5 R.C.C
Wall starter Cu.Mtr 1 12 0.2 0.1 0.24
Base Concrete Cu.Mtr 1 3.5 4.5 0.3 4.725
Reintaining wall Cu.Mtr 2 2.5 3 0.2 3
Reintaining wall Cu.Mtr 2 3.5 3 0.2 4.2
Top slab Cu.Mtr 1 2.5 3.5 0.2 1.75
Inside IPS flooring Cu.Mtr 1 2 3 0.1 0.6
14.515
6 Shuttering work
Footing Sq.Mtr 2 3.5 0.3 2.1
Sq.Mtr 2 4.5 0.3 2.7
Reintaining wall Sq.Mtr 4 3.5 3 42
Reintaining wall Sq.Mtr 4 2.5 3 30
Slab Sq.Mtr 1 2.5 3.5 8.75
Starter 2 12 0.2 4.8
90.35
7 Plastering work
External Sq.Mtr 1 12 3 36
Slab Top & Bottom Sq.Mtr 2 2.5 3.5 17.5
53.5
8 Water proofing work Sq.Mtr 1 12 3 36
Sq.Mtr 2 2.5 3.5 17.5
53.5
9 Acid tile linning work Sq.Mtr 1 12 3 36
Sq.Mtr 2 2.5 3.5 17.5
53.5
5 R.C.C
Wall starter Cu.Mtr 1 12 0.2 0.1 0.24
Base Concrete Cu.Mtr 1 3.5 4.5 0.3 4.725
Reintaining wall Cu.Mtr 2 2.5 2.2 0.2 2.2
Reintaining wall Cu.Mtr 2 3.5 2.2 0.2 3.08
Top slab Cu.Mtr 1 2.5 3.5 0.2 1.75
Inside IPS flooring Cu.Mtr 1 2 3 0.1 0.6
12.595
6 Shuttering work
Footing Sq.Mtr 2 3.5 0.3 2.1
Sq.Mtr 2 4.5 0.3 2.7
Reintaining wall Sq.Mtr 4 3.5 2.2 30.8
Reintaining wall Sq.Mtr 4 2.5 2.2 22
Slab Sq.Mtr 1 2.5 3.5 8.75
Starter 2 12 0.2 4.8
71.15
7 Plastering work
External Sq.Mtr 1 12 2.2 26.4
Slab Top & Bottom Sq.Mtr 2 2.5 3.5 17.5
43.9
8 Water proofing work Sq.Mtr 1 12 2.2 26.4
Sq.Mtr 2 2.5 3.5 17.5
43.9
9 Acid tile linning work Sq.Mtr 1 12 2.2 26.4
Sq.Mtr 2 2.5 3.5 17.5
43.9
5 R.C.C
Wall starter Cu.Mtr 1 8.4 0.2 0.1 0.168
Base Concrete Cu.Mtr 1 2.7 2.7 0.3 2.187
Reintaining wall Cu.Mtr 2 2.1 2 0.2 1.68
Reintaining wall Cu.Mtr 2 2.1 2 0.2 1.68
Top slab Cu.Mtr 1 2.1 2.1 0.2 0.882
Inside IPS flooring Cu.Mtr 1 2 3 0.1 0.6
7.197
6 Shuttering work
Footing Sq.Mtr 2 2.7 0.3 1.62
Sq.Mtr 2 2.7 0.3 1.62
Reintaining wall Sq.Mtr 4 2.1 2 16.8
Reintaining wall Sq.Mtr 4 2.1 2 16.8
Slab Sq.Mtr 1 2.1 2.1 4.41
Starter 2 8.4 0.2 3.36
44.61
7 Plastering work
External Sq.Mtr 1 8.4 2 16.8
Slab Top & Bottom Sq.Mtr 2 2.1 2.1 8.82
25.62
8 Water proofing work Sq.Mtr 1 8.4 2 16.8
Sq.Mtr 2 2.1 2.1 8.82
25.62
9 Acid tile linning work Sq.Mtr 1 8.4 2 16.8
Sq.Mtr 2 2.1 2.1 8.82
25.62