang Lebar
satu titik titk
m m bh m2 bh m2

Side Form Kanan-kiri 1.5 1.5 2 4.5 113 508.5

Depan-
Belakang 6 1.5 2 18 113 2034
Jumlah 22.5

Bottom Form Kanan Kiri 2.356 1.5 2 7.068 113 798.684

Depan-
Belakang 2.356 2.25 2 10.602 113 1198.026
Jumlah 17.67

40.17

Angkur BJ Panjang Jumlah Berat


kg/m m T
26.047 1 14 0.365
CUTING LIST BAR OF PIER HEAD
PROYEK LRT PALEMBANG
ITEM PEKERJAAN BAR
NO SKET GAMBAR No. MARK

1 PIER HEAD

1 22 D32
5.86 1 22 D 32

0.655 0.655 2 8 D 32

3 10 D 25

2 8 D32 4 D 19 - 100
5.86
0.46 0.46 5 D 19 - 100

6 D 19 - 100

0.815 4.8 0.815 D 19 - 100

3 10 D25 D 19 - 100

D 19 - 100
0.85 1.4 0.85
7 D 19 - 100
2.215 0.14 0.14 2.125
D 19 - 100
4 D19 - 100 5 D19 - 100 9 D19 - 100
1.42 D 19 - 100
ITEM PEKERJAAN BAR
NO SKET GAMBAR No. MARK

0.10 0.32 0.32


D 19 - 100
1.865
1.42 1.42 1.42 1.950 8 D 19 - 100
2.030
2.110 D 19 - 100
2.195
D 19 - 100
1.42 0.32 0.32
D 19 - 100
6 D19 - 100 7 D19 - 100 8 D19 - 100
1.42 D 19 - 100
0.10 0.32 0.32
9 D 19 - 100
1.195 1.195 1.195 1.46
1.295 1.295 1.295 1.54 D 19 - 100
1.35 1.35 1.35 1.625
1.4 1.4 1.4 1.705 D 19 - 100
1.785
0.32 D 19 - 100
1.42 0.32
D 19 - 100
ITEM PEKERJAAN BAR
NO SKET GAMBAR No. MARK

11 D19 - 100 12 D19 - 100 11 D 19 - 100


1.42 1.42
0.10 0.10 D 19 - 100

1.460 1.46 1.865 1.865 D 19 - 100


1.540 1.54 1.950 1.950
1.625 1.625 2.030 2.030 D 19 - 100
1.705 1.705 2.110 2.110
1.785 1.785 2.195 2.195 D 19 - 100

1.42 1.42 12 D 19 - 100

13 5 D19 D 19 - 100

D 19 - 100
0.85 1.4 0.85
D 19 - 100
0.825 0.14 0.14 0.825
0.64 0.64 D 19 - 100
0.46 0.46
0.28 0.28 13 D 19
0.1 0.1
D 19

14 D13 - 600 15 D13 - 600 D 19

1.42 0.1 0.1 D 19


ITEM PEKERJAAN BAR
NO SKET GAMBAR No. MARK

0.295 0.1 1.42 D 19

0.1
14 D 13 - 600
16 8 D25

15 D 13 - 600
3.285

16 8 D 25

CATATAN :
ER HEAD
Jumlah Panjang Total Berat TOTAL Rencana
Potongan Diameter Potongan Panjang (Kg / M) BERAT Jumlah Panjang Berat
per unit ( Btg ) (M) (M) ( KG ) Titik m Kg

22 32 7.170 157.74 6.313 995.81 90.00 14,196.60 89,623.14


- - - -
8 32 7.350 58.80 6.313 371.20 90.00 5,292.00 33,408.40
- - - -
20 25 7.720 154.40 3.853 594.90 90.00 13,896.00 53,541.29
- - - -
16 19 5.880 94.08 2.226 209.42 90.00 8,467.20 18,847.99
- - - -
64 19 2.06 131.84 2.226 293.48 90.00 11,865.60 26,412.83
- - - -
2 19 5.43 10.86 2.226 24.17 90.00 977.40 2,175.69
- - - -
2 19 5.63 11.26 2.226 25.06 90.00 1,013.40 2,255.83
- - - -
2 19 5.74 11.48 2.226 25.55 90.00 1,033.20 2,299.90
- - - -
2 19 5.84 11.68 2.226 26.00 90.00 1,051.20 2,339.97
- - - -
8 19 1.84 14.68 2.226 32.68 90.00 1,321.20 2,940.99
19 - - - -
8 19 1.94 15.48 2.226 34.46 90.00 1,393.20 3,101.26
- - - -
8 19 1.99 15.92 2.226 35.44 90.00 1,432.80 3,189.41
Jumlah Panjang Total Berat TOTAL Rencana
Potongan Diameter Potongan Panjang (Kg / M) BERAT Jumlah Panjang Berat
per unit ( Btg ) (M) (M) ( KG ) Titik m Kg
- - - -
8 19 2.04 16.32 2.226 36.33 90.00 1,468.80 3,269.55
- - - -
8 19 2.10 16.80 2.226 37.40 90.00 1,512.00 3,365.71
- - - -
8 19 2.18 17.44 2.226 38.82 90.00 1,569.60 3,493.93
- - - -
8 19 2.27 18.12 2.226 40.34 90.00 1,630.80 3,630.16
- - - -
8 19 2.35 18.76 2.226 41.76 90.00 1,688.40 3,758.38
- - - -
8 19 2.43 19.40 2.226 43.18 90.00 1,746.00 3,886.60
- - - -
8 19 2.51 20.04 2.226 44.61 90.00 1,803.60 4,014.81
- - - -
8 19 2.59 20.72 2.226 46.12 90.00 1,864.80 4,151.04
- - - -
8 19 2.67 21.36 2.226 47.55 90.00 1,922.40 4,279.26
- - - -
8 19 2.75 22.00 2.226 48.97 90.00 1,980.00 4,407.48
- - - -
8 19 2.84 22.68 2.226 50.49 90.00 2,041.20 4,543.71
- - - -
Jumlah Panjang Total Berat TOTAL Rencana
Potongan Diameter Potongan Panjang (Kg / M) BERAT Jumlah Panjang Berat
per unit ( Btg ) (M) (M) ( KG ) Titik m Kg
- - - -
2 19 5.96 11.92 2.226 26.53 90.00 1,072.80 2,388.05
- - - -
2 19 6.12 12.24 2.226 27.25 90.00 1,101.60 2,452.16
- - - -
2 19 6.29 12.58 2.226 28.00 90.00 1,132.20 2,520.28
- - - -
2 19 6.45 12.90 2.226 28.72 90.00 1,161.00 2,584.39
- - - -
2 19 6.61 13.22 2.226 29.43 90.00 1,189.80 2,648.49
- - - -
- - - -
2 19 6.77 13.54 2.226 30.14 90.00 1,218.60 2,712.60
- - - -
2 19 6.94 13.88 2.226 30.90 90.00 1,249.20 2,780.72
- - - -
2 19 7.10 14.20 2.226 31.61 90.00 1,278.00 2,844.83
- - - -
2 19 7.26 14.52 2.226 32.32 90.00 1,306.80 2,908.94
- - - -
2 19 7.43 14.86 2.226 33.08 90.00 1,337.40 2,977.05
- - - -
2 19 5.03 10.06 2.226 22.39 90.00 905.40 2,015.42
- - - -
2 19 4.66 9.32 2.226 20.75 90.00 838.80 1,867.17
- - - -
2 19 4.30 8.60 2.226 19.14 90.00 774.00 1,722.92
- - - -
2 19 3.94 7.88 2.226 17.54 90.00 709.20 1,578.68
Jumlah Panjang Total Berat TOTAL Rencana
Potongan Diameter Potongan Panjang (Kg / M) BERAT Jumlah Panjang Berat
per unit ( Btg ) (M) (M) ( KG ) Titik m Kg
- - - -
2 19 3.58 7.16 2.226 15.94 90.00 644.40 1,434.43
- - - -
- - - -
16 13 1.92 30.64 1.042 31.93 90.00 2,757.60 2,873.42
- - - -
- - - -
8 13 1.62 12.96 1.042 13.50 90.00 1,166.40 1,215.39
- - - -
- - - -
16 25 3.285 52.56 1.042 54.77 90.00 4,730.40 4,929.08
- - - -
3,637.68 327,391.36
Batang
Bh

1,183
-
441
-
1,158
-
706
-
989
-
81
-
84
-
86
-
88
-
110
-
116
-
119
Batang
Bh
-
122
-
126
-
131
-
136
-
141
-
146
-
150
-
155
-
160
-
165
-
170
-
Batang
Bh
-
89
-
92
-
94
-
97
-
99
-
-
102
-
104
-
107
-
109
-
111
-
75
-
70
-
65
-
59
Batang
Bh
-
54
-
-
230
-
-
97
-
-
394
-
Pekerjaan Pier Head
Lokasi Volume Rencana
No Pier Sat IMTP 01 Tanggal
Titik Item Pekerjaan (m3)
25 0+450 Beton K-350 m3 18.09 19.5 6/5/2016

26 0+480 Beton K-350 m3 18.09 19 6/13/2016

27 0+510 Beton K-350 m3 18.09 19 6/17/2016

28 0+540 Beton K-350 m3 18.09 19 6/23/2016

29 0+570 Beton K-350 m3 18.09 19 6/25/2016

30 0+600 Beton K-350 m3 18.09 21 6/28/2016

31 0+630 Beton K-350 m3 18.09

32 0+660 Beton K-350 m3 18.09

33 0+690 Beton K-350 m3 18.09

34 0+720 Beton K-350 m3 18.09

35 0+750 Beton K-350 m3 18.09 20 7/22/2016

36 0+780 Beton K-350 m3 18.09 19 7/22/2016

37 0+810 Beton K-350 m3 18.09 19 7/23/2016

38 0+840 Beton K-350 m3 18.09

39 0+870 Beton K-350 m3 18.09

40 0+900 Beton K-350 m3 18.09

41 0+930 Beton K-350 m3 18.09

42 0+960 Beton K-350 m3 18.09

43 0+990 Beton K-350 m3 18.09

44 1+020 Beton K-350 m3 18.09

45 1+050 Beton K-350 m3 18.09

46 1+080 Beton K-350 m3 18.09


47 1+110 Beton K-350 m3 18.09

48 1+140 Beton K-350 m3 18.09

49 1+170 Beton K-350 m3 18.09

50 1+200 Beton K-350 m3 18.09

51 1+230 Beton K-350 m3 18.09

52 1+260 Beton K-350 m3 18.09

53 1+290 Beton K-350 m3 18.09

54 1+320 Beton K-350 m3 18.09

55 1+350 Beton K-350 m3 18.09

56 1+380 Beton K-350 m3 18.09

57 1+410 Beton K-350 m3 18.09 21 5/15/2016

58 1+440 Beton K-350 m3 18.09 21 4/20/2016

59 1+470 Beton K-350 m3 18.09 21 4/22/2016

60 1+500 Beton K-350 m3 18.09 21 5/9/2016

61 1+530 Beton K-350 m3 18.09 21 5/18/2016

62 1+560 Beton K-350 m3 18.09 21 5/22/2016

63 1+590 Beton K-350 m3 18.09 21

64 1+620 Beton K-350 m3 18.09 20 5/28/2016

65 1+650 Beton K-350 m3 18.09 20 5/29/2016

66 1+680 Beton K-350 m3 18.09 16 5/30/2016

67 1+710 Beton K-350 m3 18.09 17 6/2/2016

68 1+740 Beton K-350 m3 18.09 19 6/5/2016

69 1+770 Beton K-350 m3 18.09 19 7/18/2016

70 1+800 Beton K-350 m3 18.09 19 7/20/2016


71 1+830 Beton K-350 m3 18.09 19 7/24/2016

72 1+860 Beton K-350 m3 18.09

73 1+890 Beton K-350 m3 18.09 19 7/25/2016

74 1+920 Beton K-350 m3 18.09

75 1+950 Beton K-350 m3 18.09 19 6/7/2016

76 1+980 Beton K-350 m3 18.09 19 6/9/2016

77 2+010 Beton K-350 m3 18.09 19 6/10/2016

78 2+040 Beton K-350 m3 18.09 19 6/11/2016

79 2+070 Beton K-350 m3 18.09 19 6/14/2016

80 2+100 Beton K-350 m3 18.09 19 6/15/2016

81 2+130 Beton K-350 m3 18.09 19 6/16/2016

82 2+160 Beton K-350 m3 18.09 19 6/19/2016

83 2+190 Beton K-350 m3 18.09 19 6/19/2016

84 2+220 Beton K-350 m3 18.09 19 6/21/2016

85 2+250 Beton K-350 m3 18.09 19 6/21/2016

86 2+280 Beton K-350 m3 18.09 19 6/23/2016

87 2+310 Beton K-350 m3 18.09 19 6/26/2016

88 2+340 Beton K-350 m3 18.09 19 6/26/2016

89 2+370 Beton K-350 m3 18.09 19 6/27/2016

90 2+400 Beton K-350 m3 18.09

91 2+430 Beton K-350 m3 18.09

92 2+460 Beton K-350 m3 18.09 21 6/28/2016

93 2+490 Beton K-350 m3 18.09

94 2+520 Beton K-350 m3 18.09


95 2+550 Beton K-350 m3 18.09

96 2+580 Beton K-350 m3 18.09

97 2+610 Beton K-350 m3 18.09

98 2+640 Beton K-350 m3 18.09

99 2+670 Beton K-350 m3 18.09

100 2+700 Beton K-350 m3 18.09

101 2+700 Beton K-350 m3 18.09

102 2+700 Beton K-350 m3 18.09

103 2+700 Beton K-350 m3 18.09

104 2+700 Beton K-350 m3 18.09

105 2+700 Beton K-350 m3 18.09

106 2+700 Beton K-350 m3 18.09

107 2+700 Beton K-350 m3 18.09

108 2+700 Beton K-350 m3 18.09

109 2+700 Beton K-350 m3 18.09


Total Besi Pier Head Total
(m3) Lokasi Volume Terpasang (kg)
Sat
795.50 Titik Item Pekerjaan (m3) 120043.50
0+450 Besi Kg 3637.68

0+480 Besi Kg 3637.68

0+510 Besi Kg 3637.68

0+540 Besi Kg 3637.68

0+570 Besi Kg 3637.68

0+600 Besi Kg 3637.68

0+630 Besi Kg

0+660 Besi Kg

0+690 Besi Kg

0+720 Besi Kg

0+750 Besi Kg

0+780 Besi Kg

0+810 Besi Kg

0+840 Besi Kg

0+870 Besi Kg

0+900 Besi Kg

0+930 Besi Kg

0+960 Besi Kg

0+990 Besi Kg

1+020 Besi Kg

1+050 Besi Kg

1+080 Besi Kg
1+110 Besi Kg

1+140 Besi Kg

1+170 Besi Kg

1+200 Besi Kg

1+230 Besi Kg

1+260 Besi Kg

1+290 Besi Kg

1+320 Besi Kg

1+350 Besi Kg

1+380 Besi Kg

1+410 Besi Kg 3637.68

1+440 Besi Kg 3637.68

1+470 Besi Kg 3637.68

1+500 Besi Kg 3637.68

1+530 Besi Kg 3637.68

1+560 Besi Kg 3637.68

1+590 Besi Kg

1+620 Besi Kg 3637.68

1+650 Besi Kg 3637.68

1+680 Besi Kg 3637.68

1+710 Besi Kg 3637.68

1+740 Besi Kg 3637.68

1+770 Besi Kg

1+800 Besi Kg
1+830 Besi Kg

1+860 Besi Kg

1+890 Besi Kg

1+920 Besi Kg

1+950 Besi Kg 3637.68

1+980 Besi Kg 3637.68

2+010 Besi Kg 3637.68

2+040 Besi Kg 3637.68

2+070 Besi Kg 3637.68

2+100 Besi Kg 3637.68

2+130 Besi Kg 3637.68

2+160 Besi Kg 3637.68

2+190 Besi Kg 3637.68

2+220 Besi Kg 3637.68

2+250 Besi Kg 3637.68

2+280 Besi Kg 3637.68

2+310 Besi Kg 3637.68

2+340 Besi Kg 3637.68

2+370 Besi Kg 3637.68

2+400 Besi Kg

2+430 Besi Kg

2+460 Besi Kg 3637.68

2+490 Besi Kg

2+520 Besi Kg
2+550 Besi Kg

2+580 Besi Kg

2+610 Besi Kg

2+640 Besi Kg

2+670 Besi Kg

2+700 Besi Kg

2+730 Besi Kg

2+760 Besi Kg

` 2+820 Besi Kg

2+850 Besi Kg

2+880 Besi Kg

2+910 Besi Kg

2+940 Besi Kg

2+970 Besi Kg

3+000 Besi Kg
Bekisting Pier Head Total
Lokasi Volume Terpasang (m2)
Sat
Titik Item Pekerjaan (m3) 1325.61
0+450 Bekisting m2 40.17

0+480 Bekisting m2 40.17

0+510 Bekisting m2 40.17

0+540 Bekisting m2 40.17

0+570 Bekisting m2 40.17

0+600 Bekisting m2 40.17

0+630

0+660

0+690

0+720

0+750

0+780

0+810

0+840

0+870

0+900

0+930

0+960

0+990

1+020

1+050

1+080
1+110

1+140

1+170

1+200

1+230

1+260

1+290

1+320

1+350

1+380

1+410 Bekisting m2 40.17

1+440 Bekisting m2 40.17

1+470 Bekisting m2 40.17

1+500 Bekisting m2 40.17

1+530 Bekisting m2 40.17

1+560 Bekisting m2 40.17

1+590 Bekisting m2

1+620 Bekisting m2 40.17

1+650 Bekisting m2 40.17

1+680 Bekisting m2 40.17

1+710 Bekisting m2 40.17

1+740 Bekisting m2 40.17

1+770 Bekisting m2

1+800 Bekisting m2
1+830 Bekisting m2

1+860 Bekisting m2

1+890 Bekisting m2

1+920 Bekisting m2

1+950 Bekisting m2 40.17

1+980 Bekisting m2 40.17

2+010 Bekisting m2 40.17

2+040 Bekisting m2 40.17

2+070 Bekisting m2 40.17

2+100 Bekisting m2 40.17

2+130 Bekisting m2 40.17

2+160 Bekisting m2 40.17

2+190 Bekisting m2 40.17

2+220 Bekisting m2 40.17

2+250 Bekisting m2 40.17

2+280 Bekisting m2 40.17

2+310 Bekisting m2 40.17

2+340 Bekisting m2 40.17

2+370 Bekisting m2 40.17

2+400 Bekisting m2

2+430 Bekisting m2

2+460 Bekisting m2 40.17

2+490 Bekisting m2

2+520 Bekisting m2
2+550 Bekisting m2

2+580 Bekisting m2

2+610 Bekisting m2

2+640 Bekisting m2

2+670 Bekisting m2

2+700 Bekisting m2

2+730 Bekisting m2

2+760 Bekisting m2

2+820 Bekisting m2

2+850 Bekisting m2

2+880 Bekisting m2

2+910 Bekisting m2

2+940 Bekisting m2

2+970 Bekisting m2

3+000 Bekisting m2
Pekerjaan Galian
Lokasi
No Pier Sat Volume (m3) Tanggal
Titik Item Pekerjaan
1 0+030 Galian Tanah m3 Err:509

2 0+040 Galian Tanah m4 Err:509

3 0+050 Galian Tanah m5 Err:509

4 0+060 Galian Tanah m6 Err:509

5 0+070 Galian Tanah m7 Err:509

10

11

12

13

14

15

16

17

18

19

20

21
22

23

24

25 0+450 Galian Tanah m3 98.325

26 0+480 Galian Tanah m3 98.325

27 0+510 Galian Tanah m3 98.325

28 0+540 Galian Tanah m3 98.325

29 0+570 Galian Tanah m3 98.325

30 0+600 Galian Tanah m3 98.325

31 0+630 Galian Tanah m3 98.325

32 0+660 Galian Tanah m3 98.325

33 0+690 Galian Tanah m3 98.325

34 0+720 Galian Tanah m3 98.325

35 0+750 Galian Tanah m3 98.325

36 0+780 Galian Tanah m3 98.325

37 0+810 Galian Tanah m3 98.325

38 0+840 Galian Tanah m3 98.325

39 0+870 Galian Tanah m3 98.325

40 0+900 Galian Tanah m3 98.325

41 0+930 Galian Tanah m3 98.325

42 0+960 Galian Tanah m3 98.325

43 0+990 Galian Tanah m3 98.325


44 1+020 Galian Tanah m3 98.325

45 1+050 Galian Tanah m3 98.325

46 1+080 Galian Tanah m3 98.325

47 1+110 Galian Tanah m3 98.325

48 1+140 Galian Tanah m3 98.325

49 1+170 Galian Tanah m3 98.325

50 1+200 Galian Tanah m3 98.325

51 1+230 Galian Tanah m3 98.325

52 1+260 Galian Tanah m3 98.325

53 1+290 Galian Tanah m3 98.325

54 1+320 Galian Tanah m3 98.325

55 1+350 Galian Tanah m3 98.325

56 1+380 Galian Tanah m3 98.325

57 1+410 Galian Tanah m3 98.325

58 1+440 Galian Tanah m3 98.325

59 1+470 Galian Tanah m3 98.325

60 1+500 Galian Tanah m3 98.325

61 1+530 Galian Tanah m3 98.325

62 1+560 Galian Tanah m3 98.325

63 1+590 Galian Tanah m3 98.325

64 1+620 Galian Tanah m3 98.325

65 1+650 Galian Tanah m3 98.325

66 1+680 Galian Tanah m3 98.325

67 1+710 Galian Tanah m3 98.325


68 1+740 Galian Tanah m3 117.369

69 1+770 Galian Tanah m3 117.369

70 1+800 Galian Tanah m3 117.369

71 1+830 Galian Tanah m3 98.325

72 1+860 Galian Tanah m3 98.325

73 1+890 Galian Tanah m3 98.325

74 1+920 Galian Tanah m3 98.325

75 1+950 Galian Tanah m3 117.369

76 1+980 Galian Tanah m3 98.325

77 2+010 Galian Tanah m3 98.325

78 2+040 Galian Tanah m3 98.325

79 2+070 Galian Tanah m3 117.369

80 2+100 Galian Tanah m3 117.369

81 2+130 Galian Tanah m3 117.369

82 2+160 Galian Tanah m3 98.325

83 2+190 Galian Tanah m3 98.325

84 2+220 Galian Tanah m3 98.325

85 2+250 Galian Tanah m3 98.325

86 2+280 Galian Tanah m3 98.325

87 2+310 Galian Tanah m3 98.325

88 2+340 Galian Tanah m3 98.325

89 2+370 Galian Tanah m3 98.325

90 2+400 Galian Tanah m3 98.325


91 2+430 Galian Tanah m3 98.325

92 2+460 Galian Tanah m3 98.325

93 2+490 Galian Tanah m3 98.325

94 2+520 Galian Tanah m3 98.325

95 2+550 Galian Tanah m3 98.325

96 2+580 Galian Tanah m3 98.325

97 2+610 Galian Tanah m3 98.325

98 2+640 Galian Tanah m3 98.325

99 2+670 Galian Tanah m3 98.325

100 2+700 Galian Tanah m3 98.325

101 2+730 Galian Tanah m3

102 2+760 Galian Tanah m3

103 2+820 Galian Tanah m3

104 2+850 Galian Tanah m3

105 2+880 Galian Tanah m3 98.325

106 2+910 Galian Tanah m3 98.325

107 2+940 Galian Tanah m3 98.325

108 2+970 Galian Tanah m3 98.325

109 3+000 Galian Tanah m3 98.325

7606.008
Pekerjaan Urugan
Lokasi
Sat Volume (m3) Tanggal
Titik Item Pekerjaan
0+030 Urugan Tanah m3

0+040 Urugan Tanah m3

0+050 Urugan Tanah m3


0+450 Urugan Tanah m3 49.318

0+480 Urugan Tanah m3 49.318

0+510 Urugan Tanah m3 49.318

0+540 Urugan Tanah m3 49.318

0+570 Urugan Tanah m3 49.318

0+600 Urugan Tanah m3 49.318

0+630 Urugan Tanah m3 49.318

0+660 Urugan Tanah m3 49.318

0+690 Urugan Tanah m3 49.318

0+720 Urugan Tanah m3 49.318

0+750 Urugan Tanah m3 49.318

0+780 Urugan Tanah m3 49.318

0+810 Urugan Tanah m3 49.318

0+840 Urugan Tanah m3 49.318

0+870 Urugan Tanah m3 49.318

0+900 Urugan Tanah m3 49.318

0+930 Urugan Tanah m3 49.318

0+960 Urugan Tanah m3 49.318

0+990 Urugan Tanah m3 49.318


1+020 Urugan Tanah m3 49.318

1+050 Urugan Tanah m3 49.318

1+080 Urugan Tanah m3 49.318

1+110 Urugan Tanah m3 49.318

1+140 Urugan Tanah m3 49.318

1+170 Urugan Tanah m3 49.318

1+200 Urugan Tanah m3 49.318

1+230 Urugan Tanah m3 49.318

1+260 Urugan Tanah m3 49.318

1+290 Urugan Tanah m3 49.318

1+320 Urugan Tanah m3 49.318

1+350 Urugan Tanah m3 49.318

1+380 Urugan Tanah m3 49.318

1+410 Urugan Tanah m3 49.318

1+440 Urugan Tanah m3 49.318

1+470 Urugan Tanah m3 49.318

1+500 Urugan Tanah m3 49.318

1+530 Urugan Tanah m3 49.318

1+560 Urugan Tanah m3 49.318

1+590 Urugan Tanah m3 49.318

1+620 Urugan Tanah m3 49.318

1+650 Urugan Tanah m3 49.318

1+680 Urugan Tanah m3 49.318

1+710 Urugan Tanah m3 49.318


1+740 Urugan Tanah m3 49.318

1+770 Urugan Tanah m3 49.318

1+800 Urugan Tanah m3 49.318

1+830 Urugan Tanah m3 49.318

1+860 Urugan Tanah m3 49.318

1+890 Urugan Tanah m3 49.318

1+920 Urugan Tanah m3 49.318

1+950 Urugan Tanah m3 49.318

1+980 Urugan Tanah m3 49.318

2+010 Urugan Tanah m3 49.318

2+040 Urugan Tanah m3 49.318

2+070 Urugan Tanah m3 49.318

2+100 Urugan Tanah m3 49.318

2+130 Urugan Tanah m3 49.318

2+160 Urugan Tanah m3 49.318

2+190 Urugan Tanah m3 49.318

2+220 Urugan Tanah m3 49.318

2+250 Urugan Tanah m3 49.318

2+280 Urugan Tanah m3 49.318

2+310 Urugan Tanah m3 49.318

2+340 Urugan Tanah m3 49.318

2+370 Urugan Tanah m3 49.318

2+400 Urugan Tanah m3 49.318


2+430 Urugan Tanah m3 49.318

2+460 Urugan Tanah m3 49.318

2+490 Urugan Tanah m3 49.318

2+520 Urugan Tanah m3

2+550 Urugan Tanah m3

2+580 Urugan Tanah m3

2+610 Urugan Tanah m3

2+640 Urugan Tanah m3

2+670 Urugan Tanah m3

2+700 Urugan Tanah m3

2+730 Urugan Tanah m3

2+760 Urugan Tanah m3

2+820 Urugan Tanah m3

2+850 Urugan Tanah m3

2+880 Urugan Tanah m3

2+910 Urugan Tanah m3

2+940 Urugan Tanah m3

2+970 Urugan Tanah m3

3+000 Urugan Tanah m3

Urugan Pelebaran Boom Gate Baru m3 3680.222

3156.352
A. Atas 58.48
A. Bawah 52.48
T 2
No Lokasi Pengecoran Mutu Beton Volume (m3) Tanggal

Pelebaran Jalan Di Bandara K 350 11.5 5/16/2016


Tutup Saluran Di Bandara K 350 13 5/15/2016
Pelebaran Boom Gate K 350 24 5/14/2016
Pelebaran Boom Gate K 350 21 5/12/2016
Pelebaran Jalan Simpang Bandara K 350 28 5/11/2016
Pelebaran Boom Gate K 350 21 5/9/2016
Perbaikan Jalan K 350 7 5/5/2016
Perbaikan Jalan K 350 24.5 5/25/2016
Perbaikan Jalan K 350 14 5/21/2016
Perbaikan Jalan K 350 18 5/20/2016

Sambungan P 99 K 350 13 5/22/2016

Anda mungkin juga menyukai