No Uraian Pekerjaan Volume Sat Analisa Durasi Pekerja Bahan Harga

uan
A. Pekerjaan Persiapan Pekerja 1 Hari Tukang - Kayu Pekerja
1. Pengukuran dan 44 M2 Kayu = Pancang - Tukang Kayu = Rp 101,904
Pemasangan 4orang = 44 btg = Rp 407,616
Durasi=

Bouplank
= Pekerja = - Paku = - Pekerja = Rp 86,416
44 0.100
= 4orang 0.88 kg = Rp 345,664
1

Tukang Kayu = 4.4 4orang


- Papan
Kepala - Kepala Tukang = Rp 105,600
Kayu =
Tukang = = Rp 0
Durasi= 0.007 M3
0 orang

= =
- Mandor = Rp 105,600
44 0.100 Mandor = Rp 0
=
1 0
= 0 orang
Pekerja = 4.4 4orang
.
3
Bahan
Durasi= 0
- Kayu Pancang = 6,825 x 44
8
= = Rp 300,300,00

44 0.010 - Paku = 19,900 x 0,88
= 1
= 17,512
Kepala Tukang = 044 0 orang =
- Papan Kayu = 2,169,713 x
0.007

Durasi= 4
= 15,187,99
4
=
44 0.005 Total
x = Rp 1.086.279
= 1

Mandor = 022 0 orang


6 = Rp
RAB 1.975.652,80
,
Bahan
8 <RAB (OK)
Total
- Kayu Pancang = 44 x 1
P
= 44 Btg
a
- Paku = 44 x 0.020
k
= 0.88 Kg
u
- Papan Kayu = 44 x 0.007
= 0.308 M3
=

2. Pembersihan 160 M2 3 Hari - Pekerja 4


Pekerja
Lapangan = 5orang 4
Pekerja
- Pekerja = Rp 86,416
Durasi=
-Mandor= x = Rp 1.296.240

= 2 orang

160 0.100 0- Mandor = Rp 105,600
= 3
. = Rp 633.600
Pekerja = 5.3 5orang
0
2 = Rp 1.929.840
Total

Durasi=
0

= 0
RAB = Rp 2.244.000,00

160 0.050 .
Total <RAB (OK)
= 3 3
Mandor= 2.6 2 orang 0
B. Pekerjaan Pondasi Pekerja 2 Hari - Pekerja Pekerja
1. Galian Tanah 14.40 = 5orang - Pekerja = Rp 86,416
Biasa = Rp 864.160
Durasi=


- Mandor
= = 0 orang - Mandor = Rp 105,600
14.40 0.750
= = Rp 0
2

Pekerja = 5.4 5orang


Total = Rp 864.160

Durasi=
RAB =

= Rp 932.580,00
14.40 0.025
=
1 Total <RAB (OK)
Mandor = 0.18 0 orang
`

2. Mengurug tanah 5.76 Hari- - Pekerja


Pekerja
kembali =2orang
Pekerja

-
Durasi= - Pekerja = Rp 86,416
-Mandor
=

= 0 orang = Rp 86.416

5.76 0.250
= 1/2 - Mandor = Rp 105,600
Pekerja = 2.88 2orang = Rp 0
Total = Rp 86.416
Durasi=

=

5.76 0.0083
= RAB =
1/2

Mandor = 0.09 0 orang Rp 124.344,00

Total <RAB (OK)


3. Pasir urug 0.9 Pekerja


Durasi=


=
0.9 0.300
= 1

Pekerja =


Durasi=


=
0.9 0.010
= 1

Mandor =

Bahan
- Pasir Urug= 0.9 x 1.2
= 1.08Btg
4. Lantai kerja 0.9 Pekerja Hari Tukang - Semend
Batu = 0 Portalnd
orang = 230.
Durasi=

00 kg
= Pekerja = - Pasir = Pekerja
0.9 0.200
= 1/2 2orang 803.7 Kg - Tukang Batu = Rp 101,904

Tukang Batu = 0.36 0 orang - Batu = Rp 0


Kepala Pecah =
Tukang = 924.3 Kg - Pekerja = Rp 86,416
Durasi=
0 orang = Rp 86,416

=

=
0.9 1.200 Mandor - Kepala Tukang = Rp 105,600
1/2
= 0 orang = Rp 0
Pekerja = 2.16 2orang

- Mandor = Rp 105,600

Durasi= = Rp 0

=

0.9 0.020
=
1/2 Bahan
Kepala Tukang = 0.03 0 orang - Semend Portalnd
= 230. 00 kg x 1.439.2

Durasi=
=Rp. 330.970

=
- Pasir = 803.7 Kg x 60.65
0.9 0.060 = Rp. 48.744.40
=
1/2

Mandor = 0.1 0 orang


- Batu Pecah = 924.3 Kg x 306.25
= Rp. 283.066
Bahan
- Semend Portalnd = 0.9 x 230. 00
= 207 Kg
Total = Rp 749.196
- Pasir = 0.9 x 893
= 803.7 Kg
RAB =
- Batu Pecah = 0.9 x 1.027
Rp 984.587,40
= 924.3 Kg

5. Beton 16.56 4 Hari Tukang - Semend


Pekerja
Batu = 1 Portalnd Total <RAB ( OK)


orang = 293.4
Durasi= Kg

= Pekerja =

16.56 0.275 6 orang - Pasir =
= 4 Pekerja
684 Kg
Tukang Batu = 1.1 1 orang - Tukang Batu = Rp 101,904
Kepala
Tukang = = Rp 407.616

Durasi= - Batu
0 orang
Pecah = - Pekerja = Rp 86,416
= 926.1Kg = Rp 2.073.984
16.56 1.650
= =
4 Mandor
Pekerja = 6.8 6 orang = 0 orang - Kepala Tukang = Rp 105,600
9 = Rp 0
2
Durasi=

6 - Mandor = Rp 105,600
= . = Rp 0
16.56 0.028
= 1
4

Kepala Tukang = 0.11 0 orang K


Bahan
g
- Semend Portalnd
Durasi=

= 293.4 kg x 1.439.2

= =Rp. 422.202.60
16.56 0.083
= 4
- Pasir = 684 Kg x 60.65
Mandor = 0.34 0 orang
= Rp. 41.484.60

Bahan
- Batu Pecah = 926.1 Kg x 306.25
- Semend Portalnd = 0.9 x 326. 00
= Rp. 283.618.12
= 293.4 Kg
- Pasir = 0.9 x 760
= 684 Kg
Total = Rp 7.721.213.20
- Batu Pecah = 0.9 x 1.029
= 926.1Kg
RAB =
Rp 18.116.416,44
-
6. Tul Pondasi 199.91
Total >RAB ( OK)
Pekerja
7. Bekisting 11.52 2 Hari Tukang - Papan


Kayu = 1 mal =
Durasi= orang 0.35712
Kg
=
11.52 0.260
= 4 Pekerja = - Paku =
Tukang Kayu = 1.4 1 orang 2 orang 3.456 Kg


Durasi=
Kepala Pekerja
=
Tukang = - Tukang Kayu = Rp 101,904
=

0 orang 0 = Rp 203.808
11.52 0.520
= 4 .
Pekerja = 2.9 2 orang Mandor 3
=0 orang 5- Pekerja = Rp 86,416

Durasi= 7 = Rp 172.832


1
=
2- Kepala Tukang = Rp 105,600
11.52 0.026
= = Rp 0
4

Kepala Tukang = 0.14 0 orang K


g- Mandor = Rp 105,600
= Rp 0
Durasi=
=

=

11.52 0.026 Bahan
2
= 4
- Papan
9 mal =
Mandor = 0.14 0 orang
0.35712
3 Kg x 2.169.713
. =Rp. 774.847
Bahan
4
- Papan mal = 11.52 x 0.031
- Paku = 3.456 Kg x 19.900
= 0.35712 Kg K = Rp. .68.774.400
- Paku = 11.52 x 0.300 g
= 3.456 Kg
Total
= = Rp 1.220.261
8. Cerucuk 72
RAB
9 =
Rp
2 1.395.257,47
4
.
Total >RAB ( OK)
3
=

2
0
7

K
g

C. Pekerjaan Struktur
1. Kolom Pondasi
- Bekisting 5.76 -
- Beton 0.144 Pekerja


Durasi=


=
0.144 0.275
= 4

Tukang Batu = 1.4 1 orang


Durasi=

=

0.144 1.650
= 4

Pekerja = 2.9 2 orang


Durasi=

=

0.144 0.028
= 4

Kepala Tukang = 0.14 0 orang


Durasi=

=
0.144 0.083
= 4

Mandor = 0.14 0 orang

Bahan
- Papan mal = 11.52 x 0.031
= 0.35712 Kg
- Paku = 11.52 x 0.300
= 3.456 Kg

- Tulangan 35.53 Pekerja 2 Hari Tukang - Besi Pekerja


Besi= 1 beton = - Tukang Besi = Rp 101,904
orang 373.065 = Rp 203.808
Durasi=

Kg
= Pekerja = - Pekerja = Rp 86,416
35.53 0.070
= 2 orang - Kawat = Rp 345.664
2

Tukang Besi= 1.2 1 orang ikat =


Kepala 5.3295 - Kepala Tukang = Rp 105,600
Tukang = Kg = Rp 0
Durasi=
0 orang

= = - Mandor = Rp 105,600

35.53 0.070 Mandor = Rp 0
= 2
= 0 orang 3
Pekerja = 1.2 2 orang
7


3Bahan
Durasi= . - Besi beton = 373.065 Kg x 12.000

=
0 =Rp. 4.476.780
35.53 0.007 6
= 2
5 - Kawat ikat = 5.3295 Kg x 20.000
Kepala Tukang = 0.12 0 orang
= Rp. 106.590
K
g
Durasi=

Total = Rp 5.132.842
=

35.53 0.004
= RAB = Rp 509,301.23
2

Mandor = 0.07 0 orang

Bahan Total >RAB ( TDK OK)


- Besi beton = 35.53 x 10.5
= 373.065 Kg

- Kawat ikat = 35.53 x 0.150


= 5.3295 Kg

- Beugel 199 Pekerja 4 Hari Pekerja


- Tukang Besi = Rp 101,904
= Rp 1.222.848
Durasi=

= - Pekerja = Rp 86,416

199 0.070 = Rp 1.036992
= 4

Tukang Besi= 3.4 3 orang


- Kepala Tukang = Rp 105,600
= Rp 0
Durasi=

= - Mandor = Rp 105,600
= Rp 0
199 0.070
=
4

Pekerja = 3.4 3 orang


Bahan
- Besi beton = 2089.5 Kg x 12.000
Durasi= =Rp. 4.476.780

=

199 0.007 - Kawat ikat = 298.5 Kg x 20.000
=
4
= Rp. 106.590
Kepala Tukang = 0.3 0 orang


Durasi=
Total = Rp 5.132.842

=
199 0.004 RAB = Rp 509,301.23
= 4

Mandor = 0.1 0 orang

Total >RAB ( TDK OK)


Bahan
- Besi beton = 199 x 10.5
= 2089.5 Kg

- Kawat ikat = 199 x 0.150


= 298.5 Kg

2. Balok Sloof
- Bekisting 34.80
- Beton 1.45
- Tulangan 144.14
- Beugel 70.32
3. Ring Balok
- Bekisting 25.20
- Beton 0.95
- Tulangan 155.48
- Beugel 43.13
4. Kolom Praktis
- Bekisting 576
- Beton 0.14
- Tulangan 127.28
- Beugel 34.13

D. Pekerjaan Lantai
1. Memasang lantai 18.30
dibawah
2. Membuat beton 7.35 Pekerja 3 Hari Tukang - Semen Pekerja
Batu = 0 =2396.1 Kg - Tukang Batu = Rp 101,904
orang - = Rp 0
Durasi=

- Pasir
= Pekerja = - = 5586 Kg - Pekerja = Rp 86,416
7.35 0.275
= 4 orang - = Rp 1.036.992
3

Tukang Batu = 0 orang Batu Pecah


Kepala =7.5631Kg - Kepala Tukang = Rp 105,600
Tukang = = Rp 0
Durasi=
0 orang
- Mandor = Rp 105,600
=
7.35 1.650
= Rp 0
= 3 Mandor
Pekerja = 4 orang = 0 orang
Bahan

Durasi=
- Semen = 2396.1 Kg x1.432.9
= Rp 3.433.370
=

7.35 0.028
= 3 - Pasir = 5586 Kg x 60.65
Kepala Tukang = 0 orang = Rp 338.790.90

- Batu Pecah = 7.5631Kg x 306.25


Durasi=
= Rp 2.316.20

=

7.35 0.083
= 3
Total = Rp 4.811.468
Mandor = 0 orang

RAB = Rp 7,443,590.34
Bahan
- Semen = 7.35 x 326
Total <RAB ( OK)
= 2396.1 Kg
- Pasir = 7.35 x 760
= 5586 Kg
- Batu Pecah = 7.35 x 1.029
= 7.5631Kg
3. Pemasangan 71.25 Pekerja 7 Hari Tukang Keramik Pekerja
Keramik 40/40 Batu = = 445.3 Bh - Tukang Batu = Rp 101,904
3orang = Rp 2.139.984
Durasi=

= Pekerja = Semen - Pekerja = Rp 86,416
71.25 0.350
= 6 orang = 810.38 Kg = Rp 3.629.472
7

Tukang Batu = 3orang


Kepala Pasir - Kepala Tukang = Rp 105,600
Tukang = =2.99 m3 = Rp 0
Durasi=
0 orang

= - Mandor = Rp 105,600

71.25 0.620 Mandor Semen warna = Rp 0
=
7
= 0 orang = 10.6 kg
Pekerja = 6 orang


Bahan
Durasi= - Keramik = 445.3 Bh x 16.400

= = Rp 7.298.000

71.25 0.035
= 7
- Semen = 810.38 Kg x 1.439
Kepala Tukang = 0 orang
= Rp 1.166.136


Durasi= - Pasir = 2.99 m3 x 84.910

= Rp 253.880
=
71.25 0.030
= 7

Mandor = 0 orang
- Semen warna = 10.6 kg x 11.000
= Rp 116.600
Bahan
- Keramik = 71.25 x 6.25
= 445.3 Bh
Total = Rp 14.604.072
- Semen = 71.25 x 11.38
= 810.38 Kg
RAB = Rp 15,689,438.10
- Pasir = 71.25 x 0.042
= 2.99 m3 Total <RAB ( OK)

- Semen warna = 71.25 x 0.15


= 10.6 kg
1 Hari Tukang Keramik Pekerja
4. Pemasangan 2.25 Batu = 0 = 59.625 Bh - Tukang Batu = Rp 101,904
Pekerja
Keramik 20/20 orang = Rp 0

Durasi= Semen - Pekerja = Rp 86,416

=
= 23.4 Kg = Rp 86,416
2.25 0.350 Pekerja =
= 1
1 orang Pasir - Kepala Tukang = Rp 105,600
Tukang Batu = 0 orang m3
=0.10125 = Rp 0


Durasi= Kepala Semen warna - Mandor = Rp 105,600
Tukang = =0.3645 kg
= = Rp 0

2.25 0.700 0 orang
= 1
Pekerja = 1 orang

Mandor Bahan
Durasi=


= 0 orang - Keramik = 59.625 Bh x 2.868.32
= = Rp 171,023.58
2.25 0.035
=
1

Kepala Tukang = 0 orang - Semen = 23.4 Kg x 1.439.20


= Rp 33.677.28

Durasi= - Pasir = 0.10125 m3x 84.910

= = Rp 8.597.14

2.25 0.035
= 1
- Semen warna
Mandor = 0 orang
= 0.3645 kg x 11.000
= Rp 4.009.5
Bahan
- Keramik = 2.25 x 26.5
= 59.625 Bh
Total = Rp 303.722
- Semen = 2.25x 10.4
= 23.4 Kg
RAB = Rp 450,294.10
- Pasir = 2.25x 0.045
= 0.10125 m3
Total <RAB ( OK)
- Semen warna = 2.25x 0.1620
= 0.3645 kg

E. Pekerjaan Dinding
1. Pembuatan dinding 185.10
penutup kolong
2. Pemasangan 27.765
Batako
3. Plesteran 370.02
4. Pemasangan 12.80
Keramik dinding
F. Pekerjaan Atap
1. Pemasangan 64.01
rangka atap
2. Pemasangan 64.01 Pekerja 4 Hari Tukang Genteng metal Pekerja
genteng metal Kayu = = 103.696.2 - Tukang Kayu = Rp 101,904
1orang Bh = Rp 407.616
Durasi=

= Pekerja = Paku - Pekerja = Rp 86,416
64.01 0.100
= 3orang = 12.802 Kg = Rp 1.036.992
4

Tukang Kayu = 1orang


Kepala - Kepala Tukang = Rp 105,600
Tukang = = Rp 0
Durasi=
0 orang

= - Mandor = Rp 105,600
64.01 0.200 Mandor = Rp 0
= 4
= 0 orang Bahan
Pekerja = 3orang
Genteng metal = 103.696.2 Bh x 52.000

=5.392.202
Durasi=

=
64.01 0.010
= 4 Paku = 12.802 Kg x 19.900
Kepala Tukang = 0 orang = 254.759.80


Durasi=

Total = Rp 7.395.291

=

64.01 0.001
= RAB = Rp 7,479,901.35
4

Mandor = 0 orang
Total <RAB ( OK)

Bahan
Genteng metal = 64.01x 1.620
= 103.696.2 Bh
Paku = 64.01x 0.200
= 12.802 Kg

3. Lisplank 32 Pekerja 1Hari Tukang Papan Kayu Pekerja

Kayu = = 0.2816Bh - Tukang Kayu = Rp 101,904



3orang = Rp 305.712
Durasi=

Paku
= - Pekerja = Rp 86,416
Pekerja = =1.92 Kg
32 0.100 = Rp 259.248
= 3 orang
1

Tukang Kayu = 3orang


- Kepala Tukang = Rp 105,600
Kepala = Rp 0
Tukang =
Durasi=

0 orang - Mandor = Rp 105,600
=
= Rp 0
32 0.100
= Mandor Bahan
1

Pekerja = 3 orang = 0 orang Papan Kayu = 0.2816Bh x 6.698.615


= Rp 1,886,329.98

Durasi=

= Paku =1.92 Kg x 19.900
32 0.010 = Rp 38.208
=
1

Kepala Tukang = 0 orang

Total = Rp 2.489.497

Durasi=
RAB = Rp 2,729,913.92
=

32 0.050
=
4 Total <RAB ( OK)
Mandor = 0 orang

Bahan
Papan Kayu = 32 x 0.0088
= 0.2816Bh
Paku = 32 x 0.060
= 1.92 Kg
4. Bekisting 26.25
5. Beton 26.25
6. Wiremesh 5834
G. Pekerjaan Plafond
1. Rangka Plafond 73.50 -
2. Plafond GRC 73.50 Pekerja 1 Hari Tukang GRC Pekerja
Kayu = 3 = 26.754Bh - Tukang Kayu = Rp 101,904
orang = Rp 305.712
Durasi=

=
Pekerja = Paku - Pekerja = Rp 86,416
73.50 0.050
= 3 orang =8.085 Kg = Rp 259.248
1

Tukang Kayu = 3 orang


- Kepala Tukang = Rp 105,600
Kepala = Rp 0
Durasi=
Tukang =

= 0 orang - Mandor = Rp 105,600

73.50 0.100 = Rp 0
=
1
Bahan
Pekerja = 3 orang
Mandor GRC = 26.754Bh x 70.900


= 0 orang = Rp. 1.896.575
Durasi=

= Paku = 8.085 Kg x 21.300

73.50 0.005 = Rp 172.210
=
1

Kepala Tukang = 0 orang


Total = Rp 2.633.745

Durasi=

RAB = Rp 3,156,339.90
=
73.50 0.050
= 4

Mandor = 0 orang Total <RAB ( OK)

Bahan
GRC = 73.50 x 0.364
= 26.754Bh

Paku =73.50 x 0.110


= 8.085 Kg

3. List Plafond 73.50