ANALISA TRANSIENT
MENGGUNAKAN SOFTWARE ETAP 12.6
TUGAS
Dikumpulkan untuk memenuhi tugas matakuliah
PKDST II (Pemdelan Komputer dalam Sistem Tenaga)
Yang diampu oleh Bapak Sigi Syah Wibowo,B.TECH.,MT
Disusun oleh:
Lindiasari Martha Yustika 1441150002
1. Load Project
TS_IEEE9Bus.
2. First Run
Create a study case FaultLine3 (a sustained fault).
Identify G2 rotor relative rotor angle reaches 180 at approximately 0.341 sec.
@ 1 st swing.
3. Third Run
Reduce the action time to open Line3 to 0.2 sec.
G2 rotor relative angle is less than 137 during the entire oscillation.
6. Conclusions
Critical Fault Clearing Time (CFCT) = 0.138 sec. (= 8 cycles).
7. Final Run
Set the action time to open Line3 to CFCT = 7 cycles = 0.116 sec.
G2 rotor relative angle is less than 115 during the entire oscillation.
EXAMPLE 2
1. Load Project
TS_Example2
2. Enter Generator Data:
Generator Gen1
Imp/Model Page
Rotor Type Round-Rotor
Dynamic Model Subtransient (Typical Data)
Inertia Page
Generator Inertia 0.9 MW-sec/MVA
Exciter Page
Exciter Type 1 (Sample Data)
Governor Page
Governor Type ST1 (Sample Data)
PSS Page
PSS Type None
3. Edit Study Case to Simulate a Bus Fault:
Events Page (Solution Parameters)
Simulation Time Step 0.001 sec
Plot Time Step 10 x dt.
Total Simulation Time 10 sec.
Plot Page
Plot Syn. Generator Gen1
Plot Ind. Machines, MV Mtr2, Pump 1
Plot Bus Main Bus, Sub2B, Sub22, Sub23.