1 PEMBUATAN JALAN PENGHUBUNG DARI SST 16 KE SST 1 DAN SST 16 KE ARAH TAXIWAY 7,436,736,248.38 852,373,215.76 366,932,220.22 6,951,295,252.84
2 PEMBUATAN JALAN DAN SALURAN LINGKUNGAN CIQ 891,294,888.72 234,234,324.67 63,258,866.16 720,319,430.21
3 PEMBUATAN JALAN AREA STP,SST XV 104,529,343.42 29,982,767.91 38,664,441.85 113,211,017.36
4 PEMBUATAN JALAN AREA INCINERATOR 203,859,915.74 21,565,834.75 37,997,407.42 220,291,488.41
5 PEMBUATAN JALAN SUMPIT SP 2 & SP 4 231,950,617.97 - 109,961,973.41 341,912,591.38
6 PEMBUATAN JALAN DARI PINTU GERBANG BALAI PENGOBATAN 38,716,866.57 - 42,025,922.91 80,742,789.48
7 PEMBUATAN JALAN BMKG & SST-6 66,079,374.30 46,295,655.65 49,297,024.52 69,080,743.17
8 DOUBLE FENCING PERIMETER BANDARA 11,170,907,547.80 934,812,603.82 227,269,741.39 10,463,364,685.37
9 PEKERJAAN DECKER SALURAN PK-PPK 24,668,727.45 24,668,727.45 - -
10 AKSES DARI WTP KE POMPA INTAKE PONDING AREA 143,580,398.65 11,342,371.22 124,508,079.75 256,746,107.18
11 PAGAR GEDUNG WTP DAN STP 127,133,229.12 127,133,229.12 - -
12 PEMBUATAN JALAN ADBAN - PARKIR BUS 4,871,531,034.48 1,118,661,125.78 2,135,598,886.27 5,888,468,794.97
13 PEKERJAAN ELEKTRIKAL BANDARA 1,150,649,063.80 469,974,351.04 673,256,852.65 1,325,770,565.42
Terbilang : Dua Puluh Sembilan Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Ribu Rupiah
A PEKERJAAN PERSIAPAN
1 Pengukuran & bowplank LS 1.00 49,036,363.64 49,036,363.64 - - - - 1.00 49,036,363.64 49,036,363.64 - Sesuai dengan Kontrak
2 Direksi keet & Los kerja LS 1.00 81,800,000.00 81,800,000.00 - - - - 1.00 81,800,000.00 81,800,000.00 - Sesuai dengan Kontrak
3 Listrik kerja LS 1.00 33,500,000.00 33,500,000.00 - - - - 1.00 33,500,000.00 33,500,000.00 - Sesuai dengan Kontrak
4 Air kerja LS 1.00 23,000,000.00 23,000,000.00 - - - - 1.00 23,000,000.00 23,000,000.00 - Sesuai dengan Kontrak
5 Fhoto proyek + Shop drawing + As Built Drawing LS 1.00 28,000,000.00 28,000,000.00 - - - - 1.00 28,000,000.00 28,000,000.00 - Sesuai dengan Kontrak
6 Papan nama proyek Unit 4.00 500,000.00 2,000,000.00 - - - - 4.00 500,000.00 2,000,000.00 - Sesuai dengan Kontrak
7 PPPK LS 1.00 2,000,000.00 2,000,000.00 - - - - 1.00 2,000,000.00 2,000,000.00 - Sesuai dengan Kontrak
8 Mobilisasi LS 1.00 38,700,000.00 38,700,000.00 - - - - 1.00 38,700,000.00 38,700,000.00 - Sesuai dengan Kontrak
9 Demobilisasi LS 1.00 33,487,379.97 33,487,379.97 - - - - 1.00 33,487,379.97 33,487,379.97 - Sesuai dengan Kontrak
10 Pengajuan sample & test material LS 1.00 30,000,000.00 30,000,000.00 - - - - 1.00 30,000,000.00 30,000,000.00 - Sesuai dengan Kontrak
11 Peralatan & Kelengkapan Keselamatan Kerja ( K3 ) LS 1.00 20,000,000.00 20,000,000.00 - - - - 1.00 20,000,000.00 20,000,000.00 - Sesuai dengan Kontrak
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.82 3,418,124.82 2.82 1,212,101.00 3,418,124.82 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 417.38 4,768,644.54 417.38 11,425.15 4,768,644.54 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 18.22 2,119,521.59 18.22 116,329.40 2,119,521.59 - Diusulkan pekerjaan tambah
PEKERJAAN DECKER
VOLUME PEKERJAAN KURANG VOLUME PEKERJAAN TAMBAH Final Quantity
VOLUME HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SATUAN VOLUME JUMLAH VOLUME JUMLAH VOLUME HARGA SATUAN JUMLAH KETERANGAN
KONTRAK (Rp) (Rp)
Rp Rp Rp Rp
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.82 3,418,124.82 2.82 1,212,101.00 3,418,124.82 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 417.38 4,768,644.54 417.38 11,425.15 4,768,644.54 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 18.22 2,119,521.59 18.22 116,329.40 2,119,521.59 - Diusulkan pekerjaan tambah
Pekerjaan Decker
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.50 3,030,252.50 2.50 1,212,101.00 3,030,252.50 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 208.69 2,384,322.27 208.69 11,425.15 2,384,322.27 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 13.25 1,541,364.49 13.25 116,329.40 1,541,364.49 - Diusulkan pekerjaan tambah
a Lapis perekat (Tack coat) 1 kg/m2 M2 240.00 10,974.84 2,633,961.00 62.65 687,613.08 - - 177.35 10,974.84 1,946,347.92 - Disesuaikan dengan kondisi eksisting lapangan
b Laston AC-WC tebal 5 cm M2 240.00 136,063.63 32,655,271.95 62.65 8,524,876.44 - - 177.35 136,063.63 24,130,395.50 - Disesuaikan dengan kondisi eksisting lapangan
c Marking M2 12.00 122,622.50 1,471,470.00 - - 1.08 132,800.17 13.08 122,622.50 1,604,270.17 - Disesuaikan dengan kondisi eksisting lapangan
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 1.41 1,709,062.41 1.41 1,212,101.00 1,709,062.41 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 208.69 2,384,322.27 208.69 11,425.15 2,384,322.27 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 9.11 1,059,760.79 9.11 116,329.40 1,059,760.79 - Diusulkan pekerjaan tambah
PEKERJAAN JEMBATAN
s Box culvert K-350 (2,42m x 1,5m) bh 28.00 18,806,172.00 526,572,816.00 - - 7.00 131,643,204.00 35.00 18,806,172.00 658,216,020.00
t Pasangan Batu Kali m3 6.22 723,368.73 4,499,353.49 - - 23.11 16,717,051.29 29.33 723,368.73 21,216,404.78
u Beton K-125 (lean concrete) t=10cm m3 10.94 815,661.00 8,923,331.34 0.38 309,951.18 - - 10.56 815,661.00 8,613,380.16
v Limestone t= 30 cm m3 32.83 430,650.00 14,138,239.50 32.83 14,138,239.50 - - - 430,650.00 - - Disesuaikan dengan kondisi eksisting lapangan
w Beton k-350 m3 5.04 1,241,113.50 6,255,212.04 - - 15.82 19,634,415.57 20.86 1,241,113.50 25,889,627.61
x Bekisting m2 33.60 103,340.28 3,472,233.41 - - 18.16 1,877,072.85 51.76 103,340.28 5,349,306.26
y Pembesian kg 856.80 11,425.15 9,789,068.52 - - 1,322.43 15,108,910.84 2,179.23 11,425.15 24,897,979.36
z Timbunan biasa (CBR min 6%) m3 69.16 102,190.00 7,067,460.40 69.16 7,067,460.40 - - - 102,190.00 -
a2 Bongkar dinding saluran ls 1.00 5,376,000.00 5,376,000.00 - - - - 1.00 5,376,000.00 5,376,000.00
b2 Sub base course (CBR 40%), tebal 25 cm M3 448,500.00 - - - 31.68 14,208,480.00 31.68 448,500.00 14,208,480.00 - Diusulkan pekerjaan tambah
1 PEMBUATAN JALAN PENGHUBUNG DARI SST 16 KE SST 1 DAN SST 16 KE ARAH TAXIWAY 7,436,736,248.38 852,373,215.76 370,324,260.22 6,954,687,292.84
2 PEMBUATAN JALAN DAN SALURAN LINGKUNGAN CIQ 891,294,888.72 234,234,324.67 63,258,866.16 720,319,430.21
3 PEMBUATAN JALAN AREA STP,SST XV 104,529,343.42 29,982,767.91 38,664,441.85 113,211,017.36
4 PEMBUATAN JALAN AREA INCINERATOR 203,859,915.74 21,565,834.75 37,997,407.42 220,291,488.41
5 PEMBUATAN JALAN SUMPIT SP 2 & SP 4 231,950,617.97 - 110,328,631.01 342,279,248.98
6 PEMBUATAN JALAN DARI PINTU GERBANG BALAI PENGOBATAN 38,716,866.57 - 42,025,922.91 80,742,789.48
7 PEMBUATAN JALAN BMKG & SST-6 66,079,374.30 46,295,655.65 49,297,024.52 69,080,743.17
8 DOUBLE FENCING PERIMETER BANDARA 11,170,907,547.80 934,812,603.82 216,455,841.39 10,452,550,785.37
9 PEKERJAAN DECKER SALURAN PK-PPK 24,668,727.45 24,668,727.45 - -
10 AKSES DARI WTP KE POMPA INTAKE PONDING AREA 143,580,398.65 11,342,371.22 123,314,119.75 255,552,147.18
11 PAGAR GEDUNG WTP DAN STP 127,133,229.12 127,133,229.12 - -
12 PEMBUATAN JALAN ADBAN - PARKIR BUS 4,871,531,034.48 1,118,661,125.78 2,203,603,615.92 5,956,473,524.62
13 PEKERJAAN ELEKTRIKAL BANDARA 1,150,649,063.80 487,302,748.04 557,608,343.33 1,192,793,659.09
Terbilang : Dua Puluh Sembilan Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Ribu Rupiah
A PEKERJAAN PERSIAPAN
1 Pengukuran & bowplank LS 1.00 49,036,363.64 49,036,363.64 - - - - 1.00 49,036,363.64 49,036,363.64 - Sesuai dengan Kontrak
2 Direksi keet & Los kerja LS 1.00 81,800,000.00 81,800,000.00 - - - - 1.00 81,800,000.00 81,800,000.00 - Sesuai dengan Kontrak
3 Listrik kerja LS 1.00 33,500,000.00 33,500,000.00 - - - - 1.00 33,500,000.00 33,500,000.00 - Sesuai dengan Kontrak
4 Air kerja LS 1.00 23,000,000.00 23,000,000.00 - - - - 1.00 23,000,000.00 23,000,000.00 - Sesuai dengan Kontrak
5 Fhoto proyek + Shop drawing + As Built Drawing LS 1.00 28,000,000.00 28,000,000.00 - - - - 1.00 28,000,000.00 28,000,000.00 - Sesuai dengan Kontrak
6 Papan nama proyek Unit 4.00 500,000.00 2,000,000.00 - - - - 4.00 500,000.00 2,000,000.00 - Sesuai dengan Kontrak
7 PPPK LS 1.00 2,000,000.00 2,000,000.00 - - - - 1.00 2,000,000.00 2,000,000.00 - Sesuai dengan Kontrak
8 Mobilisasi LS 1.00 38,700,000.00 38,700,000.00 - - - - 1.00 38,700,000.00 38,700,000.00 - Sesuai dengan Kontrak
9 Demobilisasi LS 1.00 33,487,379.97 33,487,379.97 - - - - 1.00 33,487,379.97 33,487,379.97 - Sesuai dengan Kontrak
10 Pengajuan sample & test material LS 1.00 30,000,000.00 30,000,000.00 - - - - 1.00 30,000,000.00 30,000,000.00 - Sesuai dengan Kontrak
11 Peralatan & Kelengkapan Keselamatan Kerja ( K3 ) LS 1.00 20,000,000.00 20,000,000.00 - - - - 1.00 20,000,000.00 20,000,000.00 - Sesuai dengan Kontrak
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.82 3,418,124.82 2.82 1,212,101.00 3,418,124.82 - Diusulkan pekerjaan tambah
VOLUME PEKERJAAN KURANG VOLUME PEKERJAAN TAMBAH FINAL QUANTITY
VOLUME HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SATUAN VOLUME JUMLAH VOLUME JUMLAH VOLUME HARGA SATUAN JUMLAH KETERANGAN
KONTRAK (Rp) (Rp)
Rp Rp Rp Rp
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 417.38 4,768,644.54 417.38 11,425.15 4,768,644.54 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 18.22 2,119,521.59 18.22 116,329.40 2,119,521.59 - Diusulkan pekerjaan tambah
Pekerjaan Decker
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.50 3,030,252.50 2.50 1,212,101.00 3,030,252.50 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 208.69 2,384,322.27 208.69 11,425.15 2,384,322.27 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 13.25 1,541,364.49 13.25 116,329.40 1,541,364.49 - Diusulkan pekerjaan tambah
a Lapis perekat (Tack coat) 1 kg/m2 M2 240.00 10,974.84 2,633,961.00 62.65 687,613.08 - - 177.35 10,974.84 1,946,347.92 - Disesuaikan dengan kondisi eksisting lapangan
b Laston AC-WC tebal 5 cm M2 240.00 136,063.63 32,655,271.95 62.65 8,524,876.44 - - 177.35 136,063.63 24,130,395.50 - Disesuaikan dengan kondisi eksisting lapangan
c Marking M2 12.00 122,622.50 1,471,470.00 - - 1.08 132,800.17 13.08 122,622.50 1,604,270.17 - Disesuaikan dengan kondisi eksisting lapangan
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 1.41 1,709,062.41 1.41 1,212,101.00 1,709,062.41 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 208.69 2,384,322.27 208.69 11,425.15 2,384,322.27 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 9.11 1,059,760.79 9.11 116,329.40 1,059,760.79 - Diusulkan pekerjaan tambah
PEKERJAAN JEMBATAN
v Box culvert K-350 (2,42m x 1,5m) bh 28.00 18,806,172.00 526,572,816.00 - - 7.00 131,643,204.00 35.00 18,806,172.00 658,216,020.00
w Pasangan Batu Kali m3 6.22 723,368.73 4,499,353.49 - - 23.11 16,717,051.29 29.33 723,368.73 21,216,404.78
x Beton K-125 (lean concrete) t=10cm m3 10.94 815,661.00 8,923,331.34 0.38 309,951.18 - - 10.56 815,661.00 8,613,380.16
y Limestone t= 30 cm m3 32.83 430,650.00 14,138,239.50 32.83 14,138,239.50 - - - 430,650.00 - - Disesuaikan dengan kondisi eksisting lapangan
z Beton k-350 m3 5.04 1,241,113.50 6,255,212.04 - - 15.82 19,634,415.57 20.86 1,241,113.50 25,889,627.61
aa Bekisting m2 33.60 103,340.28 3,472,233.41 - - 18.16 1,877,072.85 51.76 103,340.28 5,349,306.26
ab Pembesian kg 856.80 11,425.15 9,789,068.52 - - 1,322.43 15,108,910.84 2,179.23 11,425.15 24,897,979.36
ac Timbunan biasa (CBR min 6%) m3 69.16 102,190.00 7,067,460.40 69.16 7,067,460.40 - - - 102,190.00 -
ad Bongkar dinding saluran ls 1.00 5,376,000.00 5,376,000.00 - - - - 1.00 5,376,000.00 5,376,000.00
ae Sub base course (CBR 40%), tebal 25 cm M3 448,500.00 - - - 31.68 14,208,480.00 31.68 448,500.00 14,208,480.00 - Diusulkan pekerjaan tambah
1 Pembersihan Lahan M2 12,902.10 6,100.00 7,000.00 12,902.10 6,100.00 78,702,785.30 90,314,671.65 78,702,785.30 Diperlukan Kajian dan Surat Menyurat
2 Pipa Drainase SST 16 M 12.00 315,900.00 319,600.00 12.00 317,000.00 3,790,800.00 3,835,200.00 3,804,000.00 Diperlukan Kajian dan Surat Menyurat
3 Timbunan Berbutir (Sirtu) M3 105.57 380,200.00 394,600.00 105.57 380,200.00 40,138,170.24 41,658,395.52 40,138,170.24 Diperlukan Kajian dan Surat Menyurat
4 Pintu Besi Galvanis Type I (6m) Unit 3.00 22,990,000.00 17,052,900.00 3.00 17,052,900.00 68,970,000.00 51,158,700.00 51,158,700.00 Diperlukan Kajian dan Surat Menyurat
5 Pintu Besi Galvanis Type 2 (5m) 3.00 14,302,400.00 3.00 14,302,400.00 - 42,907,200.00 42,907,200.00 Diperlukan Kajian dan Surat Menyurat
6 Pintu Besi Galvanis Type 3 (4m) Unit 2.00 12,342,000.00 11,551,900.00 2.00 11,551,900.00 24,684,000.00 23,103,800.00 23,103,800.00 Diperlukan Kajian dan Surat Menyurat
7 Pintu Besi Galvanis Type 4 (1m) Unit 3.00 7,200,600.00 3,025,400.00 3.00 3,025,400.00 21,601,800.00 9,076,200.00 9,076,200.00 Diperlukan Kajian dan Surat Menyurat
8 Pemindahan tiang lampu eksisting Unit 2.00 2,557,200.00 2,942,200.00 2.00 2,232,500.00 5,114,400.00 5,884,400.00 4,465,000.00 Diperlukan Kajian dan Surat Menyurat
9 Guardrail M 979.27 995,900.00 1,069,500.00 900.00 995,900.00 896,310,000.00 962,550,000.00 896,310,000.00 Diperlukan Kajian dan Surat Menyurat
10 Tiang Lampu PJU Btg 40.00 9,750,000.00 10,953,700.00 40.00 9,825,000.00 390,000,000.00 438,148,000.00 393,000,000.00 Diperlukan Kajian dan Surat Menyurat
1 Pembersihan Lahan M2 12,902.10 6,100.00 6,100.00 12,902.10 6,100.00 78,702,785.30 78,702,785.30 78,702,785.30 Diperlukan Kajian dan Surat Menyurat
2 Pipa Drainase SST 16 M 12.00 315,900.00 319,600.00 12.00 317,000.00 3,790,800.00 3,835,200.00 3,804,000.00 Diperlukan Kajian dan Surat Menyurat
3 Timbunan Berbutir (Sirtu) M3 105.57 380,200.00 392,700.00 105.57 380,200.00 40,138,170.24 41,457,810.24 40,138,170.24 Diperlukan Kajian dan Surat Menyurat
4 Pintu Besi Galvanis Type I (6m) Unit 3.00 17,052,900.00 3.00 17,052,900.00 - 51,158,700.00 51,158,700.00 Diperlukan Kajian dan Surat Menyurat
5 Pintu Besi Galvanis Type 2 (5m) 3.00 14,302,400.00 3.00 14,302,400.00 Diperlukan Kajian dan Surat Menyurat
6 Pintu Besi Galvanis Type 3 (4m) Unit 2.00 11,551,900.00 2.00 11,551,900.00 - 23,103,800.00 23,103,800.00 Diperlukan Kajian dan Surat Menyurat
7 Pintu Besi Galvanis Type 4 (1m) Unit 3.00 3,025,400.00 3.00 3,025,400.00 - 9,076,200.00 9,076,200.00 Diperlukan Kajian dan Surat Menyurat
8 Pemindahan tiang lampu eksisting Unit 2.00 2,557,200.00 2,942,200.00 2.00 2,232,500.00 5,114,400.00 5,884,400.00 4,465,000.00 Diperlukan Kajian dan Surat Menyurat
9 Guardrail M 900.00 995,900.00 1,069,500.00 900.00 995,900.00 896,310,000.00 962,550,000.00 896,310,000.00 Diperlukan Kajian dan Surat Menyurat
10 Tiang Lampu PJU Btg 40.00 9,750,000.00 10,953,700.00 40.00 9,825,000.00 390,000,000.00 438,148,000.00 393,000,000.00 Diperlukan Kajian dan Surat Menyurat
11 Cerucuk Bambu Btg 2,805.00 41,900.00 2,805.00 41,900.00 - 117,529,500.00 117,529,500.00 Diperlukan Kajian dan Surat Menyurat
12 Geotextile (Non Woven) M2 1,538.40 20,800.00 1,538.40 20,800.00 - 31,998,720.00 31,998,720.00 Diperlukan Kajian dan Surat Menyurat
11040 10
22080000
LAMPIRAN BERITA ACARA NEGOISASI ITEM PEKERJAAN BARU
PROYEK PENYEMPURNAAN PEKERJAAN CIVIL SISI UDARA DI BANDARA KUALANAMU
NOMOR :
TANGGAL :
Pada Hari tanggal telah dilaksanakan Rapat Negosiasi harga item pekerjaan baru
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
Negoisasi
Ket
Harga Satuan Jumlah Harga
6,100.00 78,639,711.30
317,000.00 3,804,000.00
380,200.00 40,138,170.24
17,052,900.00 51,158,700.00
14,302,400.00 42,907,200.00
11,551,900.00 23,103,800.00
3,025,400.00 9,076,200.00
2,232,500.00 4,465,000.00
Pada Hari tanggal telah dilaksanakan Rapat Negosiasi harga item pekerjaan baru
1 Guardrail M 860.00
2 Tiang Lampu PJU Btg 40.00
3 Cerucuk Bambu Btg 2,805.00
4 Geotextile (Non Woven) M2 1,538.40
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
Negoisasi
Ket
Harga Satuan Jumlah Harga
995,900.00 856,474,000.00
9,825,000.00 393,000,000.00
41,900.00 117,529,500.00
20,800.00 31,998,720.00
TOTAL A 341,523,743.60 - -
1 PEMBUATAN JALAN PENGHUBUNG DARI SST 16 KE SST 1 DAN SST 16 KE ARAH TAXIWAY 7,436,736,248.38 863,422,595.21 340,695,174.70
2 PEMBUATAN JALAN DAN SALURAN LINGKUNGAN CIQ 891,294,888.72 235,497,838.88 63,214,128.70
3 PEMBUATAN JALAN AREA STP,SST XV 104,529,343.42 34,132,932.76 38,664,441.85
4 PEMBUATAN JALAN AREA INCINERATOR 203,859,915.74 74,207,367.48 98,217,760.72
5 PEMBUATAN JALAN SUMPIT SP 2 & SP 4 231,950,617.97 - 204,735,197.81
6 PEMBUATAN JALAN DARI PINTU GERBANG BALAI PENGOBATAN 38,716,866.57 - 43,118,014.07
7 PEMBUATAN JALAN BMKG & SST-6 66,079,374.30 64,090,783.11 48,904,268.48
8 DOUBLE FENCING PERIMETER BANDARA 11,170,907,547.80 871,245,989.27 177,925,341.39
9 PEKERJAAN DECKER SALURAN PK-PPK 24,668,727.45 24,668,727.45 -
10 AKSES DARI WTP KE POMPA INTAKE PONDING AREA 143,580,398.65 12,956,324.22 174,959,825.21
11 PAGAR GEDUNG WTP DAN STP 127,133,229.12 127,133,229.12 -
12 PEMBUATAN JALAN ADBAN - PARKIR BUS 4,871,531,034.48 1,118,661,125.78 2,045,851,126.70
13 PEKERJAAN ELEKTRIKAL BANDARA 1,150,649,063.80 454,487,890.80 644,219,524.45
Terbilang : Dua Puluh Sembilan Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Ribu Rupiah
Kualanamu,
AIRPORT PROJECT MANAGEMENT UNIT KONSULTAN MK KONTRAKTOR
JUMLAH HARGA JUMLAH HARGA
JUMLAH HARGA KONTRAK
NO. ITEM PEKERJAAN KURANG TAMBAH
(Rp)
(Rp) (Rp)
BANDARA KUALANAMU PT ARTEFAK ARKINDO PT NINDYA KARYA (Persero)
341,523,743.60
341,523,743.60
6,914,008,827.87
719,011,178.53
109,060,852.51
227,870,308.98
436,685,815.77
81,834,880.63
50,892,859.68
10,477,586,899.93
-
305,583,899.64
-
5,798,721,035.40
1,312,219,697.45
26,433,476,256.40
26,775,000,000.00
2,677,500,000.00
29,452,500,000.00
29,452,500,000.00
Kualanamu,
KONTRAKTOR
JUMLAH HARGA CCO-01
(Rp)
Prisyanur Hartanto
Project Manager
VOLUME PEKERJAAN KURANG VOLUME PEKERJAAN TAMBAH CCO-01
VOLUME HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SATUAN VOLUME JUMLAH VOLUME JUMLAH VOLUME HARGA SATUAN JUMLAH KETERANGAN
KONTRAK (Rp) (Rp)
Rp Rp Rp Rp
A PEKERJAAN PERSIAPAN
1 Pengukuran & bowplank LS 1.00 49,036,363.64 49,036,363.64 - - - - 1.00 49,036,363.64 49,036,363.64 - Sesuai dengan Kontrak
2 Direksi keet & Los kerja LS 1.00 81,800,000.00 81,800,000.00 - - - - 1.00 81,800,000.00 81,800,000.00 - Sesuai dengan Kontrak
3 Listrik kerja LS 1.00 33,500,000.00 33,500,000.00 - - - - 1.00 33,500,000.00 33,500,000.00 - Sesuai dengan Kontrak
4 Air kerja LS 1.00 23,000,000.00 23,000,000.00 - - - - 1.00 23,000,000.00 23,000,000.00 - Sesuai dengan Kontrak
5 Fhoto proyek + Shop drawing + As Built Drawing LS 1.00 28,000,000.00 28,000,000.00 - - - - 1.00 28,000,000.00 28,000,000.00 - Sesuai dengan Kontrak
6 Papan nama proyek Unit 4.00 500,000.00 2,000,000.00 - - - - 4.00 500,000.00 2,000,000.00 - Sesuai dengan Kontrak
7 PPPK LS 1.00 2,000,000.00 2,000,000.00 - - - - 1.00 2,000,000.00 2,000,000.00 - Sesuai dengan Kontrak
8 Mobilisasi LS 1.00 38,700,000.00 38,700,000.00 - - - - 1.00 38,700,000.00 38,700,000.00 - Sesuai dengan Kontrak
9 Demobilisasi LS 1.00 33,487,379.97 33,487,379.97 - - - - 1.00 33,487,379.97 33,487,379.97 - Sesuai dengan Kontrak
10 Pengajuan sample & test material LS 1.00 30,000,000.00 30,000,000.00 - - - - 1.00 30,000,000.00 30,000,000.00 - Sesuai dengan Kontrak
11 Peralatan & Kelengkapan Keselamatan Kerja ( K3 ) LS 1.00 20,000,000.00 20,000,000.00 - - - - 1.00 20,000,000.00 20,000,000.00 - Sesuai dengan Kontrak
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.82 3,418,124.82 2.82 1,212,101.00 3,418,124.82 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 417.38 4,768,644.54 417.38 11,425.15 4,768,644.54 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 18.22 2,119,521.59 18.22 116,329.40 2,119,521.59 - Diusulkan pekerjaan tambah
PEKERJAAN DECKER
VOLUME PEKERJAAN KURANG VOLUME PEKERJAAN TAMBAH CCO-01
VOLUME HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SATUAN VOLUME JUMLAH VOLUME JUMLAH VOLUME HARGA SATUAN JUMLAH KETERANGAN
KONTRAK (Rp) (Rp)
Rp Rp Rp Rp
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.82 3,418,124.82 2.82 1,212,101.00 3,418,124.82 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 417.38 4,768,644.54 417.38 11,425.15 4,768,644.54 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 18.22 2,119,521.59 18.22 116,329.40 2,119,521.59 - Diusulkan pekerjaan tambah
Pekerjaan Decker
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 2.50 3,030,252.50 2.50 1,212,101.00 3,030,252.50 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 299.37 3,420,342.59 299.37 11,425.15 3,420,342.59 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 13.25 1,541,364.49 13.25 116,329.40 1,541,364.49 - Diusulkan pekerjaan tambah
Perbaikan Tanah
a Cerucuk Bambu btg - 41,900.00 - - - 1,401.00 58,701,900.00 1,401.00 41,900.00 58,701,900.00
b Geotextile m2 - 20,800.00 - - - 760.00 15,808,000.00 760.00 20,800.00 15,808,000.00
VOLUME PEKERJAAN KURANG VOLUME PEKERJAAN TAMBAH CCO-01
VOLUME HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SATUAN VOLUME JUMLAH VOLUME JUMLAH VOLUME HARGA SATUAN JUMLAH KETERANGAN
KONTRAK (Rp) (Rp)
Rp Rp Rp Rp
c Timbunan tanah m3 - 102,190.00 - - - 174.12 17,792,842.72 174.12 102,190.00 17,792,842.72
a Lapis perekat (Tack coat) 1 kg/m2 M2 240.00 10,974.84 2,633,961.00 62.65 687,613.08 - - 177.35 10,974.84 1,946,347.92 - Disesuaikan dengan kondisi eksisting lapangan
b Laston AC-WC tebal 5 cm M2 240.00 136,063.63 32,655,271.95 62.65 8,524,876.44 - - 177.35 136,063.63 24,130,395.50 - Disesuaikan dengan kondisi eksisting lapangan
c Marking M2 12.00 122,622.50 1,471,470.00 - - 1.08 132,800.17 13.08 122,622.50 1,604,270.17 - Disesuaikan dengan kondisi eksisting lapangan
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3 - 1,212,101.00 - - - 1.41 1,709,062.41 1.41 1,212,101.00 1,709,062.41 - Diusulkan pekerjaan tambah
b Pekerjaan Baja tulangan Kg - 11,425.15 - - - 208.69 2,384,322.27 208.69 11,425.15 2,384,322.27 - Diusulkan pekerjaan tambah
c Bekisting M2 - 116,329.40 - - - 9.11 1,059,760.79 9.11 116,329.40 1,059,760.79 - Diusulkan pekerjaan tambah
Perbaikan Tanah
a Galian Tanah Biasa m3 - 42,691.00 - - - 124.54 5,316,907.90 124.54 42,691.00 5,316,907.90
b Cerucuk Bambu btg - 41,900.00 - - - 1,404.00 58,827,600.00 1,404.00 41,900.00 58,827,600.00
c Geotextile m2 - 20,800.00 - - - 778.40 16,190,720.00 778.40 20,800.00 16,190,720.00
d Timbunan tanah m3 - 102,190.00 - - - 124.54 12,727,151.36 124.54 102,190.00 12,727,151.36
PEKERJAAN JEMBATAN
m Box culvert K-350 (2,42m x 1,5m) bh 28.00 18,806,172.00 526,572,816.00 - - 7.00 131,643,204.00 35.00 18,806,172.00 658,216,020.00
n Pasangan Batu Kali m3 6.22 723,368.73 4,499,353.49 - - 23.11 16,717,051.29 29.33 723,368.73 21,216,404.78
o Beton K-125 (lean concrete) t=10cm m3 10.94 815,661.00 8,923,331.34 0.38 309,951.18 - - 10.56 815,661.00 8,613,380.16
p Limestone t= 30 cm m3 32.83 430,650.00 14,138,239.50 32.83 14,138,239.50 - - - 430,650.00 - - Disesuaikan dengan kondisi eksisting lapangan
q Beton k-350 m3 5.04 1,241,113.50 6,255,212.04 - - 15.82 19,634,415.57 20.86 1,241,113.50 25,889,627.61
r Bekisting m2 33.60 103,340.28 3,472,233.41 - - 18.16 1,877,072.85 51.76 103,340.28 5,349,306.26
s Pembesian kg 856.80 11,425.15 9,789,068.52 - - 1,322.43 15,108,910.84 2,179.23 11,425.15 24,897,979.36
t Timbunan biasa (CBR min 6%) m3 69.16 102,190.00 7,067,460.40 69.16 7,067,460.40 - - - 102,190.00 -
u Bongkar dinding saluran ls 1.00 5,376,000.00 5,376,000.00 - - - - 1.00 5,376,000.00 5,376,000.00
v Sub base course (CBR 40%), tebal 25 cm M3 448,500.00 - - - - - - 448,500.00 - - Diusulkan pekerjaan tambah
Alat Bantu Ls
B.17 Asphalt Kg
Alat Bantu Ls
A PEKERJAAN PERSIAPAN
1 Pengukuran & bowplank LS
2 Direksi keet & Los kerja LS
3 Listrik kerja LS
4 Air kerja LS
5 Fhoto proyek + Shop drawing + As Built Drawing LS
6 Papan nama proyek Unit
7 PPPK LS
8 Mobilisasi LS
9 Demobilisasi LS
10 Pengajuan sample & test material LS
11 Peralatan & Kelengkapan Keselamatan Kerja ( K3 ) LS
TOTAL A
B PEK. PEMBANGUNAN JALAN PENYEMPURNAAN SEKTOR PUBLIK
1 PEMBUATAN JALAN PENGHUBUNG DARI SST 16
KE SST 1 DAN SST 16 KE ARAH TAXIWAY
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3
b Pekerjaan Baja tulangan Kg
c Bekisting M2
SUB TOTAL 1
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3
b Pekerjaan Baja tulangan Kg
c Bekisting M2
SUB TOTAL 2
SUB TOTAL 3
SUB TOTAL 4
Pekerjaan Decker
a Pekerjaan Decker Saluran K-350 M3
b Pekerjaan Baja tulangan Kg
c Bekisting M2
Perbaikan Tanah
a Galian Tanah Biasa m3
b Cerucuk Bambu batang
c Geotextile m2
d Timbunan tanah m3
SUB TOTAL 5
SUB TOTAL 6
SUB TOTAL 8
SUB TOTAL 9
PEKERJAAN DECKER
a Pekerjaan Decker Saluran K-350 M3
b Pekerjaan Baja tulangan Kg
c Bekisting M2
Perbaikan Tanah
a Galian Tanah Biasa m3
b Cerucuk Bambu batang
c Geotextile m2
d Timbunan tanah m3
SUB TOTAL 10
SUB TOTAL 11
PEKERJAAN JEMBATAN
s Box culvert K-350 (2,42m x 1,5m) bh
t Pasangan Batu Kali m3
u Beton K-125 (lean concrete) t=10cm m3
v Limestone t= 30 cm m3
w Beton k-350 m3
x Bekisting m2
y Pembesian kg
z Timbunan biasa (CBR min 6%) m3
a2 Bongkar dinding saluran ls
b2 Sub base course (CBR 40%), tebal 25 cm M3
SUB TOTAL 12
SUB TOTAL 13 A
SUB TOTAL 13 B
C Pekerjaan Penerangan Jalan Incenerator
a Pengadaan tiang Lampu PJU p=10m btg
b Pengaadan stang ornament lengkap klem btg
c Pengadaan lampu LED 75 W set
d Galian kabel m3
e Timbunan tanah m3
f Pasangan Batu Bata m2
g Cor beton k-250 m3
h Tulangan Kg
i Bolt M16 Galvanized Bh
j kabel NYFGBY 5x10 sqmm m'
k kabel NYYHY 3x2.5 sqmm m'
l Panel Power PJU Lengkap set
m instalasi kabel m'
n instalasi panel set
o Grounding set
p Timbunan pasir m3
q Pengadaan tiang Lampu PJU p=11m galvanis oktogonal btg
r Galian pondasi tiang lampu m3
s Bekisting m2
SUB TOTAL 13 C
SUB TOTAL 13 D
E Pekerjaan Penerangan Jalan BMKG
a Pengadaan tiang Lampu PJU p=10m btg
b Pengaadan stang ornament lengkap klem btg
c Pengadaan lampu LED 75 W set
d Galian kabel m3
e Timbunan tanah m3
f Pasangan Batu Bata m2
g Cor beton k-250 m3
h Tulangan Kg
i Bolt M16 Galvanized Bh
j kabel NYFGBY 5x10 sqmm m'
k kabel NYYHY 3x2.5 sqmm m'
l Panel Power PJU Lengkap set
m instalasi kabel m'
n instalasi panel set
o Grounding set
p Timbunan pasir m3
q Pengadaan tiang Lampu PJU p=11m galvanis oktogonal btg
r Galian pondasi tiang lampu m3
s Bekisting m2
SUB TOTAL 13 E
SUB TOTAL 13 F
G Pekerjaan Penerangan Jalan Adban - Parkir
a Pengadaan tiang Lampu PJU p=10m btg
b Pengaadan stang ornament lengkap klem btg
c Pengadaan lampu LED 75 W set
d Galian kabel m3
e Timbunan tanah m3
f Pasangan Batu Bata m2
g Cor beton k-250 m3
h Tulangan Kg
i Bolt M16 Galvanized Bh
j kabel NYFGBY 5x10 sqmm m'
k kabel NYYHY 3x2.5 sqmm m'
l Panel Power PJU Lengkap set
m instalasi kabel m'
n instalasi panel set
o Grounding set
p Timbunan pasir m3
q Pengadaan tiang Lampu PJU p=11m galvanis oktogonal btg
r Galian pondasi tiang lampu m3
s Bekisting m2
SUB TOTAL 13 G
SUB TOTAL 13 H
SUB TOTAL 13
SUB TOTAL B
TOTAL A + B
BOBOT RENCANA KONTRAK (%)
BOBOT KOMULATIF RENCANA KONTRAK (%)
BOBOT REALISASI KONTRAK (%)
BOBOT KOMULATIF REALISASI KONTRAK (%)
BOBOT RENCANA CCO-01 (%)
BOBOT KOMULATIF RENCANA CCO-01 I(%)
BOBOT REALISASI CCO-01 (%)
BOBOT KOMULATIF REALISASI CCO-01 (%)
KONTRAK CCO-01 (M24)
Bobot (%)
VOLUME HARGA SATUAN JUMLAH VOLUME HARGA SATUAN
KONTRAK
Rp Rp Rp
341,523,743.60 1.276
7,436,736,248.38 27.775
891,294,888.72 3.329
104,529,343.42 0.390 -
203,859,915.74 0.761 -
42,691.00 - - - -
39,700.00 - - 1,401.00 41,900.00
23,500.00 - - 760.00 20,800.00
102,190.00 - - 174.12 102,190.00
231,950,617.97 0.866 -
GOBATAN
38,716,866.57 0.145 -
11,170,907,547.80 41.721 -
143,580,398.65 0.536 -
4,871,531,034.48 18.194 - -
4.00 4,710,200.00 18,840,800.00 0.070 - 4,710,200.00
4.00 1,811,700.00 7,246,800.00 0.027 - 1,811,700.00
4.00 8,163,100.00 32,652,400.00 0.122 4.00 8,163,100.00
32.00 110,000.00 3,520,000.00 0.013 25.32 110,000.00
0.40 102,190.00 40,876.00 0.000 10.13 102,190.00
1.60 208,300.00 333,280.00 0.001 50.65 208,300.00
1.44 1,324,537.50 1,907,334.00 0.007 1.44 1,324,537.50
29.20 11,425.15 333,614.38 0.001 36.91 11,425.15
16.00 41,700.00 667,200.00 0.002 16.00 41,700.00
210.00 134,100.00 28,161,000.00 0.105 168.82 134,100.00
44.00 21,800.00 959,200.00 0.004 48.00 21,800.00
1.00 6,159,500.00 6,159,500.00 0.023 1.00 6,159,500.00
254.00 10,900.00 2,768,600.00 0.010 216.82 10,900.00
1.00 1,449,300.00 1,449,300.00 0.005 1.00 1,449,300.00
1.00 5,434,800.00 5,434,800.00 0.020 - 5,434,800.00
6.40 261,070.00 1,670,848.00 0.006 10.13 261,070.00
- 4.00 9,825,000.00
- 2.65 110,000.00
- 9.44 103,340.28
150.00 133,100.00
112,145,552.38 0.419
60,150,896.19 0.225 - -
4.00 4,710,200.00 18,840,800.00 0.070 - 4,710,200.00
4.00 1,811,700.00 7,246,800.00 0.027 - 1,811,700.00
4.00 8,163,100.00 32,652,400.00 0.122 4.00 8,163,100.00
25.60 110,000.00 2,816,000.00 0.011 38.47 110,000.00
0.40 102,190.00 40,876.00 0.000 15.39 102,190.00
1.60 208,300.00 333,280.00 0.001 76.95 208,300.00
1.44 1,324,537.50 1,907,334.00 0.007 1.44 1,324,537.50
29.20 11,425.15 333,614.38 0.001 36.91 11,425.15
16.00 41,700.00 667,200.00 0.002 16.00 41,700.00
170.00 134,100.00 22,797,000.00 0.085 256.49 134,100.00
42.00 21,800.00 915,600.00 0.003 48.00 21,800.00
1.00 6,159,500.00 6,159,500.00 0.023 1.00 6,159,500.00
212.00 10,900.00 2,310,800.00 0.009 304.49 10,900.00
1.00 1,449,300.00 1,449,300.00 0.005 1.00 1,449,300.00
1.00 5,434,800.00 5,434,800.00 0.020 - 5,434,800.00
6.40 261,070.00 1,670,848.00 0.006 15.39 261,070.00
- 4.00 9,825,000.00
- 2.65 110,000.00
- 9.44 103,340.28
105,576,152.38 0.394 - -
157,824,652.38 0.589 - -
4.00 4,710,200.00 18,840,800.00 0.070 - 4,710,200.00
4.00 1,811,700.00 7,246,800.00 0.027 - 1,811,700.00
4.00 8,163,100.00 32,652,400.00 0.122 - 8,163,100.00
25.60 110,000.00 2,816,000.00 0.011 - 110,000.00
0.40 102,190.00 40,876.00 0.000 - 102,190.00
1.60 208,300.00 333,280.00 0.001 - 208,300.00
1.44 1,324,537.50 1,907,334.00 0.007 - 1,324,537.50
29.20 11,425.15 333,614.38 0.001 - 11,425.15
16.00 41,700.00 667,200.00 0.002 - 41,700.00
180.00 134,100.00 24,138,000.00 0.090 - 134,100.00
42.00 21,800.00 915,600.00 0.003 - 21,800.00
1.00 6,159,500.00 6,159,500.00 0.023 - 6,159,500.00
222.00 10,900.00 2,419,800.00 0.009 - 10,900.00
1.00 1,449,300.00 1,449,300.00 0.005 - 1,449,300.00
1.00 5,434,800.00 5,434,800.00 0.020 - 5,434,800.00
6.40 261,070.00 1,670,848.00 0.006 - 261,070.00
- - 9,825,000.00
- - -
- - 103,340.28
107,026,152.38 0.400 - -
107,026,152.38 0.400 - -
16.00 4,710,200.00 75,363,200.00 0.281 - 4,710,200.00
16.00 1,811,700.00 28,987,200.00 0.108 - 1,811,700.00
16.00 8,163,100.00 130,609,600.00 0.488 17.00 8,163,100.00
102.40 110,000.00 11,264,000.00 0.042 120.72 110,000.00
1.60 102,190.00 163,504.00 0.001 48.29 102,190.00
6.40 208,300.00 1,333,120.00 0.005 241.43 208,300.00
5.76 1,324,537.50 7,629,336.00 0.028 5.80 1,324,537.50
116.80 11,425.15 1,334,457.52 0.005 111.62 11,425.15
64.00 41,700.00 2,668,800.00 0.010 68.00 41,700.00
770.00 134,100.00 103,257,000.00 0.386 804.78 134,100.00
336.00 21,800.00 7,324,800.00 0.027 204.00 21,800.00
2.00 6,159,500.00 12,319,000.00 0.046 2.00 6,159,500.00
1,106.00 10,900.00 12,055,400.00 0.045 1,008.78 10,900.00
2.00 1,449,300.00 2,898,600.00 0.011 1.00 1,449,300.00
2.00 5,434,800.00 10,869,600.00 0.041 2.00 5,434,800.00
25.60 261,070.00 6,683,392.00 0.025 48.29 261,070.00
- 17.00 9,825,000.00
- 11.25 110,000.00
- 36.88 103,340.28
414,761,009.52 1.549 - -
57,977,496.19 0.217
1,122,488,063.80 4.192
26,433,476,256.40 98.724
26,775,000,000.00 100.000
CO-01 (M24) Bobot (%) Bobot (%)
Bobot (%)
JUMLAH REALISASI SISA
CCO
Rp M24 PEKERJAAN
- - 0.000 - - -
58,701,900.00 0.219 0.000 0.219 0.219 -
15,808,000.00 0.059 0.000 0.059 0.059 -
17,792,842.72 0.066 0.000 0.066 0.066 -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
50,892,859.68 0.190 0.005 0.18478
-
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- 0.000 - - -
- - 0.000 - - -
- - 0.000 - - -
- - 0.000 -
- - 0.000 -
- - 0.000 -
- - 0.000 -
- - 0.000 - - -
- - 0.000 - - -
16,326,200.00 0.061 0.000 0.061 0.061 -
1,270,500.00 0.005 0.000 0.005 0.005 -
472,117.80 0.002 0.000 0.002 0.002 -
4,811,730.00 0.018 0.000 0.018 0.018 -
860,949.38 0.003 0.000 0.003 0.003 -
131,316.10 0.000 0.000 0.000 0.000 -
333,600.00 0.001 0.000 0.001 0.001 -
10,325,700.00 0.039 0.000 0.039 0.039 -
523,200.00 0.002 0.000 0.002 0.002 -
- - 0.000 - - -
1,100,900.00 0.004 0.000 0.004 0.004 -
- - 0.000 - - -
- - 0.000 - - -
1,206,143.40 0.005 0.000 0.005 0.005 -
19,650,000.00 0.073 0.000 0.073 0.073 -
145,530.00 0.001 0.000 0.001 0.001 -
413,361.12 0.002 0.000 0.002 0.002 -
- - 0.000 - - -
- - 0.000 - - -
32,652,400.00 0.122 0.000 0.122 0.122 -
2,874,630.00 0.011 0.000 0.011 0.011 -
1,068,212.51 0.004 0.000 0.004 0.004 -
10,887,007.80 0.041 0.000 0.041 0.041 -
1,721,898.75 0.006 0.000 0.006 0.006 -
262,632.21 0.001 0.000 0.001 0.001 -
667,200.00 0.002 0.000 0.002 0.002 -
23,362,902.00 0.087 0.000 0.087 0.087 -
1,046,400.00 0.004 0.000 0.004 0.004 -
- - 0.000 - - -
2,422,198.00 0.009 0.000 0.009 0.009 -
- - 0.000 - - -
- - 0.000 - - -
2,729,016.92 0.010 0.000 0.010 0.010 -
39,300,000.00 0.147 0.000 0.147 0.147 -
291,060.00 0.001 0.000 0.001 0.001 -
826,722.24 0.003 0.000 0.003 0.003 -
- - 0.000 -
- - 0.000 - - -
- - 0.000 - - -
32,652,400.00 0.122 0.000 0.122 0.122 -
2,148,135.00 0.008 0.000 0.008 0.008 -
798,246.97 0.003 0.000 0.003 0.003 -
8,135,573.10 0.030 0.000 0.030 0.030 -
1,902,035.85 0.007 0.000 0.007 0.007 -
421,668.01 0.002 0.000 0.002 0.002 -
667,200.00 0.002 0.000 0.002 0.002 -
17,458,479.00 0.065 0.000 0.065 0.065 -
1,046,400.00 0.004 0.000 0.004 0.004 -
6,159,500.00 0.023 0.000 0.023 0.023 -
1,942,271.00 0.007 0.000 0.007 0.007 -
1,449,300.00 0.005 0.000 0.005 0.005 -
- - 0.000 - - -
2,039,322.20 0.008 0.000 0.008 0.008 -
39,300,000.00 0.147 0.000 0.147 0.147 -
291,060.00 0.001 0.000 0.001 0.001 -
975,532.24 0.004 0.000 0.004 0.004 -
0.000
117,387,123.37 0.438 0.000 0.43842
0.000
0.000
- - 0.000 - - -
- - 0.000 - - -
138,772,700.00 0.518 0.000 0.518 0.518 -
13,278,870.00 0.050 0.000 0.050 0.050 -
4,934,428.09 0.018 0.000 0.018 0.018 -
50,290,702.20 0.188 0.000 0.188 0.188 -
7,678,343.89 0.029 0.000 0.029 0.029 -
1,275,222.69 0.005 0.000 0.005 0.005 -
2,835,600.00 0.011 0.000 0.011 0.011 -
107,920,998.00 0.403 0.000 0.403 0.403 -
4,447,200.00 0.017 0.000 0.017 0.017 -
12,319,000.00 0.046 0.000 0.046 0.046 -
10,995,702.00 0.041 0.000 0.041 0.041 -
1,449,300.00 0.005 0.000 0.005 0.005 -
10,869,600.00 0.041 0.000 0.041 0.041 -
12,606,234.88 0.047 0.000 0.047 0.047 -
167,025,000.00 0.624 0.000 0.624 0.624 -
1,237,005.00 0.005 0.000 0.005 0.005 -
3,811,189.53 0.014 0.000 0.014 0.014 -
- - 0.000 - - -
- - 0.000 - - -
40,815,500.00 0.152 0.000 0.152 0.152 -
3,922,380.00 0.015 0.000 0.015 0.015 -
1,457,556.41 0.005 0.000 0.005 0.005 -
14,855,122.80 0.055 0.000 0.055 0.055 -
3,193,459.91 0.012 0.000 0.012 0.012 -
618,642.17 0.002 0.000 0.002 0.002 -
834,000.00 0.003 0.000 0.003 0.003 -
31,878,252.00 0.119 0.000 0.119 0.119 -
1,308,000.00 0.005 0.000 0.005 0.005 -
6,159,500.00 0.023 0.000 0.023 0.023 -
3,245,148.00 0.012 0.000 0.012 0.012 -
1,449,300.00 0.005 0.000 0.005 0.005 -
5,434,800.00 0.020 0.000 0.020 0.020 -
3,723,693.62 0.014 0.000 0.014 0.014 -
49,125,000.00 0.183 0.000 0.183 0.183 -
509,355.00 0.002 0.000 0.002 0.002 -
1,595,573.92 0.006 0.000 0.006 0.006 -
0
0
0
November Desember Janua
1-6 7-13 14-20 21-27 28-4 5-11 12-18 19-28 21-1
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - 0.0181 0.0382 0.1151 0.2539 0.3233 0.3233 0.3648
- - 0.0092 0.0110 0.0129 0.0151 0.0438 0.0504 0.0716
- - 0.0092 0.0202 0.0331 0.0482 0.0920 0.1424 0.2140
- - 0.0092 0.0110 0.0129 0.0151 0.0438 0.0504 0.0716
- - 0.0092 0.0202 0.0331 0.0482 0.0920 0.1424 0.2140
1 2 3 4 5 6 7 8 9
Januari Februari Maret
2-8 9-15 16-22 23-29 30-5 6-12 13-19 22-26 27-5
- - - - - - - - 0.0113
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 0.0207 0.0305 0.0271 0.0112 0.0272 0.0695 0.0602 0.0422
- - 0.0017 0.0016 0.0013 0.0034 0.0052 0.0041 0.0042
- - 0.0447 0.0519 0.0503 0.1200 0.1803 0.1414 0.1420
- - - 0.1040 0.2365 0.4428 0.6357 0.6374 0.2768
- - - 0.0178 0.1015 0.2317 0.3332 0.2384 0.1475
- - - - 0.1489 0.1915 0.3617 0.0213 -
- - - - - - - - -
- - - - 0.0043 0.0055 0.0105 0.0006 -
- - - - - - 0.0375 0.0078 0.0086
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - 0.1184 - -
- - - - - - 0.0059 - -
0.4062 0.4557 0.5954 0.7352 0.8749 1.0293 2.5295 4.7266 7.2709
0.0746 0.0963 0.1525 0.2779 0.5820 1.0384 1.7742 1.1274 0.6760
0.2887 0.3850 0.5375 0.8154 1.3974 2.4358 4.2100 5.3375 6.0135
0.0746 0.0963 0.1525 0.2779 0.5820 1.0384 1.7742 1.1274 0.6760
0.2887 0.3850 0.5375 0.8154 1.3974 2.4358 4.2100 5.3375 6.0135
10 11 12 13 14 15 16 17 18
300 Hari Kalender
Maret April
6-12 13-19 20-26 27-2 3-9 10-16 17-23 24-30
- - - - 0.0604 - - -
- - - - - 0.0018 0.0078 0.0087
- - - - - 0.2583 1.1160 1.2452
- - - - - - - -
- - - - - 0.0099 - -
- - - - - - 0.1049 0.0066
- - - - - - 0.0187 0.0004
- - - - - - 0.8838 0.0777
- - - - - - - -
- - - - - - - -
- - - - - - 0.2221 -
- - - - - - 0.0038 0.0005
- - - - - - - -
- - - - - - - -
- - - - - 0.0178 - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - 0.0046 -
- - - - - - 0.0259 -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - 0.0024 - - - - -
- - - - - 0.0005 - -
- - - - - 0.0048 - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
0.0374 0.0436 0.0384 0.0244 0.0297 0.0227 0.0209 0.0157
0.0034 0.0036 0.0033 0.0028 0.0047 0.0039 0.0056 0.0050
0.1141 0.1232 0.1135 0.0934 0.1582 0.1329 0.1880 0.1686
0.4982 0.1677 0.7515 0.3623 0.3439 0.1845 1.2010 0.7163
0.3578 0.1229 0.3672 - - 0.5404 0.5841 0.3548
- - - - - - 0.5053 1.3297
- - - - - - - -
- - - - - - 0.0146 0.0384
0.0108 0.0475 0.0052 0.0112 - - 0.0341 0.0388
- 0.0519 - - - - - -
- 0.7847 - - - 0.0382 - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
11.7027 16.4586 20.1042 23.5566 28.5117 34.1182 39.7105 45.0453
1.4967 1.7005 1.6067 1.2594 1.2575 2.0860 5.4414 5.0500
7.5102 9.2107 10.8174 12.0768 13.3342 15.4203 20.8617 25.9116
1.4967 1.7005 1.6067 1.2594 1.2575 2.0860 5.4414 5.0500
7.5102 9.2107 10.8174 12.0768 13.3342 15.4203 20.8617 25.9116
19 20 21 22 23 24 25 26
Mei Juni
1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25
0.0178
0.3006
0.0142
0.0069
0.0057
0.8163
0.0226
0.0087
0.0018
0.2428
0.0049
0.0193
0.0031
0.4288
0.0078
-
0.2192
0.0590
0.0665
0.0013
0.0010
-
-
-
-
-
-
0.0026
0.0125
0.0040
0.1066
0.0367
0.0140
0.0008
0.0053
-
-
-
-
0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
0.0186 0.0186 0.0186 0.0186 0.0186 0.0186 0.0186
0.0199
0.2197
0.0605
0.0475
0.0155 0.0155 0.0155 0.0155 0.0155
0.0600 0.0600 0.0600 0.0600 0.0600
0.0960 0.0960 0.0960 0.0960 0.0960
0.0345 0.0345 0.0345 0.0345 0.0345
0.8202 0.8202 0.8202 0.8202 0.8202
- - - - -
- - - - -
0.2001 0.2001 0.2001 0.2001 0.2001
0.0159 0.0159 0.0159 0.0159 0.0159
0.2365 0.2365 0.2365 0.2365 0.2365
0.0039 0.0039 0.0039 0.0039 0.0039
0.0126 0.0126 0.0126 0.0126 0.0126
0.0005 0.0005 0.0005 0.0005 0.0005
0.0573 0.0573 0.0573 0.0573 0.0573
0.2725 0.2725 0.2725 0.2725 0.2725
0.0180 0.0180 0.0180 0.0180 0.0180
27 28 29 30 31 32 33 34
51.1566353
0.40
Juli Agustus
26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-7
0.2361
0.0128
0.0178
0.0079
0.0128
0.0178
0.0079
0.0058
-
0.0047
0.0273
0.0106
0.0575
0.0432
0.0157
-
0.0163
0.0286
0.0583
0.1560
0.1171
0.0384
0.0246
0.2444
0.0547
0.2713
0.0301
0.2982
0.2238
0.0132
0.0024
0.0221
0.0113
0.0128
0.0058
0.0172
0.0638
0.0134
0.0665
0.0073
0.0728
0.0546
0.0059
0.0041
0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
0.0186 0.0186 0.0186 0.0186 0.0186 0.0186 0.0186 0.0186
0.5389 0.5389 0.5389 0.5389 0.5389 0.5389 0.5389 0.5389
0.3797 0.3797 0.3797 0.3797 0.3797 0.3797 0.3797 0.3797
1.8343 1.8343 1.8343 1.8343 1.8343 1.8343 1.8343 1.8343
0.0070
0.1274
0.2137
0.1294
0.0339
0.0959
0.0311
0.0332
0.0441
0.0032
0.0999
0.0188
0.1032
0.0103
0.1022
0.0767
0.0117
0.0118
0.0057
-
0.0103
0.0013
0.1705
0.0014
0.0073
0.0901
0.0060
0.0064
0.0089
0.0040
0.0155 0.0155 0.0155
0.0600 0.0600 0.0600
0.0960 0.0960 0.0960
0.0345 0.0345 0.0345
0.8202 0.8202 0.8202
- - -
- - -
0.2001 0.2001 0.2001
0.0159 0.0159 0.0159
0.2365 0.2365 0.2365
0.0039 0.0039 0.0039
0.0126 0.0126 0.0126
0.0005 0.0005 0.0005
0.0573 0.0573 0.0573
0.2725 0.2725 0.2725
0.0180 0.0180 0.0180
1.5444 1.5444
0.0021 0.0021 0.0021
0.0001 0.0001 0.0001
0.0001 0.0001 0.0001
0.0004 0.0004 0.0004
1.2292 1.2292
0.0396 0.0396
0.0161 0.0161
- -
0.0483 0.0483
0.0100 0.0100
0.0465 0.0465
- -
0.0100 0.0100
- -
-
0.0610 0.0610
0.0052 0.0052
0.0019 0.0019
0.0197 0.0197
0.0036 0.0036
0.0008 0.0008
0.0008 0.0008 0.0008
0.0282 0.0282 0.0282
0.0013 0.0013 0.0013
0.0077 0.0077 0.0077
0.0029 0.0029 0.0029
0.0018 0.0018 0.0018
0.0049 0.0049
0.0734 0.0734
0.0005 0.0005
0.0018 0.0018
0.0373 0.0373
-
0.0305 0.0305
0.0024 0.0024
0.0009 0.0009
0.0090 0.0090
0.0016 0.0016
0.0002 0.0002
0.0004 0.0004 0.0004
0.0129 0.0129 0.0129
0.0007 0.0007 0.0007
- - -
0.0014 0.0014 0.0014
- - -
0.0023 0.0023
0.0367 0.0367
0.0003 0.0003
0.0008 0.0008
-
0.0610 0.0610
0.0079 0.0079
0.0029 0.0029
0.0299 0.0299
0.0036 0.0036
0.0008 0.0008
0.0008 0.0008 0.0008
0.0428 0.0428 0.0428
0.0013 0.0013 0.0013
0.0077 0.0077 0.0077
0.0041 0.0041 0.0041
0.0018 0.0018 0.0018
0.0075 0.0075
0.0734 0.0734
0.0005 0.0005
0.0018 0.0018
-
0.0610 0.0610
0.0054 0.0054
0.0020 0.0020
0.0203 0.0203
0.0032 0.0032
0.0005 0.0005
0.0008 0.0008 0.0008
0.0291 0.0291 0.0291
0.0013 0.0013 0.0013
- - -
0.0030 0.0030 0.0030
- - -
0.0051 0.0051
0.0734 0.0734
0.0005 0.0005
0.0015 0.0015
-
- -
- -
- -
- -
- -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- -
- -
- -
-
0.0610 0.0610
0.0040 0.0040
0.0015 0.0015
0.0152 0.0152
0.0036 0.0036
0.0008 0.0008
0.0008 0.0008 0.0008
0.0217 0.0217 0.0217
0.0013 0.0013 0.0013
0.0077 0.0077 0.0077
0.0024 0.0024 0.0024
0.0018 0.0018 0.0018
0.0038 0.0038
0.0734 0.0734
0.0005 0.0005
0.0018 0.0018
-
0.2591 0.2591
0.0248 0.0248
0.0092 0.0092
0.0939 0.0939
0.0143 0.0143
0.0024 0.0024
0.0035 0.0035 0.0035
0.1344 0.1344 0.1344
0.0055 0.0055 0.0055
0.0153 0.0153 0.0153
0.0137 0.0137 0.0137
0.0018 0.0018 0.0018
0.0406
0.0235 0.0235
0.3119 0.3119
0.0023 0.0023
0.0071 0.0071
-
0.0762 0.0762
0.0073 0.0073
0.0027 0.0027
0.0277 0.0277
0.0060 0.0060
0.0012 0.0012
0.0010 0.0010 0.0010
0.0397 0.0397 0.0397
0.0016 0.0016 0.0016
0.0077 0.0077 0.0077
0.0040 0.0040 0.0040
0.0018 0.0018 0.0018
0.0203
0.0070 0.0070
0.0917 0.0917
0.0010 0.0010
0.0030 0.0030
77.1024 ### 85.5094 90.4746 93.4411 97.5899 98.8307 99.8254 100.0000
35 36 37 38 39 40 41 42 43
###
###
Bobot (%) Bobot (%) 300 Hari Kalender
Bobot (%) Bobot (%) November Desember Januari Februari Maret April Mei Juni Juli Agustus Keterangan
No ITEM PEKERJAAN REALISASI SISA
KONTRAK CCO
M24 PEKERJAAN 1-6 7-13 14-20 21-27 28-4 5-11 12-18 19-28 21-1 2-8 9-15 16-22 23-29 30-5 6-12 13-19 22-26 27-5 6-12 13-19 20-26 27-2 3-9 10-16 17-23 24-30 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-7
A PEKERJAAN PERSIAPAN
100
1 PEKERJAAN PERSIAPAN 1.2755 1.2755 0.8834 0.3921 0.0000 0.0000 0.0092 0.0110 0.0129 0.0151 0.0438 0.0504 0.0716 0.0746 0.0756 0.0756 0.0756 0.0280 0.0163 0.0163 0.0163 0.0434 0.0434 0.0434 0.0434 0.0430 0.0205 0.0205 0.0205 0.0132 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231 0.0231
1.1 Pekerjaan Jalan Lentur 12.0311 12.4274 4.7591 7.6683 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0113 0.4317 0.3119 0.2817 0.7223 0.6402 0.8498 0.4798 1.0304 1.8082 1.6222 1.6222 0.2817 0.6993 0.6993 0.6993 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2361 0.0000
1.2 Pekerjaan Saluran Beton 2 Sisi 15.7438 13.3567 2.6981 10.6586 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0604 0.2601 1.1238 1.2539 0.7106 0.7106 0.7106 0.7106 0.7106 0.7106 0.7106 0.0000 0.0000 0.7106 0.7106 0.7106 0.7106 0.7106 0.7106 0.7106 0.7106
90
1.3 Pekerjaan Decker - 0.0385 - 0.0385 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0385 0.0000 0.0000 0.0000 0.0000 0.0000
2.1 Pekerjaan Jalan Rigid 2.1736 1.7776 1.3283 0.4493 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0099 1.2333 0.0852 0.4493 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2.2 Pekerjaan Saluran Beton 2 Sisi 1.1552 0.8693 0.0178 0.8515 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0178 0.0000 0.0000 0.0000 0.0069 0.8446 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2.3 Pekerjaan Decker - 0.0385 - 0.0385 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0385 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
80
3 PEMBUATAN JALAN AREA STP,SST XV
3.1 Pekerjaan Jalan Lentur 0.0778 0.1491 - 0.1491 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1491 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
3.2 Pekerjaan Saluran Beton 2 Sisi 0.3126 0.2583 - 0.2583 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.2583 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
4.1 Pekerjaan Jalan Lentur 0.2840 0.3920 - 0.3920 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
SCHEDULE
0.0000
AWAL
0.0000 0.3920 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
70
4.2 Pekerjaan Saluran Beton 1 Sisi 0.4774 0.4591 - 0.4591 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.4591 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
4.2 Pekerjaan Jalan Lentur 0.8663 1.2564 0.0329 1.2234 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0024 0.0000 0.0000 0.0000 0.0305 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.2234 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
4.5 Pekerjaan Decker - 0.0298 - 0.0298 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0298 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
4.6 Perbaikan Tanah - 0.3447 - 0.3447 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.3447 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
60
6 PEMBUATAN JALAN DARI PINTU GERBANG BALAI PENGOBATAN
6.1 Pekerjaan Jalan Lentur 0.1446 0.3056 - 0.3056 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.3056 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
8.1 Pagar BRC h = 2400 mm 41.5468 38.4605 15.1874 23.2731 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0207 0.0770 0.2023 0.5540 1.0222 1.6336 1.1112 0.6213 1.0216 0.5085 1.2791 0.4941 0.5364 0.8845 2.5536 2.6674 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0216 0.0025 0.0025 2.8896 2.8896 2.8896 2.8896 2.8896 2.8896 2.8896 2.8896
8.2 Pekerjaan Pemindahan Tanaman 0.1746 0.0070 - 0.0070 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0070
8.3 Pintu Pagar - 0.6645 - 0.6645 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.6645
9 PEKERJAAN DECKER SALURAN PK-PPK - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
40
9.1 Pekerjaan Decker 0.0921 - - - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
10.1 Pekerjaan Jalan Lentur 0.2061 0.4876 - 0.4876 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.4876 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
10.2 Pekerjaan Saluran Beton 0.1928 0.1835 - 0.1835 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1835 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
10.3 Pekerjaan Overlay 0.1373 0.1034 - 0.1034 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1034 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
10.4 Pekerjaan Decker - 0.0192 - 0.0192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0192 0.0000 0.0000 0.0000 0.0000 0.0000 30
10.5 Perbaikan Tanah - 0.3476 - 0.3476 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.3476 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
11.1 PAGAR BRC h = 2400 mm 0.4748 - - - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
12.1 Pekerjaan Jalan Rigid 16.0054 18.8577 0.9992 17.8586 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1244 0.0000 0.0000 0.0000 0.8366 0.0000 0.0000 0.0000 0.0382 0.0000 0.0000 1.8462 1.8462 0.0000 1.8462 1.8462 0.0000 1.8462 0.0000 0.0000 0.0000 0.0000 1.8462 1.8462 1.8462 0.0000 1.5444 1.5444 20
12.2 Pekerjaan Jembatan 2.1890 2.7995 - 2.7995 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.3997 1.3997 0.0000
13.2 Pekerjaan Penerangan Jalan STP - SST XV 0.2247 0.2150 - 0.2150 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0023 0.0023 0.0823 0.0823 0.0153 0.0153 0.0153
13.3 Pekerjaan Penerangan Jalan Incenerator 0.3943 0.5544 - 0.5544 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0075 0.0075 0.1818 0.1818 0.0586 0.0586 0.0586 10
13.4 Pekerjaan Penerangan Jalan Sumpit SP2 & SP4 0.5894 0.4486 - 0.4486 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0051 0.0051 0.1679 0.1679 0.0342 0.0342 0.0342
13.5 Pekerjaan Penerangan Jalan BMKG 0.3997 - - - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
13.6 Pekerjaan Penerangan Jalan Ponding Area 0.3997 0.4384 - 0.4384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0038 0.0038 0.1618 0.1618 0.0358 0.0358 0.0358
13.7 Pekerjaan Penerangan Jalan Adban - Parkir 1.5491 2.0607 - 2.0607 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0235 0.0235 0.7251 0.7251 0.1743 0.1743 0.2148
13.8 Pekerjaan Penerangan Parkir Taxi Dekat SP-4 0.2165 0.6354 - 0.6354 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0070 0.0070 0.2168 0.2168 0.0559 0.0559 0.0762 0
TOTAL 100.0000 100.0000 25.9116 74.0884
BOBOT RENCANA KONTRAK (%)
BOBOT KOMULATIF RENCANA KONTRAK (%) 0.0000 0.0000 0.0181 0.0382 0.1151 0.2539 0.3233 0.3233 0.3648 0.4062 0.4557 0.5954 0.7352 0.8749 1.0293 2.5295 4.7266 7.2709 11.7027 16.4586 20.1042 23.5566 28.5117 34.1182 39.7105 45.0453 50.7311 56.3931 62.0750 64.9694 68.0049 72.6514 77.0766 77.0895 77.1024 81.6910 85.5094 90.4746 93.4411 97.5899 98.8307 99.8254 100.000
BOBOT REALISASI KONTRAK (%) 0.0000 0.0000 0.0092 0.0110 0.0129 0.0151 0.0438 0.0504 0.0716 0.0746 0.0963 0.1525 0.2779 0.5820 1.0384 1.7742 1.1274 0.6760 1.4967 1.7005 1.6067 1.2594 1.2575 2.0860 5.4414 5.0500
BOBOT KOMULATIF REALISASI KONTRAK (%) 0.0000 0.0000 0.0092 0.0202 0.0331 0.0482 0.0920 0.1424 0.2140 0.2887 0.3850 0.5375 0.8154 1.3974 2.4358 4.2100 5.3375 6.0135 7.5102 9.2107 10.8174 12.0768 13.3342 15.4203 20.8617 25.9116
BOBOT RENCANA CCO-01 (%) 0.0000 0.0000 0.0092 0.0110 0.0129 0.0151 0.0438 0.0504 0.0716 0.0746 0.0963 0.1525 0.2779 0.5820 1.0384 1.7742 1.1274 0.6760 1.4967 1.7005 1.6067 1.2594 1.2575 2.0860 5.4414 5.0500 4.8590 4.2305 3.2221 2.8832 4.0181 2.1468 3.4855 0.0255 0.0255 5.4262 4.7873 5.5813 7.2104 7.2104 5.4397 7.2202 6.3167
BOBOT KOMULATIF RENCANA CCO-01 I(%) 0.0000 0.0000 0.0092 0.0202 0.0331 0.0482 0.0920 0.1424 0.2140 0.2887 0.3850 0.5375 0.8154 1.3974 2.4358 4.2100 5.3375 6.0135 7.5102 9.2107 10.8174 12.0768 13.3342 15.4203 20.8617 25.9116 30.7706 35.0011 38.2232 41.1064 45.1244 47.2713 50.7568 50.7823 50.8079 56.2341 61.0214 66.6027 73.8131 81.0234 86.4631 93.6833 100.000
BOBOT REALISASI CCO-01 (%)
BOBOT KOMULATIF REALISASI CCO-01 (%)
Iwan Khrishadianto Ismail Emri Jusmar Ir. Syaiful Bahri Prisyanur Hartanto
General Manager Chief of Airport Project Management Unit Team Leader Project Manager
M1 M2
A PEKERJAAN PERSIAPAN
1 Pengukuran & bowplank - -
2 Direksi keet & Los kerja - -
3 Listrik kerja - -
4 Air kerja - -
5 Fhoto proyek + Shop drawing + As Built Drawing - -
6 Papan nama proyek - -
7 PPPK - -
8 Mobilisasi - -
9 Demobilisasi - -
10 Pengajuan sample & test material - -
11 Peralatan & Kelengkapan Keselamatan Kerja ( K3 ) - -
- -
- -
- -
B PEK. PEMBANGUNAN JALAN PENYEMPURNAAN SEKTOR - -
- -
1 PEMBUATAN JALAN PENGHUBUNG DARI SST 16 - -
KE SST 1 DAN SST 16 KE ARAH TAXIWAY - -
- -
Pekerjaan jalan Lentur - -
a Galian tanah biasa - -
b Urugan tanah dengan tanah bekas galian - -
c Sub base course (CBR 40%), tebal 20 cm - -
d Lapis resap pengikat (prime coat) 2 kg/m2 - -
e Base Course (Agregat kelas A), CBR > 80%tebal 20cm - -
f Lapis perekat (Tack coat) 1 kg/m2 - -
g Laston AC-BC (ATB) tebal 4 cm - -
h Laston AC-WC tebal 3 cm - -
i Marking - -
J Pekerjaan Pembongkaran & Pemasangan Pagar - -
- -
PEKERJAAN SALURAN BETON 2 SISI - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
d timbunan biasa - -
- -
2 PEMBUATAN JALAN DAN SALURAN LINGKUNGAN CIQ - -
- -
Pekerjaan Jalan Rigid - -
a Timbunan biasa - -
b Beton K-125 (lean concrete) t=5cm - -
c Bekisting - -
d Rigid Beton K-350 tebal = 27 cm - -
e Joint Sealent - -
f Marka - -
g dowel 32 mm (BJTP24) p=70cm, interval lebar 10cm, - -
h Tie Bar D22 mm (BJTD40) p=30cm, interval panjang 10 - -
- -
PEKERJAAN SALURAN BETON 2 SISI - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
d timbunan biasa - -
- -
3 PEMBUATAN JALAN AREA STP,SST XV - -
- -
Pekerjaan Jalan lentur (Overlay) - -
a Lapis perekat (Tack coat) 1 kg/m2 - -
b Laston AC-WC tebal 5 cm - -
c Marking - -
- -
PEKERJAAN SALURAN BETON 2 SISI - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
d timbunan biasa - -
- -
4 PEMBUATAN JALAN AREA INCINERATOR - -
- -
Pekerjaan Jalan lentur (Overlay) - -
a Lapis perekat (Tack coat) 1 kg/m2 - -
b Laston AC-WC tebal 5 cm - -
c Marking - -
- -
PEKERJAAN SALURAN BETON 1 sisi - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
d timbunan biasa - -
- -
5 PEMBUATAN JALAN SUMPIT SP 2 & SP 4 - -
- -
Pekerjaan jalan Lentur - -
a Galian tanah biasa - -
b Urugan tanah dengan tanah bekas galian - -
c Sub base course (CBR 40%), tebal 20 cm - -
d Lapis resap pengikat (prime coat) 2 kg/m2 - -
e Base Course (Agregat kelas A), CBR > 80%tebal 20cm - -
f Lapis perekat (Tack coat) 1 kg/m2 - -
g Laston AC-BC (ATB) tebal 4 cm - -
h Laston AC-WC tebal 3 cm - -
i Marking - -
j Pekerjaan Pemindahan tanaman - -
- -
6 PEMBUATAN JALAN DARI PINTU GERBANG BALAI PENG - -
- -
Pekerjaan jalan Lentur - -
a Galian tanah biasa - -
b Sub base course (CBR 40%), tebal 20 cm - -
c Lapis resap pengikat (prime coat) 2 kg/m2 - -
d Base Course (Agregat kelas A), CBR > 80%tebal 20cm - -
e Lapis perekat (Tack coat) 1 kg/m2 - -
f Laston AC-BC (ATB) tebal 4 cm - -
g Laston AC-WC tebal 3 cm - -
h Marking - -
- -
7 PEMBUATAN JALAN BMKG & SST-6 - -
- -
Pekerjaan jalan Lentur - -
a Galian tanah biasa - -
b Urugan tanah dengan tanah bekas galian - -
c Sub base course (CBR 40%), tebal 20 cm - -
d Lapis resap pengikat (prime coat) 2 kg/m2 - -
e Base Course (Agregat kelas A), CBR > 80%tebal 20cm - -
f Lapis perekat (Tack coat) 1 kg/m2 - -
g Laston AC-BC (ATB) tebal 4 cm - -
h Laston AC-WC tebal 3 cm - -
i Marking - -
- -
PEKERJAAN SALURAN BETON 1 sisi - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
- -
8 DOUBLE FENCING PERIMETER BANDARA - -
- -
Pagar BRC h = 2400 mm - -
a Galian Tanah biasa untk pondasi tiang dan pasangan - -
b Pasang pasir urug 5 cm untuk dasar pondasi - -
c Pasangan Batu Kali, Camp 1 Pc : 4 Ps - -
d Pasang tiang pipa galvanized dia 2" dan angkur besi - -
e Cor Pondasi beton tiang pagar camp 1 Pc : 2 Ps : 3 kr - -
f Pasang panel BRC Hotdeep Galvanize D 6mm (1 panel uk - -
dipasang lengkap mur baut - -
g Pek. Coating BRC dengan aspal bakar - -
h Pasang kawat duri biasa 3 baris - -
i Total Pagar Per Modul L= 5 m' - -
Harga Pagar Per M' - -
Untuk Panjang 17,500 M - -
Pekerjaan Pemindahan Tanaman - -
- -
9 PEKERJAAN DECKER SALURAN PK-PPK - -
- -
a Pekerjaan Decker Saluran K-350 PK-PPK - -
b Pekerjaan Baja tulangan - -
c Bekisting - -
d pembengkoran beton - -
e Pasang pipa dia 5" - -
f Pemindahan hydrant - -
- -
10 AKSES DARI WTP KE POMPA INTAKE PONDING AREA - -
- -
Pekerjaan jalan Lentur - -
a Galian tanah biasa - -
b Urugan tanah dengan tanah bekas galian - -
c Sub base course (CBR 40%), tebal 20 cm - -
d Lapis resap pengikat (prime coat) 2 kg/m2 - -
e Base Course (Agregat kelas A), CBR > 80%tebal 20cm - -
f Lapis perekat (Tack coat) 1 kg/m2 - -
g Laston AC-BC (ATB) tebal 4 cm - -
h Laston AC-WC tebal 3 cm - -
i Marking - -
- -
PEKERJAAN SALURAN BETON - -
a Galian Tanah Biasa - -
b Pasir urug - -
c Saluran Terbuka U-Ditch uk. 600 x 800 mm, tebal 7 c - -
- -
PEKERJAAN OVERLAY JALAN STA 0+000 - STA 0+060 - -
Pekerjaan jalan Lentur (Overlay) - -
- -
a Lapis perekat (Tack coat) 1 kg/m2 - -
b Laston AC-WC tebal 5 cm - -
c Marking - -
- -
11 PAGAR GEDUNG WTP DAN STP - -
- -
Pagar BRC h = 2400 mm - -
a Galian Tanah biasa untk pondasi tiang dan pasangan - -
b Pasang pasir urug 5 cm untuk dasar pondasi - -
c Pasangan Batu Kali, Camp 1 Pc : 4 Ps - -
d Pasang tiang pipa galvanized dia 2" dan angkur besi - -
e Cor Pondasi beton tiang pagar camp 1 Pc : 2 Ps : 3 kr - -
f Pasang panel BRC Hotdeep Galvanize D 6mm (1 panel uk - -
dipasang lengkap mur baut - -
g Pek. Coating BRC dengan aspal bakar - -
h Pasang kawat duri biasa 3 baris - -
i Total Pagar Per Modul L= 5 m' - -
Harga Pagar Per M' - -
Untuk Panjang 200 M - -
- -
12 PEMBUATAN JALAN ADBAN - PARKIR BUS - -
- -
Pekerjaan jalan Rigid - -
a Galian Tanah Biasa - -
b Timbunan biasa (CBR min 6%) - -
c Beton K-125 (lean concrete) t=5cm - -
d Bekisting - -
e Rigid Beton K-350 tebal = 27 cm - -
f Agregat A t=15 cm - -
g Limestone t=10 cm - -
h Joint Sealent - -
i Marka - -
j dowel 32 mm (BJTP24) p=70cm, interval lebar 10cm, - -
k Tie Bar D22 mm (BJTD40) p=30cm, interval panjang 10 - -
m Pekerjaan Pemindahan pagar - -
n Pekerjaan Pemindahan tanaman - -
- -
- -
Pekerjaan Jembatan - -
m Box culvert K-350 (2,42m x 1,5m) - -
n Pasangan Batu Kali - -
o Beton K-125 (lean concrete) t=10cm - -
p Limestone t= 30 cm - -
q Beton k-350 - -
r Bekisting - -
s Pembesian - -
t Timbunan biasa (CBR min 6%) - -
u Bongkar dinding saluran - -
- -
13 PEKERJAAN ELEKTRIKAL BANDARA - -
A Pekerjaan Penerangan Jalan Lingkunan CIQ - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian Kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
B Pekerjaan Penerangan Jalan STP - SST XV - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
C Pekerjaan Penerangan Jalan Incenerator - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
D Pekerjaan Penerangan Jalan Sumpit SP2 & SP4 - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Pengadaan dan Pemasangan Gate Valve 14" - -
p Timbunan pasir - -
- -
E Pekerjaan Penerangan Jalan BMKG - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
F Pekerjaan Penerangan Jalan Ponding Area - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
G Pekerjaan Penerangan Jalan Adban - Parkir - -
a Pengadaan tiang Lampu PJU p=10m - -
b Pengaadan stang ornament lengkap klem - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o Grounding - -
p Timbunan pasir - -
- -
H Pekerjaan Penerangan Parkir Taxi Dekat SP-4 - -
Pekerjaan Penerangan Jalan - -
a Pengadaan tiang Lampu PJU p=10m - -
c Pengadaan lampu LED 75 W - -
d Galian kabel - -
e Timbunan tanah - -
f Pasangan Batu Bata - -
g Cor beton k-250 - -
h Tulangan - -
i Bolt M16 Galvanized - -
j kabel NYFGBY 5x10 sqmm - -
k kabel NYYHY 3x2.5 sqmm - -
l Panel Power PJU Lengkap - -
m instalasi kabel - -
n instalasi panel - -
o grounding - -
p Timbunan pasir - -
M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
0.009 0.009 0.009 0.009 0.009 0.009 0.018 0.018 0.018 0.018
- - - - 0.031 0.031 0.031 0.031 0.031 0.031
- - - - - - - - - -
- - - - - - - - - -
- - - 0.001 0.001 0.001 0.001 0.005 0.005 0.005
- - - - - - - - - -
- 0.002 0.002 0.002 - - - 0.002 - -
- - - - - - - - - -
- - - - - - - - - -
- - - 0.003 0.003 0.006 0.014 0.011 0.014 0.014
- - 0.002 - - 0.004 0.007 0.007 0.007 0.007
- - - - - - - - - -
0.009 0.011 0.013 0.015 0.044 0.050 0.072 0.075 0.076 0.076
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - 0.021 0.031
- - - - - - - - - 0.002
- - - - - - - - - 0.045
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
M13 M14 M15 M16 M17 M18 M19 M20 M21 M22
Pada Hari Selasa tanggal 25 April 2017 telah dilaksanakan Rapat Negosiasi harga item pekerjaan baru
1 Pengadaan tiang Lampu PJU Galvanis Btg 40.00 Rp 10,953,700 Rp 438,148,000 Rp 9,750,000 Rp 390,000,000
Oktogonal p= 11m
2 Pembersihan Lahan M2 20,928.14 Rp 7,000 Rp 146,496,967 Rp 6,100 Rp 127,661,642
3 Guardrail M 830.43 Rp 1,069,500 Rp 888,143,954 Rp 995,900 Rp 827,024,370
4 Pintu Besi Galvanis Type I Unit 2.00 Rp 17,947,000 Rp 35,894,000 Rp 17,052,900 Rp 34,105,800
5 Pintu Besi Galvanis Type 2 Unit 4.00 Rp 15,197,000 Rp 60,788,000 Rp 14,302,400 Rp 57,209,600
6 Pintu Besi Galvanis Type 3 Unit 3.00 Rp 11,806,900 Rp 35,420,700 Rp 11,551,900 Rp 34,655,700
7 Pintu Besi Galvanis Type 4 Unit 3.00 Rp 5,592,000 Rp 16,776,000 Rp 3,025,400 Rp 9,076,200
8 Cerucuk Bambu Btg 2,805.00 Rp 44,100 Rp 123,700,500 Rp 41,900 Rp 117,529,500
9 Geotextile (Non Woven) M2 1,538.40 Rp 22,000 Rp 33,844,800 Rp 20,800 Rp 31,998,720
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
Negoisasi
Ket
Harga Satuan Jumlah Harga
Rp 9,825,000 Rp 393,000,000
Rp 6,100 Rp 127,661,642
Rp 995,900 Rp 827,024,370
Rp 17,052,900 Rp 34,105,800
Rp 14,302,400 Rp 57,209,600
Rp 11,551,900 Rp 34,655,700
Rp 3,025,400 Rp 9,076,200
Rp 41,900 Rp 117,529,500
Rp 20,800 Rp 31,998,720