Tugas Kelompok 4 Pdti (Rabat Beton)
Tugas Kelompok 4 Pdti (Rabat Beton)
KELOMPOK IV (PDTI)
1. ABDUL HAYAT
2. WAYAN SUKARIAWAN
3. CHANDRA AGUSTIAN SHAFRI
4. HABIB
5. FIRMANSYAH
6. JUSANTARA
PEMASANGAN PATOK / 25 M
MENGUKUR TANJUAKAN
PEMBENTUKAN BADAN JALAN DENGAN SWADAYA
Form 24
PROVINSI
LAMPUNG
KABUPATEN
KECAMATAN
DESA
JENIS PRASARANA
LOKASI
JUDUL GAMBAR
DIBUAT OLEH :
......................................
KADER TEKNIK
DIPERIKSA OLEH :
...................................
PDTI
DIKETAHUI :
...................................
KASI PMD
Form 24
DARI :
Form 24
...................................
Form 24
KASI PMD
DARI :
DAFTAR HARGA SATUAN UPAH DAN BAHAN
BAHAN
1 Batu Belah Hitam m3 250,000.00
2 Pasir pasang m3 145,800.00
3 Pasir Urug m3 125,000.00
4 PC (Semen) zak 75,000.00
5 Split m3 400,000.00
6 Sirtu m3 190,000.00
7 Batu Bata bh 500.00
8 Keramik lantai (20x20) dus 87,000.00
9 Keramik dinding (20x20) dus 84,000.00
10 Semen warna kg 21,200.00
11 Besi 10 mm btg 75,000.00
12 Besi 8 mm btg 54,000.00
13 Besi 6 mm btg 36,000.00
14 Bendrat kg 24,000.00
15 Kayu bksting kls III (papan) kpg 35,000.00
16 Kayu bksting kls III (papan) m3 1,500,000.00
17 Kayu bksting kls II balok m3 2,500,000.00
18 Kasau btg 35,000.00
19 Paku kg 20,700.00
20 Playwood lbr 145,000.00
21 Amplas lbr 10,000.00
22 Plamir kg 8,000.00
23 Cat tembok kg 25,000.00
24 Tanah urug m3 65,000.00
25 Pipa PVC AW 4" btg 254,000.00
26 Pipa PVC AW 1 1/4" btg 50,000.00
27 Pipa PVC AW 1" btg 42,000.00
28 Pipa PVC AW 3/4" btg 34,000.00
29 Sock Draft Luar (SDL) 1 1/4 " bh 6,500.00
30 Sock Draft Dlm (SDD) 1 1/4 " bh 6,500.00
31 Sock Draft Luar (SDL) 1" bh 6,000.00
32 Over Sock 1" - 3/4" bh 5,700.00
33 Tee 3/4" bh 6,300.00
34 Tee Draft Dalam 3/4" bh 6,500.00
35 SDL 3/4" - Dalam 1/2" bh 6,500.00
36 Kran air besi 1/2" bh 49,700.00
37 Knee 1 1/4" bh 7,000.00
38 Knee 3/4" bh 6,000.00
39 Knee 1/2" bh 6,000.00
40 Dop PVC 4" bh 30,000.00
41 Dop Draft Dalam 1/2" bh 6,000.00
42 Dop 3/4" bh 6,000.00
43 Stop kran 1" bh 33,200.00
44 Tandon Air 2000 ltr (Exel) bh 3,500,000.00
45 Lem Isarplas kaleng 400 gr bh 30,000.00
46 Seal Tape bh 6,700.00
47 Kabel NYM 3 x 1,5 m 11,300.00
48 Klem pipa 1 1/4" bh 3,000.00
49 Klem pipa 1 " bh 2,700.00
50 Klem pipa 3/4" bh 2,700.00
51 Piting Stop Kontak bh 15,000.00
52 Klem kabel bngkus 6,000.00
53 Isolasi bh 6,000.00
ALAT
1 Mesin Gilas jam 250,000.00
2 Mobilisasi + Demobilisasi ls 3,000,000.00
3 Sewa Molen hari 150,000.00
4 Meteran 5 m bh 15,000.00
5 Meteran 50 m bh 70,000.00
6 Cangkul bh 60,000.00
7 Sekop bh 75,000.00
8 Troli bh 380,000.00
9 Godam palu 5 kg bh 50,000.00
10 Ember adukan bh 6,000.00
11 Kuas kayu bh 19,900.00
12 Tali tambang kg 45,000.00
13 Gergaji besi bh 30,000.00
14 Mata gergaji besi bh 10,000.00
15 Pompa Submersible 3/4 HP unit 2,800,000.00
16 Saklar Tandon Air (otomatis) unit 75,000.00
17 Prasasti/Nomenklatur bh 400,000.00
18 Papan proyek/papan nama kegiat bh 200,000.00
UPAH
1 Pekerja hok 70,000.00
2 Tukang hok 90,000.00
3 Tukang pecah batu hok 70,000.00
4 Upah Pengeboran Ls 8,000,000.00
Dibuat Oleh
Pelaksana Kegiatan
..
PERHITUNGAN PERKERASAN JALAN RABAT BETON
Perhitungan Volume
~ Sewa Molen :
- Kapasitas 1 Molen 1 x mixing = 0.30 m3 / 15 menit
- Dalam 1 jam = 1.20 m3
- 1 hari ( 6 jam kerja ) = 7.20 m3
- Waktu sewa = 5.00 hari
Analisa
Rincian Pendanaan :
Harga Satuan
No Kode Rekening URAIAN Volume Satuan Jumlah ( Rp )
( Rp )
1 2 3 4 5 6 7=4x6
2018
. .. ..
PELAKSANAAN JALAN RABAT BETON MUTU K-125
KOMPOSISI ADUKAN
TRIAL PENGECORAN
PEMASANGAN DELATASI
PENGECORAN
PENGAWASAN PELAKSANAAN
1. PELAKU PEMELIHARAAN
a. PEMBENTUKAN TIM PEMELIHARA
b. PELATIHAN TIM PEMELIHARA
c. MEMBUAT PERDES TERHADAP TIM PEMELIHARAAN
4. SISTEMATIKA PEMELIHARAAN
a. ANGGARAN DANA DESA
b. SWADAYA MASYARAKAT
c. IURAN SUKARELA TERHADAP MASYARAKAT YANG MELINTASI JALAN (SUDAH DIMUSYAWARAHKAN)
PEMELIHARAAN
RETAK PERMUKAAN