Anda di halaman 1dari 15

KSKV SVM 2017

MINISTRY OF EDUCATION, MALAYSIA

VOCATIONAL COLLEGE STANDARD CURRICULUM

COURSE INFORMATION

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

LEVEL / SEMESTER : 2 SEMESTER 1

CREDIT UNIT : 3.0

CONTACT HOUR : FACE TO FACE : 5.0 HOURS / WEEK

NON FACE TO FACE :

COURSE TYPE : VOCATIONAL

PREREQUISITE : -

CORE REQUISITE : -

ETE 1013 Document Page 1/15


KSKV SVM 2017

COURSE OUTCOMES (COMPETENCY UNIT WORK ACTIVITIES)

At the end of the course, students should be able to:-

1. Identify single phase drawing specifications and requirement.


2. Carry out layout drawing.
3. Carry out single line / schematic diagram drawing.
4. Carry out single phase wiring drawing.
5. Inspect single phase drawing.

COURSE DESCRIPTION (COMPETENCY UNIT DESCRIPTOR)

Single phase drawing is covering the scope of competency to carry out wiring activities for Single Phase based on drawing given by utilizing
wiring tools, equipment and materials in compliance with Electrical Act 1990, Electrical Regulation 1994 and other related rules and regulations
body and statutory requirements. The personnel who are competent in the single phase electrical drawing must be able to identify drawing
specification for single phase wiring and carry out drawing according to standard requirements.

ETE 1013 Document Page 2/15


KSKV SVM 2017

CONTENT AND LEARNING STANDARDS

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA /


(TRAINING DURATION) (WORK ACTIVITIES) (RELATED KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ ATTITUDE / SAFETY / ENVIRONMENTAL)

20 HOURS 1. IDENTIFY SINGLE RELATED KNOWLEDGE ASSESSMENT CRITERIA


(4 WEEKS) PHASE DRAWING
SPECIFICATIONS AND 1.1 Procedure of site visit and evaluation. 1.1 Sketch layout plan according to
THEORY : REQUIREMENT requirement.
8 HOURS 1.2 Technique to produce layout drawing.
PRACTICAL : 1.2 Calculate Ohms Law, MD & TCL
12 HOURS 1.3 Calculation of Ohms Law. correctly according to Electrical Act
& Regulation and Standard.
1.4 Calculation of diversity factor.
1.3 List out the selection of protection
1.5 Bill of quantity (BQ). devices, and cable listed out
according to Electrical Act &
1.6 Types of calculation: Total connected load Regulation and Standard.
(TCL) and Maximum Demand (MD).

1.7 Diversity factor.

ETE 1013 Document Page 3/15


KSKV SVM 2017

1.8 Various type of conductor: Copper and


Aluminium.

1.9 Various type of cable, such as:


XLPE/SCT/PVC, PVC/PVC, PVC/SWA/PVC
and XLPE/SWA/PVC.

1.10 Various types of protection devices: MCB,


MCCB, RCCB/ELCB and Fuse.

1.11 Types of single phase wiring: Surface wiring,


Conceal wiring, Conduit wiring, Conceal
conduit Wiring, Ducting wiring,
Trunking/Casing, Cable tray and
Underground.

1.12 Earthing / grounding requirement.

1.13 Electrical Act & Regulation and Standard:


Energy Commission Act 2001, Electricity
Supply Act 1990 (Act 447), Electrical
Regulation 1994, MS 1936: 2006 / IEC
60364, MS 1979: 2007 (COP) Electrical
Installation of Buildings Code of practice
(COP) and Based on latest instruction by
regulatory body.

1.14 Occupational Safety & Health Act 514


(OSHA) 1994.

1.15 Authorisation requirement to access site


such as: Green card and Safety passport

ETE 1013 Document Page 4/15


KSKV SVM 2017

RELATED SKILLS

1.1 Determine procedure to carry out site visit


and evaluation.

1.2 Visit and evaluate site location.

1.3 Sketch layout plan.

1.4 Calculate Ohms Law

1.5 Calculate total connected load.

1.6 Calculate maximum demand.

1.7 Determine types of single phase wiring.

1.8 Determine types of protection devices.

1.9 Determine types of conductor.

1.10 Determine types of cable.

1.11 Determine Authorisation requirement to


access site.

ATTITUDE / SAFETY / ENVIRONMENTAL

Attitude

1.1 Meticulous in calculating Ohms Law, TCL &


MD.
1.2 Adhere to safety regulation.

ETE 1013 Document Page 5/15


KSKV SVM 2017

CONTENT AND LEARNING STANDARDS

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA /


(TRAINING DURATION) (WORK ACTIVITIES) (RELATED KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ ATTITUDE / SAFETY / ENVIRONMENTAL)

35 HOURS 2. CARRY OUT LAYOUT RELATED KNOWLEDGE ASSESSMENT CRITERIA


(7 WEEKS) DRAWING
2.1 Drawing set. 2.1 Sketch building layout according to
THEORY : specification.
14 HOURS 2.2 Computer Added Drawing software.
PRACTICAL : 2.2 Determine the single phase wiring
21 HOURS 2.3 Computer operation. configuration according to
specification.
2.4 Measurement scale technique.
2.3 Determine the types of accessories
2.5 Building layout symbol. and fittings accoding to
requirement and specification.
2.6 Application of configuration.
2.4 Carry out layout drawing drew
2.7 Electrical symbol, circuit and measurements according to requirement and
for layout drawing. specification.

ETE 1013 Document Page 6/15


KSKV SVM 2017

2.5 Check layout drawing format


2.8 Electrical accessories and fittings. according to standard format.

2.9 Procedure to draw layout drawing.

2.10 Format of layout drawing.

RELATED SKILLS

2.1 Acquire drawing set.


2.2 Utilise Computer Added Drawing.
2.3 Utilise computer system.
2.4 Utilise drawing software.
2.5 Interpret building layout plan.
2.6 Determine electrical symbol.
2.7 Determine electrical accessories/fittings.
2.8 Sketch building layout.
2.9 Determine single phase wiring configuration.
2.10 Determine types of accessories and fittings
to be used.
2.11 Draw building layout (indoor / outdoor).

ATTITUDE / SAFETY / ENVIRONMENTAL

Attitude

2.1 Handle computer with care.

ETE 1013 Document Page 7/15


KSKV SVM 2017

CONTENT AND LEARNING STANDARDS

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA /


(TRAINING DURATION) (WORK ACTIVITIES) (RELATED KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ ATTITUDE / SAFETY / ENVIRONMENTAL)

25 HOURS 3. CARRY OUT SINGLE RELATED KNOWLEDGE ASSESSMENT CRITERIA


(5 WEEKS) LINE / SCHEMATIC
DIAGRAM DRAWING 3.1 Single line/schematic diagram drawing 3.1 Determine single line drawing
THEORY : requirements and specifications as per rules requirements and specification
10 HOURS and regulation. according to standard format.
PRACTICAL :
15 HOURS 3.2 Devices and cable specification: Switches, 3.2 Determine the devices and cable
Protection, Cable and Socket outlet (Switch / specification according to Electrical
Unswitch). Act & Regulation and Standard.

3.3 Circuit connection method. 3.3 Determine electrical symbol circuit


according to requirement and
3.4 Types of single phase wiring: Indoor single specification.
phase wiring and Outdoor single phase
wiring. 3.4 Draw single line drawing drew
according to requirement and
3.5 Electrical symbol circuit. specification.

ETE 1013 Document Page 8/15


KSKV SVM 2017

3.6 Procedure to draw single line drawing. 3.5 Check single line drawing format
according to standard format.
3.7 Format of single line drawing

RELATED SKILLS

3.1 Determine electrical symbol.

3.2 Determine electrical accessories and fittings.

3.3 Read and interpret blue print.

3.4 Determine types of single phase wiring


protection.

3.5 Determine types of accessories and fittings.

3.6 Compare single line drawing to layout


drawing.

3.7 Draw electrical single line drawing.

ATTITUDE / SAFETY / ENVIRONMENTAL

Attitude

3.1 Handle computer with care.


3.2 Adhere to ergonomic requirements.

ETE 1013 Document Page 9/15


KSKV SVM 2017

CONTENT AND LEARNING STANDARDS

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA /


(TRAINING DURATION) (WORK ACTIVITIES) (RELATED KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ ATTITUDE / SAFETY / ENVIRONMENTAL)

15 HOURS 4. CARRY OUT SINGLE RELATED KNOWLEDGE ASSESSMENT CRITERIA


(3 WEEKS) PHASE WIRING
DRAWING 4.1 Type of accessories. 4.1 Determine Single phase wiring
THEORY : configuration according to
6 HOURS 4.2 Single phase wiring connection, terms and requirement and specification.
PRACTICAL : specification.
9 HOURS 4.2 Determine the types of accessories
4.3 Single phase wiring protection. and fittings according to
requirement and specification.
4.4 Earthing system layout.
4.3 Draw single phase single phase
4.5 Cable size chart. wiring drawing according to
requirement and specification.
4.6 Single phase wiring specification and
regulation. 4.4 Check single phase single phase
wiring drawing format according to
standard format.

ETE 1013 Document Page 10/15


KSKV SVM 2017

4.7 Procedure to draw single phase wiring


drawing.

4.8 Format of single phase wiring drawing

RELATED SKILLS

4.1 Read and interpret blue print.

4.2 Determine types of electrical connection.

4.3 Differentiate type of loads.

4.4 Determine types of connection.

4.5 Determine type of single phase wiring/


accessories and fittings.

4.6 Draw single phase wiring drawing.

ATTITUDE / SAFETY / ENVIRONMENTAL

Attitude

4.1 Meticulous in drawing.

ETE 1013 Document Page 11/15


KSKV SVM 2017

CONTENT AND LEARNING STANDARDS

PROGRAMME : ELECTRICAL TECHNOLOGY

COURSE NAME : SINGLE PHASE DRAWING

CODE NAME : ETE 1013

CONTACT HOURS CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA /


(TRAINING DURATION) (WORK ACTIVITIES) (RELATED KNOWLEDGE / APPLIED SKILLS ASSESSMENT CRITERIA
/ ATTITUDE / SAFETY / ENVIRONMENTAL)

5 HOURS 5. INSPECT SINGLE RELATED KNOWLEDGE ASSESSMENT CRITERIA


(1 WEEKS) PHASE DRAWING
5.1 Types of drawing. 5.1 Check the drawing error correctly
THEORY : according to specification.
2 HOURS 5.2 Procedure to check drawing error.
PRACTICAL : 5.2 Check drawing specification
3 HOURS 5.3 Drawing specification. according to format.

5.4 Procedure to check Ohms Law, Total 5.3 Calculate Ohms Law, TCL & MD
Connected Load (TCL) and Maximum according to Electrical Act &
Demand (MD) from drawing. Regulation and Standard.

5.5 Tender/clients requirements.

5.6 Procedure to submit single phase wiring


drawing for approval.

ETE 1013 Document Page 12/15


KSKV SVM 2017

RELATED SKILLS

5.1 Determine types of drawing.

5.2 Check drawing error.

5.3 Check drawing specification against design


requirements.

5.4 Calculate Ohms Law, TCL & MD.

5.5 Print out single phase drawing.

5.6 Determine tender / clients requirements.

5.7 Submit single phase wiring drawing for


approval to superior.

5.8 Carry out housekeeping activities.

ATTITUDE / SAFETY / ENVIRONMENTAL

Attitude

5.1 Meticulous in calculation.

ETE 1013 Document Page 13/15


KSKV SVM 2017

CORE ABILITY

CORE ABILITY

SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV

SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY

TOOLS, EQUIPMENT AND MATERIALS (TEM)

ITEMS RATIO (TEM : TRAINEES)

1. Schematic diagram 1:1


2. Block Diagram 1:1
3. Measuring Instruments 1:1
4. Electrical components/Parts Specification 1:1
5. Equipment Data Book 1:2
6. Drawing instrument 1:1
7. Computer 1:1
8. Computer Added Drawing software 1:5

ETE 1013 Document Page 14/15


KSKV SVM 2017

REFERENCES

1. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan Elektrik 1994,
Pindaan sehingga 2005. MDC Publisher Sdn Bhd Malaysia.

2. Suruhanjaya Tenaga Malaysia. Standard Pendawaian Malaysia (Electrical Installations Of Buildings -


MS IEC 60364) Jabatan Standard Malaysia

3. The Institution of Electrical Engineers, 1998, Peraturan-Peraturan bagi Pemasangan Elektrik, Edisi
16. Golden Books Centre Sdn Bhd

4. Giesecke, F. E. et. Al. 2002. Technical Drawing. Prentice Hall

5. BS 7671: 2001 Requirements for Electrical Installations (IEE Wiring Regulations, Sixteenth Edition)
Institution of Electrical Engineers

ETE 1013 Document Page 15/15

Anda mungkin juga menyukai