= 2.000.000 / 12
= 166.000 / Bulan
= 166.000 / 30
= 5.555 / hari
= 5.555 / 24
= 231,46 / jam
( Alat muat = 231,46ton/jam)
2. Hino
(Sistem sewa)
Hino = 150.000/jam x 5jam
= 750.000
Operator = 100.000/jam x 5jam
= 500.000
Solar = 50 liter/jam x14.000 x 5jam
=3.500.000
---------------------------------+
=4.750.000
3. Bouldozer
(sistem sewa)
Bouldozer = 350000/ jam x 5jam
= 1.750.000
Operator = 100.000/jam x 5jam
= 500.000
Solar = 70liter/jam x 14.000 x5 jam
= 4.900.000
---------------------------------+
= 6.150.000
Jumlah Backhoe yang digunakan 2 alat
Sehingga harga total 1 backhoe x 2
=8.750.00 x 2
= 17.500.000
Jumlah hino yang digunakan 4 alat
Sehingga harga total 1 hino x 4
= 4.750.00 x 4
= 19.000.000
Jumlah buldozer yang digunakan 1 alat
Sehingga harga total 1 hino = 4.750.000
--------------------------------+
=41.250.000
Sehingga didapat total pengeluaran / jam = 41.250.000
Harga bahan galian mangan = 1.900.000/ton
Total bahan galian yang diperoleh / jam = 231,46 ton
Sehingga total pendapatan /jam = 1.900.000 x 231,46
=439.774.000
Sedangkan total pengeluaran / jam =41.250.000