Anda di halaman 1dari 11

: INSTALLATION OF BUFFER VESSEL AND PRESSURE REDUCING & METERING STATION FOR OXYGEN,NITROGEN

PROJECT NAME ARGON , PACKAGE 75B, AT BHILAI STEEL PLANT, BHILAI.


PROJECT NO : DGM/PCC/TK/2012/361
CLIENT : BHILAI STEEL PLANT BHILAI ORDER DATE : 07.07.2012
CONSULTANT : MECON COMPLETION DATE : 07.07.2013
Status As on date-30.08.16
1st Submission 2nd Submission 3rd Submission 4th Submission 5th Submission 6th Submission 7th Submission Final Status
Billing sch
Approved /
Drawing Drawing Description Drawing No Category Submitted Comments Submitted Comments Rcvd Submitted Comments Submitted Comments Submitted Comments Submitted Comments Submitted Comments
Additiona Rev No Rev No Rev No Rev No Rev No Rev No Rev No Status Code Date REF. MECON LETTER NO. Rev No
list SNo. l On Rcvd On On On On Rcvd On On Rcvd On On Rcvd On On Rcvd On On Rcvd On

BASIC DATA:
1 LIST OF DRAWING WITH SCHEDULE OF SUBMISSION BSP-BSL-10-075B-24-000-000-BD-07001 B B(A) 0 13.08.12 13.09.12 1 22.08.12 08.10.12 2 22.09.12 3 09.03.15 16.04.15 4 27.04.15 5 20.05.15 A 28.05.15 MEC/02/40/9101/075B/01069 DT. 28.05.15 2,5
2 COMISSIONING AND START UP PROCEDURE BSP-BSL-10-075B-24-000-000-BD-07002 B B(A) 0 30.03.13 U/S 30.03.13 0
3 L-2 PERT NETWORK BSP-BSL-10-075B-24-000-000-BD-07003 B B(A) 3 04.04.13 A 20.05.13 3
CIVIL: -

BASIC ENGINEERING -

CIVIL DESIGN CRITERIA AND CALCULATION FOR ALL 0 24..01.13 07.02.13 1 25.01.13 A 04.03.13 1
4 BUILDING, STRUCTURES & FOUNDATION BSP-BSL-10-075B-24-000-32-BE-06001 B B(A)

DETAIL ENGINEERING -
OVERALL CIVIL LAYOUT FOR BUFFER VESSEL AND PRMS
5 STATION BSP-BSL-10-075B-24-000-32-DE-06002 B A 0 18.02.13 08.03.13 1 24.04.13 08.05.13 2 30.07.16 U/S 30.07.16 1
6 RCC DETAILS OF BUFFER VESSEL FOUNDATION BSP-BSL-10-075B-24-000-32-DE-06003 B A 0 29.04.13 23.04.13 1 03.05.13 A 07.05.13 1
7 RCC DETAILS OF CONTROL ROOM BSP-BSL-10-075B-24-000-32-DE-06004 B A 1 01.08.13 A 07.08.13 1
RCC DETAILS OF PRMS ROOM(OXYGEN, NITROGEN & 1 25.11.14 16.12.14 NR
ARGON) BSP-BSL-10-075B-24-000-32-DE-06005 NR NR

GENERAL ARRANGEMENT, PLAN SECTION AND DETAILS


8 OF FOUNDATION OF EQUIPMENTS BSP-BSL-10-075B-24-000-32-DE-06006 B A 0 24.04.14 28.04.14 C 28.04.14 0
ARCHITECTURAL PLAN, ELEVATION, SECTION OF PRMS
9 CONTROL ROOM BSP-BSL-10-075B-24-000-57-DE-06007 B A 1 01.08.13 A 08.08.13 1

G.A & DETAIL FOR DRAINAGE & ROADS FOR PRMS NR


STATION BSP-BSL-10-075B-24-000-32-DE-06008 NR NR

10 CIVIL LOAD DATA FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-32-DE-06501 I 0 07.08.12 KFR 22.08.12 0

11 CIVIL LOAD DATA FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-32-DE-06502 I 0 07.08.12 KFR 22.08.12 0

12 CIVIL LOAD DATA FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-32-DE-06503 I 0 07.08.12 KFR 22.08.12 0

13 CIVIL LOAD DATA FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-32-DE-06504 I 0 07.08.12 KFR 22.08.12 0

14 CIVIL LOAD DATA FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-32-DE-06505 I 2 29.10.12 KFR 31.10.12 2

1 Civil GA Drawing for PRMS Control Room BSP-BSL-10-075B-24-000-32-DE-06010 A A (add) 1 01.08.13 A 05.08.13 1
2 Design Calculation for Electrical Cum Control Room BSP-BSL-10-075B-24-000-32-DE-06011 A A (add) 0 19.07.13 A 29.07.13 0
3 Design calculation for foundation of O2,N2,Ar Vessels. BSP-BSL-10-075B-24-000-32-DE-06009 A A (add) 0 19.04.13 23.04.13 1 07.05.13 A 7.05.13 1
layout pf pipe supporting structure in Buffer Vessel BSP-BSL-10-075B-24-000-32-DE-06012 A 0 20.12.13 A 0
4 A (add)
area
General arrangment of fondation for T & TR BSP-BSL-10-075B-24-000-32-DE-06013 A 0 20.12.13 A 19.09.13 MEC/02/40/9101/075B/01012 DT. 21.05.15 0
5 A (add)
supports in BV Area
G.A. Details of foundations for TR-21,TW-39 & Duck foot 0 08.05.15 A 21.05.15 MEC/02/40/9101/075B/01012 DT. 21.05.15 0
BSP-BSL-10-075B-24-000-32-DE-06013 (Sheet-02) A A (add)
support in buffer vessel area
G.A. Details of foundations for TW-17,TR-22 & Duck foot 0 08.05.15 A 21.05.15 MEC/02/40/9101/075B/01012 DT. 21.05.15 0
BSP-BSL-10-075B-24-000-32-DE-06013 (Sheet-03) A A (add)
support in buffer vessel area
RCC Detail drg. Of foundation for T & TR in BSP-BSL-10-075B-24-000-32-DE-06014 A 0 20.12.13 31.01.14 1 24.04.13 28.06.14 2 5.09.14 RE-A 19.09.14 MEC/02/40/9101/075B/01012 DT. 21.05.15 2
6 A (add)
buffervessel area
G.A & RCC Detail drawing. Of foundation for T & TR in 1 30.04.15 17.05.15 2 22.05.15 KFR 24.06.15 2
6A buffer vessel area
BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-11) A A (add)
R.C.C. Details of foundations for TR-21,TW-39 & Duck 0 08.05.15 A 21.05.15 MEC/02/40/9101/075B/01012 DT. 21.05.15 0
6B foot support in buffer vessel area
BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-15) A A (add)
R.C.C. Details of foundations for TW-17,TR-22 & Duck 0 08.05.15 A 21.05.15 MEC/02/40/9101/075B/01012 DT. 21.05.15 0
6C foot support in buffer vessel area
BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-16) A A (add)
G.A. & R.C.C. Details of foundations for TW-16 support 1 08.05.15 A 21.05.15 MEC/02/40/9101/075B/01012 DT. 21.05.15 1
6D in buffer vessel area
BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-13) A A (add)
G.A & RCC Detail drawing of foundation for TW
6E supports in buffer vessel area with design BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-17) A A (add) 0 01.06.15 KFR 24.06.15 0
calculation.
G.A & RCC Detail drawing of foundation for TW
6F supports in buffer vessel area with design BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-18) A A (add) 0 01.06.15 KFR 24.06.15 0
calculation.
G.A & RCC Detail drawing of foundation for TW
6G supports in buffer vessel area with design BSP-BSL-10-075B-24-000-32-DE-06014 (Sheet-19) A A (add) 0 01.06.15 KFR 24.06.15 0
calculation.

7 GA & RCC detail drg of fdn for TW supports BSP-BSL-10-075B-24-000-32-DE-06015 A A (add) 0 20.12.13 A 31.01.14 0

CIVIL design calculation for founsdation of TW1 To BSP-BHPV-10-075B-24-003-40-DE-05016 A 0 20.12.13 31.01.14 1 13.03.14 03.05.14 2 19.05.14 KFR 28.05.14 2
8 A (add)
TW10 and T17 T18
Civil desing Calculation for the foundation of TR- BSP-BHPV-10-075B-24-003-40-DE-06012/2 A 0 5.09.14 19.09.14 KFR 19.09.14 0
9 A (add)
19 & 20
Civil design calculation for foundation of TW-15, TW- 1 08.05.15 A 21.05.15 1
BSP-BHPV-10-075B-24-003-40-DE-06012 (Sheet-4) A A (add)
16 support in buffer vessel area
Civil design calculation for foundation of TR-21,TW-39 & A 0 08.05.15 A 21.05.15 0
Duck foot support in buffer vessel area
BSP-BHPV-10-075B-24-003-40-DE-06012 (Sheet-5) A (add)
Civil design calculation for foundation of TW-17, TR-22
BSP-BHPV-10-075B-24-003-40-DE-06012 (Sheet-6) A A (add) 0 08.05.15 A 21.05.15 0
& Duck foot support in buffer vessel area
Structural detail with design calculation of Duck Foot 0 08.05.15 KFR 06.06.15 0
BSP-BSL-10-075B-24-003-40-DE-05039 (Sheet-1) A A (add)
Support in buffer vessels area
Civil desing Calculation for the foundation of TW to BSP-BHPV-10-075B-24-003-40-DE-06012/A A 0 20.12.13 1 30.04.15 17.05.15 2 22.05.15 A 25.06.15 MEC/02/40/9101/075B/01284 DT. 25.06.15 2
10 A (add)
TW 13 and T27 T15
GENERAL LAYOUT & DETAIL OF ROAD ,
0 05.06.14 28.06.14 1 29.09.14 1.10.14 2 23.03.15 3 17.07.15 A 24.07.15 & MEC/02/40/9101/075B/00207 DT. 15.02.16 & 3&3
15 FENCING & GATE IN BUFFER VESSELS & BSP-BHPV-10-075B-24-003-40-DE-06020 B A 15.02.16 DT.24.07.15
PRMS AREA.
GA & RCC DETAIL OF FOUNDATION FOR PIPE
16 SUPPORT IN NITROGEN PRMS & DESIGN BSP-BHPV-10-075B-24-003-40-DE-06021 B A 0 19.05.14 16.06.14 1 19.09.14 A 10.10.14 1
CALCULATION
G.A & RCC DETAIL OF FOUNDATIONS FOR
17 PIPE SUPPORT IN ARGON PRMS AREA & BSP-BHPV-10-075B-24-000-32-DE-06022 B A 0 26.04.14 12.06.14 1 25.11.14 18.12.14 2 30.12.14 A 06.01.15 2
DESIGN CALCULATION.
G.A FOUNDATIONS FOR PIPE SUPPORT AND
18 BOUNDARY WALL IN OXYGEN PRMS AREA & BSP-BHPV-10-075B-24-000-32-DE-06023 B A 0 16.03.15 A 06.04.15 MEC/02/40/9101/075B/00708 DT. 06.04.15 0
DESIGN CALCULATION.(03 Sheet)
RCC DETAILS OF FOUNDATIONS FOR PIPE
SUPPORT AND BOUNDARY WALL IN OXYGEN BSP-BHPV-10-075B-24-000-32-DE-06024 A 0 16.03.15 A 06.04.15 MEC/02/40/9101/075B/00708 DT. 06.04.15 0
A (add)
PRMS AREA & DESIGN CALCULATION.(03
Sheet)
STRUCTURAL : -

DETAIL ENGINEERING -
19 STAIR CASE & WALK WAY FOR OXYGEN PRMS BSP-BHPV-10-075B-24-001-40-DE-05001 B I 0 27.08.15 19.09.15 1 16.11.15 KFR 11.12.15 MEC/02/40/9101/075B/02216 DT. 11.12.15 1
20 STAIR CASE & WALK WAY FOR NITROGEN PRMS BSP-BHPV-10-075B-24-002-40-DE-05002 B I 0 27.08.15 19.09.15 1 16.11.15 KFR 11.12.15 MEC/02/40/9101/075B/02216 DT. 11.12.15 1
21 STAIR CASE & WALK WAY FOR ARGON PRMS BSP-BHPV-10-075B-24-003-40-DE-05003 B I 0 27.08.15 19.09.15 1 16.11.15 KFR 11.12.15 MEC/02/40/9101/075B/02216 DT. 11.12.15 1
STAIR CASE & WALK WAY FOR OXYGEN PRESSURE 0 28.07.13 KFR 08.07.13 1
22 VESSELS BSP-BHPV-10-075B-24-001-40-DE-05004 B I

STAIR CASE & WALK WAY FOR NITROGEN PRESSURE 0 28.06.13 KFR 08.07.13 1
23 VESSELS BSP-BHPV-10-075B-24-002-40-DE-05005 B I

24 STAIR CASE & WALK WAY FOR ARGON PRESSURE VESSELS BSP-BHPV-10-075B-24-003-40-DE-05006 B I 0 28.07.13 KFR 08.07.13 0
General arrangement of platforms for 65m3 nitrogen
13 storage vessels BSP-BHPV-10-075B-24-003-40-DE-05007 A I (add) 0 17.05.13 KFR 20.05.13 0
General arrangement of platforms for 16m3 nitrogen 0 17.05.13 KFR 20.05.13 0
14 storage vessels BSP-BHPV-10-075B-24-003-40-DE-05008 A I (add)
15 Details of ladder for LD-1 to LD-5 for Argon Vessels BSP-BHPV-10-075B-24-003-40-DE-05009 A I (add) 0 KFR 03.07.13 0
16 Details of ladder for LD-1 to LD-3 for Nitrogen Vessels BSP-BHPV-10-075B-24-003-40-DE-05010 A I (add) 0 KFR 03.07.13 0
17 Details of ladder for LD-1 to LD-6 for Oxygen Vessels BSP-BHPV-10-075B-24-003-40-DE-05011 A I (add) 0 KFR 03.07.13 0
11 Layout of Pipes Supporting Structures in Buffer Vessel Area BSP-BHPV-10-075B-24-003-40-DE-05012 A A (add) 0 1 2 10.01.14 3 28.03.15 RE-A 08.04.15 MEC/02/40/9101/075B/00737 DT. 08.04.15 3
18 Structural Design Calculation of 'T'&'TR' supports BSP-BHPV-10-075B-24-003-40-DE-05013 A A (add) 0 28.09.13 18.11.13 1 06.01.14 AAN 13.02.14 1
19 GA DRAWINGS OF 'T' & 'TR'- SUPPORTS FOR O2 N2 & ARG BSP-BHPV-10-075B-24-003-40-DE-05014 A A (add) 0 09.12.13 18.01.14 1 12.12.13 18.01.14 2 29.01.14 A 13.02.14 MEC/02/40/9101/075B/000368 DT. 13.02.14 2
DETAIL OF ''T'' & ''TR'' Suport for O2,N2& AR pipe line in
20 buffer vessel area SHT-2 BSP-BHPV-10-075B-24-003-40-DE-05015 A A (add) 0 29.01.14 KFR 13.02.14 MEC/02/40/9101/075B/000368 DT. 13.02.14 0

structure GA of tower marked TW5 to TW7 and


21 bridge marked B4&5 in Buffer Vessels area BSP-BSL-10-075B-24-003-40-DE-05020 A A (add) 1 28.09.13 18.11.13 3 13.03.14 07.05.14 4 19.05.14 A 28.05.14 4
(SHT1-3)
structure GA of tower marked TW1 TO TW4 in BSP-BSL-10-075B-24-003-40-DE-05017 A 1 19.12.13 18.01.14 4 19.05.14 A 28.05.14 MEC/02/40/9101/075B/1271 DT. 28.05.14 4
22 A (add)
Buffer Vessels area (SHT1-3)
STRUCTURAL DETAIL OF TW 1 TO TW 4 & BSP-BSL-10-075B-24-003-40-DE-05018 A 0 13.03.14 07.05.14 1 18.06.14 KFR 18.06.14 MEC/02/40/9101/075B/1505 DT. 27.06.14 0
23 A (add)
BRIDGES MARKED B1 & B3 (SHT1-4)
STR.DESING CALCULATION TW-5 TO TW-7 & BSP-BSL-10-075B-24-003-40-DE-05019 A 0 13.03.14 03.05.14 1 19.05.14 KFR 28.05.14 MEC/02/40/9101/075B/1271 DT. 28.05.14 0
24 A (add)
BG 4&5
STRUCTURAL GA OF TOWER MARKED TW 5
25 TO TW 7 & BRIDGES MARKED B4 & B5 (SHT 1- BSP-BSL-10-075B-24-003-40-DE-05021 A A (add) 0 13.03.14 07.05.14 1 18.06.14 KFR 27.06.14 MEC/02/40/9101/075B/1505 DT. 27.06.14 0
3)
STRUCTURAL GA OF TOWER MARKED TW 5
26 TO TW 7 & BRIDGES MARKED B4 & B5 (SHT 1- BSP-BSL-10-075B-24-003-40-DE-05022 A A (add) 0 13.03.14 03.05.14 1 19.05.14 KFR 28.06.14 MEC/02/40/9101/075B/1271 DT. 28.05.14 2
3)
structure GA of tower marked TW8 to TW10 and
27 bridge marked B6 &7 in Buffer Vessels area (SHT BSP-BSL-10-075B-24-003-40-DE-05023 A A (add) 0 28.09.13 18.11.13 1 13.03.14 07.05.14 2 19.05.14 A 28.06.14 MEC/02/40/9101/075B/1271 DT. 28.05.14 4
1-3)
STR.DETAIL TW-8 TO TW-10 & BG-6&7 (SHT-1- BSP-BSL-10-075B-24-003-41-DE-05024 A 0 27.10.13 20.02.14 1 13.03.14 07.05.14 2 18.06.14 KFR 27.06.14 MEC/02/40/9101/075B/1505 DT. 27.06.14 0
28 A (add)
2)
GA DRAWINGS OF 'T' & 'TR'- SUPPORTS FOR BSP-BSL-10-075B-24-003-40-DE-05025 A 0 29.01.14 20.02.14 C 20.02.14 0
29 A (add)
N2

30 GA DRAWING OF T & TR -SUPPORTS FOR N2 BSP-BSL-10-075B-24-003-40-DE-05026 A A (add) 0 13.03.14 A 13.05.14 MEC/02/40/9101/075B/01160 DT. 13.05.14 1

31 STRUCTURAL DETAIL DRG FOR T & TR FOR N2 BSP-BSL-10-075B-24-003-41-DE-05027 A A (add) 0 13.03.14 KFR 13.05.14 MEC/02/40/9101/075B/1186 DT. 17.05.14 0
32 DESING CAL OF TOWER TW12 BSP-BSL-10-075B-24-003-40-DE-05028/B A A (add) 0 29.01.14 20.02.14 1 13.03.14 13.05.14 2 6.09.14 KFR 18.09.14 2
33 DESING CAL OF TOWER TW11 BSP-BSL-10-075B-24-003-40-DE-05028/A A A (add) 0 6.09.14 KFR 18.09.14 MEC/02/40/9101/075B/2066 DT. 18.09.14 0
34 DESING CAL OF TOWER T13 BSP-BSL-10-075B-24-003-40-DE-05028/C A A (add) 0 6.09.14 KFR 18.09.14 MEC/02/40/9101/075B/2066DT. 18.09.14 0
35 STRUCTURAL GA OF TW 11,12&13 (SHT-1-3) BSP-BSL-10-075B-24-003-40-DE-05029 A A (add) 0 13.03.14 13.05.14 2 6.09.14 A 18.09.14 MEC/02/40/9101/075B/2066 DT. 18.09.14 2
STRUCTURAL GA OF TOWER MARKED TW13 3 28.03.15 15.04.15 4 23.04.15 A 02.05.15 MEC/02/40/9101/075B/0904 DT. 02.05.15 4
BSP-BSL-10-075B-24-003-40-DE-05029(Sheet-3) A A (add)
WITH DESIGN CALCULATION
36 STRUCTURAL DETAIL OF TW 11,12&13(SHT1-3) BSP-BSL-10-075B-24-003-41-DE-05030 A A (add) 0 13.03.14 17.05.14 1 6.09.14 KFR 18.09.14 MEC/02/40/9101/075B/2066 DT. 18.09.14 1

STRUCTURAL DETAIL OF TOWER MKD TW-13 IN 2 30.04.15 KFR 05.05.15 MEC/02/40/9101/075B/0909 DT. 05.05.15 2
BUFFER VESSEL AREA.
BSP-BSL-10-075B-24-003-41-DE-05030 (Sheet-3) A A (add)
37 STR.DESING CALCULATION TR-19 & TR-20 BSP-BSL-10-075B-24-003-40-DE-05031/B A A (add) 0 6.09.14 KFR 18.09.14 MEC/02/40/9101/075B/00773 DT. 15.04.15 0

STR.DESING CALCULATION T33 TO T39 & TR- 0 6.09.14 KFR 18.09.14 MEC/02/40/9101/075B/2066 DT. 18.09.14 0
25 BSP-BSL-10-075B-24-003-40-DE-05031/A B A
16,17,18
38 STR.GA OF TR-16 TO TR-20 & T-28 TO T-34 BSP-BSL-10-075B-24-003-40-DE-05032 A A (add) 0 19.04.14 13.05.14 1 6.09.14 A 18.09.14 MEC/02/40/9101/075B/2066 DT. 18.09.14 1
STRUCTURAL GA OF TOWER MARKED TR-21 & BSP-BSL-10-075B-24-003-40-DE-05032(Sheet-2) A 0 28.03.15 15.04.15 1 23.04.15 A 02.05.15 MEC/02/40/9101/075B/0904 DT. 02.05.15 1
38A A (add)
T-40
38B STRUCTURAL GA OF TOWER MARKED TR-22 BSP-BSL-10-075B-24-003-40-DE-05032(Sheet-3) A A (add) 0 28.03.15 15.04.15 1 23.04.15 A 02.05.15 MEC/02/40/9101/075B/0904 DT. 02.05.15 1

39 STR.DETAIL OF TR-16 TO TR-20 & T-28 TO T-34 BSP-BSL-10-075B-24-003-41-DE-05033 A A (add) 0 6.09.14 KFR 18.09.14 0

STRUCTURAL DETAIL OF TOWER MKD TR-21 & T-40 0 30.04.15 KFR 05.05.15 MEC/02/40/9101/075B/0909 DT. 05.05.15 0
IN BUFFER VESSEL AREA.
BSP-BSL-10-075B-24-003-41-DE-05033 (Sheet-3) A A (add)
STRUCTURAL DETAIL OF TOWER MKD TR-22 IN 0 30.04.15 KFR 05.05.15 MEC/02/40/9101/075B/0909 DT. 05.05.15 0
BUFFER VESSEL AREA.
BSP-BSL-10-075B-24-003-41-DE-05033 (Sheet-4) A A (add)

Page 1 of 11
1st Submission 2nd Submission 3rd Submission 4th Submission 5th Submission 6th Submission 7th Submission Final Status
Billing sch
Approved /
Drawing Drawing Description Drawing No Category
list SNo.
Additiona Rev No Submitted Comments Rev No Submitted Comments Rcvd Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Status Code Date REF. MECON LETTER NO. Rev No
On Rcvd On On On On Rcvd On On Rcvd On On Rcvd On On Rcvd On On Rcvd On
l

40 STR.GA OF TW 14 TO TW 16 BSP-BSL-10-075B-24-003-40-DE-05035 A A (add) 0 19.04.14 13.05.14 1 5.09.14 KFR 18.08.14 1


STRUCTURAL.GA OF TW 17 BSP-BSL-10-075B-24-003-40-DE-05035(Sheet-2) A A (add) 0 28.03.15 15.04.15 1 23.04.15 A 02.05.15 MEC/02/40/9101/075B/0904 DT. 02.05.15 1
41 STR.DETAIL OF TW 14,15 & TW 16 (SHT-1 &2) BSP-BSL-10-075B-24-003-41-DE-05036 A A (add) 0 6.09.14 KFR 18.09.14 0

STRUCTURAL DETAIL OF TOWER MKD TW-17 IN 0 30.04.15 KFR 05.05.15 MEC/02/40/9101/075B/0909 DT. 05.05.15 0
41A BUFFER VESSEL AREA.
BSP-BSL-10-075B-24-003-41-DE-05036 (Sheet-3) A A (add)

GA & DETAIL OF DUAL PROTECION BARRIER BSP-BSL-10-075B-24-003-40-DE-05038 A 0 18.11.14 11.12.14 1 22.01.15 27.01.15 2 10.02.16 A 15.02.16 MEC/02/40/9101/075B/00207 DT. 15.02.16 2
42 A (add)
WALL PLATES IN OXYGEN PRMS AREA
UTILITIES : -
BASIC ENGINEERING -
GENERAL LAYOUT DRAWING & SITE PLAN OF PRMS BSP-BSL-10-075B-24-000-50-BE-02001 B B(A) 0 09.01.13 23.01.13 1 04.02.13 16.02.13 2 02.03.14 3 15.05.15 A 25.05.15 MEC/02/40/9101/075B/01046 DT. 25.05.15 3
26 SYSTEM
DETAIL ENGINEERING -
27 GA LAYOUT & CROSS SECTION OF ARGON PRMS BSP-BSL-10-075B-24-003-01-DE-02002 B A 0 04.02.13 06.03.13 1 14.03.14 24.03.14 2 29.04.14 3 26.09.14 4 24.11.14 8.12.14 6 17.12.14 A 19.01.15 MEC/02/40/9101/075B/0125 DT. 19.01.15 6
28 GA LAYOUT & CROSS SECTION OF OXYGEN PRMS BSP-BSL-10-075B-24-001-01-DE-02003 B A 0 4.02.13 06.03.13 1 25.08.14 2.09.14 2 1.11.14 24.12.14 3 22.01.15 A 16.02.15 MEC/02/40/9101/075B/01046 DT. 16.02.15 3
29 GA LAYOUT & CROSS SECTION OF NITROGEN PRMS BSP-BSL-10-075B-24-002-01-DE-02004 B A 0 4.02.13 06.03.13 1 14.03.14 24.03.14 2 13.05.14 3 A 19.08.14 3
PIPING MATERIAL SPECIFICATION ALONG WITH BOM BSP-BSL-10-075B-24-000-01-DE-02005 NR NR NR
DESIGN CALCULATIONS FOR PIPE SIZE BSP-BSL-10-075B-24-000-01-DE-02006 NR NR NR
30 DATA SHEET AND GA DRG. FOR AIR CONDITIONER BSP-BSL-10-075B-24-000-01-DE-02007 B A 0 02.07.14 KFR 22.07.14 MEC/02/40/9101/075B/1701 DT. 22.07.14 1
31 HEAT LOAD CALCULATION OF AC BSP-BSL-10-075B-24-000-01-DE-02008 B I 0 12.12.13 31.12.13 2 15.02.14 14.04.14 3 2.07.14 A 22.07.14 MEC/02/40/9101/075B/1701 DT. 22.07.14 3
43 Piping GA & Sectional Drawing for Buffer Vessels & PRMS. BSP-BSL-10-075B-24-000-01-DE-02009 A A (add) 0 19.02.13 23.03.13 1 24.04.13 A 30.04.13 2
GA DRAWING FOR PKG. AIR CONDITIONER ALONG WITH 0 1 19.11.14 05.12.14 2 18.12.14 A 20.12.14 MEC/02/40/9101/075B/02631 DT. 20.12.14 2
44 DUCTING BSP-BSL-10-075B-24-000-01-DE-02010 A A (add)

SCHEMATIC DIAGRAM OF COOLING WATER SUPPLY & 0 09.01.15 KFR 24.01.15 MEC/02/40/9101/075B/0183 DT. 24.01.15 0
32 RETURN LINE FOR AIR CONDITION IN CONTROL ROOM BSP-BSL-10-075B-24-000-01-DE-02011 B I

COOLING WATER SUPPLY LINE FOR AIR CONDITION IN 0 09.01.15 KFR 24.01.15 MEC/02/40/9101/075B/0183 DT. 24.01.15 0
45 CONTROL ROOM BSP-BSL-10-075B-24-000-01-DE-02011A A I (add)
COOLING WATER RETURN LINE FOR AIR CONDITION IN BSP-BSL-10-075B-24-000-01-DE-02011B A 0 09.01.15 KFR 24.01.15 MEC/02/40/9101/075B/0183 DT. 24.01.15 0
46 CONTROL ROOM I (add)
MECHANICAL : -
33 DESIGN CALCULATION OF ARGON FILTER BSP-BSL-10-075B-24-003-01-DE-00001 B A 0 02.11.13 18.02.14 1 5.09.14 11.09.14 2 1.11.14 16.11.14 3 08.06.15 A 23.06.15 MEC/02/40/9101/075B/01268 DT. 23.06.15 3
34 GA DRAWING OF ARGON FILTER BSP-BSL-10-075B-24-003-01-DE-00002 B A 0 02.11.13 18.02.14 1 12.07.14 11.09.14 2 1.11.14 KFR 16.11.14 MEC/02/40/9101/075B/2372 DT. 13.11.14 2
35 DESIGN CALCULATION OF NITROGEN FILTER BSP-BSL-10-075B-24-002-01-DE-00003 B A 0 02.11.13 18.02.14 1 12.07.14 24.07.14 2 08.06.15 A 23.06.15 MEC/02/40/9101/075B/01268 DT. 23.06.15 2
36 GA DRAWING OF NITROGEN FILTER BSP-BSL-10-075B-24-002-01-DE-00004 B A 0 02.11.13 18.02.14 1 12.07.14 KFR 24.07.14 MEC/02/40/9101/075B/00207 DT. 24.07.14 1
37 DESIGN CALCULATION OF OXYGEN FILTER BSP-BSL-10-075B-24-001-01-DE-00005 B A 0 24.04.14 28.04.14 1 12.07.14 22.07.14 2 08.06.15 A 26.06.15 MEC/02/40/9101/075B/01296 DT. 26.06.15 2
38 GA DRAWING OF OXYGEN FILTER BSP-BSL-10-075B-24-001-01-DE-00006 B A 0 24.04.14 28.04.14 1 12.07.14 KFR 22.07.14 1
DATA SHEET, GA AND
39 DESIGN CALCULATIONS FOR SAFETY RELIEF BSP-BSL-10-075B-24-002-01-DE-00007 B A 0 1 06.01.14 03.02.14 2 1.09.14 A 6.09.14 MEC/02/40/9101/075B/1983 DT. 02.09.14 1,2
VALVE(NITROGEN)
DATA SHEET, GA AND
40 DESIGN CALCULATIONS FOR SAFETY RELIEF BSP-BSL-10-075B-24-001-01-DE-00008 B A 0 28.04.14 A 12.05.14 MEC/02/40/9101/075B/01156 DT. 12.05.14 0
VALVE(OXYGEN)
DATA SHEET, GA AND
41 DESIGN CALCULATIONS FOR SAFETY RELIEF BSP-BSL-10-075B-24-003-01-DE-00009 B A 0 1 02.01.14 A 18.01.14 1
VALVE(ARGON)
42 DATA SHEET & GA OF QUICK SHUT OFF VALVE(N2) BSP-BSL-10-075B-24-002-01-DE-00010 B A 0 25.06.13 A 30.08.13 0
43 DATA SHEET & GA OF QUICK SHUT OFF VALVE(O2) BSP-BSL-10-075B-24-001-01-DE-00011 B A 0 16.04.14 08.05.14 1 17.07.15 A 24.07.15 MEC/02/40/9101/075B/01469 DT. 24.07.15 1
44 DATA SHEET & GA OF QUICK SHUT OFF VALVE(AR) BSP-BSL-10-075B-24-003-01-DE-00012 B A 0 25.06.13 A 30.08.13 0
DATA SHEET & GA OF PRESSURE REGULATING VALVE BSP-BSL-10-075B-24-000-01-DE-00013 NR NR NR
DATA SHEET & GA OF MANUAL 0 25.06.13 A 02.07.13 0
45 ISOLATION VALVES(NITROGEN) BSP-BSL-10-075B-24-002-01-DE-00014 B A

DATA SHEET & GA OF MANUAL 0 16.04.14 1 15.05.15 A 25.05.15 MEC/02/40/9101/075B/01046 DT. 25.05.15 1
46 ISOLATION VALVES(OXYGEN) BSP-BSL-10-075B-24-001-01-DE-00015 B A

DATA SHEET & GA OF MANUAL


47 ISOLATION VALVES(ARGON) BSP-BSL-10-075B-24-003-01-DE-00016 B A 0 25.06.13 A 02.07.13 0

GA DRAWING FOR NON-FERROUS FITTINGS-OXYGEN 21.02.15 & 23.03.15 &


48 PRMS BSP-BSL-10-075B-24-001-01-DE-00017 B A 0 KFR 0
26.02.15 04.04.15

49 PIPING SUPPORT DETAILS DRAWING BSP-BSL-10-075B-24-000-40-DE-00018 B A 0 28.08.14 1 30.07.16 U/S 30.07.16 MEC/02/40/9101/075B/2048 DT. 15.09.14 0

50 QUALITY ASSURANCE PLAN FOR MECHANICAL ITEMS BSP-BSL-10-075B-24-000-01-DE-00019 B A 0 02.03.13 08.04.13 1 2 3 17.08.13 17.10.13 4 20.10.13 5 28.07.15 A 27.08.15 MEC/02/40/9101/075B/01685 DT. 27.08.15 5

DATA SHEET OF EQUALIZING VALVE-GLOBE FOR OXYGEN 0 16.04.13 A 08.05.13 MEC/02/40/9101/075B/01125 DT. 15.02.16 0
91 SERVICE BSP-BSL-10-075B-24-001-01-DE-00020 B I
DATA SHEET OF EQUALIZING VALVE-GLOBE FOR
90 NIROGEN SERVICE BSP-BSL-10-075B-24-001-01-DE-00021 B I 0 20.04.14 KFR 30.04.14 MEC/02/40/9101/075B/01031 DT. 30.04.14 0

47 LONG.SEC.DRG WITH SUPPORT DETAILS FOR ARG.PRMS BSP-BSL-10-075B-24-001-01-DE-00022 A A (add) 0 26.04.14 26.05.14 1 2 24.11.14 A 20.12.14 MEC/02/40/9101/075B/02631 DT. 20.12.2014 2
LONG.SEC.DRG WITH SUPPORT DETAILS FOR 0 13.05.14 30.05.14 1 28.08.14 2 30.07.16 U/S 30.07.16 1
92 NITROGEN.PRMS BSP-BSL-10-075B-24-001-01-DE-00023 B I

LONGITUDINAL SECTIONAL DRWING WITH SUPPORT 0 22.01.15 A 24.02.15 MEC/02/40/9101/075B/0389 DT. 24.02.15 0
48 DETAILS FOR OXYGEN PRMS. BSP-BSL-10-075B-24-001-01-DE-00024 A A (add)

51 DATA SHEET FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01001 A 0 3 08.10.12 26.10.12 4 10.06.13 A 17.06.13 4
52 GENERAL ASSEMBLY FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01002 A 1 08.10.12 26.10.12 3 10.06.13 A 17.06.13 3
53 ORIENTATION OF NOZZLES FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01003 A 1 08.10.12 26.10.12 2 10.06.13 A 17.06.13 2
54 MANHOLE DAVIT FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01004 I 0 08.10.12 KFR 29.10.12 0
55 EXTERNAL CLEATS FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01005 I 0 10.06.13 KFR 17.06.13 0
56 DESIGN OF 200 GO2 VESSEL FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01006 A 3 27.05.13 A 28.05.13 3
57 DESIGN OF LIFTING LUGS FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01007 A 0 08.10.12 29.10.12 1 27.12.12 KFR 16.01.13 1
58 DESIGN OF TAILING LUGS FOR 200 GO2 VESSEL BSP-BHPV-10-075B-24-001-01-DE-01008 A 0 27.12.13 KFR 16.01.13 0
59 DATA SHEET FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01009 A 3 05.09.12 20.09.12 5 28.12.12 A 10.01.13 5
60 GENERAL ASSEMBLY FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01010 A 1 12.10.12 26.10.12 3 10.06.13 A 18.06.13 3
61 ORIENTATION OF NOZZLES FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01011 A 0 12.10.12 26.10.12 1 10.06.13 A 18.06.13 1
62 MANHOLE DAVIT FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01012 I 0 31.08.12 KFR 26.10.12 0
63 EXTERNAL CLEATS FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01013 I 1 10.06.13 KFR 18.06.13 1
64 DESIGN OF 200 GN2 VESSEL FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01014 A 3 29.10.12 03.12.12 5 27.05.13 A 28.05.13 5
65 DESIGN OF LIFTING LUGS FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01015 A 1 12.10.12 26.10.12 3 10.06.13 KFR 18.06.13 3
66 DESIGN OF TAILING LUGS FOR 200 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01016 A 1 28.12.12 A 10.01.13 1
67 DATA SHEET FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01017 A 4 15.10.12 30.10.12 5 28.12.12 A 10.01.13 5
68 GENERAL ASSEMBLY FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01018 A 1 15.10.12 30.10.12 2 13.06.13 A 19.06.13 2
69 ORIENTATION OF NOZZLES FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01019 A 1 15.10.12 30.10.12 2 13.06.13 A 19.06.13 2
70 MANHOLE DAVIT FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01020 I 0 15.10.12 KFR 31.10.12 0
71 EXTERNAL CLEATS FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01021 I 1 10.6.13 KFR 18.06.13 1
72 DESIGN OF 100 GAR VESSEL FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01022 A 3 29.10.12 27.11.12 5 27.05.13 A 28.05.13 5
73 DESIGN OF LIFTING LUGS FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01023 A 0 15.10.12 KFR 31.10.12 0
74 DESIGN OF TAILING LUGS FOR 100 GAR VESSEL BSP-BHPV-10-075B-24-003-01-DE-01024 A 0 15.10.12 KFR 31.10.12 0
75 DATA SHEET FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01025 A 3 10.06.13 A 21.06.13 3
76 GENERAL ASSEMBLY FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01026 A 1 08.10.12 23.10.12 3 10.06.13 A 21.06.13 3

77 ORIENTATION OF NOZZLES FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01027 A 1 08.10.12 23.10.12 3 10.06.13 A 21.06.13 3

78 MANHOLE DAVIT FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01028 I 0 31.08.12 KFR 23.10.12 0


79 EXTERNAL CLEATS FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01029 I 0 18.06.13 KFR 21.06.13 0
80 DESIGN OF 65 GN2 VESSEL FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01030 A 1 08.10.12 23.10.12 2 27.05.13 A 28.05.13 2
81 DESIGN OF LIFTING LUGS FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01031 A 0 29.10.12 KFR 14.11.12 0
82 DESIGN OF TAILING LUGS FOR 65 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01032 A 0 31.08.12 KFR 23.10.12 0
83 DATA SHEET FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01033 A 1 29.10.12 A 1.02.13 3
84 GENERAL ASSEMBLY FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01034 A 1 29.10.12 A 09.02.13 1
85 ORIENTATION OF NOZZLES FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01035 A 1 29.10.12 A 09.02.13 1
86 MANHOLE DAVIT FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01036 I 0 29.01.12 KFR 31.10.12 0
87 EXTERNAL CLEATS FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01037 I 0 07.03.13 KFR 08.03.13 0
88 DESIGN OF FOR 16 GN2 VESSEL FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01038 A 4 27.05.13 A 28.05.13 4
89 DESIGN OF LIFTING LUGS FOR 16 GN2 VESSEL BSP-BHPV-10-075B-24-002-01-DE-01039 I 0 29.10.12 KFR 31.10.12 0

49 QUALITY ASSURANCE PLAN FOR ALL BUFFER VESSELS Q/QA/5586/SHEET 1 TO 7 A A (add) 0 20.11.12 A 28.12.12 0

50 Safety valve sizing calculation for 200 m3 GOX vessel BSP-BHPV-10-075B-24-001-01-DE-01040 A A (add) 0 27.12.12 16.01.13 KFR 04.07.13 MEC/02/40/9101/075B/01373 DT. 04.07.13 4
51 Safety valve sizing calculation for 200 m3 GAN vessel BSP-BHPV-10-075B-24-002-01-DE-01042 A A (add) 1 28.12.12 KFR 10.01.13 1
52 Safety valve sizing calculation for 100 m3 GAR vessel BSP-BHPV-10-075B-24-003-01-DE-01041 A A (add) 1 7.06.13 18.06.13 KFR 1
53 Safety valve sizing calculation for 65 m3 GAN vessel BSP-BHPV-10-075B-24-002-01-DE-01043 A A (add) 1 07.01.13 AAN 15.01.13 1
54 Safety valve sizing calculation for 16 m3 GAN vessel BSP-BHPV-10-075B-24-002-01-DE-01044 A A (add) 1 10.02.13 A 04.02.13 1
SCHEME FOR SRV & LRV VENT LINE OF OXYGEN, 0 22.06.15 30.06.15 KFR 29.08.15 MEC/02/40/9101/075B/01701 DT. 29.08.15 1
NITROGEN & ARGON PRMS. BSP-BSL-10-075B-24-001-01-DE-00025 A I (add)

INSTRUMENTATION & AUTOMATION : -

BASIC ENGINEERING -
94 P & I DIAGRAM OF ARGON PRMS SYSTEM BSP-BSL-10-075B-24-003-27-BE-03001 B B(A) 0 22.08.12 26.09.12 1 01.10.12 06.11.12 2 25.12.12 A 29.12.12 2
95 P & I DIAGRAM OF NITROGEN PRMS SYSTEM BSP-BSL-10-075B-24-002-27-BE-03002 B B(A) 0 22.08.12 26.09.12 1 01.10.12 06.11.12 2 25.12.12 A 29.12.12 2
96 P & I DIAGRAM OF OXYGEN PRMS SYSTEM BSP-BSL-10-075B-24-001-27-BE-03003 B B(A) 1 01.10.12 06.11.12 2 25.12.12 A 29.12.12 2
97 OPERATION AND CONTROL PHILOSOPHY BSP-BSL-10-075B-24-000-27-BE-03004 B B(A) 0 05.04.13 12.04.13 1 25.04.13 2 18.03.15 01.05.15 C 07.12.16 2
DETAIL ENGINEERING -
98 LIST OF INSTRUMENTS BSP-BSL-10-075B-24-000-27-DE-03005 B A 1 18.01.13 06.02.13 2 19.02.13 02.03.13 3 15.03.13 04.04.14 4 23.04.13 A 26.04.13 4
99 I/O LIST BSP-BSL-10-075B-24-000-27-DE-03006 B I 1 18.01.13 06.02.13 4 21.05.13 KFR 22.05.13 4
100 DATA SHEET OF PRESSURE TRANSMITTER BSP-BSL-10-075B-24-000-27-DE-03007 B A 1 31.05.13 29.06.13 2 11.10.13 A 28.10.13 2
101 DATA SHEET OF TEMPERATURE TRANSMITTER BSP-BSL-10-075B-24-000-27-DE-03008 B A 1 31.05.13 29.06.13 2 11.10.13 A 28.10.13 2
102 DATA SHEET OF TEMPERATURE ELEMENT BSP-BSL-10-075B-24-000-27-DE-03009 B A 1 06.06.13 15.06.13 2 11.11.13 A 04.12.13 2
103 DATA SHEET OF TEMPERATURE GAUGE BSP-BSL-10-075B-24-000-27-DE-03010 B A 2 28.09.13 A 07.10.13 2
104 DATA SHEET OF PRESSURE GAUGE BSP-BSL-10-075B-24-000-27-DE-03011 B A 2 28.09.13 A 07.10.13 2
DATA SHEET OF DIFFERENTIAL PRESSURE TRANSMITTE 1 06.06.13 29.06.13 2 11.10.13 A 30.10.13 2
105 R BSP-BSL-10-075B-24-000-27-DE-03012 B A
MEC/02/40/9101/075B/00207 DT. 15.02.16 &
106 DATA SHEET OF FLOW TRANSMITTER BSP-BSL-10-075B-24-000-27-DE-03013 B A 1 05.12.13 11.01.14 2 22.01.14 30.01.14 3 02.07.14 09.07.14 5 12.09.14 3.12.14 6 8.12.14 11.12.14 7 15.12.14 18.12.14 A 18.12.14 DT.24.07.15 , MEC/02/40/9101/075B/02613 DT. 7
18.12.2014
DATA SHEET FOR PRESSURE CONTROL VALVE(OXYGEN) 0 29.01.14 13.03.14 1 04.06.14 19.06.14 2 28.08.14 3 12.09.14 19.09.14 4 01.06.15 A 01.06.15 MEC/02/40/9101/075B/01126 DT. 01.06.15 4
107 (PCV-O2-01,PCV-O2-02) BSP-BSL-10-075B-24-001-27-DE-03014A B A
DATA SHEET FOR PRESSURE CONTROL VALVE(OXYGEN) 0 29.01.14 13.03.14 1 04.06.14 19.06.14 2 28.08.14 3 12.09.14 4 30.09.15 5 04.11.15 A 28.11.14 3
108 (PCV-O2-03, PCV-O2-04) BSP-BSL-10-075B-24-001-27-DE-03014B B A

GA DRAWING & SIZING CALCULATION FOR PRESSURE 0 29.01.14 13.02.14 1 04.06.14 19.06.14 2 28.08.14 3 12.09.14 4 04.11.15 KFR 28.11.14 3
109 CONTROL VALVE(OXYGEN) (PCV-O2-03, PCV-O2-04) BSP-BSL-10-075B-24-001-27-DE-03015B B I

GA DRAWING & SIZING CALCULATION FOR PRESSURE 0 29.01.14 13.02.14 1 04.06.14 19.06.14 2 28.08.14 3 12.09.14 KFR 19.09.14 MEC/02/40/9101/075B/2080 DT. 19.09.14 3
110 CONTROL VALVE(OXYGEN) (PCV-O2-01,PCV-O2-02) BSP-BSL-10-075B-24-001-27-DE-03015A B I

111 DATA SHEET FOR PRESSURE CONTROL VALVE(ARGON) BSP-BSL-10-075B-24-003-27-DE-03016 B A 1 19.09.13 3 24.12.13 03.01.14 4 09.04.14 A 23.04.14 MEC/02/40/9101/075B/00987 DT. 23.04.14 4
GA DRAWING & SIZING CALCULATION FOR PRESSURE 2 09.04.14 23.04.14 3 24.12.13 KFR 03.01.14 3
112 CONTROL VALVE(ARGON) BSP-BSL-10-075B-24-003-27-DE-03017 B I

DATA SHEET FOR PRESSURE CONTROL VALVE(NITROGEN


113 ) BSP-BSL-10-075B-24-003-27-DE-03018 B A 1 19.09.13 2 09.04.14 23.04.14 3 24.12.13 A 09.01.14 MEC/02/40/9101/075B/00987 DT. 23.04.14 4
GA DRAWING & SIZING CALCULATION FOR PRESSURE
114 CONTROL VALVE(NITROGEN) BSP-BSL-10-075B-24-003-27-DE-03019 B I 3 24.12.13 KFR 09.01.14 MEC/02/40/9101/075B/0073 DT. 09.01.14 3
115 DATA SHEET OF ORIFICE PLATE BSP-BSL-10-075B-24-000-27-DE-03020 B A 2 11.10.13 A 30.10.13 2
116 GA & SIZING CALCULATION OF ORIFICE PLATES BSP-BSL-10-075B-24-000-27-DE-03021 B I 0 26.06.13 KFR 17.07.13 0
58 DATA SHEET INSTRUMENT & CONTROL CABLE BSP-BSL-10-075B-24-000-27-DE-03022 A A (add) 0 21.07.15 29.08.15 1 30.01.16 A 13.02.16 MEC/02/40/9101/075B/0193 DT. 13.02.16 1
117 DATA SHEET OF DCS SYSTEM BSP-BSL-10-075B-24-000-27-DE-03023 B A 2 20.09.13 04.10.13 3 13.11.13 25.11.13 A 25.11.13 3
DATA SHEET OF AUTOMATION EQUIPMENTS (BROUGHT 2 28.09.14 14.01.13 3 15.02.14 07.03.14 4 14.03.14 24.03.14 5 22.01.15 A 14.02.15 MEC/02/40/9101/075B/0304 DT. 14.02.15 5
118 OUT ITEMS)-FF CABLE BSP-BSL-10-075B-24-000-27-DE-03024 B A

119 DCS SYSTEM CONFIGURATION DIAGRAM BSP-BSL-10-075B-24-000-27-DE-03025 B A 3 13.11.13 16.12.13 4 15.02.14 07.03.14 5 14.08.14 A 14.08.14 MEC/02/40/9101/075B/1827 DT. 14.08.14 4
120 GA & BOM OF DCS PANEL BSP-BSL-10-075B-24-000-27-DE-03026 B A 0 14.03.14 02.04.14 4 A 6.03.14 4
56 GA & BOM OF DCS PANEL(WORK STATION CONSOLE) BSP-BSL-10-075B-24-000-27-DE-03026(A) A I (add) 0 22.01.15 20.02.15 1 04.03.15 KFR 16.03.15 MEC/02/40/9101/075B/0509 DT. 16.03.15 1
MODULE WIRING DIAGRAM & POWER SUPPLY DIAGRAM 0 13.03.14 02.04.13 1 14.04.14 30.06.14 2 23.07.14 28.08.14 C 28.08.14 MEC/02/40/9101/075B/1915 DT. 27.08.14 2
121 OF DCS PANEL BSP-BSL-10-075B-24-000-27-DE-03027 B I

122 DCS SOFTWARE DOCUMENTS BSP-BSL-10-075B-24-000-27-DE-03028 B I 0 14.03.14 02.04.14 1 02.01.15 23.01.15 2 04.03.15 24.03.15 3 15.04.15 KFR 15.04.15 3
123 DCS FAT PROCEDURE BSP-BSL-10-075B-24-000-27-DE-03029 B I 0 14.03.14 30.06.14 1 02.01.15 04.02.15 2 04.03.15 30.03.15 3 15.04.15 4 08.08.15 KFR 20.08.15 MEC/02/40/9101/075B/01604 DT. 18.08.15 4
124 DCS GRAPHIC PAGES BSP-BSL-10-075B-24-000-27-DE-03030 B I 0 21.02.15 11.03.15 1 08.08.15 KFR 20.08.15 MEC/02/40/9101/075B/01604 DT. 18.08.15 1
59 LIST OF SYSTEM & APPLICATION SOFTWARES BSP-BSL-10-075B-24-000-27-DE-03031 A I (add) 0 30.01.16 KFR 30.01.16 0
60 SAFETY LOGIC AND INTERLOCKING DIAGRAM BSP-BSL-10-075B-24-000-27-DE-03032 A I (add) 0 21.04.15 01.05.15 C 01.05.15 0
INSTRUMENT WIRING DIAGRAM BSP-BSL-10-075B-24-000-27-DE-03033 NR NR NR
125 INSTRUMENT & CONTROL CABLE SCHEDULE BSP-BSL-10-075B-24-000-27-DE-03034 B I 0 22.05.15 28.05.15 1 22.06.15 06.07.15 2 21.07.15 KFR 24.07.15 MEC/02/40/9101/075B/01469 DT. 24.07.15 2

Page 2 of 11
1st Submission 2nd Submission 3rd Submission 4th Submission 5th Submission 6th Submission 7th Submission Final Status
Billing sch
Approved /
Drawing Drawing Description Drawing No Category
list SNo.
Additiona Rev No Submitted Comments Rev No Submitted Comments Rcvd Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Rev No Submitted Comments Status Code Date REF. MECON LETTER NO. Rev No
On Rcvd On On On On Rcvd On On Rcvd On On Rcvd On On Rcvd On On Rcvd On
l

126 INSTRUMENT LOCATION & CABLE TRAY LAYOUT BSP-BSL-10-075B-24-000-27-DE-03035 B I 0 08.11.14 8.12.14 1 27.05.15 08.06.15 2 22.06.15 KFR 06.07.15 MEC/02/40/9101/075B/01346 DT. 06.07.15 2
127 PROCESS HOOK-UP DIAGRAM WITH BOQ BSP-BSL-10-075B-24-000-27-DE-03036 B I 0 08.11.14 3.12.14 1 01.01.15 KFR 05.01.15 1
PNEUMATIC HOOK-UP DIAGRAM WITH BOQ BSP-BSL-10-075B-24-000-27-DE-03037 NR NR NR
61 INSTRUMENT CABLE & JUNCTION BOX SCHEDULE BSP-BSL-10-075B-24-000-27-DE-03038 A I (add) 0 30.01.16 KFR 16.02.16 MEC/02/40/9101/075B/0273 DT. 27.02.16 0
128 QUALITY ASSURANCE PLAN FOR INSTRUMENT ITEMS BSP-BSL-10-075B-24-000-27-DE-03039 B A 4 7.11.13 A 25.11.13 4
62 OPERATION & MAINTAINANCE MANUAL BSP-BSL-10-075B-24-000-27-DE-03040 A I (add) NS
TEST CERTIFICATES OF INSTRUMENT ITEMS BSP-BSL-10-075B-24-000-27-DE-03041 NR NR NR
129 EARTHING SCHEME FOR AUTOMATION SYSTEM BSP-BSL-10-075B-24-000-27-DE-03042 B I 2 28.09.13 KFR 17.10.13 2
130 POWER SUPPLY & SLD FOR ALL INSTRUMENTS BSP-BSL-10-075B-24-000-27-DE-03043 B I 2 28.09.13 2.11.13 3 15.02.14 24.02.14 5 23.07.14 KFR 25.08.14 MEC/02/40/9101/075B/1877 DT. 23.08.14 5
LOAD LIST FOR ALL INSTRUMENTS BSP-BSL-10-075B-24-000-27-DE-03045 NR NR NR
DATA SHEET OF PC'S PRINTER ETHERNET SW &
131 NETWORK COMPONENTS BSP-BSL-10-075B-24-000-27-DE-03046 B I 0 20.04.13 22.05.13 1 20.09.13 10.10.13 2 13.11.13 3 15.03.14 19.03.14 5 18.07.14 KFR 24.07.14 MEC/02/40/9101/075B/1718 DT. 24.07.14 5
132 DCS HARDWARE DESIGN MANUAL BSP-BSL-10-075B-24-000-27-DE-03047 B I 0 02.01.15 23.01.15 1 04.03.15 14.03.15 2 15.04.15 3 08.08.15 KFR 20.08.15 MEC/02/40/9101/075B/01604 DT. 18.08.15 3
133 LOOP DIAGRAM OF INSTRUMENTS BSP-BSL-10-075B-24-000-27-DE-03048 B I 0 28.06.1325.07.14 / 10.01.15 1 12.03.15 KFR 03.09.15 MEC/02/40/9101/075B/1720 DT.03.09.2015 2
PROPOSED POWER CABLE LAYING ROUTE FOR BUFFER
160 VESSELS & PRMS (INCOMING TO PDB) BSP-BSL-10-075B-24-000-27-DE-03049 B I 0 01.01.15 22.01.15 1 04.03.15 KFR 20.03.15 MEC/02/40/9101/075B/0558 DT. 20.03.15 1
DN 40 DRINKING WATER LINE FOR BUFFER VESSEL &
93 PRMS CONTROL ROOM. BSP-BSL-10-075B-24-000-27-DE-03050 B I 0 05.01.15 22.01.15 1 18.02.15 KFR 21.02.15 MEC/02/40/9101/075B/0378 DT. 21.02.15 1
134 DCS INPUT/OUTPUT ASSIGNMENT BSP-BSL-10-075B-24-000-27-DE-03051 B I 0 21.02.15 KFR 11.03.15 MEC/02/40/9101/075B/0471 DT. 11.03.15 0
135 DCS TERMINAL ASSIGNMENT DIAGRAMS BSP-BSL-10-075B-24-000-27-DE-03052 B I 0 21.02.15 KFR 11.03.15 MEC/02/40/9101/075B/0471 DT. 11.03.15 0
136 FF SEGMENT DETAILS BSP-BSL-10-075B-24-000-27-DE-03077 B I 0 22.01.15 12.02.15 1 04.03.15 KFR 16.03.15 MEC/02/40/9101/075B/0509 DT. 16.03.15 1
ELECTRICAL: -
BASIC ENGINEERING -
137 ELECTRICAL LOAD LIST BSP-BSL-10-075B-24-000-25-BE-03044 B B(A) 1 28.09.12 A 12.10.12 1
138 SINGLE LINE DIAGRAM FOR PDB SCHEME BSP-BSL-10-075B-24-000-25-BE-03049 B B(A) 1 17.10.13 30.10.12 2 17.10.12 A 29.11.12 2
139 SINGLE LINE DIAGRAM FOR LDB SCHEME BSP-BSL-10-075B-24-000-25-BE-03050 B B(A) 2 17.10.12 A 29.11.12 2
DETAIL ENGINEERING

140 BOM, GA , WIRING DIAGRAM OF PDB BSP-BSL-10-075B-24-000-25-DE-03051 B A 1 10.10.13 30.10.13 3 03.01.14 A 21.01.14 3

141 GA OF LDB, SLDB, SWITCH BOARD BSP-BSL-10-075B-24-000-25-DE-03052 B A 1 10.10.13 30.10.13 3 03.01.14 A 21.01.14 3
142 SLD OF SLDB, SWITCH BOARD BSP-BSL-10-075B-24-000-25-DE-03053 B A 1 18.10.13 A 30.10.13 1
143 WIRING DIAGRAM OF LDB, SLDB, SWITCH BOARD BSP-BSL-10-075B-24-000-25-DE-03054 B I 1 10.10.13 30.10.13 2 03.01.14 KFR 21.01.14 2
LOAD CALCULATION OF LDB, SLDB, SWITCH BOARD BSP-BSL-10-075B-24-000-25-DE-03055 NR NR NR
144 EARTHING SYSTEM CALCULATION BSP-BSL-10-075B-24-000-25-DE-03056 B A 0 8.11.14 18.12.14 1 17.12.14 09.01.15 2 04.02.16 A 27.02.16 MEC/02/40/9101/075B/0273 DT. 27.02.16 2
145 EARTHING SYSTEM LAYOUT & BOM BSP-BSL-10-075B-24-000-25-DE-03057 B I 0 12.12.13 28.12.13 1 8.11.14 18.12.14 2 12.01.15 KFR 12.02.15 MEC/02/40/9101/075B/0309 DT. 12.02.15 2
57 EARTHING SYSTEM CALCULATION(Buffer Vessel Area) BSP-BSL-10-075B-24-000-25-DE-03056A A A (add) 0 17.12.14 09.01.15 1 02.02.15 A 14.02.15 MEC/02/40/9101/075B/0304 DT. 14.02.15 1

161 EARTHING SYSTEM LAYOUT FOR BUFFER VESSEL AREA BSP-BSL-10-075B-24-000-31-DE-03057A B I 0 17.12.14 09.01.15 1 02.02.15 KFR 14.02.15 MEC/02/40/9101/075B/0304 DT. 14.02.15 1
LIGHTING SYSTEM DESIGN & CALCULATION WITH 0 15.02.14 05.03.14 1 19.04.14 13.05.14 3 08.11.14 24.11.14 AAN 24.11.14 3
146 FITTINGS BSP-BSL-10-075B-24-000-31-DE-03058 B A

147 LIGHTING SYSTEM LAYOUT & BOM BSP-BSL-10-075B-24-000-31-DE-03059 B I 0 15.02.14 05.03.14 1 19.04.14 13.05.14 3 08.11.14 KFR 24.11.14 MEC/02/40/9101/075B/2425 DT. 24.11.14 3
LIGHTNING PROTECTION LAYOUT WITH DESIGN
148 CALCULATION BSP-BSL-10-075B-24-000-25-DE-03060 B I 1 08.11.14 24.11.14 2 04.02.16 KFR 26.02.16 MEC/02/40/9101/075B/0273 DT. 27.02.16 2
149 DATA SHEET & BOM OF UPS SYSTEM BSP-BSL-10-075B-24-000-25-DE-03061 B A 0 17.04.13 26.04.13 2 28.08.13 A 20.09.13 2
150 GA OF UPS SYSTEM BSP-BSL-10-075B-24-000-25-DE-03062 B A 0 17.04.13 26.04.13 2 28.08.13 KFR 20.09.13 2
151 SLD OF UPS SYSTEM BSP-BSL-10-075B-24-000-25-DE-03063 B A 0 17.04.13 26.04.13 2 28.08.13 A 20.09.13 2
152 WIRING, DISPLAY DETAILS OF UPS SYSTEM BSP-BSL-10-075B-24-000-25-DE-03064 B I 0 17.04.13 26.04.13 2 28.08.13 KFR 20.09.13 2
BATTERY SIZING CALCULATION & BATTERY RACK GA OF
153 UPS SYSTEM BSP-BSL-10-075B-24-000-25-DE-03065 B I 0 17.04.13 26.04.13 2 28.08.13 KFR 20.09.13 2
CABLE TRENCH LAYOUT BSP-BSL-10-075B-24-000-25-DE-03066 NR NR NR
POWER CABLE SIZING CALCULATION BSP-BSL-10-075B-24-000-25-DE-03067 NR NR NR
154 POWER CABLE SCHEDULE BSP-BSL-10-075B-24-000-25-DE-03068 B A 0 08.11.14 C
155 DATA SHEET OF FDA SYSTEM BSP-BSL-10-075B-24-000-32-DE-03069 B A 0 27.04.15 01.06.15 1 29.06.15 09.07.15 2 21.07.15 01.08.15 3 26.08.15 03.09.15 4 30.09.15 A 05.10.15 MEC/02/40/9101/075B/01888 DT. 05.10.15 4
156 GA, LAYOUT & WIRING DIAGRAM OF FDA SYSTEM BSP-BSL-10-075B-24-000-32-DE-03070 B I 0 27.04.15 01.06.15 1 29.06.15 A 09.07.15 MEC/02/40/9101/075B/01374 DT. 09.07.15 (KFR) 1
157 EQUIPMENT LAYOUT FOR CONTROL ROOM BSP-BSL-10-075B-24-000-25-DE-03071 B A 0 04.02.13 14.03.13 1 25.03.13 08.04.13 2 30.4.13 22.05.13 3 07.06.13 A 08.06.13 3
158 QUALITY ASSURANCE PLAN FOR ELECTRICAL ITEMS BSP-BSL-10-075B-24-000-25-DE-03072 B A 0 02.03.13 14.03.13 1 05.06.13 15.06.13 2 28.06.13 A 07.07.13 2
159 Data Sheet for Power & Control Cable. BSP-BSL-10-075B-24-000-25-DE-03073 B A 0 15.02.14 05.03.14 1 16.04.14 08.05.14 2 02.07.14 A 10.07.14 2
63 DATA SHEET OF LIGHTING FIXTURE BSP-BSL-10-075B-24-000-27-DE-03074 A A (add) 0 16.04.14 A 02.05.14 0
DETAILED CONNECTIVITY DIAGRAM FROM OPC SERVER
64 TO PWN (Plant Wide Area network - CEMS showing BSP-BSL-10-075B-24-000-27-DE-03078 A I (add) NS
necessary interface)

ADDITIONAL DRAWING :

STRUCTURAL DESIGN CALCULATION OF T & TR


SUPPORTS BSP-BHPV-10-075B-24-003-40-DE-5031/C A KFR 15.04.15

STRUCTURAL CALCULATION FOR DUCT FOOT SUPPORT KFR 5.6.15


BSP-BSL-10-075B-24-003-40-DE-5039/1 A
OF PIPE SUPPORT IN O2 PRMS
DATA SHEET FOR PCV (OXYGEN) DN 50 MM BSP-BSL-10-075B-24-000-27-DE-0314 B A RE-A 18.12.15

GA DRAWING & SIZING CALCULATION FOR


BSP-BSL-10-075B-24-000-27-DE-0315 B A RE-A 18.12.15
PCV(OXYGEN) DN 50MM

STRUCTURAL DESIGN CALCULATION OF TW17 BSP-BHPV-10-075B-24-003-40-DE-5034/C A KFR


APPRO
AAN /
TOTAL SUBMITTED VED / KFRN COMMENTED U/S BAL
KFR
BASIC ENGG(Appl.Cat.) 12 12 10 0 1 1 0
DETAIL ENGINEERING
APPROVAL CATEGORY 91 91 86 1 2 2 0

REFERANCE CATEGORY 58 58 56 0 1 1 0

ADDITIONAL DRAWING

APPROVAL CATEGORY 50 50 47 2 1 0 0

REFERANCE CATEGORY 14 12 11 0 1 0 2

Page 3 of 11
Drawing Receiving Status(Hard Copy)
10 set AS 10 set as
Drg. Scope CD
DRAWING
HARD COPY Billing Status approved AVAILABILI built dwg scan status MAKING
REV STATUS OF DRG REMARKS NO OF SHEET BHPV / BSL STATUS
RECEIVING STATUS dwg status TY STATUS status

2&5 APPROVED WITH MECHANICAL B-01 1 BSL


BSL
3 APPROVED WITH MECHANICAL B-01 1 BSL

1 APPROVED 11 B-01 1 BSL

1 AAN B-01 BSL


1/2 RE-APPROVED 1,3,4 B-01 1 BSL DONE
0 APPROVED 1,2,3,4 B-01 2 BSL DONE
BSL

NA BSL

1 APPROVED 1 B-01 2 BSL DONE

BSL

NR BHPV

NR BHPV

NR BHPV

NR BHPV

NR BHPV

1 APPROVED 1 B-01 BSL DONE


0 APPROVED B-01 BSL
BSL
1 APPROVED 1 B-01 BSL

0 APPROVED 1 B-01 BSL

0 APPROVED 2 B-01 BSL

0 APPROVED 3 B-01 BSL


(1,9,10,11,13,15,16,19 BSL
0 APPROVED ,18,17 B-01

2 KFR 11 B-01 BSL

0 APPROVED 15 B-01 BSL

0 APPROVED 16 B-01 BSL

1 APPROVED 13 B-01 BSL

0 KFR 17 B-01 BSL

0 KFR 18 B-01 BSL

0 KFR 19 B-01 BSL

1,2,3,4,5,6,7,8,9,10,11 BSL
0 APPROVED ,12 B-01

2 KFR BSL

0 KFR 9 B-01 BSL

1 APPROVED B-01 BSL

0 APPROVED B-01 BSL

0 APPROVED B-01 BSL

0 KFR B-01 BSL

2 KFR 7 B-01 BSL

3&3 APPROVED 1,2 B-01 6 BSL

2 APPROVED 1,2,3 B-01 6 BSL

2 APPROVED (1,2) B-01 6 BSL

0 APPROVED (1,2,3),(1,2,3) B-01 6 BSL

0 APPROVED (1,2,3),(1,2,3) B-01 BSL

1 KFR 1,2,3 B-01 7 BSL


1 KFR 1,2,3 B-01 7 BSL
1 KFR 1 B-01 7 BSL
1 KFR 1,2,3 B-01 3 BSL

1 KFR 1,2,3 B-01 3 BSL

0 KFR 1,2,3 B-01 3 BSL

0 KFR 1 B-01 BSL

0 KFR 1 B-01 BSL


0 KFR 1 B-01 BSL
0 KFR 1 B-01 BSL
0 KFR 1 B-01 BSL
3 APPROVED 1,1 B-01 BSL
NA BSL
1 APPROVED RE-1 AVAILABLE 1,2,3 B-01 BSL
RE-1 AVAILABLE FOR 2
0 KFR (1,2),(1) B-01 BSL
SHEET

4 APPROVED 1,2,3 B-01 BSL

4 APPROVED 1,2,3 B-01 BSL

0 KFR 1,2,3,4 B-01 BSL

0 KFR B-01 BSL

0 KFR 1,2,3 B-01 BSL

2 KFR BSL

4 APPROVED 1,2,3 B-01 BSL

0 KFR 1,2 B-01 BSL

0 B-01 BSL

1 APPROVED 1 B-01 BSL

0 KFR 1 B-01 BSL


2 KFR B-01 BSL
2 KFR B-01 BSL
2 KFR B-01 BSL
2 APPROVED (1,2,3),(3),(3) B-01 BSL
4 APPROVED B-01 BSL

1 KFR (1,2),(3),(3) B-01 BSL

2 KFR B-01 BSL


0 KFR B-01 BSL
Not claim due
0 KFR B-01 to doble claim BSL
of dwg.-3023
1 APPROVED 3,(1,2,3) B-01 BSL

1 APPROVED B-01 BSL

1 APPROVED B-01 BSL

0 KFR (1,2,3),(3) B-01 BSL

0 KFR B-01 BSL

0 KFR B-01 BSL

Page 4 of 11
Drawing Receiving Status(Hard Copy)
10 set AS 10 set as
Drg. Scope CD
DRAWING
HARD COPY Billing Status BHPV / BSL approved AVAILABILI built dwg scan status MAKING
REV STATUS OF DRG REMARKS NO OF SHEET dwg status TY STATUS status STATUS
RECEIVING STATUS

0 KFR 2,(2,3) B-01 BSL


1 APPROVED B-01 BSL
0 KFR 1,2,3 B-01 BSL

0 KFR B-01 BSL

2 APPROVED 1 B-01 BSL

3 APPROVED 1 B-01 4 BSL

6 APPROVED 1 B-01 4 BSL


3 APPROVED 1,2 B-01 4 BSL
3 APPROVED 1,2 B-01 5 BSL
BSL
BSL
1 KFR B-01 5 BSL
3 APPROVED B-01 5 BSL
2 APPROVED 1,2 B-01 BSL

2 APPROVED 1 B-01 BSL

0 KFR 1 B-01 6 BSL

0 KFR 1 B-01 BSL

0 KFR 1 B-01 BSL

3 APPROVED B-01 3 BSL


2 APPROVED 1 B-01 3 BSL
2 APPROVED B-01 3 BSL
1 KFR 1 B-01 3 BSL
2 APPROVED B-01 6 BSL
1 KFR 2 B-01 5 BSL

2 APPROVED B-01 3 BSL

0 A B-01 5 BSL

1 KFR B-01 3 BSL

2 BSL
1 APPROVED B-01 7 BSL
0 APPROVED B-01 2 BSL
BSL

0 APPROVED B-01 2 BSL

0&1 KFR B-01 5 BSL

0 APPROVED B-01 2 BSL

0 KFR B-01 5 BSL

0 AAN 1 B-01 BSL


RE- 3 3 BSL
5 B-01
APPROVED
0 APPROVED 3 B-01 6 BSL

0 KFR 2 B-01 6 BSL

2 APPROVED 1 B-01 BSL

1 AAN 1,2,3 B-01 BSL

0 APPROVED 1,2 B-01 BSL


NR BHPV
3 APPROVED B-01 BHPV
NR BHPV
NR BHPV
NR BHPV
3 KFR B-01 BHPV
NR BHPV
NR BHPV
5 APPROVED B-01 BHPV
1 APPROVED B-01 BHPV
1 APPROVED B-01 BHPV
NR BHPV
NR BHPV
NR BHPV
0 KFR B-01 BHPV
NR BHPV
5 APPROVED B-01 BHPV
1 APPROVED B-01 BHPV
NR BHPV
NR BHPV
NR BHPV
NR BHPV
NR BHPV
0 KFR B-01 BHPV
2 APPROVED B-01 BHPV
2 APPROVED B-01 BHPV

NR BHPV

NR BHPV
NR BHPV
NR BHPV
NR BHPV
NR BHPV
3 APPROVED B-01 BHPV
1 APPROVED B-01 BHPV
NR BHPV
NR BHPV
NR BHPV
NR BHPV
NR BHPV

NR BHPV

4 KFR RE-A AVAILABLE 3 B-01 BSL


1 KFR B-01 BSL
NA BSL
BSL
BSL
1 KFR 1 B-01 BSL

2 APPROVED 1 B-01 1 BSL


2 APPROVED 1 B-01 1 BSL
2 APPROVED 1 B-01 1 BSL
BSL

4 APPROVED B-01 1 BSL


4 KFR B-01 3 BSL
2 APPROVED B-01 2 BSL
2 APPROVED B-01 2 BSL
2 APPROVED B-01 2 BSL
1 APPROVED B-01 2 BSL
1 APPROVED B-01 2 BSL
2 APPROVED B-01 2 BSL

7 APPROVED B-01 5 BSL

4 APPROVED B-01 6 BSL

3 APPROVED B-01 5 BSL

3 KFR B-01 5 BSL

3 KFR B-01 5 BSL

4 APPROVED B-01 3 BSL

NA 3 BSL

4 APPROVED B-01 3 BSL

3 BSL
2 APPROVED B-01 2 BSL
1 KFR B-01 2 BSL
1 APPROVED B-01 BSL
3 APPROVED B-01 2&3 BSL
5 APPROVED B-01 5 BSL
5 APPROVED 2,3 B-01 3 BSL
4 APPROVED 1,2,3,4 B-01 3 BSL
1 KFR B-01 BSL

NA BSL
3 KFR B-01 5 BSL
4 KFR B-01 7 BSL
1 KFR B-01 7 BSL
BSL
BSL
BSL
2 KFR B-01 7 BSL

Page 5 of 11
Drawing Receiving Status(Hard Copy)
10 set AS 10 set as
Drg. Scope CD
DRAWING
HARD COPY Billing Status BHPV / BSL approved AVAILABILI built dwg scan status MAKING
REV STATUS OF DRG REMARKS NO OF SHEET dwg status TY STATUS status STATUS
RECEIVING STATUS

2 KFR 1,2,3 B-01 7 BSL


1 KFR B-01 5 BSL
BSL
0 KFR B-01 BSL
4 APPROVED B-01 2 BSL
BSL
BSL
2 KFR 3 BSL
5 KFR B-01 5 BSL
BSL
5 KFR B-01 7 BSL
3 KFR B-01 7 BSL
2 KFR B-01 7 BSL
1 KFR 1 B-01 6 BSL

1 KFR 1 B-01 6 BSL


0 KFR B-01 6 BSL
0 KFR B-01 6 BSL
1 KFR B-01 BSL

1 APPROVED B-01 1 BSL


2 APPROVED 1 B-01 1 BSL
2 APPROVED 1 B-01 1 BSL

3,4,5,6,7,8,9,10,11,12, 3 BSL
3 APPROVED 13,14,15 B-01

3 APPROVED 5,6,7,8,10 B-01 3 BSL


1 APPROVED 2,3 B-01 3 BSL
3 KFR 2,3,4,5,6 B-01 3 BSL
BSL
2 A B-01 7 BSL
2 KFR 1,2,3,4 B-01 5 BSL
1 APPROVED B-01 BSL

1 KFR 1 B-01 6 BSL

BSL
3 KFR 1,2 B-01 5 BSL
2 KFR 1 B-01 7 BSL
2 APPROVED B-01 2 BSL
2 KFR B-01 2 BSL
2 APPROVED B-01 2 BSL
2 KFR B-01 2 BSL
2 KFR B-01 2 BSL
BSL
BSL
BSL
4 APPROVED B-01 7 BSL
1 APPROVED B-01 7 BSL
3 APPROVED 2 BSL
2 APPROVED B-01 2 BSL
2 APPROVED B-01 5 BSL
0 APPROVED B-01 BSL

BSL

0 KFR B-01

0 KFR B-01

Page 6 of 11
DRAWING PROGRESS MONITOR
: INSTALLATION OF BUFFER VESSEL AND PRESSURE REDUCING &
PROJECT NAME METERING STATION FOR OXYGEN,NITROGEN ARGON , PACKAGE 75B, AT
PROJECT NO BHILAI STEEL PLANT, BHILAI.
: DGM/PCC/TK/2012/361
CLIENT : BHILAI STEEL PLANT BHILAI : 07.07.2012
CONSULTANT : MECON : 07.07.2013
Status As on date-02.08.16
Status
SNo. Drawing Description Drawing No Category Status Date Rev No
Code

195 OPERATION & MAINTAINANCE MANUAL BSP-BSL-10-075B-24-000-27-DE-03040 I (add) NS


DETAILED CONNECTIVITY DIAGRAM FROM OPC SERVER TO
237 PWN (Plant Wide Area network - CEMS showing necessary BSP-BSL-10-075B-24-000-27-DE-03078 I (add) NS
interface)
REMARKS
DRAWING PROGRESS MONITOR

PROJECT NAME INSTALLATION OF BUFFER VESSEL AND PRESSURE REDUCING & METERING STATION FOR OXYGEN,NITROGEN
ARGON , PACKAGE 75B, AT BHILAI STEEL PLANT, BHILAI.
PROJECT NO DGM/PCC/TK/2012/361
CLIENT BHILAI STEEL PLANT BHILAI
CONSULTANT MECON
Status As on date-02.08.16
Status
SNo. Drawing Description Drawing No Category
Status Code Date Rev No

2 COMISSIONING AND START UP PROCEDURE BSP-BSL-10-075B-24-000-000-BD-07002 B(A) U/S 30.03.13 0


DRAWING PROGRESS MONITOR
: INSTALLATION OF BUFFER VESSEL AND PRESSURE REDUCING & METERING STATION FOR
PROJECT NAME OXYGEN,NITROGEN ARGON , PACKAGE 75B, AT BHILAI STEEL PLANT, BHILAI.
PROJECT NO : DGM/PCC/TK/2012/361
CLIENT : BHILAI STEEL PLANT BHILAI : 07.07.2012
CONSULTANT : MECON : 07.07.2013
Status As on date-02.08.16
Status
SNo. Drawing Description Drawing No Category Status
Code Date Rev No REMARKS

OVERALL CIVIL LAYOUT FOR BUFFER VESSEL AND PRMS


5 STATION BSP-BSL-10-075B-24-000-32-DE-06002 A AAN 08.05.13 1 RE-SUBMITTED
GENERAL ARRANGEMENT, PLAN SECTION AND DETAILS OF
9 FOUNDATION OF EQUIPMENTS BSP-BSL-10-075B-24-000-32-DE-06006 A C 28.04.14 0 NA
44 Structural Design Calculation of 'T'&'TR' supports BSP-BHPV-10-075B-24-003-40-DE-05013 A (add) AAN 13.02.14 1 NA
100 PIPING SUPPORT DETAILS DRAWING BSP-BSL-10-075B-24-000-40-DE-00018 A AAN 15.09.14 0 RE-SUBMITTED
105 LONG.SEC.DRG WITH SUPPORT DETAILS FOR NITROGEN.PRMS BSP-BSL-10-075B-24-001-01-DE-00023 I AAN 16.09.14 1 RE-SUBMITTED
156 OPERATION AND CONTROL PHILOSOPHY BSP-BSL-10-075B-24-000-27-BE-03004 B(A) C 01.05.15 2 A
182 MODULE WIRING DIAGRAM & POWER SUPPLY DIAGRAM OF DCS BSP-BSL-10-075B-24-000-27-DE-03027 I C 28.08.14 2
PANEL NA
187 SAFETY LOGIC AND INTERLOCKING DIAGRAM BSP-BSL-10-075B-24-000-27-DE-03032 I (add) C 01.05.15 0 A
220 LIGHTING SYSTEM DESIGN & CALCULATION WITH FITTINGS BSP-BSL-10-075B-24-000-31-DE-03058 A AAN 24.11.14 3 A
230 POWER CABLE SCHEDULE BSP-BSL-10-075B-24-000-25-DE-03068 A C A

10 OF 11
DRAWING P R O G R: EINSTALLATION
S S M O OF N BUFFER
I T O R(HARD COPY
VESSEL AND NOT
PRESSURE AVAILABLE)
REDUCING & METERING
PROJECT NAME STATION FOR OXYGEN,NITROGEN ARGON , PACKAGE 75B, AT BHILAI STEEL PLANT,
PROJECT NO : DGM/PCC/TK/2012/361 BHILAI.
CLIENT : BHILAI STEEL PLANT BHILAI : 07.07.2012
CONSULTANT : MECON : 07.07.2013
Status As on date-02.08.16
Status
SNo. Drawing Description Drawing No Category Status
Date Rev No
Code REMARKS

Structural Design Calculation of 'T'&'TR'


44
supports
BSP-BHPV-10-075B-24-003-40-DE-05013 A (add) AAN 13.02.14 1
Safety valve sizing calculation for 100 m3 GAR
149 vessel BSP-BHPV-10-075B-24-003-01-DE-01041 A (add) KFR 1
GA DRAWING & SIZING CALCULATION FOR
171 PRESSURE CONTROL VALVE(ARGON) BSP-BSL-10-075B-24-003-27-DE-03017 I KFR 03.01.14 3