uan
A. Pekerjaan Persiapan Pekerja 1 Hari Tukang - Kayu Pekerja
1. Pengukuran dan 44 M2 Kayu = Pancang - Tukang Kayu = Rp 101,904
Pemasangan 4orang = 44 btg = Rp 407,616
Durasi=
Bouplank
= Pekerja = - Paku = - Pekerja = Rp 86,416
44 0.100
= 4orang 0.88 kg = Rp 345,664
1
Durasi=
=
0.9 0.300
= 1
Pekerja =
Durasi=
=
0.9 0.010
= 1
Mandor =
Bahan
- Pasir Urug= 0.9 x 1.2
= 1.08Btg
4. Lantai kerja 0.9 Pekerja Hari Tukang - Semend
Batu = 0 Portalnd
orang = 230.
Durasi=
00 kg
= Pekerja = - Pasir = Pekerja
0.9 0.200
= 1/2 2orang 803.7 Kg - Tukang Batu = Rp 101,904
=
0.9 1.200 Mandor - Kepala Tukang = Rp 105,600
1/2
= 0 orang = Rp 0
Pekerja = 2.16 2orang
- Mandor = Rp 105,600
Durasi= = Rp 0
=
0.9 0.020
=
1/2 Bahan
Kepala Tukang = 0.03 0 orang - Semend Portalnd
= 230. 00 kg x 1.439.2
Durasi=
=Rp. 330.970
=
- Pasir = 803.7 Kg x 60.65
0.9 0.060 = Rp. 48.744.40
=
1/2
orang = 293.4
Durasi= Kg
= Pekerja =
16.56 0.275 6 orang - Pasir =
= 4 Pekerja
684 Kg
Tukang Batu = 1.1 1 orang - Tukang Batu = Rp 101,904
Kepala
Tukang = = Rp 407.616
Durasi= - Batu
0 orang
Pecah = - Pekerja = Rp 86,416
= 926.1Kg = Rp 2.073.984
16.56 1.650
= =
4 Mandor
Pekerja = 6.8 6 orang = 0 orang - Kepala Tukang = Rp 105,600
9 = Rp 0
2
Durasi=
6 - Mandor = Rp 105,600
= . = Rp 0
16.56 0.028
= 1
4
Bahan
- Batu Pecah = 926.1 Kg x 306.25
- Semend Portalnd = 0.9 x 326. 00
= Rp. 283.618.12
= 293.4 Kg
- Pasir = 0.9 x 760
= 684 Kg
Total = Rp 7.721.213.20
- Batu Pecah = 0.9 x 1.029
= 926.1Kg
RAB =
Rp 18.116.416,44
-
6. Tul Pondasi 199.91
Total >RAB ( OK)
Pekerja
7. Bekisting 11.52 2 Hari Tukang - Papan
Kayu = 1 mal =
Durasi= orang 0.35712
Kg
=
11.52 0.260
= 4 Pekerja = - Paku =
Tukang Kayu = 1.4 1 orang 2 orang 3.456 Kg
Durasi=
Kepala Pekerja
=
Tukang = - Tukang Kayu = Rp 101,904
=
0 orang 0 = Rp 203.808
11.52 0.520
= 4 .
Pekerja = 2.9 2 orang Mandor 3
=0 orang 5- Pekerja = Rp 86,416
Durasi= 7 = Rp 172.832
1
=
2- Kepala Tukang = Rp 105,600
11.52 0.026
= = Rp 0
4
2
0
7
K
g
C. Pekerjaan Struktur
1. Kolom Pondasi
- Bekisting 5.76 -
- Beton 0.144 Pekerja
Durasi=
=
0.144 0.275
= 4
Durasi=
=
0.144 1.650
= 4
Durasi=
=
0.144 0.028
= 4
Durasi=
=
0.144 0.083
= 4
Bahan
- Papan mal = 11.52 x 0.031
= 0.35712 Kg
- Paku = 11.52 x 0.300
= 3.456 Kg
3Bahan
Durasi= . - Besi beton = 373.065 Kg x 12.000
=
0 =Rp. 4.476.780
35.53 0.007 6
= 2
5 - Kawat ikat = 5.3295 Kg x 20.000
Kepala Tukang = 0.12 0 orang
= Rp. 106.590
K
g
Durasi=
Total = Rp 5.132.842
=
35.53 0.004
= RAB = Rp 509,301.23
2
Durasi=
Total = Rp 5.132.842
=
199 0.004 RAB = Rp 509,301.23
= 4
2. Balok Sloof
- Bekisting 34.80
- Beton 1.45
- Tulangan 144.14
- Beugel 70.32
3. Ring Balok
- Bekisting 25.20
- Beton 0.95
- Tulangan 155.48
- Beugel 43.13
4. Kolom Praktis
- Bekisting 576
- Beton 0.14
- Tulangan 127.28
- Beugel 34.13
D. Pekerjaan Lantai
1. Memasang lantai 18.30
dibawah
2. Membuat beton 7.35 Pekerja 3 Hari Tukang - Semen Pekerja
Batu = 0 =2396.1 Kg - Tukang Batu = Rp 101,904
orang - = Rp 0
Durasi=
- Pasir
= Pekerja = - = 5586 Kg - Pekerja = Rp 86,416
7.35 0.275
= 4 orang - = Rp 1.036.992
3
RAB = Rp 7,443,590.34
Bahan
- Semen = 7.35 x 326
Total <RAB ( OK)
= 2396.1 Kg
- Pasir = 7.35 x 760
= 5586 Kg
- Batu Pecah = 7.35 x 1.029
= 7.5631Kg
3. Pemasangan 71.25 Pekerja 7 Hari Tukang Keramik Pekerja
Keramik 40/40 Batu = = 445.3 Bh - Tukang Batu = Rp 101,904
3orang = Rp 2.139.984
Durasi=
= Pekerja = Semen - Pekerja = Rp 86,416
71.25 0.350
= 6 orang = 810.38 Kg = Rp 3.629.472
7
Bahan
Durasi= - Keramik = 445.3 Bh x 16.400
= = Rp 7.298.000
71.25 0.035
= 7
- Semen = 810.38 Kg x 1.439
Kepala Tukang = 0 orang
= Rp 1.166.136
Durasi= - Pasir = 2.99 m3 x 84.910
= Rp 253.880
=
71.25 0.030
= 7
Mandor = 0 orang
- Semen warna = 10.6 kg x 11.000
= Rp 116.600
Bahan
- Keramik = 71.25 x 6.25
= 445.3 Bh
Total = Rp 14.604.072
- Semen = 71.25 x 11.38
= 810.38 Kg
RAB = Rp 15,689,438.10
- Pasir = 71.25 x 0.042
= 2.99 m3 Total <RAB ( OK)
Durasi= Kepala Semen warna - Mandor = Rp 105,600
Tukang = =0.3645 kg
= = Rp 0
2.25 0.700 0 orang
= 1
Pekerja = 1 orang
Mandor Bahan
Durasi=
= 0 orang - Keramik = 59.625 Bh x 2.868.32
= = Rp 171,023.58
2.25 0.035
=
1
E. Pekerjaan Dinding
1. Pembuatan dinding 185.10
penutup kolong
2. Pemasangan 27.765
Batako
3. Plesteran 370.02
4. Pemasangan 12.80
Keramik dinding
F. Pekerjaan Atap
1. Pemasangan 64.01
rangka atap
2. Pemasangan 64.01 Pekerja 4 Hari Tukang Genteng metal Pekerja
genteng metal Kayu = = 103.696.2 - Tukang Kayu = Rp 101,904
1orang Bh = Rp 407.616
Durasi=
= Pekerja = Paku - Pekerja = Rp 86,416
64.01 0.100
= 3orang = 12.802 Kg = Rp 1.036.992
4
=5.392.202
Durasi=
=
64.01 0.010
= 4 Paku = 12.802 Kg x 19.900
Kepala Tukang = 0 orang = 254.759.80
Durasi=
Total = Rp 7.395.291
=
64.01 0.001
= RAB = Rp 7,479,901.35
4
Mandor = 0 orang
Total <RAB ( OK)
Bahan
Genteng metal = 64.01x 1.620
= 103.696.2 Bh
Paku = 64.01x 0.200
= 12.802 Kg
Total = Rp 2.489.497
Durasi=
RAB = Rp 2,729,913.92
=
32 0.050
=
4 Total <RAB ( OK)
Mandor = 0 orang
Bahan
Papan Kayu = 32 x 0.0088
= 0.2816Bh
Paku = 32 x 0.060
= 1.92 Kg
4. Bekisting 26.25
5. Beton 26.25
6. Wiremesh 5834
G. Pekerjaan Plafond
1. Rangka Plafond 73.50 -
2. Plafond GRC 73.50 Pekerja 1 Hari Tukang GRC Pekerja
Kayu = 3 = 26.754Bh - Tukang Kayu = Rp 101,904
orang = Rp 305.712
Durasi=
=
Pekerja = Paku - Pekerja = Rp 86,416
73.50 0.050
= 3 orang =8.085 Kg = Rp 259.248
1
= 0 orang = Rp. 1.896.575
Durasi=
= Paku = 8.085 Kg x 21.300
73.50 0.005 = Rp 172.210
=
1
Bahan
GRC = 73.50 x 0.364
= 26.754Bh