Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14
No Activity
Description / 6/3 13/3 20/3 27/3 3/4 10/4 17/4 24/4 1/5 8/5 15/5 22/5 5/6 12/6
Date
1. Planning and
surveying
(method and
cost estimation)
2. Box (cutting
shearing
drilling)
3. Bracket
(cutting,drilling
,welding)
4. Pedal
(cutting,weldin
g)
5. Fabricate
connecting rods
6. Installation
(box, bracket,
pedal, pump,
brake
lamp,brake
caliper)
7. Final detail
(grinding)
8. Presentation
Making
9. Report Making
10. Submission of
Report
Planning Actual