SAP IMPLEMENTATION
IIT ROORKEE
USER MANUAL
Maintenance Processing
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 1
Table of Contents
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 2
Lesson 1: Overview of SAP Plant Maintenance Notifications
A Plant Maintenance Notification is a request to have work done at your site by the
Maintenance and Operations Department.
Overview
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 3
Lesson 2: Terms and Concepts
Plant Maintenance Notification
A notification is a request for work. This must be created from each site so that
Maintenance & Operations is aware that work needs to be done.
Work Order
The work order is the document that gives the go-ahead for maintenance work to
proceed. It contains the plan of where, when, how, and by whom the work will be
done and where the cost will be taken care for the materials and services used
against the order.
Notification Type
A notification type is a key that determines the kind of maintenance and the
department scheduled to do the work. Notifications can be corrective (CM) or
special order (Z1 to Z8, ZS), Vehicle Notification (TR).
Functional Location
A functional location refers to an organization unit that is to be maintained, such as
a department or other building site.
Equipment
Equipment refers to the physical object that needs to be repaired or maintained as
an autonomous unit.
Status
This lets everyone know what the progress is for any particular work order. There is
several business transactions involved in issuing a work order status: Posting time
and other follow-up costs after the job has been technically completed (TECO).
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 4
1. Notification Creation
Creation of Notification.
Trigger:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 5
Following notification has been defined for IIT Roorkee.
3. Complaint E&W (Z3 to Z7) This is maintenance that will fix something
that is broken. This is the type that you will create most often and will be
department specific in E&W.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 6
5. Shutdown Notification (ZS) This type of maintenance will mainly
use if the department used to make the maintenance for the long period of
time like one month or even more than that where the maximum equipments
maintenance will be done.
9. IT and Network Compl (IT) This type is maintenance that will fix
something that is related to IT and network complaint and needs to be
attended on the priority basis so that the internet will be working and no
problem can occur in future.
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 7
Double click and you will get the following screen:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 8
Put the cursor on the Notification Type field and press F4,
Press F4
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 9
The Following Initial Screen of Creating the Notification Type will appear:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 10
Take help at the equipment
Identify the Reference object, which is malfunction (trouble), this can be either a
functional location or equipment. This can be entered by typing directly or taking help
at the field. E.g. take help at the field equipment following. Following Screen will
appear.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 11
Fill technical object, equipment category, Maintenance plant and Plant Section. List
of equipments related to above criteria will appear. Select the required equipment.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 12
Select the required equipment and click on
The data corresponding to the selected equipment will be automatically filled in the
notification screen as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 13
Change the user status from selecting the user status button and select the
SUBMIT TO HOD Status from the list as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 14
After selecting the Status click on .
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 15
Now to fill the Object parts, damage and cause, check the following screen:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 16
Select the defect. The defect can be further described using text field.
If causes are known, to enter causes takes help at the causes field.
Following window POPS UP-
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 17
Select the cause. The cause can be further described using long text field.
On Tab Activities, action taken to rectify the problem can be stored in the
system for future reference.
Once all the data is entered click on save button . Once you click on the save
button, the following screen will come and the notification will be saved.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 18
Now go to the main screen and enter the T-Code IW22 Change Notification
Screen as shown below and press enter:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 19
The following screen will come once you press enter:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 20
From here the HOD can either APPROVE or REJECT the request and process can
further.
From here you can change the details of the Notification if needed and put in
Process the Notification by clicking on the button after APPROVING the status.
Now save the notification by clicking on save button.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 21
2. Order Creation
Trigger:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 22
Following Maintenance Order has been finalized for IIT Roorkee.
ZPM1 General Maintenance Order
ZPM2 Breakdown Maintenance Order
ZPM3 Preventive Maintenance Order
ZPM4 Corrective Maintenance Order
ZPM5 E&W Horticulture Maintenance Order
ZPM6 Calibration Maintenance Order
ZPM7 Shutdown Maintenance Order E&W
PMTE Repair and Maintenance Telephone Exchange
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 23
Calibration Order
Any regular inspection and for recording inspection result calibration order is
used. Order Type ZPM6 is created for PM-QM Integration.
To carry out the necessary work and to capture the cost occurred during taking the
necessary action against the notification we create the maintenance order.
To Create the maintenance order from notification, click on the create order button
as shown below:
Once you click on the button, the following pop up screen appears in which you need
to fill up the Maintenance Order Type,
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 24
Place your cursor on Order type and press F4, the following different type of
Maintenance Order type comes.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 25
Select the Order Type as ZPM1 and press Enter
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 26
2.2 Order Creation without Notification
Creation of Order
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 27
Instructions
In the initial screen, enter the values in the following fields:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 28
When you press the F4 on the Order type the following different types of order type
will come:
Select the order type as required and enter the functional location and equipment
and press enter
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 29
On screen Create Maintenance Order: Initial Screen, enter information in the
fields as specified in the below table:
When you press enter following screen occurs for creating the order:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 30
On Tab Operation, some of the fields will be filled in with information from.
The Notification Master and in addition to this you have to fill following field.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 31
shown below:
After clicking on the Fund management, you will get the following sub-screen:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 32
Planning the Maintenance Order
Planning a maintenance Order means identifying Operation and Planning resource
requirement for each operation. Each Maintenance Order must have at least one
operation. Thus system creates one operation by copying the short text of
maintenance order as operation description at the time of the Maintenance Order.
This description can be changed. Ideally there has to be at least one operation for
internal Processing (Job done by Internal Employee) and one operation for external
processing (job done by contractors) for each of the contractors working on that
Maintenance Order.
After entering the operations, go to the Components Tab and enter the material
required to execute the work for the order and to rectify the problem.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 33
Field name Required User action and allowed values
/ Optional
Component R Material Number (Material for Maintenance
Order)
Reqmt Qty R Required Quantity (Quantity of the material
required to execute the work.)
IC R Item Category (Item Category will be L if the
material is already into the stock.)
OpAc R Operation Account defines in which operation
the material is used
(Note: On the above table, in column R/O; R = required, O = Optional)
Now, save the order. You will get the following message:
Now go to the main screen and enter the T-Code IW32 Change Order Screen as
shown below and press enter:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 34
Once you press enter, the Change order will come as shown:
Now press the Cost button and the Planned cost will get calculated against the
order. You can see the planned cost in the cost tab as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 35
Now from here, the concern department responsible for carrying out the
maintenance work will put the order in process by changing the user status and then
finally release the order for processing by clicking on button. Once you press
the release the button and save the order, the order will get released for processing
and the costing.
If order has been released and subsequently additional operations are entered for it,
these are automatically released.
Withdrawing material
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 36
2.3 Issue of Material Against the order
Trigger:
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 37
Against this order, now the material will be issued by the store personnel so that the
actual cost will be captured against the order.
Tips and Tricks
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 38
Once you select the goods Issue for the drop down (Shown Highlighted) and enter
the order Number, the following screen will come:
Press Enter
Select the Material Lines and click on OK if the material is correct and is as per the
number. Also, enter the Storage Location also where the material is present in the
stores and whether it belongs to the correct plant or not.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 39
After entering all the details above, click on the save button. You will get the
following message.
Now again go the IW32 T-code and check the actual cost against the order. As the
material is issued against the order, you can now check the actual cost of the order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 40
b) Operation for External Processing.
Control Key for External Processing is PM03. Select an operation; Change the
Control key to PM03
Once you write PM03 in control key and press enter, a pop up will come for entering
external services parameters.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 41
Enter the details for the Material Group and Purch. Group directly or using F4
Selection help. After entering the details, press enter.
Now select the particular operation line and click on the External Tab at the bottom.
In this pop select the From Purch. Document and click on button. Once you
click on the button the following selection screen will come:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 43
In this select the Pur. Order and enter. You will get the following screen:
Here you can select the Purchase Order by giving the selections. You will get the list
of Purchase Orders from where you can select the required purchase order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 44
Once you select the purchase order, you will see the selected purchase order into
the screen:
Press Enter, you will get the details of the Purchase Order:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 45
Click on the Services Button .
Once you click on the Services Button, the services will automatically come into the
order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 46
Now, save the order. You will get the following message:
Now go to the main screen and enter the T-Code IW32 Change Order.
Once you press enter, the Change order will come as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 47
Now press the Cost button and the Planned cost will get calculated against the
order. You can see the planned cost in the cost tab as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 48
Now release the order for processing by clicking on button. Once you press the
release the button and save the order, the order will get released for processing and
the costing.
Now against the order, we will create the Service Entry sheet so as to book the
actual services captured and to book the actual cost against the order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 49
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 50
Click on Button.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 51
(Note: On the above table, in column R/O; R = required, O = Optional)
Here in the Purchase Order field enter the Purchase Order number directly if you
know it otherwise you can take the F4 help to enter the Purchase Order Number.
Once you enter the purchase order number, press enter, you will get the following
screen and here then click on the Create Button to create the service entry sheet
against the Purchase Order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 52
Fill up the following data in Accept Data Tab and press Enter:
1. Short Text
2. Reference
3. Doc. Text
Also in The basic data tab, select the Acct Assgt cat. As F (Order)
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 53
Adopt service after selection by clicking on . Once you select the services,
the services against the purchase will come into the Service Entry Sheet.
From here if you want to consume the quantity than you can change that as
highlighted, else you can take the complete quantity also. Also, give the Order
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 54
Number where you want to utilize the services and capture the cost of the order.
Now release the service entry sheet by clicking on button. Once you press the
release button and save the sheet, the service entry sheet will get released and the
actual cost is booked against the order and the service entry sheet will be locked and
un-editable further and will get accepted.
After saving the Service Entry Sheet, go the main screen and go to the T-Code IW32
to check the actual cost against the order in the Costs Tab.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 55
Here we can see that the Actual cost of the work done against the order (through the
external vendor) is captured and will be settled into the cost center of the order. Save
the order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 56
Business Process Procedure Overview
The actual hours worked per operation are recorded/ posted to the PM order via time
confirmation.
Any materials used may be posted at this time.
Technical reporting to the notification may also be performed at this time.
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 57
Press Enter key or double click (with mouse Left key) to reach the following screen;
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 58
Press enter key to reach the following screen
Select the operations to be confirmed and follow the menu path shown in the next
screen
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 59
Click on the actual data following screen will appear
Trigger:
All service procured through Service Purchase order will be copied into the Service
Entry Sheet.
Procedural Steps
Access transaction by:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 61
Path to completion of Order
Click on the technically complete button to complete the order so that the cost
against the order can be settled into the cost center after doing settlement.
While completing technically system defaults current date & time but still it can be
changed for past confirmations.
Now when you again to the change order screen in the t-code IW32, you will not be
able to edit the Order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 62
Check the System Status during the various stages of Order Creation and Order
Processing
Status Description
CRTD Created
MANC Material Availability not checked
NTUP Dates Not Updated
NMAT No Material Components
PRC Pre-costed
SETC Settlement Rule Created
REL Released
TECO Technically Completed
PCNF Partial Confirmation
CNF Complete Confirmation
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 63
2.7 Order Settlement
Trigger:
Order settlement is used to control costs and to identify where maximum costs are
being incurred for maintenance. Costs associated with the maintenance work are
assigned to Cost centers. Costs arising out of executing an order are initially
collected on the order. These costs are then transferred to a receiver, for e.g. Cost
center. The receiver of costs are specified in the order and settlement carried out
at regular intervals.
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 64
Press Enter key or double click (with mouse Left key) to reach the following screen;
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 65
Field name Required User action and allowed values
/ Optional
As the Financial year starts from April and ends in March, so we have to take
Settlement Period and Posting Period accordingly as per the table.
Month Settlement Period Posting Period
April 01 01
May 02 02
June 03 03
July 04 04
August 05 05
September 06 06
October 07 07
November 08 08
December 09 09
January 10 10
February 11 11
March 12 12
For initially checking purpose, execute the settlement including the test run.
You will get the following screen which shows the Processing mode as Test Run as
highlighted in the screenshot:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 66
Now again go back, remove the tick mark from the Test Run and execute the
settlement again.
The following screen will come which shows the Processing Mode as Update Run
as highlighted below which shows that the order is settled:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 67
2.8 Business Completion
The business completion of an order is usually performed when no further costs are
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 68
No outstanding purchase orders (commitments) exist for it.
All data that refers to the reference object of the maintenance order is
available and correct
All relevant data in the operations and sub-operations is available and correct
The business completion function for an order defines the following information for
the order:
An individual order
Once you do business completion, the order cannot be process further and the
System status of the Order will be changed as:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 69
3. Preventive Maintenance
To ensure higher equipment availability and reliability, preventive maintenance plans
are required for critical equipments and systems.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 70
Description:
Use this transaction for creating & maintaining General task list Press Enter Key to
get the following screen
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 71
The procedure to create the Task List is same as given in PM Master Data Manual.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 72
3.2 Maintenance Plan
Maintenance plan describes the maintenance and inspection tasks to be performed
at maintenance objects with the dates and scope of the tasks.
Maintenance Planning:
The maintenance planner also needs to identify the units for the maintenance plans -
time (weekly, monthly, yearly, etc.) or performance (every 100 running hours, every
10,000 shots etc.). For performance based maintenance plans, relevant measuring
counter needs to be defined for the technical object and measurement readings need
to be updated regularly.
The maintenance planner decides the maintenance call objects for the plan. The call
object can be maintenance order, notification or service entry sheet. Based on the
selection, system generates a call object for a maintenance plan, when a
maintenance call is due. The maintenance planner decides initially which call object
is required.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 73
As mentioned earlier, maintenance plans can be single cycle, strategy based or
multiple counters, as per the requirement of each equipment / functional location.
Maintenance task lists shall be prepared for equipments / functional location, as per
the requirement. The task lists contains detailed sequence of activities to be
performed, spares and estimated time required for completing the job.
For the activities, which are common amongst group of equipments, a general task
list may be prepared.
A maintenance plan includes the task list, maintenance strategy along with other
scheduling parameters.
Trigger:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 74
The following screen appears once you enter:
2. Maintenance Order
From the drop down menu of Maintenance Plan Category, select Maintenance order
as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 75
After selecting Maintenance Order, Press Enter, the following screen for creating the
maintenance plan will occur:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 76
Field name Required User action and allowed values
/ Optional
Maintenance Plan Maintenance Plan Description
Description R
Fill the maintenance plan cycle with its unit i.e.
when we require the maintenance order to be
Cycle/Unit R generated.
As we select 2 week cycle then the order will
generate every 2 weeks.
Cycle Text O Text for the maintenance cycle
Main Work Centre Work Center which will carry out the
R maintenance
Now select the Task List which you have created by clicking on Button.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 77
Now click on Button, you will find the list of all the task lists as below:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 78
Select the task list as per necessity and press enter or click on button. The last
list will be selected in the Maintenance plan as shown:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 79
Field name Required User action and allowed values
/ Optional
The shift factor in the event of late completion
of a maintenance task defines the percentage
Shift Factor late of the shift to be applied to the calculation of
Complete the next date.
O
It is only applied when the variance between
target and actual date is outside the tolerance
range.
Tolerance for Interval between two operations
O As % of tolerance
Late completion
Fill percentage when the call to be come for
maintenance. Eg: If cycle = 100days and call
horizon = 90% means at the 90th day we will
Call Horizon O receive the order for planning man and
material required to complete the maintenance
order.
We will fill the maintenance planning
scheduling parameters i.e. the time for which
Scheduled we will schedule this plan. Eg: If cycle set is 1
R
Period Year and scheduling period is 10 Years, then
total 10 maintenance order will be generated
with yearly cycle.
(Note: On the above table, in column R/O; R = required, O = Optional)
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 80
Click on save button.
Whenever a schedule falls due, the system creates a maintenance order, notification
or service entry sheet depending on definition of the call object of the plan
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 81
The maintenance planner shall schedule the maintenance plan. Before the call
objects are created by the system, maintenance planner may manually call the job or
skip the job, depending on the situation.
If the call object is a maintenance order, then maintenance planner shall release it
manually after checking the order.
There is provision in the system to shift the next scheduled maintenance date of a
maintenance plan, if there is considerable delay in completing the order or the orders
are completed much ahead of the schedule. These tolerance ranges for shifting can
be decided while defining maintenance plan by the maintenance planner depending
on the nature of the job.
Trigger:
When you schedule a maintenance plan for the first time, the start date entered
triggers the maintenance cycle. The following special features are valid for the start
date:
If you enter the start date in the scheduling parameters, then you can start the
automatic deadline monitoring (parameters to execute the program at the
background) directly for the maintenance plan.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 82
For Maintenance Plan Scheduling
Double click and the following screen appears. After entering the maintenance plan
number, press enter
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 83
Now click on the start button .
The system will ask for the start date of the Maintenance Plan cycle. Enter the date
and press enter.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 84
After pressing enter the scheduling of the maintenance plan orders will occur as per
the parameters.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 85
Once the Plan date comes, the order is automatically created on the planned date
and the user needs to release and execute the order as per the procedures shown
above.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 86
Field name Required User action and allowed values
/ Optional
Maintenance Plan O Maintenance Plan Number
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 87
We can select the order number from this list and can do the further processing on
the order as per the requirement. Also, all the tasks which are assigned in the task
list which is further assigned to the maintenance plan will automatically come into the
maintenance order in the operations tab from where they can be further processed.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 88
4. Calibration Maintenance
Test equipment is used for performing quality inspections. In order to ensure that the
equipment used always fulfils the defined performance criteria, we have to regularly
test and calibrate these equipments.
Task lists can be grouped, for example in to two groups - "Inspection" and
"Mechanical Repairs".
Equipment task lists have a specific link to a piece of equipment. Using equipment
task lists, you can centrally define and manage maintenance tasks for your pieces of
equipment. Equipment task lists can also help you to prepare maintenance plans and
orders.
Trigger:
Need to prepare a sequence of activities that must be repeatedly performed within a
company.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 89
BUSINESS PROCESS PROCEDURE OVERVIEW
Equipment Maintenance task lists describe a sequence of individual maintenance
activities which must be repeatedly performed within a company. They are used to
standardize repetitive work processes, to plan them more effectively, and to save time
when creating maintenance orders and maintenance plans.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 90
Description:
Use this transaction for creating & maintaining Equipment task list.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 91
Field name Required User action and allowed values
/ Optional
Key date R Date from which the task list is to be used
(Note: On the above table, in column R/O; R = required, O = Optional)
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 92
Enter the field value according to the following table
Field name Required User action and allowed values
/ Optional
Group CNTR R System defaults grp cntr is to be entered
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 93
Inspection Points R/O If the Task list for the inspection purpose, then
we need to assign the inspection point to the
Task list else for the general purpose, the
inspection point is not required.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 94
Field name Required User action and allowed values
/ Optional
Work center R Select work center
The following screen will occur once you click on Insp. Char tab.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 95
Field name Required User action and allowed values
/ Optional
Master Insp. Char. R Give the MIC Name
(Note: On the above table, in column R/O; R = required, O = Optional)
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 96
Field name Required User action and allowed values
/ Optional
Target Value R Target value for the MIC
Lower Specf. Limit R Lower
Upper Specf. Limit R Date from which the task list is to be used
(Note: On the above table, in column R/O; R = required, O = Optional)
Press Enter after entering all the details as shown above, the following screen will
come:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 97
Field name Required User action and allowed values
/ Optional
Sampling Procedure R Give the Procedure Name (here as Test for
PM)
(Note: On the above table, in column R/O; R = required, O = Optional)
Click on to save the task list. You will get the message.
Now after this scheduling of the Maintenance Plan will take place as shown earlier.
We can take the order number from IP24 Maintenance Plan List overview or we
can take it from IW32 by searching using F4 Help.
Also, for the calibration type of maintenance plans, the Order Type will be ZPM6.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 98
4.2 Calibration Order Processing
Trigger:
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 99
Double Click and you will get the following screen for change Order:
Now put the order in Process by changing the user status from CRTD to INPR. Click
on Release button by clicking on Button and save the order.
Now again to the order by giving Order Number, you will get the following screen
with the Inspection lot button near the Order description.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 101
When you click on the inspection lot generated icon, you will have the following
screen for Display Usage Decision. From here not down the Inspection Lot Number
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 102
4.3 Inspection Lot Selection
Trigger:
Procedural Steps
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 103
Field name Required User action and allowed values
/ Optional
Lot Created on R/O Give the date from which you want to check
the number of Inspection Lots generated
Select only inspection R Select the radio button which will give only
lots without usage
those lots for which usage decision is not
decision
done.
(Note: On the above table, in column R/O; R = required, O = Optional)
Click on execute button, you will get the list of all the inspection lots for which the
usage decision has not been done in the particular interval of date.
Check the inspection lot number what we have taken from the Calibration Order.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 104
Select the line and click on the Results button . You will get the following
screen:
Once you click on the button, the equipment number assigned to the Inspection Lot
will automatically come as shown below:
Now press Enter and you will get the following screen:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 105
Field name Required User action and allowed values
/ Optional
Result R The result obtained while doing the reading
check using the TEST equipment.
Attribute O The attribute for the result (Here we will take
Estimated for average of multiple readings).
(Note: On the above table, in column R/O; R = required, O = Optional)
Now from the below screen, after selecting the Inspection Lot Number Line again,
click on button.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 106
Now enter the Usage Decision Details, in the below Usage Decision sub-screen by
pressing F4 on the UD Code and select the Usage Decision for the Equipment from
the list shown below:
Once you click on Accepted and press enter, the following Usage Decision Screen
will come:
Save the Inspection Lot. You will get the following message:
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 107
Now when you again go back to the Change Order Screen, and give the Order
Number and click on the inspection lot icon, you will get the details of the results
recorded and the Usage Decision taken as shown below:
Now, you can save do the time confirmation of the order using IW41 and then
Technically Complete (TECO) the order by clicking on button in IW32. And then
settle the order using KO88 and finally do the business completion using IW32.
Date: 30th July 2016 Prepared By: Anshul Chelawat Page Number : 108