6PLTU TANJUNG AWAR-AWAR T/L BAY 150kV TUBAN 1 Pemel. 2 tahunan peralatan
8PLTU TANJUNG AWAR-AWAR T/L BAY 150kV BABAT 1 Pemel. 2 tahunan peralatan
11 SMN TUBAN III T/L BAY 150kV KEREK 1 Pemel. 2 tahunan peralatan
13 SMN TUBAN III T/L BAY 150kV KEREK 1 Pemel. 4 bulanan peralatan
19 SMN TUBAN III T/L BAY 150kV KEREK 2 Pemel. 4 bulanan peralatan
20 KEREK T/L BAY 150kV KOPEL & BUS A Pemel. 4 bulanan peralatan
25 SMN TUBAN -3 T/L BAY 150kV KOPEL & BUS A Pemel. 4 bulanan peralatan
27 SMN TUBAN -3 T/L BAY 150kV BUS TIE 1 Pemel. 4 bulanan peralatan
28 SMN TUBAN -3 T/L BAY 150kV BUS TIE 2 Pemel. 4 bulanan peralatan
ARAAN PERALATAN GARDU INDUK & TRANSMISI
BULAN NOVEMBER 2017
USULAN
PERALATAN PADAM SIFAT PN.JAWAB NO SPK
AWAL
Rabu, 01/11/17
3 M. APP
07:30
Rabu, 01/11/17
3 M. APP
07:30
Kamis, 02/11/17
3 M. APP
07:30
Kamis, 02/11/17
3 M. APP
07:30
Kamis, 02/11/17
3 M. APP
07:30
Selasa, 07/11/17
3 M. APP
07:30
Selasa, 07/11/17
3 M. APP
07:30
Rabu, 08/11/17
3 M. APP
07:30
Rabu, 08/11/17
3 M. APP
07:30
Senin, 13/11/17
3 M. APP
07:30
Senin, 13/11/17
3 M. APP
07:30
Selasa, 21/11/17
3 M. APP
07:30
Selasa, 21/11/17
3 M. APP
07:30
Selasa, 21/11/17
3 M. APP
07:30
USULAN DIJADWALKAN
STATUS APB
AKHIR AWAL AKHIR
Rabu, Rabu,
Rabu, 01/11/17
01/11/17 01/11/17 Propose Setuju
16:00
08:00 16:00
Rabu, Rabu,
Rabu, 01/11/17
01/11/17 01/11/17 Propose Setuju
16:00
08:00 16:00
Kamis, Kamis,
Kamis, 02/11/17
02/11/17 02/11/17 Propose Setuju
16:00
08:00 16:00
Kamis, Kamis,
Kamis, 02/11/17
02/11/17 02/11/17 Propose Setuju
16:00
08:00 16:00
Kamis, Kamis,
Kamis, 02/11/17
02/11/17 02/11/17 Propose Setuju
16:00
08:00 16:00
Selasa, Selasa,
Selasa, 07/11/17
07/11/17 07/11/17 Propose Setuju
16:00
08:00 16:00
Selasa, Selasa,
Selasa, 07/11/17
07/11/17 07/11/17 Propose Setuju
16:00
08:00 16:00
Rabu, Rabu,
Rabu, 08/11/17
08/11/17 08/11/17 Propose Setuju
16:00
08:00 16:00
Rabu, Rabu,
Rabu, 08/11/17
08/11/17 08/11/17 Propose Setuju
16:00
08:00 16:00
Senin, Senin,
Senin, 13/11/17
13/11/17 13/11/17 Propose Setuju
16:00
08:00 16:00
Senin, Senin,
Senin, 13/11/17
13/11/17 13/11/17 Propose Setuju
16:00
08:00 16:00
Selasa, Selasa,
Selasa, 21/11/17
21/11/17 21/11/17 Propose Setuju
16:00
08:00 16:00
Selasa, Selasa,
Selasa, 21/11/17
21/11/17 21/11/17 Propose Setuju
16:00
08:00 16:00
Selasa, Selasa,
Selasa, 21/11/17
21/11/17 21/11/17 Propose Setuju
16:00
08:00 16:00
KETERANGAN
View
View
View
View
View
View
View
View
View
View
View
View
View
PT. PLN ( PERSERO )
DISTRIBUSI JAWA TIMUR
AREA PENGATUR DISTRIBUSI
RENCANA PEMELIHAR
NOVEMB
TRAFO MERK
No. GARDU INDUK APP AREA
NO kV MVA CUBICLE
ASMAN OPSIS
2
GI 150KV LAMONGAN PHT 150kV BABAT#2 150kV 1001326167
14
GIS 150KV PLTU PACITAN PHT 150kV NGUNTORONADI#1 150kV 300086667
15
GIS 150KV PLTU PACITAN PHT 150kV NGUNTORONADI#1 150kV 1001352165
16
GIS 150KV PLTU PACITAN PHT 150kV PACITAN#1 150kV 1001352164
21
GI 150KV JOMBANG PHT 150kV JAYAKERTAS#1 150kV 1001335554
22
GI 150KV JAYAKERTAS PHT 150kV JOMBANG BARU#1 150kV 300086645
39
GI 150KV BANARAN PHT 150kV MANISREJO 150kV 1001237265
40
GIS 150KV PLTU PACITAN BUSBAR A 150kV 150kV 300086689
43
GI 150KV MLIWANG PHT 150kV HOLCIM#1 150kV 300086633
48
GIS 150KV PLTU PACITAN BUSBAR B 150kV 150kV 300086688
50
GI 70KV KERTOSONO PHT 70kV SEKARPUTIH#2 70kV 1001360772
62
TRS 70KV DOLOPO-PONORO TRS 70KV DOLOPO-PONOROGO 70kV 1001334305
64
GI 150KV BABAT PHT 150kV BOJONEGORO#2 150kV 1001322222
65
GI 150KV BOJONEGORO PHT 150kV BABAT#2 150kV 1001326630
68
GI 150KV NEWPACITAN PHT 150kV PLTU PACITAN#1 150kV 300086034
69
GIS 150KV PLTU PACITAN PHT 150kV PACITAN#1 150kV 300086038
70
GIS 150KV PLTU PACITAN 5A2 DIAMETER#2 150kV 150kV 300086668
92
GI 70KV CARUBAN PHT 70kV NGANJUK 70kV 1001319327
106 GI 70KV CARUBAN PHT 70kV NGANJUK 70kV 1001319328
Pengg Distance & OCR Bay Bjgro #2 Babat (Pekerjaan 2 Sisi) TRS-3613-367.367-B0003
3 M. APP
T/L Bay Jatigedong #1 (Padam 2 Sisi) Bay ini masih belum masuk d 3 PLN Proyek
3 M. APP
3 M. APP
3 M. APP
3 M. APP
T/L Bay Bojonegoro #2 150kV (Padam 2 Sisi) Padam 2 Hari terus men 3 M. APP
3 M. APP
3 M. APP
3 M. APP
1. A/R dinonAktifkan (diBlock) 2. Posisi PMS diposisikan Normally Open (NO) Edit
3. Konfigurasi PMS Bus B (yang dikerjakan) diposisikan Open
HAR OFF GIS PPCT BUSBAR A 150kV Edit
Pengg Distance & OCR Bay Bjgro #2 Babat Pengg Rele Distance Bay Babat Edit
#2 Bjgro Pekerjaan 2 Sisi & 2 Lokasi
Pengg Rele Distance Bay Babat #2 Bjgro Edit
EI 2017
HAR OFF GI KDIRI 7B1 DIAMETER#1 500kV 03 ROT
HAR OFF GI KDIRI 7AB1 DIAMETER#1 500kV 03 ROT
HAR OFF GI NGBNG IBT#1500/150kV166.67MVA 03 ROT
GI 25KV GOLANG Rabu, 01/11/17 1 08:00 - 16:00 Pengg Relay DGR Bay Giringan #1 Golang 03 ROB SKI
GI 25KV GIRINGAN Rabu, 01/11/17 1 08:00 - 16:00 Pengg Relay DGR Bay Golang #1 Giringan 03 ROB SKI
GI 150KV KEDIRI Rabu, 01/11/17 1 08:00 - 16:00 300086706 HAR OFF GI KDIRI KOPEL BUS 150kV 03 ROT Rutin
GI 150KV KEDIRI Rabu, 01/11/17 1 08:00 - 16:00 300086707 HAR OFF GI KDIRI BUSBAR A 150kV 03 ROT Rutin
GI 150KV NGAWI Kamis, 02/11/17 2 08:00 - 16:00 300086700 HAR OFF GI NGAWI PHT 150kV MANISREJO#1 03 ROT Rutin
GI 150KV KEDIRI Kamis, 02/11/17 2 08:00 - 16:00 300086708 HAR OFF GI KDIRI BUSBAR B 150kV 03 ROT Rutin
GI 150KV MANISREJO Kamis, 02/11/17 2 08:00 - 16:00 300086701 HAR OFF GI MNRJ5 PHT 150kV NGAWI#1 03 ROT Rutin
GI 150KV BANARAN Senin, 06/11/17 6 08:00 - 16:00 November Pengg Diff Relay IBT #2 Bnrn5 03 ROB SKI
GI 150KV TUBAN Selasa, 07/11/17 7 08:00 - 16:00 300086695 HAR OFF GI TUBAN PHT 150kV TJ AWARAWAR#1 03 ROT Rutin
GI 150KV TANJUNG AWAR AWAR Selasa, 07/11/17 7 08:00 - 16:00 300086698 HAR OFF GI TGWAR PHT 150kV TUBAN#1 03 ROT Rutin
GI 150KV BABAT Rabu, 08/11/17 8 08:00 - 16:00 300086694 HAR OFF GI BABAT PHT 150kV TJ AWARAWAR#1 03 ROT Rutin
GI 150KV TANJUNG AWAR AWAR Rabu, 08/11/17 8 08:00 - 16:00 300086699 HAR OFF GI TGWAR PHT 150kV BABAT#1 03 ROT Rutin
GI 70KV BANARAN Sabtu, 11/11/17 11 08:00 - 16:00 November Pengg Dist Relay Tulungagung #2 Bnrn4 03 ROB SKI
GI 70KV TULUNGAGUNG Minggu, 12/11/17 12 08:00 - 16:00 November Pengg Dist Relay Banaran #2 Tlgng 03 ROB SKI
GI 150KV KEREK Senin, 13/11/17 13 08:00 - 16:00 300086696 HAR OFF GI KEREK PHT150kV SMN TUBAN#3.1 03 ROT Rutin
GI 150KV SEMENTUBAN 3 Senin, 13/11/17 13 08:00 - 16:00 300086697 HAR OFF GI STBAN PHT 150kV KEREK#1 03 ROT Rutin
GI 150KV KEREK Senin, 13/11/17 13 08:00 - 16:00 Pemel 4 Bln Bay Stban 3 #1 Kerek 03 ROB
GI 150KV SEMEN TUBAN 3 Senin, 13/11/17 13 08:00 - 16:00 Pemel 4 Bln Bay Kerek #1 Stban 03 ROB
GI 150KV BANARAN Selasa, 14/11/17 14 08:00 - 16:00 November Pengg Diff Relay IBT #3 Bnrn5 03 ROB SKI
GI 150KV KEREK Selasa, 14/11/17 14 08:00 - 12:00 Pemel 4 Bln Bay Mliwang #1 Kerek 03 ROB
GI 150KV KEREK Selasa, 14/11/17 14 12:00 - 16:00 Pemel 4 Bln Bay Tuban #1 Kerek 03 ROB
GI 150KV KEREK Rabu, 15/11/17 15 08:00 - 12:00 Pemel 4 Bln Bay Mliwang #2 Kerek 03 ROB
GI 150KV KEREK Rabu, 15/11/17 15 12:00 - 16:00 Pemel 4 Bln Bay Tuban #2 Kerek 03 ROB
GI 25KV GOLANG Rabu, 15/11/17 15 08:00 - 16:00 Pengg Relay DGR Bay Giringan #2 Golang 03 ROB SKI
GI 70KV KERTOSONO Kamis, 16/11/17 16 08:00 - 16:00 November Pengg Dist Relay Nganjuk #1 Ktsn4 03 ROB SKI
GI 150KV KEREK Kamis, 16/11/17 16 08:00 - 16:00 Pemel 4 Bln Bay Stban 3 #2 Kerek 03 ROB
GI 150KV SEMEN TUBAN 3 Kamis, 16/11/17 16 08:00 - 16:00 Pemel 4 Bln Bay Kerek #2 Stban 03 ROB
GI 70KV BLITAR Minggu, 19/11/17 19 08:00 - 16:00 November Pengg Dist Relay Wlingi #1 Bltru 03 ROB SKI
GI 70KV PLTA.TULUNGAGUNG Minggu, 19/11/17 19 08:00 - 16:00 1001373442 Pasang Kubikel Outgoing Trf 1 TLGPA 03 ROB APD
GI 70KV MRANGGEN Senin, 20/11/17 20 08:00 - 16:00 1001373443 Pasang 3 kubikel Outgoing Trf 1 MSPT 03 ROB APD
GI 150KV KEREK Senin, 20/11/17 20 08:00 - 16:00 T/L BAY 150kV KOPEL & BUS A 03 ROB
GI 150KV KEREK Selasa, 21/11/17 21 08:00 - 16:00 T/L BAY 150kV BUS B 03 ROB
Padam bersamaan
GI 150KV KEREK Selasa, 21/11/17 21 08:00 - 16:00 Pemel 4 Bln Bay Bustie #1 Kerek 03 ROB Bus B (Single DS
Bus)
GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 300098262 HAR OFF GI TLGNG CUB TRF#4 70/20kV 03 ROT Rutin
GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 300098261 HAR OFF GI TLGNG TRF#4 70/20kV 20MVA 03 ROT Rutin
GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 300093393 HAR OFF PR TLGNG TRF#4 70/20kV 20MVA 03 ROT Rutin
GI 25KV GOLANG Selasa, 21/11/17 21 08:00 - 16:00 Pengg Relay DGR Bay Dolopo #1 Golang 03 ROB SKI
GI 25KV GOLANG Rabu, 22/11/17 22 08:00 - 16:00 Pengg Relay DGR Bay Dolopo #2 Golang 03 ROB SKI
GI 150KV KEREK Rabu, 22/11/17 22 08:00 - 16:00 Pemel 4 Bln Bay Bustie #2 Kerek 03 ROB
GI 70KV KERTOSONO Kamis, 23/11/17 23 08:00 - 16:00 November Pengg Dist Relay Nganjuk #2 Ktsn4 03 ROB SKI
GI 150KV SEMEN TUBAN 3 Senin, 27/11/17 27 08:00 - 16:00 Pemel 4 Bln Bay Kopel & Bus A Stban 03 ROB
GI 70KV KERTOSONO Senin, 27/11/17 27 08:00 - 16:00 November Pengg Dist Relay Ploso #1 Ktsn4 03 ROB SKI
GI 150KV SEMEN TUBAN 3 Selasa, 28/11/17 28 08:00 - 16:00 Pemel 4 Bln Busbar B Stban 03 ROB
GI 150KV MANISREJO Selasa, 28/11/17 28 08:00 - 16:00 1001373444 Bongkr intrface & Pasng DS Kpl TRF5 MNSJ 03 ROB APD
GI 150KV MANISREJO Selasa, 28/11/17 28 08:00 - 16:00 Pengg Diff Relay Bay Trafo #5 GI Mnrj5 03 ROB APD
GI 70KV KERTOSONO Selasa, 28/11/17 28 08:00 - 16:00 November Pengg Dist Relay Ploso #2 Ktsn4 03 ROB SKI
JADWAL RENCANA PEMELIHARAAN PERALATAN TRANSMISI DAN GARDU INDUK
BULAN NOVEMBER 2017
Lokasi Tgl Pemadaman T/L dan T/R Bay Jenis Keterangan
No Hari Jam Realisasi WO NOTIF PR Sifat Pekerjaan Jenis
Gardu Induk (Ok) Yang Dikerjakan
GI 150KV SEMEN TUBAN 3 Rabu, 29/11/17 29 08:00 - 12:00 Pemel 4 Bln Bay Bustie #1 Stban 03 ROB
GI 150KV SEMEN TUBAN 3 Rabu, 29/11/17 29 12:00 - 16:00 Pemel 4 Bln Bay Bustie #2 Stban 03 ROB
GI 150KV LAMONGAN Kamis, 30/11/17 30 08:00 - 16:00 November Pengg Dist Relay Segoromadu #1 Lngan 03 ROB SKI
GITET 500KV KEDIRI Minggu 3 07:00 - 15:00 November Pengg Diff Relay IBT #2 GITET Kediri 03 ROB SKI
GI 150KV LAMONGAN Minggu 1 08:00 - 16:00 Desember Pengg Dist Relay Segoromadu #2 Lngan 03 ROB SKI
GI 70KV BANARAN Minggu 1 08:00 - 16:00 Desember Pengg Dist Relay Pare #2 Bnrn4 03 ROB SKI
GI 70KV PARE Minggu 1 08:00 - 16:00 Desember Pengg Diff Relay Trafo #2 GI Pare 03 ROB SKI
GI 150KV BANARAN Minggu 2 08:00 - 16:00 Desember Pengg Diff Relay Trafo #5 GI Banaran 03 ROB SKI
Apabila ada permasalahan dengan APD/APJ harap melaporkan ke ENJINIRING APP (45100 / 45104)
sebagai bahan Rapat Koordinasi untuk disampaikan ke APD/Area agar supaya ditindaklanjuti
Menyetujui Mengetahui Yang Membuat
PLH MANAJER ASMAN ENJINIRING JE ASDIG ALAT JARGI
Keterangan :
03 =Pekerjaan
Peralatan Padam Selama
Berlangsung
05 = Tanpa padam & PDKB
Untuk pekerjaan yang statusnya T.APD, T.Konsumen & T APB masih akan dikonfirmasi ulang IRCHAM SUSANTO BASIS SUKARJA MUHAMMAD RIZZAL
sebelum Hari & Tanggal Pelaksanaan
PT PLN (PERSERO) TRANSMISI JAWA BAGIAN TIMUR & BALI
AREA PELAKSANA PEMELIHARAAN MADIUN
No Lokasi Hari Tgl Jam Pemadaman T/L dan T/R Bay Sifat Jenis Keterangan Jenis
Gardu Induk (Ok) Yang Dikerjakan Pekerjaan
1 GI 25KV GOLANG Rabu, 01/11/17 1 08:00 - 16:00 Pengg Relay DGR Bay Giringan #1 Golang 03 ROB SKI
2 GI 25KV GIRINGAN Rabu, 01/11/17 1 08:00 - 16:00 Pengg Relay DGR Bay Golang #1 Giringan 03 ROB SKI
3 GI 150KV KEDIRI Rabu, 01/11/17 1 08:00 - 16:00 HAR OFF GI KDIRI KOPEL BUS 150kV 03 ROT Rutin
4 GI 150KV KEDIRI Rabu, 01/11/17 1 08:00 - 16:00 HAR OFF GI KDIRI BUSBAR A 150kV 03 ROT Rutin
5 GI 150KV NGAWI Kamis, 02/11/17 2 08:00 - 16:00 HAR OFF GI NGAWI PHT 150kV MANISREJO#1 03 ROT Rutin
6 GI 150KV KEDIRI Kamis, 02/11/17 2 08:00 - 16:00 HAR OFF GI KDIRI BUSBAR B 150kV 03 ROT Rutin
7 GI 150KV MANISREJO Kamis, 02/11/17 2 08:00 - 16:00 HAR OFF GI MNRJ5 PHT 150kV NGAWI#1 03 ROT Rutin
8 GI 150KV BANARAN Sabtu, 04/11/17 4 08:00 - 16:00 Pengg Diff Relay IBT #2 Bnrn5 03 ROB SKI
9 GI 70KV BLITAR Minggu, 05/11/17 5 08:00-16:00 Pengg Rele DOCR Bay Wlingi #2 Bltru 03 ROB PT.Satriangga DOCR
Sebelumnya Minggu,
10 GI 70KV BLITAR Minggu, 05/11/17 5 08:00-16:00 Pengg PMS Bus A Macet Bay Wlingi #2 Bltru 03 ROB
22/10/17
11 GI 70KV BLITAR Minggu, 05/11/17 5 08:00-16:00 Pengg Dist Relay Bay Wlingi #2 Bltru SKI
12 GI 150KV TUBAN Selasa, 07/11/17 7 08:00 - 16:00 HAR OFF GI TUBAN PHT 150kV TJ AWARAWAR#1 03 ROT Rutin
13 GI 150KV TANJUNG AWAR AWAR Selasa, 07/11/17 7 08:00 - 16:00 HAR OFF GI TGWAR PHT 150kV TUBAN#1 03 ROT Rutin
14 GI 150KV BABAT Rabu, 08/11/17 8 08:00 - 16:00 HAR OFF GI BABAT PHT 150kV TJ AWARAWAR#1 03 ROT T.P2B Rutin
15 GI 150KV TANJUNG AWAR AWAR Rabu, 08/11/17 8 08:00 - 16:00 HAR OFF GI TGWAR PHT 150kV BABAT#1 03 ROT T.P2B Rutin
16 GI 70KV BANARAN Sabtu, 11/11/17 11 08:00 - 16:00 Pengg Dist Relay Tulungagung #2 Bnrn4 03 ROB SKI
17 GI 70KV TULUNGAGUNG Minggu, 12/11/17 12 08:00 - 16:00 Pengg Dist Relay Banaran #2 Tlgng 03 ROB SKI
HAR OFF GI KEREK PHT150kV SMN TUBAN#3.1 & Pemel 4
18 GI 150KV KEREK Senin, 13/11/17 13 08:00 - 16:00 03 ROT Rutin
Bln Bay Stban 3 #1 Kerek
HAR OFF GI STBAN PHT 150kV KEREK#1 & Pemel 4 Bln
19 GI 150KV SEMENTUBAN 3 Senin, 13/11/17 13 08:00 - 16:00 03 ROT Rutin
Bay Kerek #1 Stban
20 GI 150KV BANARAN Selasa, 14/11/17 14 08:00 - 16:00 Pengg Diff Relay IBT #3 Bnrn5 03 ROB SKI
21 GI 150KV KEREK Selasa, 14/11/17 14 08:00 - 12:00 Pemel 4 Bln Bay Mliwang #1 Kerek 03 ROB
22 GI 150KV KEREK Selasa, 14/11/17 14 12:01 - 16:00 Pemel 4 Bln Bay Tuban #1 Kerek 03 ROB
23 GI 150KV KEREK Rabu, 15/11/17 15 08:00 - 12:00 Pemel 4 Bln Bay Mliwang #2 Kerek 03 ROB
24 GI 150KV KEREK Rabu, 15/11/17 15 12:00 - 16:00 Pemel 4 Bln Bay Tuban #2 Kerek 03 ROB
25 GI 25KV GOLANG Rabu, 15/11/17 15 08:00 - 16:00 Pengg Relay DGR Bay Giringan #2 Golang 03 ROB SKI
26 GI 70KV KERTOSONO Kamis, 16/11/17 16 08:00 - 16:00 Pengg Dist Relay Nganjuk #1 Ktsn4 03 ROB SKI
27 GI 150KV KEREK Kamis, 16/11/17 16 08:00 - 16:00 Pemel 4 Bln Bay Stban 3 #2 Kerek 03 ROB
28 GI 150KV SEMEN TUBAN 3 Kamis, 16/11/17 16 08:00 - 16:00 Pemel 4 Bln Bay Kerek #2 Stban 03 ROB
29 GI 70KV BLITAR Minggu, 19/11/17 19 08:00 - 16:00 Pengg Dist Relay Wlingi #1 Bltru 03 ROB SKI
30 GI 70KV PLTA.TULUNGAGUNG Minggu, 19/11/17 19 08:00 - 16:00 Pasang Kubikel Outgoing Trf 1 TLGPA 03 ROB APD
31 GI 70KV MRANGGEN Senin, 20/11/17 20 08:00 - 16:00 Pasang 3 kubikel Outgoing Trf 1 MSPT 03 ROB APD
32 GI 150KV KEREK Senin, 20/11/17 20 08:00 - 16:00 Pemel 4 Bln Bay Kopel & Bus A Kerek 03 ROB
33 GI 150KV KEREK Selasa, 21/11/17 21 08:00 - 16:00 Pemel 4 Bln Busbar B Kerek 03 ROB
Padam bersamaan
34 GI 150KV KEREK Selasa, 21/11/17 21 08:00 - 16:00 Pemel 4 Bln Bay Bustie #1 Kerek 03 ROB Bus B (Single DS
Bus)
35 GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 HAR OFF GI TLGNG CUB TRF#4 70/20kV 03 ROT Rutin
36 GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 HAR OFF GI TLGNG TRF#4 70/20kV 20MVA 03 ROT Rutin
37 GI 70KV TULUNGAGUNG Selasa, 21/11/17 21 08:00 - 16:00 HAR OFF PR TLGNG TRF#4 70/20kV 20MVA 03 ROT Rutin
38 GI 25KV GOLANG Selasa, 21/11/17 21 08:00 - 16:00 Pengg Relay DGR Bay Dolopo #1 Golang 03 ROB SKI
39 GI 25KV GOLANG Rabu, 22/11/17 22 08:00 - 16:00 Pengg Relay DGR Bay Dolopo #2 Golang 03 ROB SKI
40 GI 150KV KEREK Rabu, 22/11/17 22 08:00 - 16:00 Pemel 4 Bln Bay Bustie #2 Kerek 03 ROB
41 GI 70KV KERTOSONO Kamis, 23/11/17 23 08:00 - 16:00 Pengg Dist Relay Nganjuk #2 Ktsn4 03 ROB SKI
42 GI 150KV SEMEN TUBAN 3 Senin, 27/11/17 27 08:00 - 16:00 Pemel 4 Bln Bay Kopel & Bus A Stban 03 ROB
43 GI 70KV KERTOSONO Senin, 27/11/17 27 08:00 - 16:00 Pengg Dist Relay Ploso #1 Ktsn4 03 ROB SKI
44 GI 150KV SEMEN TUBAN 3 Selasa, 28/11/17 28 08:00 - 16:00 Pemel 4 Bln Busbar B Stban 03 ROB
45 GI 150KV MANISREJO Selasa, 28/11/17 28 08:00 - 16:00 Bongkr intrface & Pasng DS Kpl TRF5 MNSJ 03 ROB APD
46 GI 150KV MANISREJO Selasa, 28/11/17 28 08:00 - 16:00 Pengg Diff Relay Bay Trafo #5 GI Mnrj5 03 ROB APD
47 GI 70KV KERTOSONO Selasa, 28/11/17 28 08:00 - 16:00 Pengg Dist Relay Ploso #2 Ktsn4 03 ROB SKI
48 GI 150KV SEMEN TUBAN 3 Rabu, 29/11/17 29 08:00 - 12:00 Pemel 4 Bln Bay Bustie #1 Stban 03 ROB
49 GI 150KV SEMEN TUBAN 3 Rabu, 29/11/17 29 12:00 - 16:00 Pemel 4 Bln Bay Bustie #2 Stban 03 ROB
50 GI 150KV LAMONGAN Kamis, 30/11/17 30 08:00 - 16:00 Pengg Dist Relay Segoromadu #1 Lngan 03 ROB SKI
Apabila ada permasalahan dengan APD/APJ harap melaporkan ke ENJINIRING APP (45100 / 45104)
sebagai bahan Rapat Koordinasi untuk disampaikan ke APD/Area agar supaya ditindaklanjuti
Menyetujui Mengetahui Yang Membuat
PLH MANAJER ASMAN ENJINIRING JE ASDIG ALAT JARGI
Keterangan :
= Peralatan Padam Selama
03 Pekerjaan Berlangsung
NO WBS URAIAN
TRANSMISI
M.3613.17.07.2.0003 1
M.3613.17.07.2.0003 2
M.3613.17.07.2.0004 4
M.3613.17.07.2.0005 1
M.3613.17.07.2.0005 2
M.3613.17.07.2.0008 2
M.3613.17.07.2.0008 3
M.3613.17.07.2.0008 4
M.3613.17.07.2.0008 5
M.3613.17.07.2.0009 1
M.3613.17.07.2.0009 2
M.3613.17.07.2.0009 3
M.3613.17.07.2.0009 5
M.3613.17.07.2.0009 6
M.3613.17.07.2.0009 7
M.3613.17.07.2.0009 8
M.3613.17.07.2.0009 9
M.3613.17.07.2.0009 10
M.3613.17.07.2.0009 11
M.3613.17.07.2.0009 12
M.3613.17.07.2.0009 13
M.3613.17.07.2.0009 14
M.3613.17.07.2.0009 15
M.3613.17.07.2.0009 17
M.3613.17.07.2.0009 18
M.3613.17.07.2.0009 19
M.3613.17.07.2.0009 20
M.3613.17.07.2.0009 21
M.3613.17.07.2.0009 22
M.3613.17.07.2.0009 23
M.3613.17.07.2.0009 26
M.3613.17.07.2.0009 27
M.3613.17.07.2.0009 28
M.3613.17.07.2.0035 1
M.3613.17.07.2.0035 2
M.3613.17.07.2.0037 4
M.3613.17.07.2.0037 6
M.3613.17.07.2.0038 1
M.3613.17.07.2.0038 5
M.3613.17.07.2.0038 6
M.3613.17.07.2.0032 1
M.3613.17.07.2.0032 2
M.3613.17.07.2.0032 2
M.3613.17.07.2.0032 3
M.3613.17.07.2.0032 4
M.3613.17.07.2.0032 5
M.3613.17.07.2.0032 6
M.3613.17.07.2.0032 8
M.3613.17.07.2.0032 9
M.3613.17.07.2.0032 12
LAMPIRAN SURAT KUASA KERJA
GRAM KERJA NON RUTIN TAHUN 2017 PLN APP MADIUN
PERIODE : JANUARI S.D DESEMBER 2017
PENETAPAN
URAIAN
SAT VOL
TRANSMISI
Penggantian meter Ampere, Volt, MW, MVAR T/R Trafo IBT #1 150/70 kV 100 MVA bh 1.0
GI Kertosono
Perbaikan rembes minyak BCT Trafo IBT #3 150/70 kV 35 MVA GI Banaran bh 1.0
Perbaikan kabel Schoen outdoor 630 mm Ph-RST Inc 20 kV Trafo #2 150/20 kV 60 lot 1.0
MVA GI New Ponorogo
Penggantian Announciator Trafo #2 70/20 kV 20 MVA GI Dolopo lot 1.0
Penggantian O-ring seal top bushing sekunder Trafo #1 70/20 kV GI Tulungagung set 1.0
Penggantian terminasi klem T/L 150kV Bay Ngawi #1 GI Manisrejo lot 1.0
Penggantian terminasi klem T/L 150kV Bay Ngawi #2 GI Manisrejo lot 1.0
Penggantian terminasi klem T/L 150kV Bay Babat 1 GI Bojonegoro lot 1.0
Penggantian terminasi klem T/L 150kV Bay Babat 2 GI Bojonegoro lot 1.0
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- set 1.0
21 T/L Bay Blitar #1 GI Tulungagung
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/R Bay Trafo #1 GI Tulungagung
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- set 2.0
21 T/R Bay Trafo #2 GI Tulungagung
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV PLTA Tulungagung GI Tulungagung
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Ponorogo 1 GI Dolopo
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO-
21 T/L Bay 70 kV Trenggalek GI Tulungagung bh 1.0
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Wlingi 2 GI Blitar
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Ploso 2 GI Kertosono
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Sekarputih 1 GI Kertosono
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Nganjuk 1 GI Kertosono
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Nganjuk 2 GI Kertosono
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO-
21 T/L Bay 70 kV Caruban GI Manisrejo bh 1.0
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Mranggen 1 GI Manisrejo
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Mranggen 2 GI Manisrejo
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO-
21 T/L Bay 70 kV Manisrejo 2 GI Mranggen bh 1.0
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- set 1.0
21 T/L Bay Banaran #2 GI Tulungagung
Penggantian Pipa penghubung tanki ke Closing dari besi menjadi steinless PMT SO- bh 1.0
21 T/L Bay 70 kV Tulungagung 2 GI Banaran
Penggantian terminal Klem PMS Line 70 kV T/L Bay Manisrejo GI Nganjuk lot 1.0
Penggantian terminasi klem peralatan PMS Line T/L 70kV Bay Caruban GI Nganjuk lot 1.0
Penggantian terminal Klem PMS Line 70 kV T/L Bay Manisrejo GI Caruban lot 1.0
Penggantian terminasi klem peralatan PMS Line T/L 70kV Bay Nganjuk GI Caruban lot 1.0
Penggantian rele 50G arah Ponorogo-Dolopo 1 bh 1.0
Penggantian rele 50G arah Ponorogo-Trenggalek 1 & 2 bh 1.0
Penggantian PMT Mranggen-Magetan #2 lot 1.0
Pembuatan/Pengadaan Papan Informasi SUTET Kediri-Pedan dan Kediri - Paiton twr 117.0
(117 Tower)
Perbaikan grounding hilang Kediri - Paiton 11 tower
(T.364,365,367,368,369,370,371,372,374,423,425) dan Kediri - Pedan 2 tower twr 13.0
(T.36,83)
Perbaikan grounding hilang SUTT 150 kV twr 125.0
Pemasangan grounding langsung top gsw ke tanah SUTT 150 kV PLTU Pacitan-
Nguntoronadi-Pacitan T. 104, 106 (2 tower) twr 2.0
Penggantian PG Klem ke Compress Joint SUTT 70kV Mranggen - Magetan 1,2 lot 1.0
Pekerjaan grounding langsung top Tower GSW ke tanah (rod 6 mtr) SUTT 70kV
Trenggalek - Ponorogo T.23,30,39,52,69,70,71,72,83,84,85,88,89,90,93,100,101(17 twr 17.0
tower)
Perbaikan Grounding SUTT 70kV Ponorogo - Dolopo T. 8, 10, 19, 53, 18, 15, 29, 35,
twr 10.0
23, 36 (10 tower)
Perbaikan Plafon rumah instalasi GI Tuban lot 1.0
Renovasi Central Arsip APP Madiun lot 1.0
Pengadaan Switch Core App Madiun lot 2.0
Pengadaan Access Switch APP Madiun lot 1.0
Penggantian Server FTP Rusak lot 2.0
Pengadaan dan pemasangan Server WEB lot 1.0
Access Point Kantor APP Madiun lot 1.0
Pengadaan Dehumidifier untuk ruang server lot 1.0
Pengadaan USB Wireless Adapter (setara asus usb-ac56) unit 90.0
GPS untuk pengujian TP lot 2.0
PROGRESS FISIK RENCANA
BULAN BAYAR KENDALA DOKUMENTAS
(%) PENGERJAAN
JULI ok
AGUSTUS April + Har ok
APRIL ###
JULI ok
APRIL ###
NOVEMBER belum
MEI belum
SEPTEMBER belum
APRIL belum
JULI ###
APRIL ###
APRIL belum
MEI ###
APRIL ###
JUNI ###
JUNI ok
APRIL belum
MEI ###
MEI ###
MEI belum
SEPTEMBER belum
SEPTEMBER belum
SEPTEMBER belum
SEPTEMBER
SEPTEMBER
AGUSTUS
AGUSTUS
AGUSTUS
AGUSTUS
JULI belum
JULI belum
MEI belum
APRIL
MEI
MEI
MEI
APRIL
MEI, JUNI
MEI
AGUSTUS
AGUSTUS
JUNI
MEI
APRIL
MEI
MEI
AGUSTUS
AGUSTUS
JUNI