Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
NO. OF GIRDERS= 8
NO. OF DIAPHRAGMS= 4
(i) be=Span/4.0
be= 7475 mm
be= 2340 mm
INPUT DATA
Span 29.9m
B1 = 600 mm
B2 = 600 mm
B3 = 200 mm
B4 = 0 mm
St = 170 mm D1
D1 = 1330 mm
D2 = 100 mm
D3 = 150 mm
file:///conversion/tmp/scratch/371156400.xlsx
D4 = 0 mm
D5 = 150 mm
D6 = 225 mm
0.0
500.0
400.0
300.0
200.0
100.0
100.0
200.0
300.0
400.0
500.0
GIRDER SECTION
file:///conversion/tmp/scratch/371156400.xlsx
OUTPUT COMPOSITE SECTION
AREA (Ax) = 660000 mm2
AREA (Reduced) = 643911.00408 mm2
y' LOCATON OF N.A FROM BOTTOM = 850.67512017 mm
M.O.I (Ix) (Iz) = 178773949126 mm4
M.O.I (Iy) = 27452756779 mm4
SHEAR AREA (Ay) (Web) = 300000 mm2
SHEAR AREA (Az) (Flang) = 204000 mm2
SECTION MODULUS (BOTTOM) Zb = 0.2102 m3
SECTION MODULUS (TOP) Zt = 0.2753 m3
file:///conversion/tmp/scratch/371156400.xlsx
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
B1 St
D2
D3
D4
B4
B3
file:///conversion/tmp/scratch/371156400.xlsx
D5
D6
B2
= 4 Ksi
= 4.79 Ksi
= 5 Ksi
file:///conversion/tmp/scratch/371156400.xlsx
ONLY GIRDER
= 456000 mm2
= 456000 mm2
= 618.125 mm
= 93818496875 mm4
= 8320000000 mm4
= 266000 mm2
=
= 0.1518 m3
= 0.1318 m3
C B/T
905104670 6.50
1028112594 3.92
1880000000 3.53
4155432128 2.17
7968649391.843 mm 4
file:///conversion/tmp/scratch/371156400.xlsx
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
CALCULATION OF LOSSES
Es = 28000000 (psi)
193192561.79543 (KN/m2)
Eci = 4200214.2802481 (psi)
Page7of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
Wobble Coofficent, K = 0.0033 (per meter) ACI Code: for Grouted Tendon
Curvature Coofficient, = 0.25 sheathing Wire Strand
Anchorege Set " L"= 0.005 (m)
Relative Humidity RH = 50 %
Page8of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
FRICTRION LOSSES 4
Pj = Px * ( 1 + K*L + * ) stressingfrom
Sum = 0.003780
ELASTIC SHORTENING
Page9of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
ANCHORAGE SLIP
P = (Pj - Px) / x
= 2.24 (T/m)
22.00 (KN/m)
CREEP OF CONCRETE
fcds = Md * e / Ic
Page10of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
= 13377.74 (KN/m2)
SHRINKAGE OF CONCRETE
Page11of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
TOTAL LOSSES
= 59.24 (Tons)
581.17 (KN)
= 94.21 (Tons)
924.17 (KN)
= 153.45 (Tons)
1505.34 (KN)
Page12of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
Stage 1: At Yard
Pe = 3769.99 (KN)
Pe = 3769.99 (KN)
Page13of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
From Model
From Model
END SECTION
Page14of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
ng Hold Table
Page15of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
5 6
5 6
2 ends
Pj Px P
= 6.23 %
Page16of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
25.72
e:- The value of cell "H" should
be the value of cell "G" untill
it becomes equal
= 4.78 %
= 0.00 %
Page17of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
= 10.51 %
= 3.76 %
Page18of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
= 3.25 %
= 11.02 %
= 17.52 %
= 28.54 %
Page19of48
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
Page20of48
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
Check:
Reinforcement Index = Asr fsu*/(b'd fcgirder)
0.36 1 =
pe
fpe = pe / Ac + pe * e / Zb
Check: 1.7(fc')1/2b'd
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
fpc = Pe/Ac
Vu
VS = Vu - Vc
Vnh
Vu
Vu>fVnh stirrups of pre cast girder must be extend into the deck slab
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
fc' of girder
fci' i.e conc. Strength at jacking
fy
Height of girder
AL STRENGTH
= 273.30 Ton-m
= 594.10 Ton-m
= 250.00 Ksi
= 60.00 Ksi
= 4.06 Ksi
= 4.79 Ksi
= 5.00 Ksi
= 0.00233
= 235.42 Ksi
= 3.864 inches2
not included (included / not included)
= 1.996 inches2
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
= 0.23
= 0.29 eq.1 not valid
SHEAR
= 6,500 Psi
= 60,000 Psi
= 52.00 Ton - m
= 100.00 Ton
= 290.10 Ton = 639.37 Kips
= 0.441 m
= -0.059 m
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
= 21351.85 kN = 2176.54 tons
= 379.84 Ton /m2 = 77.82 k/ft2
= 540.11 lbs/in2
= 166.56 Tons OK
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
= 0.31 in2
= 4 Nos.
= 19.55 in = 497 mm
= 24.00 inches
= 44.29 inches
= 14.00 inches
= 179.3 Tons
= 128.1 Tons
= 250 mm
= 75 mm
= 310 mm
= 0.0581 m2
= 0.0961 m2
= 155 mm
= 125 mm
= 0.806
= 0.15 From Table II Stronghold Brochure
= 0.0006999439 m2 = 1.09 in2
al and Vertical over a Length of 2Yo = 310 mm from face behind each anchor
Cable: C1 C2 C3 C
Cable: C1 C2 C3 C
At end 0 0 0 0 0
0.05L 1.495 0 33 -33 33
0.1L 2.99 0 63 -63 63
0.15L 4.485 0 89 -89 89
0.2L 5.98 0 112 -112 112
0.25L 7.475 0 131 -131 131
0.3L 8.97 0 147 -147 147
0.35L 10.465 0 159 -159 159
0.4L 11.96 0 168 -168 168
0.45L 13.455 0 173 -173 173
At mid span 14.95 0 175 -175 175
TENDON ELONGATION
Cable Length Ap Pj Px
NATIONAL ENGINEERING SERVICES PAKISTAN (Pvt.) LTD.
Project: KHANEWAL-LODHRAN
Subject: Prestressed Girder 29.9 m span
L = L T
= co.off of thermal expansion = 0.0000055
L= 29.9 m
T = 25 C = 77 F
L= 12.7 mm
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
ATION
C C C
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
C C C
-0.175
-638.6 0.0
-0.175 0.000
0 0
0 0
-33 0
-63 0
-89 0
-112 0
-131 0
-147 0
-159 0
-168 0
-173 0
-175 0
2 ends
E = 28 x 10 psi
6
Elongation
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
(mm)
102
101
100
0
0
0
0
Job No.: SA-349
By: HQ
Chk.: TR
Date: June 2017
7
21
35
0
0
0
0
ION OF GIRDER
in/in per F