Anda di halaman 1dari 3

Re: AIE/HMSCSB/TKH/JH/L 16/057172 Date: 181h May 2016

Attn: En. Jaffar Ibrahim


Sabah Electricity Sdn Bhd
Unit Kendalian, Pengurusan Stok dan Bahan Api
Stesen Janakuasa Patau-Patau
Jalan Rancha-Rancha, Peti Surat 80756,
87017 W.P. Labuan, Malaysia.
Tel : +6087411121
Fax :+6087 4178541

Dear Sir,
Re: SESB PIPELINE AT LABUAN, WILAYAH PERSEKUTUAN
SUB : APPLICATION FOR PTI AND PTO WORKS

With regards to the above we would like to submit herewith our quotation for
your kind attention.
Hoping that our submission will meet with your kind approval and looking forward
to your early confirmation.
Trust the above satisfactory and please do not hesitate to contact us should
you required any further clarification. Assuring you of our best services at all times.

Thank you.
UNIT PRICE
ITEM DESCRIPTION QTY UNIT TOTAL ( MYR )
(MYR)

To undertake verification for


NPS 8 Natural Gas pipeline from
PGB to SESB boundary
including application for PTI
and PTO.

Mobilization and making


1 good of trial pit, and clearing LOT L/S
12,500.00 12,500.00
from site

To perform UG Mapping to
2 produce shop drawing for PTI LOT L/S
8,000.00 8,000.00
submission

To excavate trial pt by manual


excavation to expose the
3 3 L/S
underground pipeline to 10,200.00 30,600.00
perform NDT

To perform NDT by using


4 Gamma Ray to verify the pipe 3 L/S 7,600.00
22,800.00
welding circumference
in good order.

To randomly test the thickness


5 of the existing pipe in order to LOT L/S
13,000.00 13,000.00
calculate the integrity of the
pipe for compliance to JKKP
and Petronas specification.

To perform calculation and


justification on the results of
6 LOT L/S
the NDT Thickness gauging of 21,500.00 21,500.00
the pipe and also the CP
findings to established the
integrity of the pipeline.
Application cost for
7 documentation drawing, LOT L/S
22,300.00 22,300.00
shop drawing,
As built, calculations and final
documentation for SESB

TOTAL (RM) EXCLUDED PTO WORK AND GST (6%) 130,700.00

8 OPTIONAL (PTO)
To perform Pressure Test on
Pipeline including testing
cleaning,
drying in accordance to DOSH
requirement (Pneumatic or
Hydrostatic test
method for 24 hours)

8A LOT L/S
With Pneumatic Test 24,000.00 25,000.00

8B LOT L/S
With Hydrostatic Test 28,000.00 28,000.00