Here is the schedule from Section 21 with different calendars assigned to the work centres, and the calendar calculations appli
- the 1st calculations take the stop of the previous operation and apply the lag duration, using the calendar of the nex
- the 2nd calculations apply the operation duration to the start
- the 3rd calculations take the start again, re-use Calc4 and Calc5, and apply the lag duration, the result is then foun
W/C Calendar
6 Calendar 2
7 Calendar 1
8 Calendar 2
The next operation can start 1 hour after the start of the previous operation (Lag)
Start
Calc6 Stop Calc7 +Lag
13 ### 6 14/3 9:00
20 ### 14 16/3 8:02
24 ### 21 ###
10 ### 8 ###
31 21/3 8:53 17 16/3 9:02
35 ### 31 21/3 9:53
20 ### 7 ###
24 21/3 9:53 20 ###
34 23/3 9:48 27 ###