CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

WISORE CONSULTORES Y CONTRATISTAS GENERALES SRL


PROYECTO: MEJORAMIENTO DEL CAMINO VECINAL TOTORA - SAN MIGUEL DE AYACUCHO - MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO
Mollepata
% MES 01 MES 02 MES 03 MES 04 MES 05
Costo
ITEM DESCRIPCION Und Cantidad PARCIAL SUB TOTAL
Unitario INCID. METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %

MOLLEPATA 2,050,423.12 #REF!


01 OBRAS PROVISIONALES 12,787.15
01.01 CAMPAMENTO ITINERANTES A=120M2 Und 1.00 11,573.70 11,573.70 11,573.70 1.00 11,573.70 100.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M Und 1.00 1,213.45 1,213.45 1,213.45 1.00 1,213.45 100.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
02 TRABAJOS PRELIMINARES 60,644.93
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Glb 1.00 31,501.62 31,501.62 31,501.62 0.50 15,750.81 50.00% - - 0.00% 0.50 15,750.81 50.00% - - 0.00% - - 0.00%
02.02 LIMPIEZA Y DEFORESTACION Ha 7.39 1,166.09 8,617.41 8,617.41 3.70 4,308.71 50.00% - - 0.00% 3.70 4,308.71 50.00% - - 0.00% - - 0.00%
02.03 TRAZO, NIVELACION Y REPLANTEO Km 10.56 823.10 8,691.94 8,691.94 - 0.00 0.00% - - 0.00% 5.28 4,345.97 50.00% 5.28 4,345.97 50.00% - - 0.00%
02.04 CONTROL TOPOGRAFICO DURANTE LA EJECUCIN Km 10.56 1,120.64 11,833.96 11,833.96 2.11 2,366.79 20.00% 1.06 1,183.40 10.00% 4.22 4,733.58 40.00% 3.17 3,550.19 30.00% - - 0.00%
03 MOVIMIENTO DE TIERRAS 950,307.40 - ###
CORTE EN MATERIAL SUELTO C/TRACTOR ORUGA
3.01 m3 61,551.95 4.36 268,366.50 268,366.50 - 0.00 0.00% - - 0.00% 30,775.98 134,183.25 50.00% 30,775.98 134,183.25 50.00% - - 0.00%
CORTE EN ROCA SUELTA: PERFORACION Y DISPARO
3.02 m3 18,306.54 10.58 193,683.19 193,683.19 - 0.00 0.00% - - 0.00% 9,153.27 96,841.60 50.00% 9,153.27 96,841.60 50.00% - - 0.00%
DESQUINCHE Y PEINADO DE TALUDES EN ROCA SUELTA
3.03 m3 21,967.84 6.15 135,102.22 135,102.22 - - 0.00% - - 0.00% 10,983.92 67,551.11 50.00% 10,983.92 67,551.11 50.00% - - 0.00%
CORTE EN ROCA FIJA: PERFORACION Y DISPARO
3.04 m3 3,747.38 14.46 54,187.11 54,187.11 - - 0.00% - - 0.00% 1,873.69 27,093.56 50.00% 1,873.69 27,093.56 50.00% - - 0.00%
DESQUINCHE Y PEINADO DE TALUDES EN ROCA DURA
3.05 m3 3,396.86 8.44 28,669.50 28,669.50 - - 0.00% - - 0.00% - - 0.00% 3,396.86 28,669.50 100.00% - - 0.00%
RELLENO CON MATERIAL PROPIO
3.06 m3 6,416.42 5.17 33,172.89 33,172.89 - - 0.00% - - 0.00% - - 0.00% 6,416.42 33,172.89 100.00% - - 0.00%
TRANSPORTE DE MATERIAL EXCEDENTE A D<1KM
3.07 m3 92,627.34 2.56 237,125.99 237,125.99 - 0.00 0.00% 27,788.20 71,137.80 30.00% 37,050.94 94,850.40 40.00% 27,788.20 71,137.80 30.00% - - 0.00%
04 PLAZOLETAS DE CRUCE 9,849.84 ###
CORTE EN MATERIAL SUELTO C/TRACTOR ORUGA
4.01 m3 1,320.00 4.36 5,755.20 5,755.20 - 0.00 0.00% - - 0.00% - - 0.00% 1,320.00 5,755.20 100.00% - - 0.00%
RELLENO CON MATERIAL PROPIO
4.02 m3 792.00 5.17 4,094.64 4,094.64 - 0.00 0.00% - - 0.00% - - 0.00% 792.00 4,094.64 100.00% - - 0.00%
SUPERFICIE DE RODADURA - AFIRMADO E=0.20 M
05 626,316.07 ###
5.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN ZONA DE CORTE m2 52,809.52 1.43 75,517.61 75,517.61 - 0.00 0.00% - - 0.00% - - 0.00% 26,404.76 37,758.81 50.00% 26,404.76 37,758.81 50.00%
5.02 TRANSPORTE DE MATERIAL AFIRMADO CANTERA - TRAMO I (R=68.85 M3/m3 5,476.56 17.12 93,758.71 93,758.71 - 0.00 0.00% - - 0.00% - - 0.00% 2,738.28 46,879.36 50.00% 2,738.28 46,879.36 50.00%
5.03 TRANSPORTE DE MATERIAL AFIRMADO CANTERA - TRAMO II (R=68.85 M3/m3 7,725.82 13.77 106,384.54 106,384.54 - 0.00 0.00% - - 0.00% - - 0.00% 3,862.91 53,192.27 50.00% 3,862.91 53,192.27 50.00%
5.04 RIEGO RENDIMIENTO CISTERNA CAP=2,000 GAL m2 52,809.52 0.23 12,146.19 12,146.19 - - 0.00% - - 0.00% - - 0.00% 26,404.76 6,073.10 50.00% 26,404.76 6,073.10 50.00%
5.05 ESPARCIDO Y COMPACTADO AFIRMADO E=0.20M m2 52,809.52 6.41 338,509.02 338,509.02 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 52,809.52 338,509.02 100.00%
06 OBRAS DE ARTE Y ESTRUCTURAS DE DRENAJE ###
06.01 BADEN TIPO I, L=6MT (02 UND) ###
06.01.01 TRABAJOS PRELIMINARES 286.02 ###
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 84.00 0.88 73.92 73.92 - - 0.00% 84.00 73.92 100.00% - - 0.00% - - 0.00% - - 0.00%
06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 42.00 5.05 212.10 212.10 - - 0.00% 42.00 212.10 100.00% - - 0.00% - - 0.00% - - 0.00%
06.01.02 MOVIMIENTO DE TIERRA 707.05 ###
06.01.02.01 EXCAVACION NO CLASIFICADA EN TERRENO SUELTO m3 14.70 43.86 644.74 644.74 - - 0.00% 14.70 644.74 100.00% - - 0.00% - - 0.00% - - 0.00%
06.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE (<1KM) m3 18.38 3.39 62.31 62.31 - - 0.00% 18.38 62.31 100.00% - - 0.00% - - 0.00% - - 0.00%
06.01.03 OBRAS DE CONCRETO SIMPLE 17,210.42 ###
06.01.03.01 ENCOFRADO Y DESENCOFRADO m2 21.00 54.31 1,140.51 1,140.51 - - 0.00% 10.50 570.26 50.00% 10.50 570.26 50.00% - - 0.00% - - 0.00%
06.01.03.02 CONCRETO F'C=140 KG/CM2. +30%PM m3 22.08 337.92 7,461.27 7,461.27 - - 0.00% 11.04 3,730.64 50.00% 11.04 3,730.64 50.00% - - 0.00% - - 0.00%
06.01.03.03 ALBAILERIA DE PIEDRA SELECCIONADA, ASENTADO EN CONCRETO F'Cm3 7.41 315.25 2,336.00 2,336.00 - - 0.00% 3.71 1,168.00 50.00% 3.71 1,168.00 50.00% - - 0.00% - - 0.00%
06.01.03.04 ENROCADO PARA TRANSICION m3 14.40 435.60 6,272.64 6,272.64 - - 0.00% 7.20 3,136.32 50.00% 7.20 3,136.32 50.00% - - 0.00% - - 0.00%
06.02 ALCANTARILLA DE TMC 36" (08 UND) 49,044.94 ###
06.02.01 LIMPIEZA DE TERRENO MANUAL m2 336.00 0.88 295.68 295.68 - - 0.00% - - 0.00% 336.00 295.68 100.00% - - 0.00% - - 0.00%
06.02.02 TRAZO Y REPLANTEO m2 168.00 4.34 729.12 729.12 - - 0.00% - - 0.00% 168.00 729.12 100.00% - - 0.00% - - 0.00%
06.02.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 72.00 43.86 3,157.92 3,157.92 - - 0.00% - - 0.00% 72.00 3,157.92 100.00% - - 0.00% - - 0.00%
06.02.04 CAMA DE APOYO Y RELLENO CON MATERIAL SELECCIONADO m3 21.60 51.90 1,121.04 1,121.04 - - 0.00% - - 0.00% - - 0.00% 21.60 1,121.04 100.00% - - 0.00%
06.02.05 ALCANTARILLA TMC 0=36" C=14 RENDIMIENTO=10 ML/DIA*** ml 32.00 430.30 13,769.60 13,769.60 - - 0.00% - - 0.00% - - 0.00% 32.00 13,769.60 100.00% - - 0.00%
06.02.06 ENCOFRADO Y DESENCOFRADO MURO Y ALA m2 137.41 54.31 7,462.74 7,462.74 - - 0.00% - - 0.00% - - 0.00% 137.41 7,462.74 100.00% - - 0.00%
06.02.07 CONCRETO F'C=140 KG/CM2.+30% PM. m3 47.60 337.92 16,084.99 16,084.99 - - 0.00% - - 0.00% - - 0.00% 47.60 16,084.99 100.00% - - 0.00%
06.02.08 ELIMINACION DE MATERIAL EXCEDENTE @ 30mts. m3 25.32 20.78 526.15 526.15 - - 0.00% - - 0.00% - - 0.00% 25.32 526.15 100.00% - - 0.00%
06.02.09 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 41.90 54.38 2,278.52 2,278.52 - - 0.00% - - 0.00% - - 0.00% 41.90 2,278.52 100.00% - - 0.00%
06.02.10 ALBAILERIA DE PIEDRA EMBOQUILLADA EN MORTERO 1:3 m3 22.96 157.63 3,619.18 3,619.18 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 22.96 3,619.18 100.00%
06.03 CUNETAS DE DRENAJE LONGITUDINAL (0.50x0.50M) 28,683.13 ###
06.03.01 CONFORMACION DE CUNETAS DE CUNETAS EN MATERIAL SUELTO ml 9,719.80 1.96 19,050.81 19,050.81 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 9,719.80 19,050.81 100.00%
06.03.02 CONFORMACION DE CUNETAS DE CUNETAS EN ROCA SUELTA ml 2,890.82 2.46 7,111.42 7,111.42 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 2,890.82 7,111.42 100.00%
06.03.03 CONFORMACION DE CUNETAS DE CUNETAS EN ROCA DURA ml 591.76 4.26 2,520.90 2,520.90 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 591.76 2,520.90 100.00%
07 OBRAS DE PROTECCION ###
7.01 CONSTRUCCION MURO DE SOSTENIMIENTO 76,907.32 ###
07.01.01 TRAZO Y REPLANTEO m2 350.00 4.34 1,519.00 1,519.00 - - 0.00% - - 0.00% 350.00 1,519.00 100.00% - - 0.00% - - 0.00%
07.01.02 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 252.00 43.86 11,052.72 11,052.72 - - 0.00% - - 0.00% 252.00 11,052.72 100.00% - - 0.00% - - 0.00%
07.01.03 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 420.00 54.38 22,839.60 22,839.60 - - 0.00% - - 0.00% - - 0.00% 420.00 22,839.60 100.00% - - 0.00%
07.01.04 MURO SECO DE PIEDRA DE 16" m3 262.50 158.08 41,496.00 41,496.00 - - 0.00% - - 0.00% - - 0.00% 262.50 41,496.00 100.00% - - 0.00%
08 SEALIZACION VERTICAL 36,392.22 ###
8.01 SEALES INFORMATIVAS Und 4.00 682.11 2,728.44 2,728.44 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 4.00 2,728.44 100.00%
8.02 SEALES REGLAMENTARIAS Und 12.00 582.04 6,984.48 6,984.48 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 12.00 6,984.48 100.00%
8.03 SEALES PREVENTIVAS Und 42.00 527.65 22,161.30 22,161.30 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 42.00 22,161.30 100.00%
8.04 POSTES KILOMETRICOS Und 12.00 376.50 4,518.00 4,518.00 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 12.00 4,518.00 100.00%
09 MITIGACION AMBIENTAL ###
9.01 PROGRAMACION DE MEDIDAS PREVENTIVAS Y CORRECTIVAS 22,845.78 ###
09.01.01 EDUCACION, CAPACITACION AMBIENTAL Y SEGURIDAD VIAL A POBLACIO Tller 3.00 1,180.00 3,540.00 3,540.00 - - 0.00% - - 0.00% 1.50 1,770.00 50.00% 1.50 1,770.00 50.00% - - 0.00%
09.01.02 CHARLAS DE SEGURIDAD OCUPACIONAL Y MEDIO AMBIENTE A LOS TR Glb 2.00 3,000.00 6,000.00 6,000.00 - - 0.00% - - 0.00% 1.00 3,000.00 50.00% 1.00 3,000.00 50.00% - - 0.00%
09.01.03 IMPLEMENTACION DE EQUIPO DE PROTECCION PERSONAL (EPP) Glb 1.00 9,317.10 9,317.10 9,317.10 - - 0.00% - - 0.00% 0.50 4,658.55 50.00% 0.50 4,658.55 50.00% - - 0.00%
09.01.04 SEALIZACION AMBIENTAL DE PROTECCION OCUPACIONAL Y DE SEGURUnd 12.00 332.39 3,988.68 3,988.68 - - 0.00% - - 0.00% 6.00 1,994.34 50.00% 6.00 1,994.34 50.00% - - 0.00%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
WISORE CONSULTORES Y CONTRATISTAS GENERALES SRL
PROYECTO: MEJORAMIENTO DEL CAMINO VECINAL TOTORA - SAN MIGUEL DE AYACUCHO - MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO
Mollepata
% MES 01 MES 02 MES 03 MES 04 MES 05
Costo
ITEM DESCRIPCION Und Cantidad PARCIAL SUB TOTAL
Unitario INCID. METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
9.02 PROGRAMA DE DE MANEJO DE RESIDUOS SOLIDOS 8,036.08 ###
09.02.01 SUMINISTRO DE TACHOS PARA RESIDUOS ORGANICO Y INORGANICO Und 20 164.94 3298.8 3,298.80 - - 0.00% - - 0.00% 10.00 1,649.40 50.00% 10.00 1,649.40 50.00% - - 0.00%
09.02.02 PREPARACION DE CAPA SUPERFICIAL DE DEPOSITOS DE RESIDUOS SO Ha 1 4737.28 4737.28 4,737.28 - - 0.00% - - 0.00% 0.50 2,368.64 50.00% 0.50 2,368.64 50.00% - - 0.00%
9.03 SUMINISTRO DE BAO PORTATIL 6,606.00 ###
09.03.01 BAO PORTATIL Und 6.00 1,101.00 6,606.00 6,606.00 6.00 6,606.00 100.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00%
9.04 RECUPERACION DE LA COBERTURA VEGETAL 8,173.46 ###
09.03.02 INSTALACION DE PLANTONES EN ZONAS PREVISTAS Ha 0.99 8,256.02 8,173.46 8,173.46 - - 0.00% - - 0.00% 0.50 4,086.73 50.00% 0.50 4,086.73 50.00% - - 0.00%
9.05 PLAN DE MONITOREO AMBIENTAL 11,700.00 ###
09.05.01 MONITOREO DE AGUA Und 3.00 1,500.00 4,500.00 4,500.00 - - 0.00% - - 0.00% 3.00 4,500.00 100.00% - - 0.00% - - 0.00%
09.05.02 MONITOREO DE AIRE Und 3.00 1,500.00 4,500.00 4,500.00 - - 0.00% - - 0.00% 3.00 4,500.00 100.00% - - 0.00% - - 0.00%
09.05.03 MONITOREO DE RUIDO Und 3.00 900.00 2,700.00 2,700.00 - - 0.00% - - 0.00% 3.00 2,700.00 100.00% - - 0.00% - - 0.00%
9.06 PROGRAMA DE ABANDONO DE OBRA 16,129.14 ###
09.06.01 LIMPIEZA FINAL DE OBRA Km 11.51 479.35 5,517.32 5,517.32 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 11.51 5,517.32 100.00%
09.06.02 RESTAURACION DE AREA OCUPADA POR CAMPAMENTOS Y MAQUINARIAm2 3,522.00 1.56 5,494.32 5,494.32 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 3,522.00 5,494.32 100.00%
09.06.03 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN EL DME m3 5,750.00 0.89 5,117.50 5,117.50 - - 0.00% - - 0.00% 2,875.00 2,558.75 50.00% 2,875.00 2,558.75 50.00% - - 0.00%
10 PRUEBAS DE ENSAYO Y CONTROL DE CALIDAD ###
10.01 PRUEBAS DE COMPACTACION EN PAVIMENTO 17,171.44 ###
10.01.01 PRUEBAS DE COMPACTACION EN AFIRMADO C/0.5KM Und 22.00 780.52 17,171.44 17,171.44 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 22.00 17,171.44 100.00%
10.02 PRUEBAS A LA CALIDAD DE CONCRETO 3,986.44 ###
10.02.01 PRUEBA DE CALIDAD DE CONCRETO (PRUEBA ALA COMPRESION) Und 50.00 59.32 2,966.00 2,966.00 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 50.00 2,966.00 100.00%
10.02.02 PRUEBA DE ANALISIS DE AGREGADO Und 2.00 510.22 1,020.44 1,020.44 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 2.00 1,020.44 100.00%
10.03 FLETE 57,238.29 ###
10.03.01 TRANSPORTE DE MATERIALES Y HERRAMIENTAS A OBRA Glb 1.00 45985.03 45985.03 45,985.03 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 1.00 45,985.03 100.00%
10.03.02 TRANSPORTE Y CUSTODIA DE MATERIALES EXPLOSIVOS LIMA -AYACUCHGlb 1.00 11,253.26 11,253.26 11,253.26 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 1.00 11,253.26 100.00%
FORTALICIMIENTO ORGANIZACIONAL VECINAL Y COMUNAL PARA ###
11
REALIZAR PRACTICAS DE MANTENIMIENTO DE LA VIA
11.01 SENSIBILIZACION A LA POBLACION BENEFICIARIA 5,400.00 ###
11.01.01 SENSIBILIZACION SOCIAL DE LAS POBLACIONES AFECTADAS POR EL P Mes 2.00 2,700.00 5,400.00 5,400.00 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 2.00 5,400.00 100.00%
11.02 CAPACITACION DE LOS COMITES DE MANTENIMIENTO Y SENSIBILIZACION SOCIAL 24,000.00 ###
11.02.01 CONSTITUCION Y CAPACITACION DE LOS COMITES PARA CONSERVACIOGlb 2.00 12,000.00 24,000.00 24,000.00 - - 0.00% - - 0.00% - - 0.00% - - 0.00% 2.00 24,000.00 100.00%
###
COSTO DIRECTO 2,050,423.12 41,819.46 81,919.47 508,805.04 747,964.27 669,914.89 ###
PROCENTAJE DE AVANCE MENSUAL 100% 2.04% 4.00% 24.81% 36.48% 32.67% ###
41,819.46 123,738.93 632,543.97 1,380,508.24 2,050,423.12 ###
PORCENTAJE DE AVANCE ACUMULADO 2.04% 6.03% 30.85% 67.33% 100.00% ###
CALENDARIO DE DESEMBOLSOS
PROYECTO:

MEJORAMIENTO DEL CAMINO VECINAL TOTORA - SAN MIGUEL DE AYACUCHO - MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO

Cliente
Lugar
Hecho por:
Item Descripcin SUB TOTAL % MES MES MES MES
INCID. N 01 N 02 N 03 N 04
01 OBRAS PROVISIONALES 0.00 #REF! 0.00 0.00 0.00 0.00

02 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


03 TRABAJOS PRELIMINARES 0.00 #REF! 0.00 0.00 0.00 0.00
04 CORTE EN ROCA SUELTA: PERFORACION Y DISPARO 193,683.19 #REF! 0.00 0.00 96,841.60 96,841.60
05 TRAZO Y REPLANTEO 729.12 #REF! 0.00 0.00 729.12 0.00
06 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
07 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
08 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
09 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

10 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


11 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
17 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
18 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

19 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


20 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
22 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
23 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
24 0 #REF! #REF! #REF! #REF! #REF! #REF!
25 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!


PROCENTAJE DE DESEMBOLSO MENSUAL % #REF! #REF! #REF! #REF!
CALENDARIO DE DESEMBOLSOS
PROYECTO:

MEJORAMIENTO DEL CAMINO VECINAL TOTORA - SAN MIGUEL DE AYACUCHO - MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO

Cliente
Lugar
Hecho por:
Item Descripcin SUB TOTAL % MES MES MES MES
INCID. N 01 N 02 N 03 N 04
PORCENTAJE DE DESEMBOLSO ACUMULADO % #REF! #REF! #REF! #REF!
E DESEMBOLSOS

MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO

MES MES
N 05 N 06
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
E DESEMBOLSOS

MOLLEPATA SECTOR II, DISTRITO DE JESS NAZARENO - HUAMANGA - AYACUCHO

MES MES
N 05 N 06
#REF! #REF!