FEED SERVICE FOR SURFACE FACILITIES

DEVELOPMENT OF SOUTH AZADEGAN PROJECT

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 1/20

ARCHITECTURAL DESIGN BASIS

Contract No.: CSA-12S-041SD

Project No.: D-G502-1113

6,17,18,19,20

IFI
21-SEP-2014 M.KARIMI
C

03 2013.09.25 Issued for Approval Shi Juan Cui Shu Wang Yu Meng WenXia

02 2013.06.18 Issued for Approval Shi Juan Cui Shu Wang Yu Meng WenXia

01 2013.04.14 Issued for Comments Shi Juan Cui Shu Wang Yu Meng WenXia

Rev. Date Description Prepared by Checked by Reviewed by Approved by



FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 2/20
DocumentTittle ArchitecturalDesignBasis
DOCUMENT REVISION HISTORY

REVISION REVISION REVISION


PAGE

PAGE

PAGE
B01

B02

B03

10

11

12

13

14

15

16

17

18

19

20




FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 3/20
DocumentTittle ArchitecturalDesignBasis

Contents

1.0 GENERAL .......................................................................................................... 4


1.1 Introduction ......................................................................................................... 4
1.2 Definitions ........................................................................................................... 4
1.3 Abbreviations ...................................................................................................... 4
1.4 Environmental Data ............................................................................................ 5
2.0 CODES AND STANDARDS ............................................................................... 6
3.0 DESIGN PRINCIPLES ........................................................................................ 9
4.0 BUILDING FIREPROOFING ............................................................................ 10
4.1 Fire compartment .............................................................................................. 10
4.2 The buildings fire resistance rating................................................................... 10
4.3 Safety Principle Of Interior Decoration.............................................................. 10
4.4 Fire doors and fire windows .............................................................................. 10
4.5 Maximum Allowable Sound Pressure ............................................................... 11
5.0 BUILDING DESIGN .......................................................................................... 11
5.1 Steel Frame And Clay Block Wall Structure ...................................................... 11
5.2 Cast-in-place Reinforced Concrete Blast Resistant Structure .......................... 12
5.3 Reinforced Concrete Frame And Clay Block Wall Structure ............................. 13
5.4 Engineering Practice List .................................................................................. 14
6.0 BUILDING LIST ................................................................................................ 17














FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 4/20
DocumentTittle ArchitecturalDesignBasis

1.0 GENERAL

1.1 Introduction

CNPCI is responsible for development operations of the South Azadegan oil field located in
the southwest of the Islamic Republic of Iran, close to the border of Iran and Iraq and 80km
west of Ahwaz city in Khuzestan province.

This document covers the Architectural design for the Surface Facilities development
of the South Azadegan Oilfield Project. Specific Project Specifications have been prepared
based on Iranian National Building Codes and Iranian Petroleum Standards,International
Standards and Codes of Practice.

1.2 Definitions

Company China National Petroleum Co. International LTD.(IRAN)


(hereinafter "CNPCI")

Engineering Subcontractor China Petroleum Engineering Company (CPE)

Purchaser The party who is in charge of awarding agreement on behalf


of COMPANY / CONTRACTOR for the supply of goods and
services in connection with the work

Vendor/Supplier/Subcontractor The party to the contract and/or purchase order which has
undertaken the obligation to supply the goods and/or
services which are ordered and specified herein

Shall Is used where a provision is mandatory

Should Is used where a provision is advisory only

Will Is normally used in connection with the action by the


"Company" rather than by a contractor, supplier or vendor.

May Is used where a provision is completely discretionary.

1.3 Abbreviations

ASTM : American Society for Testing and Materials

ASME : American Society of Mechanical Engineers



FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 5/20
DocumentTittle ArchitecturalDesignBasis
API : American Petroleum Institue

IPS : Iranian Petroleum Standand

QA : Quality Assurance

QC : Quality Control

NFPA : National Fire Protection Association

IBC : International Building Code

1.4 Environmental Data

Table 1.4-1 Meteorological Data


Item Specification
Temperature
Max. Atmospheric Temp. 52 (extreme)
Min. Atmospheric Temp. -4.4 (extreme)
Monthly average Temp. max. 45
Monthly average Temp. min. 7.6
Monthly average Temp. 12.1(January)
Design Temperature for Equipment &
Machines under direct sunlight 85
Ambient Design Temp. for air coolers 45
Design Wet Bulb Temperature(refer to 27
Abadan) 32
Recirculating Cooling Water Supply
Temperature
Relative Humidity
Max. 76.4%
Min. 25.9 %
Rain Fall
Max. 78 mm in winter season (February)
Min. 0 mm in summer season
Prevailing Wind
General Direction northwest wind
Maximum: 30 m/s (NW);
Annually average: 2.6 m/s
Monthly average: 2.0 m/s (January), 3.3 m/s (July).

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 6/20
DocumentTittle ArchitecturalDesignBasis
Item Specification
Wind Speed for Design Purpose (refer to 110km/hr (from IPS-E-CE-500)
Ahwaz) 60.5 dN/m2 (from IPS-E-CE-500)
Basic Pressure of Wind (refer to Ahwaz)
This occurs on an average 3-7 times
each month, with the highest frequency
Sand Storm
occurring during the summer months and
in the early afternoon
Seismic zone: Zone IV
(from Iranian Code of Practice for
Seismic Conditions Seismic Resistant Design of Buildings
Standard No. 2800 3rd Edition)
Design base acceleration value: 0.2g
Ground water level Contract Area: 2.19-3.95 m
The maximum water level (once in 100 years ) 3.65m AMSL (Above Mean Sea Level)
Average evaporation data l 7 mm/day(July)
Design snow load 0
Thunder days 4.5days/year

2.0 CODES AND STANDARDS

The South Azadegan Field facilities are to be designed and constructed in accordance with
applicable Iranian Petroleum Standard (IPS) and international code/standards.
Iranian National Building Codes (INBC)
o Part 3: Fire Protection
o Part 4: General Notes for Buildings
o Part 5: Construction Materials
o Part 12: Safety for Construction
o Part 13: Electrical Equipment and Wiring
o Part 14: HVAC and Plumbing in Construction
Iranian criteria for design and administrative
o Part 16: Sanitary Equipment
building, Publication No. 178 shall be added
o Part 17: Piping of NG (Natural Gas) in Buildings
o Part 18: Sound Insulation in Buildings
o Part 19: Energy Conservation in Buildings
o Part 20: Signs and Tableaus
Iranian Petroleum Standards (IPS)
o IPS-E-CE-200 Engineering Standard for Concrete Structure

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 7/20
DocumentTittle ArchitecturalDesignBasis
o IPS-E-CE-210 Engineering Standard for Steel Structures
o IPS-M-CE-105 Building Materials Part One
o IPS-E-CE-140 Engineering Standard for Retaining Walls & Slope Protection
o IPS-E-CE-260 Engineering Standard for Fireproofing
o IPS-E-CE-360 Engineering Standard for Building Piping (Hot and Cold Systems)
o IPS-C-CE-112 Construction Standard for Earthworks
o IPS-D-CE-101 Structural Steel Connections Shear Connection Beam to Column
Flange
o IPS-D-CE-104 Fire Proofing of Structural Members Typical Details
o IPS-D-CE-141 Industrial Stair & Handrail Typical Details All Process Units
American National Standard Institute (ANSI):
o ANSI A10.9 Safety requirements for concrete construction and masonry work
o ANSI A108 American National Standard Specifications for Install of Ceramic Tile
o ANSI A118.1 American National Standard Specifications for Dry-set Portland
Cement Mortar
o ANSI A118.3 American National Standard Specifications for Chemical-resistant,
Water-cleanable Tile-setting and grouting Epoxy and Water Cleanable Tile-setting
Epoxy Adhesive
o ANSI A118.4 American National Standard Specifications for Latex-portland
Cement Mortar
o ANSI A118.5 American National Standard Specifications for Chemical Resistant
Furan Mortar and Grouts for Tile Installation
o ANSI A118.6 American National Standard Specifications for Cement Grouts for
Tile Installation
o ANSI A118.8 American National Standard Specifications for Modified Epoxy
Emulsion Mortar/Grout
o ANSI A136.1 American National Standard Specifications for Organic Adhesives for
Installation of Ceramic Tile
o ANSI A137.1 American National Standard Specifications for Ceramic Tile
o ANSI A1264.1, Safety Requirements for Workplace Floor and Wall Openings,
Stairs and Railing Systems
o ANSI Z 97.1, Glazing Materials Used in Buildings, Safety Performance
Specifications and Methods of Test
American Concrete Institute (ACI):
o ACI 302 Guide for Concrete floor and slab Construction
o ACI 315 Detailing Manual for Reinforced Concrete
American Society for Testing and Materials (ASTM):
o ASTM A 153/A 153M, Standard Specification for Zinc Coating (Hot-Dip) on Iron

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 8/20
DocumentTittle ArchitecturalDesignBasis
and Steel Hardware
o ASTM A 463/A 463 M, Standard Specification for Steel Sheet, Aluminium-Coated, by
the Hot-Dip Process
o ASTM A 572 Specification for High-strength Low-alloy Columbium-vanadium
Structural Steel
o ASTM A 755/A 755M, Standard Specification for Steel Sheet, Metallic Coated by the
Hot-Dip Process and Pre painted by the Coil-Coating Process for Exterior Exposed
Building Products
o ASTM C 0216-04 Specification for Facing Brick
o ASTM C 0652-04A Specification for Hollow Brick
o ASTM C 22/C 22M Specification for Gypsum
o ASTM C 33 Specification for Concrete Aggregates
o ASTM C 55 Specification for Concrete Brick
o ASTM C 91 Specification for Masonry Cement
o ASTM C 94/C 94M Specification for Ready-mixed Concrete
o ASTM C 140 Test Method Sampling and Testing Concrete Masonry Units and
Related Units
o ASTM C 150 Specification for Portland Cement
o ASTM C 206, Standard Specification for Finishing Hydrated Lime
o ASTM C 476, Standard Specification for Grout for Masonry
o ASTM C 840, Standard Specification for Application and Finishing of Gypsum Board
o ASTM C 1396/C 1396M, Standard Specification for Gypsum Board
BRITISH STANDARDS (BS)
o BS 459 Doors
o BS 729 Specification for hot dip galvanized coating on iron and steel articles
o BS 747 Specification for roofing felts
o BS 882 Sand cement screed
o BS 952 Glass for glazing
o BS 1091 Pressed steel gutters, rainwater, fitting and accessories
o BS 1191 Specification for Gypsum building plasters
o BS 1192 Construction drawing practice
o BS 1485 Galvanized wire netting
o BS 3261 Un backed flexible PVC flooring
o BS 4131 Terrazzo tile
o BS 4449 Specification for Carbon Steel Bars for the Reinforcement of Concrete
o BS 4483 Steel Fabric for the Reinforcement of Concrete
National Fire Protection Association (NFPA)
o NFPA 1 Uniform Fire Code

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 9/20
DocumentTittle ArchitecturalDesignBasis
o NFPA 101 Life Safety Code
o NFPA 101A Guide on Alternative Approaches to Life Safety
o NFPA 101B Code for Means of Egress for Buildings and Structures
o NFPA 220 Standard on Types of Building Construction
o NFPA252 Standard Methods of Fire Tests of Door Assemblies
o NFPA257 Standard on Fire Tests for window and Glass Block Assemblies
o NFPA 5000 Building Construction and Safety Code
International Building Code(IBC)
o Chapter 3 Use And Occupancy Classification
o Chapter 5 General Building Height And Areas
o Chapter 6 Types Of Construction
o Chapter 7 Fire-Resistance-Rated Construction
o Chapter 8 Interior Finishes
o Chapter 9 Fire Protection systems
o Chapter 10 Means Of Egress
o Chapter 12 Interior Environment
o Chapter 14 Exterior Walls
o Chapter 15 Roof Assemblies And Rooftop Structure
o Chapter 19 Concrete
o Chapter 20 Aluminium
o Chapter 21 Masonry
o Chapter 22 Steel
o Chapter 23 Wood
o Chapter 24 Glass And Glazing
o Chapter 25 Gypsum Board And Plaster
o Chapter 26 Plastic

3.0 DESIGN PRINCIPLES

1)The design of building should meet the requirements of Safety and


reliability,technological advance, elegant appearance and economic rationality besides
application requirements.
2) The architectural design of the buildings shall meet the requirements of process flow,
arrangement of equipment and facilities, construction and installation, working and
operation, repair and maintenance.
3) The selection of building materials should be optimized according to the local natural
(climate,etc), and social conditions (construction ,etc). Local resources should be used
as much as possible. The durability, practical principles and the fire and explosion

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 10/20
DocumentTittle ArchitecturalDesignBasis
prevention requirements must be followed.

4.0 BUILDING FIREPROOFING

4.1 Fire compartment

Fireproofing of buildings are satisfy with Part 3 of INBC, IPS-E-CE-260 Engineering


Standard for Fireproofing , IPS-E-SF-380 Fire Protection in Buildings and the Life
Safety Code (NFPA 101).
Every building is a fire compartment, the area of which is showed in unit drawing. Each
building have two or three safety exit.

4.2 The buildings fire resistance rating

The fire resistance rating of all buildings is 2 hour rating.


Burning qualities and fire endurance of constructional elements

Component Fire wall Column, Beam Other Structural


name Bearing wall Element
Fire-resistance Non-combustible Non-combustible Non-combustible Non-combustible
rating component component component component
3.00 hr 2.50 hr 2.00 hr 2.00 hr

4.3 Safety Principle Of Interior Decoration

The Interior Finish should satisfy Chapter 10 of the Building Construction and Safety
Code (NFPA 5000).
The fire resistance rating of decoration materials should be considered in decoration
design.

4.4 Fire doors and fire windows

Fire-resistance rating of steel fire door and fire window is 1.5 hour rating. All fire doors
should fix door closer, Double-leaf fire doors need door closer and gravity arm door
selector, hold-open fire doors need signal control close and feedback device.
The fire door satisfies the Standard Methods of Fire Tests of Door Assemblies
(NFPA252). The fire window satisfies the Standard on Fire Tests for window and Glass
Block Assemblies (NFPA257).

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 11/20
DocumentTittle ArchitecturalDesignBasis
4.5 Maximum Allowable Sound Pressure

The sound pressure level anywhere in the site area shall not exceed 115 dBA in any
situation, including emergency.
The maximum allowable sound pressure level for site buildings is specified in the following
table.

4..5-1. Maximum Allowable Sound Pressure Level

Area Description Maximum Allowable Sound Pressure


Level
Control rooms, Substations, not continuously 60 dBA
manned and Computer rooms
Continuously manned,Open plan offices , 50 dBA
Social rooms,Wash places and Toilets
Offices 45 dBA

5.0 BUILDING DESIGN

5.1 Steel Frame And Clay Block Wall Structure

5.1.1 Roofing
The roof use colour steel sandwich panel which chip with polyurethane that is not less than
100mm thick and the bulk density is not less than 40kg/m3 2, the colour profiled steel
sheet is more than 0.6mm in thickness and the weight of double plated Al-Zn is 180g/.
Fasteners should adapt to the fixed components.
5.1.2 Wall
200 mm thickness clay hollow block, 110 mm thickness face clay brick and 50mm thickness
thermal insulation are used for the outside walls.200 mm thickness clay hollow blocks are
used for the inside walls.
5.1.3 Interior finish
The toilet wall is affixed with tiles and the rest room wall is painted with white emulsion
paint.
5.1.4 Ceiling
Toilet adopt aluminium alloy gusset plate ceiling.Office,control room,equipment room
adopt light steel keel mineral wool slab.
5.1.4 Outside finish
Outside wall is covered with face brick.
5.1.5 Ground

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 12/20
DocumentTittle ArchitecturalDesignBasis
Local equipment room and control room adopt concrete floor capped with 700mm high
overhead anti-static raised floor. Toilet adopts anti-skid tiles.The rest rooms adopt ceramic
floor tiles and concrete ground.
5.1.6 Windows
Unless specified, all windows are single frame hollow glass aluminium-alloy windows with
white surface colour. Hinges, supports and handles of their hardware are made of stainless
steel castings. The others like connectors, tapping screws and embedded parts must have
the performance of anti-corrosion and anti rust besides adequate strength. All window
screenings are made of stainless steel. Glasses are double layers of glass (6 mmGlass,
7.5mm air Layer and 8 mm Glass).
All windows should satisfy the main physical property index listed here below.
Wind load resistance performance: 3.5kPa
Air permeability: 0.5 m3/h.m
Watertightness 600Pa
Heat preservation 2.0W/m2.k
Sound insulation 40 dB
5.1.7 Doors
Unless specified, Outside door is finished steel security steel door or aluminium alloy door,
glass is 6+8 (mm) transparent glass .Thickness of air layer between double layers of glass
is 7.5mm.Inside door is wooden door, UPVC door, glass is 6mm transparent glass. Hinges,
supports and handles are made of stainless steel castings and the others like connectors,
tapping screws and embedded parts must have the performance of anti-corrosion and anti
rust besides adequate strength.
All doors should satisfy the main physical property index listed here below.
Wind load resistance performance: 3.5kPa
Air permeability: 0.5 m3/h.m
Watertightness 600Pa
Heat preservation 2.0W/m2.k
Sound insulation 40dB

5.2 Cast-in-place Reinforced Concrete Blast Resistant Structure

(Only for Central Control Building)


5.2.1 Roofing
Roof: Reinforced concrete roof, according to structural section.
5.2.2 Wall
Cast-in-place reinforced concrete (as thickness of structural drawings) and 50mm
thickness thermal insulation are used for the outside walls .200mm thick hollow clay
blocks are used for the inside walls.

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 13/20
DocumentTittle ArchitecturalDesignBasis
5.2.3 Ceiling
Toilet and shower room adopt aluminium alloy gusset plate ceiling and the other rooms
adopt light steel keel mineral wool slab.
5.2.4 Interior finish
The toilet wall is affixed with tiles and the rest room wall is painted with white emulsion
paint.
5.2.5 Outside finish
Outside wall is covered with face brick.
5.2.6 Ground
Control, cabinet adopt concrete floor capped with 700mm high
overhead anti-static raised floor.
5.2.7 Doors
Outside door is steel fire and explosion door .Inside door is sliding aluminium-alloy
door, glass is 6mm tempered glass. Hinges, supports and handles are made of
stainless steel castings and the others like connectors, tapping screws and embedded
parts must have the performance of anti-corrosion and anti-rust besides adequate
strength.

5.3 Reinforced Concrete Frame And Clay Block Wall Structure

5.3.1 Roofing:
Reinforced concrete roof shall be according to structural section.
5.3.2 Wall:
200 mm thickness clay hollow block, 110 mm thickness face clay brick and 50mm
thickness thermal insulation are used for the outside walls. 200 mm thickness clay hollow
blocks are used for the inside walls.
5.3.3 Ceiling:
Toilet and shower room adopt aluminium alloy gusset plate ceiling and the other rooms
adopt light steel keel mineral wool slab.
5.3.4 Interior finish:
The toilet wall is affixed tiles and the rest room wall is painted with white emulsion
paint.
5.3.5 Outside finish:
Outside wall is covered with face brick.
5.3.6 Floor:
Laboratory adopts acid and alkali resistant tiles.Toilet adopts anti-skid tiles. The rest rooms
adopt ceramic floor tiles and concrete ground.
5.3.7 Windows:
Unless specified, all windows are single frame hollow glass aluminium-alloy windows

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 14/20
DocumentTittle ArchitecturalDesignBasis
with white surface colour. Hinges, supports and handles of their hardware are made of
stainless steel castings. The others like connectors, tapping screws and embedded
parts must have the performance of anti-corrosion and anti rust besides adequate
strength. All window screenings are made of stainless steel. Glasses are double layers
of glass (6 mm Glass, 7.5mm air Layer and 8 mm Glass). Inside windows use
aluminium alloy single frame single glassglass is 6mm transparent glass.
All windows should satisfy the main physical property index listed here below.
Wind load resistance performance: 3.5kPa
Air permeability: 0.5 m3/h.m
Watertightness 600Pa
Heat preservation 2.0W/m2.k
Sound insulation 40 dB
5.3.8 Doors:
Unless specified, Outside door is finished steel security steel door or aluminium alloy
door, glass is 6+8 (mm) transparent glass. Thickness of air layer between double
layers of glass is 7.5mm. Inside door is wooden door, UPVC door or fire door, glass is
6mm transparent glass. Hinges, supports and handles are made of stainless steel
castings and the others like connectors, tapping screws and embedded parts must
have the performance of anti-corrosion and anti rust besides adequate strength.
Wind load resistance performance: 3.5kPa
Air permeability: 0.5 m3/h.m
Watertightness 600Pa
Heat preservation 2.0W/m2.k
Sound insulation 40dB

5.4 Engineering Practice List

Exterior Wall1: Face Brick Wall Floor1: White Anti-skid Ceramic Tile

Standard commercial Iranian manufactured, 18mm-10mm thick ceramic tile, grout (or
white color sand-lime brick shall be used. color
The maximum absorption (by weight) shall grout) troweled joints.
be 16% by 24 hours submersion in cold 2220mm thick 1:3 hard cement mortar
water or 19% by 5 hour boiling and the coating, scatting cement dust on the
minimum compressive strength shall be 176 surface.
kg/sq.cm.(2500 psi), tested according to 3Humid insulation
ASTM C67. 41:3 cement mortar or 30mm thick for the
1Brick sizes shall be such that the thickness thinnest fine aggregate concrete slope
of grout or mortar between masonry units making screeding .

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 15/20
DocumentTittle ArchitecturalDesignBasis
and reinforcement will not be less than 6 mm 5Cement slurry(mixes the construction
(1/4 inch). adhesive)
2Surface texture and color shall be 6100mm thick fc= 15 MPa Lean concrete
approved by the COMPANY. layer.
3Surface texture and color shall match the 7300mm thick hardcore (50mm gravel on
brick that has been used on any other newly 250mm hardcore).
constructed building on the site. 8Soil to be Compacted up to 95% aashto
4Bricks shall be unloaded, sorted and modified.
stacked neatly when delivered to the site.
Floor2: Beige Ceramic Tile Floor3: Anti-static wooden floor

18mm-10mm thick ceramic tile,grout(or 1700mm high overhead raised wooden


color grout) troweled joints. floor.
220mm thick 1:3 hard cement mortar 220mm thick 1:3 hard cement mortar ,to
coating,scatting cement dust on the surface. be stripped and compaction.
3Cement slurry(mixes the construction 3 1.5mm thick polyurethane
adhesive) waterproofing coating or 2mm thick polymer
4100mm thick fc= 15 MPa Lean cement-based waterproof coating.
concrete layer. 420mm thick 1:3 hard cement mortar
5250mm thick hardcore(50mm gravel on 5Cement slurry(mixes the construction
200mm hardcore). adhesive)
6Soil to be Compacted up to 95% aashto 6100mm thick fc= 15 MPa Lean
modified. concrete layer.
7250mm thick hardcore(50mm gravel on
200mm hardcore).
8Soil to be Compacted up to 95% aashto
modified.
Floor 4: Concrete floor Floor 5: Anti-Acid Tile

1100mm thick fc= 25 MPa concrete placing 120(30)mm thick Anti-Acid tile, push joints
and troweling, dregged 1:1 cement sand with epoxy mortar(2-3mm gap).
over the floor finish the floor. 25mm thick epoxy mortar bonding layer.
2Cement slurry (mixes the construction 3Epoxy glass copper(2 layer epoxy
adhesive). primer)
3100mm thick fc= 15 MPa Lean concrete 2 layer glass fiber cloth) isolation layer.
layer. 420mm thick dry-mixed mortar leveling
4300mm thick hardcore (50mm gravel on layer.
250mm hardcore). 5120mm thick fc= 15 MPa Lean concrete
5Soil to be Compacted up to 95% aashto layer.
modified. 6300mm thick hardcore(50mm gravel on
250mm hardcore).

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 16/20
DocumentTittle ArchitecturalDesignBasis
7Soil to be Compacted up to 95% aashto
modified.

Ceiling1 Light steel keel mineral wool slab Ceiling2 Aluminum alloy square plate

112 thick mineral wool sound-absorbing 1 Aluminum alloy square plate 600 X600
panel surface,standard 600x600 fixed with special supporting keel.
2T-cladding light weight steel secondary 2A square plate connected with special
keel TB24x28,distance 600,spliced with lower keel ,the distance <600mm.
major keel. 3Special upper keel (<1200mm) ,make
3T-cladding light weight steel secondary leveling.
keel TB24x38(or TB24x28) ,distance 410 galvanized low carbon steel wire
600,fixed with main keel by pendant. boom, the boom fixed with reserve rings.
4U-cladding light weight steel main 5.110 steel ring should be Cast-in-place
keelCB38x12,distance1200,jointed with reinforced concrete board reserved
the steel boom by hanger then leveling. reinforced exchange, distance < 1200mm
56 steel boom two-way midordinate
1200,the top of boom is fixed with future
expanding steel hanger
6Cast in-site reinforced concrete beam
reserves 10 steel hanger (hook) ,two-way
midordinate1200
Skirting1:Ceramic tile skirting(100mm high) Skirting2: PVC skirting(100mm high)

18mm-10mm thick floor brick 1. The PVC skirting board is installed on


skirting,cement water grout(or colored metal fastener.
cement water grout)caulking. 2. The metal fastener should be fixed on
28mm thick 1:2 cement mortar(addition of the wall with 500mm distance.
building adhesive)bonding coat. 3. Interior wall with finishes decoration.
35mm thick1:3 cement mortar sweep and
draw patterns.
Skirting3: Cement skirting(100mm high) ApronConcrete surface apron
110mm thick 1:2.5 cement mortar finishing 1.50 thick C20 concrete surface,sprinkle
coat and float finish. 1:1 cement sand float finish.
2. 250mm thick hardcore(50mm gravel on
2 8mm thick 1:3 cement mortar sweep and 200mm hardcore).
draw patterns. 3.Soil tamp,slope outward 3%-5%
3Paint one coat of plain concrete
roughening(addition of building adhesive)
Step :Cement surface entrance step Ramp :Cement surface ramp

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 17/20
DocumentTittle ArchitecturalDesignBasis
1.20 thick 1:2 cement mortar surface 1.20 thick 1:2 cement mortar sweep surface
2.One coat of plain concrete(addition of 2.One coat of plain concrete(addition of
building adhesive)
building adhesive)
3.60 thick fc= 15 MPa Lean concrete
3.60 thick fc= 15 MPa Lean concrete
stepped surface slope outward 1%
stepped surface slope outward 1% 4. 250mm thick hardcore(50mm gravel on
4.250mm thick hardcore(50mm gravel on 200mm hardcore).
200mm hardcore). 5. Soil to be Compacted up to 95% aashto
5. Soil to be Compacted up to 95% aashto modified.
modified.

6.0 Building List

Building
Building area shall be specified during List
detail of CTEP
design
stage based on updated architectural plan by EPCC
contractor.

Construction Name Height Structure Building Storey Quantity Fire


No. m Type Area Resistanc
omitted e
Rating
1 Cmplex building 6.05 629 1 1 2-HR
BD-20001
2 Control room 6.3 Reinforced 1108 1 1 2-HR
BD-20002 Concrete
7.8
3 Laboratory frame 1 1 2-HR
6.05 365
BD-20003
4 Fire station 7.7 605 1 1 2-HR
BD-20004
5 CTEP 132KV 9.85 643 1 1 2-HR
switchyard 9.25
BD-20005 2
6 Workshop 10.9 836 1 1 2-HR
BD-20006
7 Oil area substation 9.85 1187 1 1 2-HR
and LER room Steel frame
BD-20007 Structure
9.95 2
omitte
8 Gas area substation 9.85 1671 1 1 2-HR
d and LER room 2
BD-20008 2
9 Export area 9.85 1256 1 1 2-HR
substation and LER
room
Administrative building 6 Reinforced 988 1 1 2-HR
concrete frame
The width and length of building should increase
20%(about width=23m , length=86m)
added(according to attached file)

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY
Building area shall be specified during PRODUCTION)
detail design
stage based on updated architectural plan by EPCC
DocumentNo.
contractor. SA01GENXXXSDARBSDS0001B03 Discipline AR
Rev. 03 System GEN
Stage B Page 18/20
Foam house
DocumentTittle - - -
ArchitecturalDesignBasis - 2 2-HR
(BD-20009)
BD-20009
10 LER room 6.3 Reinforced 234 1 4 2-HR
BD-20010 Concrete
frame 2
11 Warehouse 6.5 318 1 1 2-HR
BD-20011
12 Waterdraw skid room 5.65 Steel frame 31 1 1 2-HR
(BD-20012) Structure 2
shall be omitted
13 Guard room 1 1 2-HR
3.45 28
BD-20013
14 Heat area substation 9.85 351 1 1 2-HR
BD-20014
15 Office area substation 9.85 Steel
9.95frame 370 1 1 2-HR
BD-20015 Structure 2
shall be omitted Steel frame
16 CTEP 230KV 20014 10.8 536 1 1 2-HR
switchyard 11.1
BD-20016
17 Oil area substation 9.85 1187 1 1 2-HR
and LER room 2
BD-20017

Fire water
B03 house(BD-20016) - - - - 1 -
Foam house (BD-20017) - - - - 1 -
Building area and other specifications Building List of SOUTH-GOSP
shall be specified
during detail design stage based on updated
architectural plan by EPCC contractor. Height Structure Building Storey Quantity Fire
No. Construction Name m Type Area Resistance
7.8 Rating
1 Control room Reinforced 1464 One 1 2-HR
(BD-70001) 6.3 concrete
frame
2 Substation Steel frame 863 One 1 2-HR
9.85
(BD -70002) Structure 2
3 Guard room 19 One 1 2-HR
3.45
(BD -70003)

Building area shall be specified during detail design


stage based on updated architectural plan by EPCC
contractor.

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 19/20
DocumentTittle ArchitecturalDesignBasis

Building List of NORTH-GOSP

Height Structure Building Storey Quantity Fire


No. Construction Name m Type Area Resistance
7.8 Rating
1 Control room Reinforced 1464 One 1 2-HR
(BD -60001) 6.3 concrete
frame
2 Substation Steel frame 863 One 1 2-HR
9.85
(BD -60002) Structure
3 Guard room One 21 2-HR
3.45 19
(BD -60003)
Building area shall be specified during detail design
stage based on updated architectural plan by EPCC
contractor. Building List of FSF

Height Structure Building Storey Quantity Fire


No. Construction Name m Type Area Resistance
Rating
1 Typical local 4.8 70.8 1 91 2-HR
equipment room for
well pad
( BD-30001)
2 Typical complex 4.8 Steel frame 91.6 1 8 2-HR
building for manifold Structure
( BD-30002)
3 Typical complex 4.8 70.8 1 1 2-HR
building for water
disposal well pad
( BD-30003)

Building area shall be specified during detail design


stage based on updated architectural plan by EPCC
contractor.

for N-GOSP and S-Gosp unit , pump house (quantity=4) shall be added

FEED SERVICE FOR SURFACE FACILITIES
DEVELOPMENT OF SOUTH AZADEGAN PROJECT
(EARLY PRODUCTION)

DocumentNo. SA01GENXXXSDARBSDS0001B03 Discipline AR


Rev. 03 System GEN
Stage B Page 20/20
DocumentTittle ArchitecturalDesignBasis

Building List of WSP

Height Structure Building Storey Quantity Fire


No. Construction Name m Type Area Resistance
Rating
1 Complex building Reinforced 186 One 1 2-HR
BD -50001 concrete
6.3
frame
Structure
2 Substation 255 One 1 2-HR
6.3
BD -50002
3 Guard room 19 One 1 2-HR
3.45
BD -50003
4 Water transport pump Steel frame One 1 2-HR
196
room 6.2 Structure
BD -50004
5 Remote i/o station 19 One 1 2-HR
room 3.45
BD -50005

4.8
7.0 Protection B03
Provide final protection and maintain conditions, in a suitable manner which ensures
material selection & manufacturing, storage ,construction being without damage or
deterioration at time of substantial completion.

Building area shall be specified during detail design


stage based on updated architectural plan by EPCC
contractor.