Anda di halaman 1dari 24

PHYSICAL PROPERTIES OF LIQ N2, LIQ O2, LIQ Ar & LNG

Properties Liquid Liquid Liquid Liquified


Nitrogen Oxygen Argon Natural
Gas
Molecular N2 O2 Ar LNG
Formula
Molecular 28.01 31.999 39.95 >16
Weight
Boiling Point @ -320.5F -297.4F -302.6F -258F
1 atm (-195.8C, 77oK) (-183.0C, (-185.9C, (-161C,
90oK) 87oK) 112 oK)
Freezing Point -346.0F -361.9F -308.8F -296F
@ 1 atm (-210.0C, 63oK) (-218.8C, (-189.4C, 85 oK (-182C,
54oK) ) 91 oK)
Critical -232.5F -181.8F -188.4F -116oF
Temperature (-146.9C) (-118.4C) (-122.4C) (-82.2C,
191 oK)
Critical Pressure 492.3 psia 729.1 psia 705.8 psia 673 psia
(33.5 atm) (49.6 atm) (48.0 atm) (45.78 atm)
Density, Liquid 50.45 lb/scf 71.23 lb/scf 87.40 lb/scf 25.6 lb/cu.ft
@ BP, 1 atm @ BP, 1 atm @ BP, 1 atm 422 kg/m
Density, Gas 0.0725 lb/scf 0.0831 lb/scf 0.1034 lb/scf
@ 68F (20C), 1 @ 68F (20C), 1 @ 68F (20C), 1
atm atm atm
Specific Gravity, 0.967 1.11 1.38 0.55-1.0
Gas (air=1) @ 68F (air=1) @ 68F (air=1) @ 68F
(20C), 1 atm (20C), 1 atm (20C), 1 atm
Specific Gravity, 0.808 1.14 1.40 0.415-0.45
Liquid (water=1) @ 68F (water=1) @ (water=1) @ @ -162C
(20C), 1 atm 68F (20C), 1 68F (20C), 1
atm atm

Specific Volume 13.80 scf/lb 12.08 scf/lb 9.67 scf/lb


@ 68F (20C), 1 @ 68F (20C), 1 @ 68F (20C), 1
atm atm atm
Latent Heat of 2399 BTU/lb 2934 BTU/lb 2804 BTU/lb 220 BTU/lb
Vaporization mole mole mole 120 cal/g
Expansion 1 to 694 1 to 860 1 to 840
Ratio, Liquid to BP to 68F BP to 68F BP to 68F
Gas, (20C): (20C): (20C):
SPACETECH CRYO EQUIPMENTS PVT. LTD.
ABOUT US:

Spacetech is organization established in 1982 by a group of experience technocrafts


who are well known in the field of design, fabrication & project engineering. We have
experience & qualified work force & well equipped manufacturing unit situated in
Mumbai & is approved by Petroleum & Explosives Safety Organization (PESO)
,Government of India , Nagpur. Licence No. PV (M) -565.

SCE, a sister concern of the Spacetech organization has manufacturing unit at


Ambernath about 40 Km from our corporate office. The unit has been incorporated as
registered company in the year 1994 & is named as Spacetech Cryo Equipments Pvt.
Ltd. (SCE).

SCE pioneers new ideas for storage & transportation of Liquid Nitrogen, Oxygen,
Argon, Helium, Ammonia, Carbondioxide by using their double walled vacuum
insulated pressure vessel design. We are engaged in the Manufacturing,
Supplying and Exporting a comprehensive array of Cryogenic Pressure Vessels.
Under this range, we are offering Pressure Vessels with single wall, double wall,
Standard Pressure Vessels. Apart from this, we are offering a broad spectrum
of Cryogenic Road Tankers to the clients. Being a renowned name, we manufacture
these products using excellent quality raw material and advance technology. Offered
range of products is highly used in the Engineering, Chemical, Petrochemicals,
Refineries and Allied Industries

We are registered with all statutory mandatory government bodies viz. Excise, Sales /
Service Tax, ESIC, SSI, NSIC etc.

The range of products, we are offering is highly appreciated among the clients for its
premium quality such as dimensional accuracy, sturdy construction, durability, low
maintenance and corrosion & chemical resistant nature. Further, in order to
manufacture a qualitative range of products, we have developed a sophisticated
infrastructure. Our modernized infrastructure spreads over 10,000 sq. ft. area of land.
To execute all business processes in a streamlined manner, we have segregated our
sprawling infrastructure into various units such as manufacturing, quality controlling
and administrative,. Further, to offer only top-notch quality products, we manufacture
these products as per ASME, EN, IS code. Also, to ensure the flawlessness of our
products it passes through third parties inspection agencies, who test all the products
on various parameters. Our third party associates are as BVIS, Lloyd's Register, TUV,
SGS, BAX COUNCIL, MEC ELEC Industrial services, EIL, DNV. Further, owing to our
hard work and client-centric approaches we have garnered a huge client all across the
Indian Subcontinent. Our major clients are M/S. Ellenbarrie Gases Ltd., M/S. Bhushan
Steel Ltd., M/S. Asiatic Oxygen Ltd., M/S. BARC, Tarapur., M/S. Shyam Ferro Alloys
Steel Ltd., M/S. Bayer's India Ltd., M/S. Trimurti Carbonic Pvt. Ltd., M/S. Jain
Associates Pvt. Ltd., M/S. Venkatswara Gases Pvt. Ltd., M/S. Ultra Dry Freeze Pvt.
Ltd., M/S. Tripti Gases Pvt. Ltd., M/S. Punjab Carbonic Pvt. Ltd., M/S. Ocean Harvest
Fisheries Pvt. Ltd., M/S. Ishan Cryogenic Pvt. Ltd., M/S. Jay Emm Gases Pvt. Ltd.,
LARGE DIAMETER FIELD ERECTED STORAGE TANK
LARGE DIAMETER FIELD ERECTED STORAGE TANK
(DOME TANK)

1000 MT Double Wall Liquid Oxygen 1000 MT Double Wall Liquid Oxygen
Storage Tank Constructed for Storage Tank at Final Stage Constructed
M/S. Ellenbarrie Gases Ltd. Ulberia, for M/S. Bhushan Steel Ltd. Meramandali,
West Bengal Orissa.
LIQUID Ar, LIQUID N2 & LIQUID O2 DOUBLE WALL VACUUM INSULATED HORIZONTAL STORAGE TANK

u i d Oxygen
Li q

50 KL Double wall Liquid Oxygen Storage Tank Constructed For M/S. Asiatic Oxygen Ltd.,
Rani Pet, Tamilnadu
LIQUID Ar, LIQUID N2 & LIQUID O2 DOUBLE WALL VACUUM INSULATED VERTICAL STORAGE TANK

Liquid
Argon

5KL Double Wall Liquid Nitrogen Storage Tank 11 KL Double Wall Liquid Argon Storage
(Inner Vessel) Constructed for M/S. BARC, Tank Constructed For M/S. Shyam Ferro
Tarapur. Alloys Steel Ltd., Durgapur, West Bengal
LIQUID Ar, LIQUID N2 & LIQUID O2 DOUBLE WALL VACUUM INSULATED ROAD TANKER

6 KL Double Wall Liquid Oxygen Road Tanker Constructed For M/S. Bayer's India Ltd., Baroda
LIQUID Ar, LIQUID N2 & LIQUID O2 DOUBLE WALL VACUUM INSULATED ROAD TANKER

Liquid Oxygen Liquid Oxygen

10 KL Double Wall Liquid Oxygen Road Tanker Constructed For M/S. Asiatic Oxygen Ltd.,
Rani Pet, Tamilnadu
LIQUID Ar, LIQUID N2 & LIQUID O2 CYLINDER FILLING STATION

Liquid Oxygen Cylinder Filling Station Constructed For M/S. Pinnacle Industries, Ambad MIDC, Nasik
LNG DOUBLE WALL VACUUM INSULATED HORIZONTAL STORAGE TANK

LNG
LNG DOUBLE WALL VACUUM INSULATED VERTICAL STORAGE TANK

LNG

127 KL Double Wall LNG Storage Tank at Final Stage Constructed for M/S. IBP Cryogenic,
Ambad MIDC, Nasik
LNG DOUBLE WALL VACUUM INSULATED ROAD TANKER
LNG DOUBLE WALL VACUUM INSULATED ROAD TANKER

LNG
LNG
LNG TO CNG CONVERTING FILLING STATION

LNG
LIQUID CO2 PUF INSULATED HORIZONTAL STORAGE TANK

Liquid CO 2

30 KL Liquid CO PUF Insulated Horizontal


2 50 KL Liquid CO PUF Insulated Horizontal
2

Storage Tank Constructed For Storage Tank Constructed For


M/S. Trimurti Carbonic Pvt. Ltd. M/S. Jain Associates Pvt. Ltd.
LIQUID CO2 PUF INSULATED VERTICAL STORAGE TANK

10 KL Liquid CO PUF Insulated Vertical


2 112 KL Liquid CO PUF Insulated Vertical
2

Storage Tank Constructed For Storage Tank Constructed For


M/S. Venkatswara Gases Pvt. Ltd. M/S. Ultra Dry Freeze Pvt. Ltd., Khopoli.
LIQUID CO2 PUF INSULATED ROAD TANKER

10 KL Liquid CO PUF Insulated Road Tanker


2 13 KL Liquid CO PUF Insulated Road Tanker
2

Constructed For M/S. Punjab Carbonic Pvt. Ltd. Constructed For M/S. Tripti Gases Pvt. Ltd.
LIQUID CO2 CYLINDER FILLING STATION

Liquid CO2 Cylinder Filling Station Constructed For M/S. Pinnacle Industries,
Ambad MIDC, Nasik
LIQUID CO2 DOUBLE WALL VACUUM INSULATED VERTICAL STORAGE TANK

Liquid CO 2

30 M3 Double Wall Liquid CO 2 30 M3 Double Wall Liquid CO 2

Storage Tank Constructed For Storage Tank Constructed For


M/S. Ocean Harvest Fisheries Pvt. Ltd. M/S. Ishan Cryogenic Pvt. Ltd, Nagpur.
LIQUID CO2 DOUBLE WALL VACUUM INSULATED ROAD TANKER

Liquid CO 2

10 KL Double Wall Liquid CO2 Road Tanker For M/S. Jay Emm Gases Pvt. Ltd., Faridabad

AMBIENT AIR HEATED ATMOSPHERIC VAPORIZER AND PRESSURE BUILT-UP COIL

High Pressure Ambient Air Heated Vaporizer of Pressure Built - Up Coil of various capacities
various capacities for Liquid Argon / Liquid Oxygen / for Liquid Argon / Liquid Oxygen / Liquid Nitrogen
Liquid Nitrogen Storage Tank Cryogenic Transportation Tank
FABRICATION AND STAGEWISE INSPECTION PROCEDURE OF THE CRYOGENIC TANKS

FABRICATION
1. Forming: Solution annealing shall be carried out on inner vessel dished ends after forming.
Normalizing shall be carried out on outer vessel dished ends after cold forming.
2. Welding: All the welding on stainless steel parts of the tank shall be carried out by Gas-purged
Tungsten Arc Welding (GTAW) & all the welding on carbon steel parts of the outer vessel of the tank
shall be carried out by Shielded Metal Arc Welding (SMAW) with root pass GTAW.
3. In case of cryogenic transportation tank, the liquid fill / drain port of the tank shall be provided with
antivortex baffles and the pressurization / vent port of the tank shall be provided with diffuser tube.

SURFACE TREATMENT
After fabrication, the interior and exterior surfaces of the inner vessel and the interior surface
of the nozzles, inter-connecting pipelines and flow components shall be cleaned by Mechanical
cleaning, De-greasing, Pickling, Passivation & Drying.
The interior and exterior surfaces of the outer vessel shall be sand-blasted and mechanically
cleaned. The interior surface of the outer vessel shall be properly de-greased.

SI PIPING CIRCUITS & FLOW COMPONENTS


The outer vessel of the tank shall be fitted with a burst disc, sufficient number of evacuation
ports with seal-off plug and a pirani or thermal conductivity type vacuum gauge head. A suitable
seal-off valve one end of which is to mate with the evacuation port of the tank and the other end of
which is provided with ISO KF coupling of suitable size.
All the inner vessel and outer vessel part subjected to Ultra-sonic test, Radio-graphic test,
Pressure test, Leak test, Vacuum stabilization test & Performance test.

Ultra-sonic test : All plates used for the fabrication of vessels and the pipes used for the nozzles and
inter-connection shall be subject to 100% ultra-sonic test using pulse-echo procedure to ASTM A 388

Radio-graphic test : All the (100% of the) stainless steel butt weld joints on the inner vessel as well as
the nozzles, interconnecting pipelines, flow components, etc and 10% of the butt weld joints on the
outer vessel shall be subject to radio-graphic test, X-rays to 2-T sensitivity.

Pressure test: The inner vessel as well as the outer vessel shall be subject to pneumatic pressure test
with GN2 at 1.25 times the respective MAWP. (Alternatively, hydraulic pressure test at 1.5 times the
respective MAWP may be employed. In such case, after the test, reasonably immediately, the
medium is to be dried down to a residual moisture content of 20 ppm, v).

Leak tests:
Before inserting the inner vessel into the outer vessel:
The Global leak tightness of the inner vessel shall be checked using Mass Spectrometer Helium Leak
Detector (GHe-MSLD).

After inserting the inner vessel into the outer vessel:


a) While leak-testing of the inner vessel, the internal volume shall be charged with a mixture of 75%
GN2 and 25% GHe and the annular space between the inner vessel and the outer vessel shall be
evacuated and connected to MSLD.

b) While leak-testing the outer vessel, the inner vessel shall be pressurized to 2 bar, a using GN2 and
the vacuum jacket shall be pressurized with a mixture of 75% GN2 and 25% GHe to 2bar(a). Then
the outer surface of the outer vessel shall be probed for leaks. After completion of leak test de-
pressurize the jacket to atmospheric pressure before decreasing the pressure inside the inner vessel.
FABRICATION AND STAGEWISE INSPECTION PROCEDURE OF THE CRYOGENIC TANKS

Vacuum stabilization test: After evacuating the jacket to the required vacuum level (1.0 E 4 mbar), the
vacuum pressure shall be monitored at regular intervals over a period of 1 week and no rise in vacuum
pressure shall be permissible atatmospheric temperature on the inner vessel

Performance test: The tank shall be filled with LN2 to 50% of its gross volume and the evaporation loss rate
shall be measured by employing a gas flow meter/rotameter in the vent line. The LN2 required for this
purpose shall be arranged by the supplier. The measured evaporation loss rate with 50% LN2 filling shall be
extra-polated to that on full tank basis by theoretical computation. The evaporation loss rate thus
measured and extra-polated to full tank basis shall be less than 0.3% per day.

Super-insulated (SI) pipe line shall be subject to Weld joint test, Pressure test, Helium MSLD test,
Vacuum leak Test, Vacuum hold test & Cold pressure test with LN2.

Long Stem Cryogenic Globe Valve shall be subject to Bellows cyclic life test, Welding joint test,
Soundness test for casting, Pre-assembly Hydraulic shell pressure test, Final hydraulic shell pressure test,
Seat leakage test & Functional test.

Flow capacity of the burst disc shall be decided by the supplier based on loss of vacuum condition
in the jacket and fire engulfing around the tank as per CGA S-1.2.The discs shall be designed to burst at
the specified Burst Pressure. However, after bursting, gaseous/ Liquid Nitrogen shall flow through the
respective burst discs at the specified Flow temperature under steady state.

A suitable pressure regulator preset to feed GN2 from the ambient vaporizer for pressurizing the
tank shall be provided. A filter of 25 m (absolute) rating shall be fitted upstream of the regulator. Both
pressure regulator & filter shall be subjected to proof pressure test with water, Bubble leak (through &
external) test. All the interior flow surfaces of the regulator have to be de-greased and cleaned to Oxygen
service as per ASTM G 93 or CGA G-4.1 standard.

Pilot-operated, back pressure regulator to maintain a constant upstream (inlet) pressure at any
desired value within the setting range.

The ambient vaporizer (atmospheric evaporator) of Aluminum finned construction to generate


GN2 from LN2 at a design flow rate. Suitable supports shall be provided for the vaporizer battery assembly
so as to take care of thermal contraction. For isolation of pressure gauges and level gauges, suitable
manual manifold valves of suitable size and end connections shall be provided.

Our Major Clients

Our Third Party Inspection Agencies


Distribution

Air Separation

Bulk Storage Tanks

Dewars Liquid Cylinders

LAR / LIN / LOX

Freezers

REGISTERED OFFICE & WORKSHOP HEAD OFFICE :


ADDRESS :
213, P. N. KOTHARI ESTATE, L. B. S. MARG,
A-24, MIDC ADDITIONAL ANAND NAGAR,
BHANDUP (W),MUMBAI - 400 078,
AMBERNATH (EAST)- 421 506,
MAHARASHTRA - INDIA
DIST. THANE, MAHARASHTRA INDIA.
Tel: - (022) 5614939 / 5677495 / 5604720
Tel:- +91-251-2620145, Mob :- +91-9892305320
Email:- spacetech@bom3.vsnl.net.in
Email:- spacetechcryo@gmail.com,
spacetec@bom3.vsnl.net.in
Website:- www.spacetech.net.in

Anda mungkin juga menyukai