No Power Plant Capacity Location Year COD

Suralaya 4x400 Cilegon Banten 1984


3x600

Bukit Asam 4x65 Muara Enim South Sumatra 1987

Paiton (PLN) 4x400 Probolinggo East Java 1993


Ombilin West Sumatra
Suralaya Baru Cilegon Banten

Paiton

Tanjung Jati B 1 Jepara Central Java


Tanjung Jati B 2 Jepara Central Java
Tanjung Jati B 3 & 4

Cirebon Cirebon Unit 1 660 MW Cirebon West Java 2012

Jawa 1 Cirebon 1000 MW Cirebon West Java 2020


Ekspansi (Unit
2)

Jawa 2
Jawa 3
Jawa 4 Tanjung Jati B 2x1000 MW Jepara Central Java 2021
Unit 5-6
Jawa 5
Jawa 6
Jawa 7 2x10000 MW Serang Banten 2019 (Unit
1), 2020
(Unit 2)

Jawa 9 1000 MW 2022

Jawa 10 1000 MW 2022

Banten 660 MW 2017


SOE / IPP Operator EPC Technology ESP Bag Filter

SOE Indonesia Power

SOE PLN

SOE PLN
PLN
SOE Indonesia Power

IPP PT Paiton Energy

IPP PT Cirebon Super Critical


Electric Power

IPP PT Cirebon Mitshubishi, Ultra Super


Electric Power Toshiba, Critical
Hyundai

IPP PT Bhumi Jati Ultra Super


Power Critical

SOE PJB PT Shenhua Ultra Super


Guoha PJB Critical
(SGPJB)

SOE Indonesia Power

SOE Indonesia Power

IPP PT Lestari Super Critical


Banten Energi
FGD Low Nox Burner OFA SNCR SCR

Wet FGD

Not installed (low


content of sulphur
<0.2%)

Mitsubishi Hitachi Wet FGD


Power Systems (MHPS)