CUADRILLAS EQUIVALENTES

OBRA: VIVIENDA UNIFAMILIAR UBICACIN: FECHA: OCTUBRE 2017 HECHO POR: REVISADO POR: ING.
DATOS OBTENIDOS DEL PRESUPUESTO Y ANALISIS DE PRESIOS UNITARIOS CALCULO NUEVA CUADRILLA
CUADRILLA BASE REND. TOTAL HORAS HOMBRE TOTAL HH TIEMPO NUEVA CUADRILLA
N ACTIVIDAD UND METRADO P.U COSTO
OPE. OFI. PEON UNIT. OPE. OFI. PEON OPE. OFI. PEON (DIAS) OPE. OFI. PEON
OFICINAS m2 30.00 139.37 4181.1 0 1 6 12 0 20 120
ALMACENES m2 42.00 139.37 5853.54 0 1 6 12 0 28 168
PROVISIONALES

CASETA DE GUARDIANIA m2 1.56 139.37 217.4172 0 1 6 12 0 1.04 6.24


OBRAS

SERVICIOS HIGENICOS m2 2.88 139.37 401.3856 0 1 6 12 0 1.92 11.5

336.69
21.47

50.96
1 CERCO PROVISIONAL DE OBRA m 101.00 26.26 2652.26 1 0 2 60 13.47 0 26.9 6 0.447 1.062 7.01444
CARTEL DE IDENTIFICACION DE LA undOBRA DE 4.80m1.00 1216.66
x 3.60m 1216.66 2 0 1 2 8 0 4
ALQUILER DE LOCAL PARA FUNCIONAMIENTO
glb DE PERSONAL
1.00 500 500 0 0 0 1 0 0 0
AGUA PARA LA CONSTRUCCION glb 1.00 800 800 0 0 0 1 0 0 0
ENERGIA ELECTRICA PARA LA CONSTRUCCION
glb 1.00 1200 1200 0 0 0 1 0 0 0
DESMONTAJE DE PUERTAS m2 11.40 3.38 38.532 1 0 1 80 1.14 0 1.14
DESMONTAJE DE VENTANAS m2 36.45 2.71 98.7795 1 0 1 100 2.916 0 2.92
DESMONTAJE DE TECHO m2 385.69 32.22 12426.932 1 0 2 12 257.1 0 514
DESMONTAJE Y DEMOLICION

DEMOLICION DE MURO DE ADOBEm2 DE E=45cm 358.59 21.97 7878.2223 0 0.5 1 8 0 179 359
DEMOLICION DE PISO DE MADERA m2 261.80 19.33 5060.594 0.5 0 1 10 104.7 0 209
DEMOLICION DE SOBRECIMIENTOm3 63.07 56.26 3548.3182 0.1 1 0.5 20 2.523 25.2 12.6
DEMOLICION DE VEREDA m3 66.35 56.26 3732.851 0.1 1 0.5 20 2.654 26.5 13.3

1313.07
386.53

339.29
ELIMINACION DE MATERIAL EXCEDENTE
m3 HASTA 448.20
3 KM 5.58 2500.956 1 1 4 600 5.976 5.98 23.9
2 10 4.832 4.241 16.4134
LIMPIEZA DE TERRENO MANUAL m2 373.50 3.3 1232.55 0.1 0 1 40 7.47 0 74.7
TRAZO DURANTE LA EJECUCION m2 DE LA OBRA 373.50 22.5 8403.75 0 1 1 100 0 29.9 29.9
REPLANTEO DURANTE LA EJECUCION m2 DE LA OBRA 904.59 22.5 20353.275 0 1 1 100 0 72.4 72.4
CAPACITACION EN SEGURIDAD Yglb SALUD 1.00 1100 1100
SEALIZACION TEMPORAL DE SEGURIDAD
glb 1.00 292.57 292.57 1 0 0 4 2 0 0
EQUIPOS DE PROTECCION COLECTIVAglb 1.00 2832.25 2832.25
EQUIPOS DE PROTECCION INDIVIDUAL
glb 1.00 2500 2500
RECURSO PARA RESPUESTA ANTE glbEMERGENCIAS1.00 1500
EN SEGURIDAD 1500 TEMPORAL
Y SALUD
EXCAVACION MANUAL PARA LAm3 CIMENTACION 258.51 34.65 8,957.37 0.1 0 1 3.8 54.42 0 544
MOVIMIENTO
DE TIERRAS

RELLENO CON MATERIAL PROPIO m3 62.71 18.46 1,157.60 0.1 0 1 7 7.167 0 71.7

1047.35
87.60

0.00
3 NIVELACION INTERIOR Y APISONADO
m2 166.00 3.34 554.44 1 0 1 100 13.28 0 13.3 8.00 1.37 0.00 16.36
ACARREO DE MATERIAL EXCAVADO m3 254.54 16.29 4,146.49 0 0 1 7 0 0 291
ELIMINACION DE MATERIAL EXCEDENTE
m3 254.54 19.52 4,968.66 0.1 0 1 16 12.73 0 127
SOLADO DE CONCRETO DE 4" MEZCLAm2 1:12 CEMENTO
170.06 44.07 7,494.37
- HORMIGON 1 1 6 40 34.01 34 204
OBRAS DE
CONCRETO

CIMIENTOS CORRIDOS MEZCLA 1:10 m3 CEMENTO92.56 255.52 + 30%


- HORMIGON 23,651.90
PG 1 2 8 14 52.89 106 423
SIMPLE

230.57

247.96

841.84
ENCOFRADO Y DESENCOFRADO m2CIMIENTO CORRIDO
76.44 45.27 3,460.34 1 1 0.5 12 50.96 51 25.5
4 10.00 2.88 3.10 10.52
SOBRE CIMIENTO 1:8 + 25% PMm3 5.45 299.68 1,634.39 1 2 8 10 4.363 8.73 34.9
ENCOFRADO Y DESENCOFRADO m2SOBRECIMIENTO
46.71 45.27 2,114.65 1 1 0.5 12 31.14 31.1 15.6
FALSO PISO MEZCLA 1:8 E=4" m2 260.00 30.05 7,813.00 3.3 1 8 120 57.2 17.3 139
ZAPATAS - ENCOFRADO Y DESENCOFRADO
m3 DE
75.00 52.36
ZAPATAS 3,927.00 0.8 1 0.5 8 60 75 37.5
ZAPATAS - ACERO GRADO 60 PARAkg ZAPATAS
2,898.78 7.24 20,987.20 1.1 1 0 200 127.5 116 0
ZAPATAS - CONCRETO f'c=210m3 Kg/cm2 PARA73.25
ZAPATAS 301.23 22,065.10 1.1 1 5 12.5 51.57 46.9 234
ZAPATAS - CURADO DE CONCRETO m2 75.00 3.11 233.25 0 1 0 60 0 10 0
CIMENTACION

LC - ENCOFRADO Y DESENCOFRADO m2 6.20 DE52.36


PARA LOSAS CIMENTACION324.63 0.8 1 0.5 8 4.96 6.2 3.1

455.04

477.11

413.05
LC - ACERO GRADO 60 PARA LOSAS kg DE CIMENTACION
124.73 7.24 903.01 1.1 1 0 200 5.488 4.99 0
5 15.00 3.79 15.73 3.28
LC - CONCRETO f'c=210 Kg/cm2m3 PARA LOSAS DE 362.67
3.00CIMENTACION 1,088.01 1 2 6 10 2.4 4.8 14.4
LC - CURADO DE CONCRETO m2 6.00 3.11 18.66 0 1 0 60 0 0.8 0
VC - ENCOFRADO Y DESENCOFRADO m2 75.03 DE 52.36
PARA VIGAS CONEXION 3,928.57 0.8 1 0.5 8 60.02 75 37.5
VC - ACERO GRADO 60 PARA VIGAS kg DE CONEXION
2,820.48 7.24 20,420.24 1.1 1 0 200 124.1 113 0
VC - CONCRETO f'c=210 Kg/cm2 m3PARA VIGAS DE 21.53 340.1
CONEXION 7,323.71 1.1 1 5 10 18.95 17.2 86.1
VC - CURADO DE CONCRETO m2 55.60 3.11 172.90 0 1 0 60 0 7.41 0
PLACAS - ENCOFRADO Y DESENCOFRADO
m2 PARA 130.09 21,323.05
163.91PLACAS 1 2 2 14 93.66 187 187
PLACAS - ACERO GRADO 60 PARA kg PLACAS3,571.64 7.1 25,358.64 1 1 0 200 142.9 143 0
PLACAS - CONCRETO f'c=175 Kg/cm2
m3 PARA PLACAS15.74 366.58 5,771.25 1 2 6 10 12.59 25.2 75.6
COLUMNAS NIVEL 1

PLACAS - CURADO DE CONCRETO m2 163.91 3.11 509.76 0 1 0 60 0 21.9 0


COLUMNAS - ENCOFRADO Y DESENCOFRADO
m2 93.87 53.86
PARA COLUMNAS 5,055.78 1 1 0.5 10 75.1 75.1 37.5
472.92

668.77

431.20

COLUMNAS - ACERO GRADO 60kg PARA COLUMNAS


1,412.54 7.24 10,226.77 1 1 0 200 56.5 56.5 0
6 8.00 7.39 10.45 6.74
COLUMNAS - CONCRETO f'c=210 m3Kg/cm2 PARA8.53 441.72
COLUMNAS 3,766.16 1.1 1 5 5 15.01 13.6 68.2
COLUMNAS - CURADO DE CONCRETO m2 93.87 3.11 291.93 0 1 0 60 0 12.5 0
C.ARRIOSTRE- ENCOFRADO Y DESENCOFRADO
m2 83.44PARA48.58
COLUMNAS4,053.52 0.5 1
DE ARRIOSTRE 0.5 8 41.72 83.4 41.7
C.ARRIOSTRE ACERO GRADO 60 kgPARA COLUMNAS 7.1
876.33 DE ARRIOSTRE 6,221.96 1 1 0 200 35.05 35.1 0
C.ARRIOSTRE CONCRETO f'c=175 m3Kg/cm2 PARA 5.21 302.1 DE1,573.34
COLUMNAS ARRIOSTRE0.1 1 5 10 0.417 4.17 20.8
C.ARRIOSTRE CURADO DE CONCRETOm2 83.44 3.11 259.50 0 1 0 60 0 11.1 0
VIGAS - ENCOFRADO Y DESENCOFRADO
m2 PARA VIGAS 61.33 13,618.68 1.1
222.06 1 0.5 9 217.1 197 98.7
VIGAS - ACERO GRADO 60 PARAkgVIGAS 2,821.90 7.24 20,430.59 1.1 1 0 200 124.2 113 0
VIGAS - CONCRETO f'c=210 Kg/cm2
m3 PARA VIGAS 25.64 344.01 8,818.73 1.1 1 5 10 22.56 20.5 103
LOSAS Y VIGAS NIVEL2

VIGAS - CURADO DE CONCRETO m2 222.06 3.11 690.59 0 1 0 60 0 29.6 0


V ARRIOSTRE - ENCOFRADO Y m2 DESENCOFRADO 4.98PARA 48.58
VIGAS DE242.10 0.5
ARRIOSTRE 1 0.5 8 2.492 4.98 2.49
V ARRIOSTRE - ACERO GRADO kg 60 PARA VIGAS728.45 7.1
DE ARRIOSTRE 5,172.02 1 1 0 200 29.14 29.1 0
711.92

709.88

544.81

7 V ARRIOSTRE - CONCRETO f'c=175m3 Kg/cm2 PARA 2.49VIGAS302.1 752.77 0.1


DE ARRIOSTRE 1 5 10 0.199 1.99 9.97 14.00 6.36 13.96 4.88
V ARRIOSTRE - CURADO DE CONCRETO
m2 34.25 3.11 106.52 0 1 0 60 0 4.57 0
LOSAS - ENCOFRADO Y DESENCOFRADO
m2 PARA LOSAS49.36
240.83 11,887.37 1.1
ALIGERADAS 1 0.5 10 211.9 193 96.3
LOSAS - LADRILLO BLOQUES HUECOS
und 15X30X30
3,010.00 3.83 11,528.30 2 1 10 1600 30.1 15.1 151
LOSAS - ACERO GRADO 60 PARAkg LOSAS ALIGERADAS
1,303.52 7.24 9,437.51 1.1 1 0 200 57.36 52.1 0
LOSAS - CONCRETO f'c=210 Kg/cm2m3 PARA LOSAS 21.07 342.5
ALIGERADAS 7,217.37 1 1 5 10 16.86 16.9 84.3
LOSAS - CURADO DE CONCRETO m2 240.83 3.11 748.98 0 1 0 60 0 32.1 0
ESCALERA

ENCOFRADO Y DESENCOFRADOm2 PARA VIGAS 54.55


DE AMARRE 85.65 4,672.00 0.5 1 1 5 43.64 87.3 87.3
S NIVEL 1

113.22

7.24 2,455.16 1.1 1 0 200 14.92 13.6 0


60.85

98.72

ACERO GRADO 60 PARA VIGAS DE kgAMARRE 339.11


8 4.00 1.90 3.54 3.09
CONCRETO f'c=210 Kg/cm2 PARA m3 VIGAS DE AMARRE2.86 342.5 980.24 1 1 5 10 2.29 2.29 11.4
CURADO DE CONCRETO m2 75.65 3.11 235.28 0 1 0 60 0 10.1 0
PLACAS - ENCOFRADO Y DESENCOFRADO
m2 PARA 130.09 21,323.05
163.91PLACAS 1 2 2 14 93.66 187 187
PLACAS - ACERO GRADO 60 PARA kg PLACAS3,571.64 7.1 25,358.64 1 1 0 200 142.9 143 0
PLACAS - CONCRETO f'c=175 Kg/cm2
m3 PARA PLACAS15.74 366.58 5,771.25 1 2 6 10 12.59 25.2 75.6
COLUMNAS NIVEL 2

PLACAS - CURADO DE CONCRETO m2 163.91 3.11 509.76 0 1 0 60 0 21.9 0


COLUMNAS - ENCOFRADO Y DESENCOFRADO
m2 93.87 53.86
PARA COLUMNAS 5,055.78 1 1 0.5 10 75.1 75.1 37.5
472.92

668.77

431.20

COLUMNAS - ACERO GRADO 60kg PARA COLUMNAS


1,412.54 7.24 10,226.77 1 1 0 200 56.5 56.5 0
9 8.00 7.39 10.45 6.74
COLUMNAS - CONCRETO f'c=210 m3Kg/cm2 PARA8.53 441.72
COLUMNAS 3,766.16 1.1 1 5 5 15.01 13.6 68.2
COLUMNAS - CURADO DE CONCRETO m2 93.87 3.11 291.93 0 1 0 60 0 12.5 0
C.ARRIOSTRE- ENCOFRADO Y DESENCOFRADO
m2 83.44PARA48.58
COLUMNAS4,053.52 0.5 1
DE ARRIOSTRE 0.5 8 41.72 83.4 41.7
C.ARRIOSTRE ACERO GRADO 60 kgPARA COLUMNAS 7.1
876.33 DE ARRIOSTRE 6,221.96 1 1 0 200 35.05 35.1 0
C.ARRIOSTRE CONCRETO f'c=175 m3Kg/cm2 PARA 5.21 302.1 DE1,573.34
COLUMNAS ARRIOSTRE0.1 1 5 10 0.417 4.17 20.8
C.ARRIOSTRE CURADO DE CONCRETOm2 83.44 3.11 259.50 0 1 0 60 0 11.1 0
VIGAS - ENCOFRADO Y DESENCOFRADO
m2 PARA VIGAS 61.33 13,618.68 1.1
222.06 1 0.5 9 217.1 197 98.7
VIGAS - ACERO GRADO 60 PARAkgVIGAS 2,821.90 7.24 20,430.59 1.1 1 0 200 124.2 113 0
VIGAS PARA TECHO

VIGAS - CONCRETO f'c=210 Kg/cm2


m3 PARA VIGAS 25.64 344.01 8,818.73 1.1 1 5 10 22.56 20.5 103
COBERTURA

711.92

709.88

544.81

10 14.00 6.36 6.34 4.86


LOSA Y VIGAS PARA TECHO
VIGAS - CURADO DE CONCRETO m2 222.06 3.11 690.59 0 1 0 60 0 29.6 0
V ARRIOSTRE - ENCOFRADO Y m2DESENCOFRADO 4.98PARA48.58
VIGAS DE242.10 0.5
ARRIOSTRE 1 0.5 8 2.492 4.98 2.49

COBERTURA
V ARRIOSTRE - ACERO GRADO kg 60 PARA VIGAS
728.45 7.1
DE ARRIOSTRE 5,172.02 1 1 0 200 29.14 29.1 0

711.92

709.88

544.81
10 V ARRIOSTRE - CONCRETO f'c=175
m3 Kg/cm2 PARA 302.1
2.49VIGAS 752.77 0.1
DE ARRIOSTRE 1 5 10 0.199 1.99 9.97 14.00 6.36 6.34 4.86
V ARRIOSTRE - CURADO DE CONCRETO
m2 34.25 3.11 106.52 0 1 0 60 0 4.57 0
LOSAS - ENCOFRADO Y DESENCOFRADO
m2 PARA LOSAS49.36
240.83 11,887.37 1.1
ALIGERADAS 1 0.5 10 211.9 193 96.3
LOSAS - LADRILLO BLOQUES HUECOS
und 15X30X30
3,010.00 3.83 11,528.30 2 1 10 1600 30.1 15.1 151
LOSAS - ACERO GRADO 60 PARAkg LOSAS ALIGERADAS
1,303.52 7.24 9,437.51 1.1 1 0 200 57.36 52.1 0
LOSAS - CONCRETO f'c=210 Kg/cm2
m3 PARA LOSAS21.07 342.5
ALIGERADAS 7,217.37 1 1 5 10 16.86 16.9 84.3
LOSAS - CURADO DE CONCRETO m2 240.83 3.11 748.98 0 1 0 60 0 32.1 0
NIVEL 1

MUROS DE CABEZA LADRILLO KING KONG 18 HUECOS MECANIZADO


157.53 20,806.88 1 0 0.75 4.2 251.6 0 189

319.56

239.67
m2 132.08

0.00
MUROS

11 10.00 3.99 0.00 0.00


MUROS DE SOGA LADRILLO KING KONG 18 HUECOS MECANIZADO
m2 53.53 92.12 4,931.32 1 0 0.75 6.3 67.98 0 51
NIVEL 2

MUROS DE CABEZA LADRILLO KING KONG 18 HUECOS MECANIZADO


m2 66.04 157.53 10,403.44 1 0 0.75 4.2 125.8 0 94.3

159.78

119.84
0.00
10.00
MUROS

12 2.00 0.00 1.50


MUROS DE SOGA LADRILLO KING KONG 18 HUECOS MECANIZADO
m2 26.77 92.12 2,465.66 1 0 0.75 6.3 33.99 0 25.5
TARRAJEO INTERIOR CON MORTERO m2 133.95 37.76 5,057.93 1 0 1 8 133.9 0 134
REVOQUES

TARRAJEO EXTERIOR CON MORTERO m2 288.93 50.99 14,732.54 1 0 1 6 385.2 0 385

1554.12

1455.17
TARRAJEO DE SUPERFICIES COLUMNASm2 226.67 37.74 8,554.53 1 0 1 8 226.7 0 227

0.00
13 22.00 8.83 0.00 8.27
TARRAJEO DE SUPERFICIES VIGAS m2 233.12 60.89 14,194.92 1 0 1 5 373 0 373
VESTIDURA DE DERRAMES EN PUERTAS,ml
VENTANAS356.06
Y VANOS 24.62 8,766.20 1 0 1 12 237.4 0 237
BRUAS ml 772.98 6.65 5,140.34 0.8 0 0.4 25 197.9 0 98.9

ENLUCIDO CON YESO EN CIELORASO


RRASOS
CIELO

469.62

384.24
m2 298.85 42.3 12,641.36 1 0 1 8 298.9 0 299

0.00
14 9.00 6.52 0.00 0.00

CIELORRASOS CON GYPLAC


m2 77.25 23,086.16
298.85 1 0 0.5 14 170.8 0 85.4
77.38 18,308.11 1 0 5 15 126.2 0 631
CONTRAPI

FALSO PISO m2 236.60

1290.84
PISOS
SOS Y

747.34
18.48 4,372.37 1 1 2 80 23.66 23.7 47.3

31.21
CONTRAPISOS m2 236.60
15 15.00 6.23 0.26 10.76
PISO DE MADERA MACHIHEMBRADA m2 473.20 99.92 47,282.14 1 0 1 6.5 582.4 0 582
ACABADO DE CONCRETO EN PISOS PULIDOm2 Y BRUADO
41.50 33.9m EN1,406.85
CADA 1.00 1 0.5
AMBOS SENTIDOS 2 22 15.09 7.55 30.2
1.9 78.85 0 0 1 60 0 0 5.53
SARDINELES

EXCAVACION DE ZANJA PARA SARDINELES m 41.50


SARDINELES DE CONCRETO DE fc=175kg/cm
m de 15x5041.50
cm 14.24 590.96 1 1 2 50 6.64 6.64 13.3
ENCOFRADO Y DESENCOFRADO EN SARDINELES
m2 20.75 39.34 816.31 0.5 0.5 1 15 5.533 5.53 11.1
CORTE DE TERRENO HASTA h=0.20 m m3 18.04 38.76 699.23 0 0 1 3 0 0 48.1

142.39

235.80

507.11
16 NIVELACION Y COMPACTADO E=4" PARA m2
VEREDAS 83.00 6.38 529.54 1 0 1 50 13.28 0 13.3 8.00 2.22 3.68 7.92
Y

EMPEDRADO CON PIEDRA MEDIA DE D=4"m2 83.00 26.35 2,187.05 0 1 1 14 0 47.4 47.4
VEREDAS

CONCRETO EN VEREDAS f'c=175kg/cm PARA


m3 VEREDAS
176.20 286.58 50,495.40 1 2 4 16 88.1 176 352
BRUAS EN VEREDAS m 176.20 4.09 720.66 1 0 0.5 50 28.19 0 14.1
SELLADO DE JUNTA EN VEREDAS m 8.00 9.01 72.08 1 0 3 100 0.64 0 1.92
ZOCA

RAZO
CALO
CONT

39.04
COBERTU LO Y

0.00

0.00
17 CONTRAZOCALO DE MADERA AGUANO 3/4" X 2 1/2" RODON DE 3/4" 3.00 1.63 0.00 0.00
ml 244.00 14.21 3,467.24 1 0 0 50 39.04 0 0
CORREA METALICAS ml 498.00 38.12 18,983.76 1 1 0 20 199.2 199 0

385.12

385.12
2850 39,900.00 0 0 0 6 0 0 0

88.81
TIJERALES METALICOS ml 14.00
RA

18 12.00 4.01 4.01 0.93


CUBIERTA DE TEJA ANDINA m2 444.05 63.7 28,285.99 1 1 0.5 20 177.6 178 88.8
CUMBRERA PARA TEJA ANDINA ml 41.50 36.45 1,512.68 1 1 0 40 8.3 8.3 0
CERRAJER

MALLA RASHALL 45000 45,000.00


CARPINTE

glb 1.00
MADERA

4506MM3,600.00
18.67

MADERA ENCHAPADA CON LAMINA DECORATIVAund AMBAS CARAS DE


8.00 CON MIRILLA PUERTA P-1 (1.20x2.10 m)
RIA,

0.00

0.00
19 12.00 0.19 0.00 0.00
Y

BISAGRA ALUMINIZADA CAPUCHINA DE 4"pza X 4" 24.00 11.9 285.60 1 0 0 18 10.67 0 0


CERRADURA DE DOS GOLPES pza 8.00 82.47 659.76 1 0 0 8 8 0 0
VIDRIO INCOLORO CRUDO DE 6mm INC ACCESORIOS
m2 CON SISTEMA
141.38 42.5 CORREDIZO
6,008.48 0 0 0 40 0 0 0
COLOCACION
DE VIDRIOS Y
VENTANAS

VENTANA DE ALUMINIO SISTEMA DESLIZANTEund TIPO V-1


16.00 172.84 2,765.44 1 0 0.5 8 16 0 8
191.79 1,534.32 1 0 0.5 8 8 0 4
41.00

20.50

VENTANA DE ALUMINIO SISTEMA DESLIZANTEund TIPO V-28.00


0.00

20 4.00 1.28 0.00 0.64


VENTANA DE ALUMINIO SISTEMA DESLIZANTEund TIPO V-38.00 169.04 1,352.32 1 0 0.5 8 8 0 4
VENTANA DE ALUMINIO SISTEMA DESLIZANTEund TIPO V-48.00 158.04 1,264.32 1 0 0.5 8 8 0 4
und
VENTANA DE ALUMINIO SISTEMA DESLIZANTE TIPO V-5 1.00 212.04 212.04 1 0 0.5 8 1 0 0.5
PINTURA LATEX EN CIELO RASO 2 MANOS m2 298.85 16.76 5,008.73 1 0 0 12 199.2 0 0
PINTURA LATEX EN ALEROS 2 MANOS m2 61.38 16.76 1,028.73 1 0 0 12 40.92 0 0
PINTURA VINILICO EN MUROS INTERIORES m2 2 MANOS133.95 7.06 945.68 1 0 0 33 32.47 0 0
PINTURA

859.29

12.56 3,628.96 1 0 0 15 154.1 0 0


13.83

PINTURA VINILICO EN MUROS EXTERIORES m2 2 MANOS288.93


0.00

21 10.00 10.74 0.00 0.17


PINTURA VINILICO EN SUPERFICIES COLUMNAS
m2 226.67 11.2 2,538.70 1 0 0 20 90.67 0 0
PINTURA VINILICO EN SUPERFICIES VIGAS m2 233.12 13.7 3,193.80 1 0 0 15 124.3 0 0
PINTURA VINILICO EN VESTIDURAS DE DERRAMES
ml 356.06 13.7 4,878.02 1 0 0 15 189.9 0 0
PINTURA EN CARPINTERIA DE MADERA m2 62.25 12.31 766.30 1 0 0.5 18 27.67 0 13.8
CION DE INSTALACION

SALIDA PARA DRENAJE PLUVIAL D=4"


pto 2.00 100.59 201.18 1 0 1 3.5 4.571 0 4.57
SANITARIAS

CANALETAS CIRCULAR DE FG DEm 6" 74.00 37.59 2,781.66 1 0 1 10 59.2 0 59.2


92.44

20.48

86.06
ES

22 MONTANTE DE AGUAS PLUVIALES m 25.60 21.86 559.62 1 0 1 25 8.192 0 8.19 12.00 0.96 0.21 0.90
CONCRETO F'C 175 KG/CM2 PROTECCION
m3 2.35 382.35
DE TUBERIA 898.52 2 2 6 8 4.7 4.7 14.1
TUBERIA P/DESAGUE PVC SAL DE 6"m 35.50 34.02 1,207.71 1 1 0 18 15.78 15.8 0
INSTALACIONES ELECTRICAS APARATO

SANITARI
COLOCA

24.00

12.00
0.00

23 CAJA DE REGISTRO DE DESAGUE 12"X24"


pza 3.00 8.00 0.38 0.00 0.19
S

298.08 894.24 2 0 1 2 24 0 12
ALIMENTADOR PRINCIPAL m 45.00 17.95 807.75 1 0 1 30 12 0 12
SALIDA DE INTERRUPTOR DOBLEpto 8.00 37.33 298.64 1 0 1 10 6.4 0 6.4
SALIDA DE INTERRUPTOR SIMPLEpto 2.00 35.33 70.66 1 0 1 10 1.6 0 1.6
SALIDA DE PUNTO DE LUZ pto 72.00 28.83 2,075.76 1 0 1 10 57.6 0 57.6
SALIDA DE TOMACORRIENTE pto 64.00 41.83 2,677.12 1 0 1 10 51.2 0 51.2
430.06

430.06
0.00

24 SALIDA PROYECTOR pto 8.00 125.77 1,006.16 1 0 1 8 8 0 8 12.00 4.48 0.00 4.48
TUBERIA PVC SEL 35 MM m 30.00 14.91 447.30 1 0 1 30 8 0 8
TUBERIA PVC SEL 25 MM m 646.00 10.78 6,963.88 1 0 1 35 147.7 0 148
CONDUCTOR DE NH-80 4 MM m 180.00 10.9 1,962.00 1 0 1 50 28.8 0 28.8
CONDUCTOR DE NH-80 2.5 MM m 420.00 10.3 4,326.00 1 0 1 50 67.2 0 67.2
CONDUCTOR DE NH-80 6 MM m 260.00 13.9 3,614.00 1 0 1 50 41.6 0 41.6
TABLERO DE DISTRIBUCION und 2.00 503.83 1,007.66 1 0 1 1 16 0 16
ARTEFACTOS
COLOCACION

ELECTRICO

INSTALACION DE FLUORESCENTEundSIMPLE 48.00 102.55 4,922.40 1 0 1 10 38.4 0 38.4


117.55 2,115.90 1 0 1 10 14.4 0 14.4
89.60

85.60

INSTALACION LUMINARIA PASILLO


und 18.00
8.00
DE

25 8.00 1.40 0.13 1.34


INSTALACION LUZ DE EMERGENCIA
und 6.00 117.55 705.30 1 0 1 10 4.8 0 4.8
POZO PUESTA TIERRA INC. CABLE und 1.00 628.11 628.11 1 0 1 1 8 0 8
PRUEBAS ELECTRICAS glb 1.00 1825.36 1,825.36 1 1 0.5 1 8 8 4
SILLAS DE MADERA SEGUN DISEOund 280.00 75 21,000.00
EQUIPAMIENTO Y

MESA DE MADERA SEGUN DISEO und 280.00 115 32,200.00


MOBILIARIO

JUEGO DE ESCRITORIOS SEGUN DISEO


und 8.00 1200 9,600.00
ECRAN PARA AULAS und 8.00 850 6,800.00
26 1.00 0.00 0.00 0.00
PROYECTOR MULTIMEDIA und 8.00 750 6,000.00
CORTINAS INC./ACCESORIOS und 40.00 450 18,000.00
EQUIPAMIENTO Y
MOBILIARIO
26 1.00 0.00 0.00 0.00

MUEBLE BAJO DE MELAMINNE EN AULAS


und 8.00 3500 28,000.00
PIZARRA ACRILICA und 8.00 650 5,200.00