Anda di halaman 1dari 48

GENERAL SUPPLY TARIFF A-1 (Including FATA)

This Tariff is applicable for supply to residences; places of worship approved religious
and charitable institutions; and Government sponsored educational institutions, hospitals
and dispensaries, etc.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. General Supply, for the purpose of this Tariff, means a supply for lamps, fans,
and other single-phase appliances such as heaters, cookers, radiators, air-
conditioners, refrigerators and domestic tubewells, etc. In premises having a
connected load exceeding 4 kilowatts supply may be given at 3-phase 400 volts
and above to allow a balanced distribution of load on the 3-phase.
2. Month for the purpose of this Tariff, means a billing month of 30 days or less.
3. Supply Charges, under this Tariff, include Energy Charge and Fuel Adjustment
Surcharge (FAS).
4. The Authority, for the purposes of these terms and conditions means the Water
and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. Supply to three-phase, 400 volts compressor and pump motors of the air
conditioning equipment installed in centrally air-conditioned premises and other
three-phase, 400 volts apparatus of domestic utility, e.g. tubewells etc., shall be
governed by the appropriate Industrial Tariff. However, the supply to three-
phase, 400 volts compressor and pump motors of the air conditioning equipment,
installed in centrally air-conditioned mosques, shall be governed by general
supply tariff A-1 instead of appropriate industrial tariff.
2. In the event of a bill being rendered for consumption accumulated over a number
of months, the average monthly consumption of the consumer for the purpose of
application of the above rates, i.e. Energy Charges, Fuel Adjustment Surcharge
and Additional Surcharge shall be determined by dividing the total consumption
by the number of months to which the accumulated consumption relates.
3. The supply under this Tariff shall not be available for resale.
4. The consumer governed by this Tariff shall be charged each month Fuel
Adjustment Surcharge (FAS) worked out on the basis of the following clause:-

A Fuel Adjustment Surcharge (FAS) will be added to each kwh sold, during
the billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

1
GENERAL SUPPLY TARIFF A-2 (Including FATA)

This Tariff is applicable for supply to all government and semi-government offices
and institutions, commercial offices and commercial establishments such as shops hotels,
restaurants, petrol pumps, services stations, places of entertainment lime cinemas, theaters
and clubs; rest houses and government lodges, private educational institutions, offices of
lawyers, solicitors, law associates and consultants etc.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS.

1. General Supply, for the purpose of this Tariff means a supply for lamps, fans
and other single-phase appliances such as heater, cookers, radiators, air-
conditioners, refrigerators and tubewells for non-agricultural purpose, etc. In
pre mises having a connected load exceeding 4 kilowatts supply may be given at
400 volts (three phase) or above, to allow a balanced distribution of load on the
three phases.
2. Maximum Demand, for the purpose of this tariff, means the highest demand
obtained in any month measured over successive periods each of 30 minutes
duration.
3. Month for the purpose of this Tariff, means a billing month of 30 days.
4. Supply Charges, under rate (a) of this tariff, include Energy Charges and Fuel
Adjustment Surcharge (FAS) and under rate (b) of this tariff include Fixed
Charges, Energy Charges and Fuel Adjustment Surcharge (FAS).
5. Fixed Charges, for the purpose of rate (b) of this tariff, mean the charges
applied on consumers maximum demand in kilowatt, recorded during the month
and not on the basis of billing demand as in the case of industrial consumers.
6. The Authority, for the purpose of these terms and conditions means the Water
and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. For consumers having peak load requirement of up to 20 Kw, supply to three


phase, 400 volts compressor and pump motors of the air conditioning equipment
installed in centrally air-conditioned premises and other three phase, 400 volts
apparatus of general utility in the premises mentioned above under this tariff,
shall be governed by the Industrial Tariff B-1. This connection shall not apply to
consumers having peak load requirement in excess of 20 KW.
2. Supply to motors operating projectors and sound apparatus in cinemas shall be
charged at the Industrial Tariff B-1.
3. In the event of a bill being rendered for consumption accumulated over a number
of months, the average monthly consumption of the consumer for the purpose of
the application of the above rates i.e. Energy Charges, Fuel Adjustment
Surcharge and Additional Surcharge shall be determined by dividing the total

2
consumption by the number of months to which the accumulated consumption
relates.
4. The supply under this Tariff shall not be available for resale.
5. The consumer governed by this Tariff shall be charged each month Fuel
Adjustment Surcharge (FAS) worked out on the basis of the following clause:-

A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during
the billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

TARIFF B-1 (INDUSTRIAL SUPPLY AT 400 VOLTS)

This Tariff is applicable for supply to Industrial having sanctioned load up to and
including 40 kilowatts.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. Industrial Supply, for the purpose of this Tariff, means a supply for bona fide
industrial purposes in factories including the supply required for the offices and
for normal working of the industry and also for water pumps and tubewells
operating on three phase 400 volts, other than those meant for the irrigation or
reclamation of agricultural land.
Note: - Three percent (3%) of the total units consumed shall be charged
at general supply tariff A-2.
2. Sanctioned load, means the load in kilowatt as applied for by the consumer
and sanctioned by the Authority.
3. Month for the purpose of this Tariff, means a billing month of 30 days.
4. Supply Charges under this Tariff include Energy Charges and Fuel Adjustment
Surcharge (FAS).
5. The Authority, for the purposes of these terms and conditions means the Water
and Power Development Authority.

SPECIAL CONDITONS OF SUPPLY

1. The industrial supply consumers taking supply under this Tariff shall be required
to bring out separate circuit in their premises for installation of separate meter
for measuring the consumption in the residential colonies attached to their
premises which shall be charged at Tariff-H.
2. The supply under this Tariff shall also be available to consumers who install
motors running a single phase 230 volts AC supply for being used for bona fide
industrial purpose.
3. The supply under this Tariff shall not be available for resale.

3
4. The consumer governed by this Tariff shall be charged each month Fuel
Adjustment Surcharge (FAS) worked out on the basis of the following clause: -
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during
the billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

5. The supply at one point at 230 / 400 volts under this Tariff shall also be
available to Poultry Farms, Hatcheries and Breeding Farms but ten percent
(10%) of the total consumption shall be charged at general supply tariff
A-2.
6. An industrial consumer, presently governed by this Tariff shall have the
option to switch over Seasonal Tariff-F provided his connection is seasonal
in nature as defined under Tariff-F, and he undertakes to abide by the
terms and conditions of Tariff-F and pays the difference of security deposit
rates previously deposited under this Tariff and those applicable to Tariff-F
at the time of acceptance of option for Season Tariff. Seasonal Tariff will
be applicable from the date of commencement of the season, as specified
by the customers at the time of submitting the option for Tariff-F. Tariff-F
consumers will have the option to convert to regular Tariff B1 and vice
versa. This option can be exercised at the time of obtaining a new
connection or at the beginning of the season. Once exercised, the option
will remain in force for at least one year.

TARIFF B-2 (INDUSTRIAL SUPPLY AT 400 VOLTS)

This tariff is applicable for supply to Industrial having sanctioned load from 41 to 500
KW.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of a consumer at the point of supply shall not be less than 90
percent. In the event of the said Power factor falling below 90 percent, the consumer shall
pay a penalty of two percent increase in the fixed charges corresponding to one percent
decrease in the power factor below 90 percent. The fixed charges for the purpose of
calculating the penalty for low power factor shall, however, be determined with reference to
maximum demand during the month.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including
bank charges, if any, for payment by the due date. However, if any bill including any
amounts other than the Supply Charges assessed against him by the Authority, is not paid
by the consumer in full within 15 days of the date of its presentation, a Late Payment
Surcharge of 10% (ten percent) shall be levied on the amount of Supply Charges as well
as on the amount of Additional Surcharge and SURCHARGE.
DEFINITIONS

1. Industrial Supply, for the purpose of this Tariff, means a supply for bona fide
industrial purposes in factories including the supply required for the offices and
for normal working of the industry and also for water pumps and tubewells

4
operating on three phase 400 volts, other than those meant for the irrigation or
reclamation of agricultural land.
Note: - Three percent (1%) of the total units consumed shall be
charged at general supply tariff A-2.

2. Billing Demand for the purpose of this Tariff during a month, means the higher
of the following:-
a) The actual maximum demand recorded during the month.
b) Fifty percent of the total sanctioned load.

3. Maximum Demand means the highest demand obtained in any month


measured over successive periods each of 30 minutes duration.
3-A. Maximum Demand in case of Arc Furnaces means the highest demand
obtained in any month measured over successive periods each of 15
minutes duration.
4. Supply Charges, for the purposes of this Tariff, include (i) Fixed Charges
for the Authoritys reservation of power for the consumers billing demand
in kilowatt as defined above, (ii) Energy Charges for the amount of
energy actually consumed by the consumer in kilowatt-hours, (iii) Fuel
Adjustment Surcharge (FAS), and (iv) penalty of low power factor.
5. Sanctioned Load means the load in kilowatt as applied for by the
consumer and sanctioned by the Authority.
6. Fixed Charges mean the charges for the Authoritys reservation of power
for consumers billing demand in kilowatt as defined above.
7. Energy Charges means the charges for the units actually consumed by
the consumer in kilowatt-hours.
8. Reservation of Power, for the purpose of assessment of fixed charges
under this Tariff, means the Authoritys reservation of power for
consumers billing demand: -

a) In the case of premises already connected to the Authoritys


supply system for twelve consecutive months of each financial
year (July-June); and
b) In the case of premises connection to the Authoritys supply
system, during the course of a financial year, for the remaining
part of the financial year.
9. Power Factor means the ratio expressed as a percentage of the
kilowatt-hours to the kilovolt ampere-hours consumed during the
month. In case of those connections where kVARh meters do not exist and
KVARh meters are installed, Power Factor shall be the ratio of kWh to
square root of sum of square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH)2 + (KVARH) KWH

10. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

5
11. The Authority, for the purpose of these terms and conditions means the
Water and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. The industrial supply consumers taking supply under this tariff shall be required to
bring out separate circuit in their premises for installation of separate meter for
measuring the consumption in the residential colonies attached to their premises
which shall be charged at Tariff-H.
2. Consumer with a sanctioned load exceeding 500 KW shall not be given supply under
this Tariff. However, the consumers with a sanctioned load exceeding 500 KW who
were connected to the Authoritys Supply System and were being charged at Tariff B-
2 (for 400 Volts) before the introduction of this Schedule of Tariff, shall continue to
be charged under this Tariff.
3. The supply under this Tariff shall not be available for resale.
4. The consumers governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during the
billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

5. The supply at one point under this tariff shall also be available to Poultry Farms,
hatcheries and Breeding Farms but ten percent (10%) of the total consumption shall be
charged at General Supply Tariff A-2.

6. An industrial consumer, presently governed by this tariff shall have the option to
switch over to Seasonal Tariff-F provided his connection is seasonal in nature as defined
under Tariff F, and he undertakes to abide by the terms and conditions of Tariff-F and pays
the difference of security deposit rates previously deposited under this tariff and those
applicable to Tariff-F at the time of acceptance of option for Seasonal Tariff. Seasonal Tariff
will be applicable from the date of commencement of the season, as specified by the
customers at the time of submitting the option for Tariff-F. Tariff-F consumers will have the
option to convert to Regular Tariff B-2 and vice versa. This option can be exercised at the
time of obtaining a new connection or at the beginning of the season. Once exercised, the
option will remain in force for a least one year.
7. The Industrial Supply consumers governed by Tariff B-2 shall have the option to
convert to Time of Day (TOD) Tariff B-2. For TOD Tariff, the following timing shall be
observed as Peak and Off peak hours.

SEASON PEAK TIMING OFF-PEAK TIMING


Dec. to Feb. 5 PM to 9 PM Remaining 20 hours
March to May 6 PM to 10 PM -do-
June to Aug. 7 PM to 11 PM -do-
Sept. to Nov. 6 PM to 10 PM -do-

6
TARIFF B-3 (INDUSTRIAL SUPPLY AT 11 KV AND 33 KV)

This tariff is applicable for supply to Industries having sanctioned load up to 5000
KW.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of a consumer at the point of supply shall not be less than 90
percent. In the event of the said power factor falling below 90 percent, the consumer shall
pay a penalty of two percent increase in the fixed charges corresponding to one percent
decrease in the power factor below 90 percent. The fixed charges for the purpose of
calculating the penalty for low power factor shall, however, be determined with reference to
maximum demand during the month.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including
bank charges, if any, for payment by the due date. However, if any bill including any
amounts other than the Supply Charges assessed against him by the Authority, is not paid
by the consumer in full within 15 days of the date of its presentation, a Late Payment
Surcharge of 10% (ten percent) shall be levied on the amount of Supply Charges as well
as on the amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. Billing Supply, for the purpose of this Tariff, means a supply for bona fide industrial
purposes in factories and also for water pumps and tubewells operating on three
phase 400 volts, other than those meant for the irrigation or reclamation of
agricultural land, and also includes supply for lamps and fans for the factory
premises but not for the residential colony attached thereto.
2. Billing Demand, for the purpose of this tariff during a month, means the higher of
the following:-
a) The actual maximum demand recorded during the month.
b) Fifty percent of the total sanctioned load.
3. Maximum Demand means the highest demand obtained in any month
measured over successive periods each of 30 minutes duration.
3-AMaximum Demand In case of Arc Furnace means the highest demand
obtained in any month measured over successive periods each of 15
minutes duration.
4. Supply Charges for the purpose of this tariff, include : (i) Fixed Charges for
the Authoritys reservation of power for the consumers billing demand in
kilowatt as defined above, (ii) Energy Charges for the amount of energy
actually consumed by the consumer in kilowatt-hours, (iii) the Fuel
Adjustment Surcharge (FAS), and (iv) the penalty of low power factor.

5. Sanctioned Load means the load in kilowatt as applied for by the


consumer and sanctioned by the Authority.
6. Fixed Charges mean the charges for the Authoritys reservation of power
for consumers billing demand in kilowatt as defined above.
7. Energy Charges means the charges for the units actually consumed by
the consumer in kilowatt-hours.

7
8. Reservation of Power, for the purpose of assessment of fixed charges
under this Tariff, means the Authoritys reservation of power for
consumers billing demand: -

a) In the case of premises already connected to the Authoritys


supply system for twelve consecutive months of each financial
year (July-June); and
b) In the case of premises connection to the Authoritys supply
system, during the course of a financial year, for the remaining
part of the financial year.
9. Power Factor means the ratio expressed as a percentage of the
kilowatt-hours to the kilovolt ampere-hours consumed during the
month. In case of those connections where kVARh meters do not exist and
KVARh meters are installed, Power Factor shall be the ratio of kWh to
square root of sum of square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH) 2 + (KVARH) KWH

10. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

11. The Authority, for the purpose of these terms and conditions means the
Water and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. The supply under this Tariff shall not be available to a prospective consumer unless
he provides, to the satisfaction and approval of the Authority, his own Transformer,
Circuit breakers and other necessary equipment for receiving and controlling the
supply, or, alternatively pays to the Authority for all apparatus and equipment if so
provide and installed by the Authority. The recovery of the remaining cost of service
connection shall be regulated by the Authoritys Abridged Conditions of Supply in
force from time to time. In case of supply through an independent feeder drawn
directly from the Grid Station, the cost of outgoing 11 KV Circuit Breakers in the Grid
Station shall also have to be paid for by the prospective consumer.
2. The consumer falling within the purview of this Tariff may not be required to have a
separate circuit in their installations for measuring the lights and fans consumption
required for the offices and for the normal working of the industry. They shall,
however, be required to have an independent connection for one point supply to
residential colonies attached to their premises, which will be charged at Tariff-H.
3. The Supply under this Tariff shall not be available for resale.
4. This Tariff shall also be applicable to the existing industrial supply consumers taking
supply at 33 KV and 66 KV.
5. The consumer governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-

8
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during the
billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

6. All industrial consumers governed by Tariff B-3 shall be converted to Time -of-Day
(TOD) Tariff B-3 For TOD Tariff, the following timings shall be observed as peak and
off-peak hours:-

SEASON PEAK TIMING OFF-PEAK TIMING


Dec. to Feb. 5 PM to 9 PM Remaining 20 hours
March to May 6 PM to 10 PM -do-
June to Aug. 7 PM to 11 PM -do-
Sept. to Nov. 6 PM to 10 PM -do-

7. An industrial consumer, presently governed by this tariff shall have the option to
switch over to Seasonal Tariff-F provided his connection is seasonal in nature as
defined under Tariff F, and he undertakes to abide by the terms and conditions of
Tariff-F and pays the difference of security deposit rates previously deposited under
this tariff and those applicable to Tariff-F at the time of acceptance of option for
Seasonal Tariff. Seasonal Tariff will be applicable from the date of commencement of
the season, as specified by the customers at the time of submitting the option for
Tariff-F. Tariff-F consumers will have the option to convert to Regular Tariff B-3 and
vice versa. This option can be exercised at the time of obtaining a new connection or
at the beginning of the season. Once exercised, the option will remain in force for a
least one year.

TARIFF B-4 (INDUSTRIAL SUPPLY AT 66 KV, 132 KV AND 220 KV)

This Tariff is applicable for supply to Industries for all loads.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of a consumer at the point of supply shall not be less than 90
percent. In the event of the said power factor falling below 90 percent, the consumer shall
pay a penalty of two percent increase in the fixed charges corresponding to one percent
decrease in the power factor below 90 percent. The fixed charges for the purpose of
calculating the penalty for low power factor shall, however, be determined with reference to
maximum demand during the month.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including
bank charges, if any, for payment by the due date. However, if any bill including any
amounts other than the Supply Charges assessed against him by the Authority, is not paid
by the consumer in full within 15 days of the date of its presentation, a Late Payment
Surcharge of 10% (ten percent) shall be levied on the amount of Supply Charges as well
as on the amount of Additional Surcharge and SURCHARGE.

9
DEFINITIONS

1. Billing Supply, for the purpose of this Tariff, means a supply for bona fide industrial
purposes in factories and also for water pumps and tubewells operating on three
phase 400 volts, other than those meant for the irrigation or reclamation of
agricultural land, and also includes supply for lamps and fans for the factory
premises but not for the residential colony attached thereto.
2. Billing Demand, for the purpose of this tariff during a month, means the higher of
the following:-
a) The actual maximum demand recorded during the month.
b) Fifty percent of the total sanctioned load.
3. Maximum Demand means the highest demand obtained in any month
measured over successive periods each of 30 minutes duration.
3-AMaximum Demand In case of Arc Furnace means the highest demand
obtained in any month measured over successive periods each of 15
minutes duration.
4. Supply Charges for the purpose of this tariff, include : (i) Fixed Charges for
the Authoritys reservation of power for the consumers billing demand in
kilowatt as defined above, (ii) Energy Charges for the amount of energy
actually consumed by the consumer in kilowatt-hours, (iii) the Fuel
Adjustment Surcharge (FAS), and (iv) the penalty of low power factor.

5. Sanctioned Load means the load in kilowatt as applied for by the


consumer and sanctioned by the Authority.
6. Fixed Charges mean the charges for the Authoritys reservation of power
for consumers billing demand in kilowatt as defined above.
7. Energy Charges means the charges for the units actually consumed by
the consumer in kilowatt-hours.
8. Reservation of Power, for the purpose of assessment of fixed charges
under this Tariff, means the Authoritys reservation of power for
consumers billing demand: -

a) In the case of premises already connected to the Authoritys


supply system for twelve consecutive months of each financial
year (July-June); and
b) In the case of premises connection to the Authoritys supply
system, during the course of a financial year, for the remaining
part of the financial year.
9. Power Factor means the ratio expressed as a percentage of the
kilowatt-hours to the kilovolt ampere-hours consumed during the
month. In case of those connections where kVARh meters do not exist and
KVARh meters are installed, Power Factor shall be the ratio of kWh to
square root of sum of square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH) 2 + (KVARH) KWH

10. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded

10
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

11. The Authority, for the purpose of these terms and conditions means the
Water and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. The supply under this Tariff shall not be available to a prospective consumer unless
he provides, to the satisfaction and approval of the Authority, independent Grid
Station, of his own including Land, Building, Transformers, Circuit Breakers and other
necessary equipment and apparatus for receiving and controlling the supply, or,
alternatively, pays to the Authority for all such Land, Building, Transformers, Circuit
Breakers and other necessary equipment and apparatus if so provided and installed
by the Authority. The recovery of remaining cost of service connection shall be
regulated by the Authoritys Abridged Conditions of Supply in force from time to
time.
2. The consumers falling within the purview of this Tariff may not be required to have a
separate circuit in their installation for measuring the lights and fans consumption
required for the offices and for the normal working of the industry, and also for the
consumption in the residential colonies.
3. The supply under this Tariff shall not be available for resale.
4. The consumer governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during the
billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

5. All industrial consumers governed by Tariff B-4 shall be converted to Time -of-Day
(TOD) Tariff B-4 For TOD Tariff, the following timings shall be observed as peak and
off-peak hours:-

SEASON PEAK TIMING OFF-PEAK TIMING


Dec. to Feb. 5 PM to 9 PM Remaining 20 hours
March to May 6 PM to 10 PM -do-
June to Aug. 7 PM to 11 PM -do-
Sept. to Nov. 6 PM to 10 PM -do-

TARIFF C-1 (BULK SUPPLY AT 400 VOLTS)

This Tariff is applicable to consumers having their own distribution facilities, i.e. own L.T.
lines etc, for the purpose of further distribution within their respective jurisdiction.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of the consumer governed by this tariff, at the point of supply
shall not be less than 90 percent. In the event of the said Power Factor falling below 90
percent, the consumer shall pay a penalty of two percent increase in the fixed charges
corresponding to one percent decrease in the power factor below 90 percent.

11
SURC HARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including
bank charges, if any, for payment by the due date. However, if any bill including any
amounts other than the Supply Charges assessed against him by the Authority, is not paid
by the consumer in full within 15 days of the date of its presentation, a Late Payment
Surcharge of 10% (ten percent) shall be levied on the amount of Supply Charges as well
as on the amo unt of Additional Surcharge and SURCHARGE.
DEFINITIONS

1. Bulk Supply for the purpose of this Tariff, means a supply given in bulk at one point to
consumers having their own distribution facilities, i.e. own L.T. lines etc, for the purpose
of further distribution within their respective jurisdiction.
2. Maximum Demand means the highest Demand obtained in any month measured over
successive periods each of 30 minutes duration.
3. Supply Charges, for purpose of this Tariff, include:- (i) Fixed Charges for the
consumers maximum demand in kilowatts where applicable, (ii) energy charges for the
energy actually consumed by the consumed by the consumer in kilowatt-hours, (iii) Fuel
Adjustment Surcharge (FAS), and (iv) penalty for low power factor, where applicable.
4. Fixed Charges for the purpose of this Tariff, mean the charges applied on the
consumers maximum demand in kilowatt recorded during the month.
5. Energy Charges mean the charges for the energy actually consumed by the consumer
in kilowatt-hours.
Power Factor means the ratio expressed as a percentage of the kilowatt-hours to the
kilovolt ampere-hours consumed during the month. In case of those connections where
KVAh meters do not exist and kVARh meters are installed. Power Factor shall be ratio of
kWh to square root of sum square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH) 2 + (KVARH) KWH

6. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

7. .The Authority, for the purpose of these terms and conditions means the Water and
Power Development Authority.

SPECIAL CONDITION OF SUPPLY

1. The fixed charges for the purpose of this Tariff shall be recovered on the basis of
monthly maximum demand and not on the basis of billing demand as in the case of
industrial supply consumers.
2. The supply under this Tariff shall not be available to Industrial Supply consumers.
3. The consumer governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during the
billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

12
TARIFF C-2 (BULK SUPPLY AT 11 KV AND 33 KV)

This Tariff is applicable to consumers having their own distribution facilities, i.e. own H.T/L.T
lines and distribution transformers etc., for the purpose of further distribution within their
respective jurisdiction.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of the consumer governed by this tariff, at the point of supply
shall not be less than 90 percent. In the event of the said Power Factor falling below 90
percent, the consumer shall pay a penalty of two percent increase in the fixed charges
corresponding to one percent decrease in the power factor below 90 percent.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. Bulk Supply, for the purpose of this Tariff, means a supply given in bulk at one
point to consumers having their own distribution facilities, i.e. own H.T/L.T lines and
distribution transformers etc, for the purpose of further distribution within their
respective jurisdiction.
2. Maximum Demand for the purpose of this tariff means the highest demand
obtained in any month measured over successive periods each of 30 minutes
duration.
3. Supply Charges, for purpose of this Tariff, include:- (i) Fixed Charges for the
consumers maximum demand in kilowatts where applicable, (ii) energy charges for
the energy actually consumed by the consumed by the consumer in kilowatt-hours,
(iii) Fuel Adjustment Surcharge (FAS), and (iv) penalty for low power factor, where
applicable.
4. Fixed Charges for the purpose of this Tariff, mean the charges applied on the
consumers maximum demand in kilowatt recorded during the month.
5. Energy Charges mean the charges for the energy actually consumed by the
consumer in kilowatt-hours.
6. Power Factor means the ratio expressed as a percentage of the kilowatt-hours to
the kilovolt ampere-hours consumed during the month. In case of those connections
where KVAh meters do not exist and kVARh meters are installed. Power Factor shall
be ratio of kWh to square root of sum square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH) 2 + (KVARH) KWH

7. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice

13
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

8. The Authority, for the purpose of these terms and conditions means the Water and
Power Development Authority.

SPECIAL CONDITION OF SUPPLY

1. The fixed charges under this Tariff shall be recovered on the basis of monthly
maximum demand and not on the basis of billing demand as in the case of industrial
supply consumers.
2. The supply under this Tariff shall not be available to a consumer unless he, provides,
to the satisfaction and approval of the Authority, his own Transformer, 11/33 KV
Circuit Breakers and other necessary equipment for receiving and controlling the
supply, or, alternatively pays to the Authority for all apparatus and equipment if so
provide and installed by the Authority. The recovery of the remaining cost of
connection shall be regulated by the Authoritys Abridged Conditions of Supply in
force from time to time.
3. The supply under this Tariff shall not be available to Industrial Supply consumers.
4. The consumer governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold, during the
billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

TARIFF C-3 (BULK SUPPLY AT 66 KV, 132 KV AND 220KV)

This Tariff is applicable to consumers having their own distribution facilities, i.e. own grid
station, HT/LT lines and distribution transformers etc., for the purpose of further
distribution within their respective jurisdiction.

PENALTY FOR LOW POWER FACTOR

Average Power Factor of the consumer governed by this tariff, at the point of supply
shall not be less than 90 percent. In the event of the said Power Factor falling below 90
percent, the consumer shall pay a penalty of two percent increase in the fixed charges
corresponding to one percent decrease in the power factor below 90 percent.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

14
DEFINITIONS

1. Bulk Supply, for the purpose of this Tariff, means a supply given in bulk at one
point to consumers having their own distribution facilities, i.e. own grid H.T/L.T lines and
distribution transformers etc, for the purpose of further distribution within their respective
jurisdiction.
2. Maximum Demand means the highest demand obtained in a month measured over
successive periods each of 30 minutes duration.
3. Supply Charges for the purpose of this Tariff, include:- :- (i) Fixed Charges for the
consumers maximum demand in kilowatts where applicable, (ii) energy charges for the
energy actually consumed by the consumed by the consumer in kilowatt-hours, (iii) Fuel
Adjustment Surcharge (FAS), and (iv) penalty for low power factor, where applicable.
4. Fixed Charges for the purpose of this Tariff, mean the charges applied on the
consumers maximum demand in kilowatt recorded during the month.
5. Energy Charges mean the charges for the energy actually consumed by the
consumer in kilowatt-hours.
6. Power Factor means the ratio expressed as a percentage of the kilowatt-hours to
the kilovolt ampere-hours consumed during the month. In case of those connections
where KVAh meters do not exist and kVARh meters are installed. Power Factor shall be
ratio of kWh to square root of sum square of kWh and kVARh, i.e.

KWh Kwh kVARh


-1
P.F.= ------- = = Cos (tan (---------))
K VAH (KWH) 2 + (KVARH) KWH

7. Month for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading date of a
consumer is altered and the acceleration / retardation in the date is up to 4 days, no notice
shall be taken of this acceleration or retardation. But if the date is accelerated or retarded
by more than 4 days, the fixed charges shall be assessed on proportionate basis for the
actual number of days between the date of the old reading and the new reading.

8. The Authority, for the purpose of these terms and conditions means the Water and
Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. The fixed charges under this Tariff shall be recovered on the basis of monthly
maximum demand and not on the basis of billing demand as in the case of industrial supply
consumers.
2. The supply under this Tariff shall not be available to a prospective consumer unless
he, provides, to the satisfaction and approval of the Authority, an independent grid station
of his own including Land, Building, Transformers, Circuit Breakers and other necessary
equipment and apparatus for receiving and controlling the supply, or, alternatively, pays to
the Authority for all such Land, Building, Transformers, Circuit Breakers and other necessary
equipment and apparatus if so provided and installed by the Authority. The recovery of the
remaining cost of the service connection shall be regulated by the Authoritys Abridged
Conditions of Supply in force time to time.
3. The supply under this Tariff shall not be available to Industrial Supply consumers.
4. The consumers governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-

15
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold during
the billing month to recover fuel cost excepting those exempted from Fuel
Adjustment Surcharge.

TARIFF-D (FOR SUPPLY TO AGRCULTURAL TUBEWELLS AND LIFT


IRRIGATION PUMPS)

This tariff shall apply to :


1. Reclamation and Drainage Scheme Tubewells under Salinity Control and Reclamation
Projects.
2. Bona fide forests, agricultural tubewells and lift irrigation pumps for the irrigation of
agricultural land.

MINIMUM MONTHLY CHARGES

The fixed charges will represent the minimum monthly charge under this Tariff even
if no energy is consumed during a month.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. Agricultural Supply means a supply for Lift Irrigation Pumps and / or Tubewells
intended solely for irrigation or reclamation of agricultural land or forests, and
includes supply for lighting of the tubewell chamber which shall also be charged
under this tariff.
2. Supply Charges, under Rate 2 of this Tariff include:- (i) Fixed Charges for the
consumers maximum demand in kilowatts where applicable, (ii) energy charges for
the energy actually consumed by the consumed by the consumer in kilowatt-hours,
(iii) Fuel Adjustment Surcharge (FAS).
3. Fixed Charges, for the purpose of this Tariff, mean the charges in respect of
Authoritys reservation of power for the consumers demand based on sanctioned
load in kilowatt.
4. Month, for the purpose of this Tariff, means a billing month of 30 days reckoned
from the date of last meter reading. However, if for any reason, the meter reading
date of a consumer is altered and the acceleration/retardation in the date is up to 4
days, no notice shall be taken of this acceleration or retardation. But if the date is
accelerated or retarded by more than 4 days, the fixed charges shall be assessed on
proportionate basis for the actual number of days between the date of the old
reading and the new reading.
5. Energy Charges, mean the charges for the energy actually consumed by the
consumer in kilowatt-hours.
6. The Authority , for the purpose of these terms and conditions means the Water and
Power Development Authority.

16
SPECIAL CONDITIONS OF SUPPLY

1. The fixed charges under this Tariff shall be recovered on the basis of sanctioned load
in kilowatt.
2. The lamps and fans consumption in the residential quarters if any attached to the
tubewells shall be charged entirely at Tariff A-1 for General Supply.
3. The supply under this Tariff shall not be available to consumers using pumps for the
irrigation of Parks, meadows, gardens, orchards, attached to and forming part of the
residential, commercial or industrial premises in which case the appropriate General
Supply Tariff A-1 / A-2 or Industrial Tariff B-1 / B-2 accordingly as the supply is
single phase or three phase, shall be applicable.
4. The supply under this Tariff shall not be available for resale.
5. The Consumers governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold during he
billing month to recover fuel cost excepting those exempted
from Fuel Adjustment Surcharge.
6. The supply under this tariff shall also be available to tubewells mean for
aquaculture, viz. fish farms, fish hatcheries and fish nurseries.

TARIFF E-1 (TEMPORARY GENERAL SUPPLY)

This Tariff shall apply to Residential and Commercial consumers for temporary supply.

SECURITY DEPOSITS

Ordinarily the supply under this Tariff shall not be given by the Authority without first
obtaining security equal to the anticipated supply charges and other miscellaneous charges
for the period of temporary supply recoverable under the normal rules framed by the
Authority from time to time.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BIL LS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

DEFINITIONS

1. Temporary General Supply means a supply given to persons temporarily on special


occasion such as ceremonial, religious gatherings, festivals, fairs, marriages and
other civil or military functions. This also includes supply to touring cinemas and
persons engaged in construction works for all kinds of single phase loads. For
connected load exceeding 4 kw, supply may be given at 400 volts (3 phase) to allow
a balanced distribution of load on the 3-phases. Normally, temporary connection
shall be allowed for a period of 3 months; however this can be extended on three
months basis by the load sanctioning authority subject to clearance of outstanding
dues.

17
2. Energy Charges mean the charges for the units actually consumed by the
consumer in kilowatt-hours.
3. Supply Charges under this tariff include Energy Charges and Fuel Adjustment
Surcharge.
4. Month means a billing month of 30 days or less.
5. The Authority, for the purposes of these terms and conditions means the Water and
Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. The supply under this Tariff shall not be available for resale.
2. The Consumers governed by this Tariff shall be charged each month Fuel Adjustment
Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold during
the billing month to recover fuel cost excepting those exempted
from Fuel Adjustment Surcharge.

TARIFF E-2 (TEMPORARY INDUSTRIAL SUPPLY AND TEMPORARY


BULK SUPPLY)

This Tariff is applicable to consumers having their own distribution facilities, i.e. own L.T
lines etc., for the purpose of further distribution within their respective jurisdiction.

SURCHARGE FOR PART PAYMENT OR LATE PAYMENT OF ELECTRICITY BILLS.

The Authority shall, ordinarily, render bills to the consumers monthly including bank
charges, if any, for payment by the due date. However, if any bill including any amounts
other than the Supply Charges assessed against him by the Authority, is not paid by the
consumer in full within 15 days of the date of its presentation, a Late Payment Surcharge of
10% (ten percent) shall be levied on the amount of Supply Charges as well as on the
amount of Additional Surcharge and SURCHARGE.

SECURITY DEPOSIT

The supply under this Tariff shall be given by the Authority after obtaining security
equal to the anticipated supply charges and other miscellaneous charges for the period of
temporary supply recoverable under the normal rules framed by the Authority from time to
time.

DEFINITIONS

1. Temporary Industrial or Bulk Supply means a supply given to any person or an


Industrial or Bulk Supply Consumer for the bona fide purpose mentioned under the
definitions of Industrial Supply and Bulk Supply in the Schedule of Tariffs.
Normally, temp orary connections shall be allowed for a period of 3 months; however
this can be extended on three months basis by the load sanctioning authority subject
to clearance of outstanding dues.
2. Energy Charges mean the charges for the units actually consumed by the
consumer in kilowatt-hours.
3. Supply Charges under this tariff include Energy Charges and Fuel Adjustment
Surcharge.
4. Month means a billing month of 30 days or less.

18
5. The Authority, for the purposes of these terms and conditions means the Water and
Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. This Tariff shall not be entitle any person or a consumer to the temporary supply
or to any temporary addition to the existing supply without previous sanction of
the competent authority.
2. The supply under this Tariff shall not be available to any industrial supply
consumer for resale.
3. The Consumers governed by this Tariff shall be charged each month Fuel
Adjustment Surcharge (FAS) worked out on the basis of the following clause:-
A Fuel Adjustment Surcharge (FAS) will be added to each kWh sold during
the billing month to recover fuel cost excepting those exempted
from Fuel Adjustment Surcharge.

TARIFF F (SEASONAL INDUSTRIAL SUPPLY)

This Tariff is applicable to seasonal industry.

DEFINITIONS

1. Seasonal Industry for the purpose of application of this Tariff, means an industry
which works only for part of the year to meet demand for goods or services arising
during a particular season of the year.
Note: Any seasonal industry running in combination with one or more seasonal
industries against one connection, in a manner that the former works in one season
while the latter works in the other season, thus running throughout the year, will not
be classified as a seasonal industry for the purpose of the application of this Tariff.
2. Year means any period comprising twelve consecutive months.
3. Seasonal Industrial Supply means a supply given to seasonal industry as
defined above.
4. All Definitions and Special Conditions of Supply as laid down under the
corresponding Industrial Tariff shall also form part of this Tariff so for as they
may be relevant.
5. The Authority, for the purposes of these terms and conditions means the
Water and Power Development Authority.

SPECIAL CONDITIONS OF SUPPLY

1. Fixed charges per kilowatt per month under this Tariff, levied at the rate of 125% of
the corresponding regular Industrial Supply Tariff Rates, shall be recovered only for the
period seasonal industry actually runs subject to minimum period of six consecutive
months during any twelve consecutive months. The condition for recovery of Fixed
Charges for a minimum period of six months shall not, however, apply to the seasonal
industries, which are connected to the Authoritys Supply System for the first time
during the course of a season.
2. The consumers falling within the purview of this Tariff shall have the option to
change over to the corresponding Industrial Supply Tariff, provided they undertake to
abide by all the conditions and restrictions, which may, from time to time, be prescribed
as an integral part of those Tariffs. The Consumers under this Tariff will have the option
to convert to Regular Tariff and vice versa. This option can be exercised at the time of

19
obtaining a new connection or at the beginning of the season. Once exercised, the
option will remain in force for at least one year.
3. All seasonal loads shall be disconnected from the authoritys Supply System at the
end of the season, specified by the consumer at the time of getting connection, for
which the supply is give. In case, however, a consumer requires to run the non-seasonal
part of his load (e.g. lights, fans, tubewells, etc.) throughout the year, he shall have to
bring out separate circuits for such load so as to enable installation of separate meters
for each type of load and charging the same at the relevant Tariff.
4. Where a Seasonal Supply consumer does not come forward to have his seasonal
industry re-connected with the Authoritys Supply System in any ensuing season, the
service line and equipment belonging to the Authority and installed at his premises shall
be removed after expiry of 60 days of the date of commencement of the season
previously specified by the consumer at the time of his obtaining new connection/re-
connection. However, at least ten clear days not in writing under registered post shall be
necessary to be given to the consumer before removal of service line and equipment
from his premises as aforesaid, to enable him to decide about the retention of
connection or otherwise. No Supply Charge shall be recovered from a disconnected
seasonal consumer for any season during which he does not come forward to have his
seasonal industry re-connected with the Authoritys Supply System.

20
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 13.08.2004

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERA L SUPPLY TARIFF A -1 (including FATA)
i) Up to 50 units --- 61 ---- 73
ii) For Consumption exceeding 50 units.
For First 100 Units (1-100) ---- 41 41 158
For Next 200 Units (101-300) ---- 58 41 229
For Next 700 Units (301-1000) ---- 151 41 355
Above 1000 Units ---- 188 36 442
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy
is consumed.
b) 3-
a) Single Phase Connections: Rs.45/- PhaseConnections:
Rs.100/-
GENERAL SUPPLY TARIFF A -2 (including FATA)
a) For peak load requirement of up to 20 KW at 400 volts
For First 100 Units ---- 292 2 382
Above 100 Units ---- 316 2 392
b) For peak load requirement exceeding 20 KW
220 109 36 283
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy
is consumed.
b) 3-Phase Connections:
a) Single Phase Connection Rs.150/-
Rs.300/-
INDUSTRIAL SUPPLY TARIFFS
B-1 UP TO 40 KW (at 400 Volts) ---- 181 20 307
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and Rs.90/ -
KW for loads between 20 -40 KW even if no energy is consumed.
B-2 41-500 KW (at 400 Volts)-
300 130 20 209
Normal
B-2 41-500 KW TOD (Off-peak) 300 120 20 207
B-2 41-500 KW TOD (peak) 300 198 20 278
B-3 Up to 5000 KW (at 11/33 KV)-
290 129 20 201
Normal
B-3 Up to 5000 KW TOD (Off-peak) 290 115 20 160
B-3 Up to 5000 KW TOD (Peak) 290 197 20 226
B-4 For All Loads (at
280 124 20 186
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-peak) 280 111 20 149
B-4 For All Loads - TOD (Peak) 280 187 20 220
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply Charges" is
also leviable. "Supply Charges" include Fixed Charges, Energy Charges, F.A.S. and Low Power
Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of Water &
Power, Govt. of Pakistan Notification No. SRO -894(I)2001, dated 28-12-2001, shall continue to
remain in force.

21
Fixed Charges Energy Addl.
TARIFF CATEGORY / F.A.S
Rs./ Charges Surcharge
PARTICULARS Ps/kWh
Kw/Month Ps/KWh Ps/kWh
1 2 3 4 5
BULK SUPPLY TARIFFS
C -1 For Supply at 400 Volts
a) For consumers having peak load
----- 124 41 342
requirement of upto 20 KW
b) For consumers having peak load
requirement of above 20 KW and 220 109 41 321
upto 500 KW
C -2 For supply at 11,33, kw (For
peak load requirement not 216 106 41 296
exceeding 5000 kw)
C -3 For supply at 66, 132, 220 kv 214 104 41 290
AGRICULTURE TARIFF-D
1- SCARP ---- 126 41 313
2- (I) Punjab and Sindh 82 90 41 159
2-(II) NWFP and Balochistan &
Distts. of Mianwali & Bahawalpur in 72 75 41 138
Punjab and Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 211 41 368
E-2-(ii) Commercial Supply ---- 394 2 474
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per day
subject to minimum of Rs.200/- for entire period of supply, even if no energy is consumed.
E-2-(i) Industrial Supply ---- 236 20 351
E-2-(ii-a) Bulk Supply at 400 V (for
---- 176 41 385
all categories)
E-2-(ii-a) Bulk Supply at 11kv (for
---- 164 41 362
all categories)
E-2-(iii) Bulk Supply to Other
---- 185 41 367
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the relevant 125% of the "Addl. Charges" of the relevant
industrial supply tariff industrial supply ta riff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice versa. This
option can be exercised at the time of a new connection or at the beginning of the season. Once
exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply Charges" is
also leviable. "Supply Charges" include Fixed Charges, Energy Charges, F.A.S. and Low Power
Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of Water &
Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001, shall continue to
remain in force.

22
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING
TARIFF - G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other
--- 193 38 457
than those in G-1 (i)
2-FIXED LINE
CHARGES PER MONTH
PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
sys tem is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be nego tiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL
PREMISES
1- Consumers having
---- 145 41 402
their own transformer
2- Consumers not having
---- 146 41 404
their own transformer
TARIFF-I FOR
---- 102 41 350
RAILWAY TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by
---- 174 41 336
WAPDA
2-(a) Purchase of Power
---- 103 ---- ----
by WAPDA (Dec-July)
2-(b) Purchase of Power
---- 78 ---- ----
by WAPDA (Aug -Nov)
TARIFF-K FOR SPECIAL CONTRACTS
a) For Government of AJ
---- 110 41 253
&K
b) For supply to KESC ---- ---- ---- 379
c) Special Tariff for HVSC
---- 188 20 211
Testing Lab Rawat.
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable.
Supply Charges" include Fixed Charges, Energy Charges, F.A.S. and Low Power
Factor Penalty.
2)Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of
Water & Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

23
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 15. 05.2004

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1 (including FATA)
i) Up to 50 units --- 61 ---- 73
ii) For Consumption exceeding 50 units.
For First 100 Units (1-100) ---- 41 49 131
For Next 200 Units (101-300) ---- 58 49 202
For Next 700 Units (301-
---- 151 49 328
1000)
Above 1000 Units ---- 188 44 415
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase Connections:
a) Single Phase Connections: Rs.45/-
Rs.100/-
GENERAL SUPPLY TARIFF A-2 (including FATA)
a) For peak load requirement of up to 20 KW at 400 volts
For First 100 Units ---- 292 10 354
Above 100 Units ---- 316 10 364
b) For peak load requirement exceeding 20 KW
220 109 44 255
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase
a) Single Phase Connection Rs.150/-
Connections: Rs.300/-
INDUSTRIAL SUPPLY
TARIFFS
B-1 UP TO 40 KW (at 400
---- 181 28 267
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400
300 130 28 169
Volts)- Normal
B-2 41-500 KW TOD (Off-
300 120 28 167
peak)
B-2 41-500 KW TOD (peak) 300 198 28 238
B-3 Up to 5000 KW (at 11/33
290 129 28 165
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 115 28 124
peak)
B-3 Up to 5000 KW TOD
290 197 28 190
(Peak)
B-4 For All Loads (at
280 124 28 154
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 111 28 117
peak)
B-4 For All Loads - TOD
280 187 28 188
(Peak)
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No. SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

24
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 For Supply at 400 Volts
a) For consumers having
peak load requirement of ----- 124 49 294
upto 20 KW
b) For consumers having
peak load requirement of
220 109 49 293
above 20 KW and upto 500
KW
C-2 For supply at 11,33, kw
(For peak load requirement 216 106 49 270
not exceeding 5000 kw)
C-3 For supply at 66, 132,
214 104 49 266
220 kv
AGRICULTURE TARIFF-D
1- SCARP ---- 126 49 255
2- (I) Punjab and Sindh 82 90 49 105
2-(II) NWFP and Balochistan
& Distts. of Mianwali &
72 75 49 88
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 211 49 341
E-2-(ii) Commercial Supply ---- 394 10 454
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 236 28 311
E-2-(ii-a) Bulk Supply at 400
---- 176 49 357
V (for all categories)
E-2-(ii-a) Bulk Supply at
---- 164 49 336
11kv (for all categories)
E-2-(iii) Bulk Supply to Other
---- 185 49 343
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the relevant
relevant industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

25
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING
TARIFF - G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 193 44 457
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 145 49 344
own transformer
2- Consumers not having
---- 146 49 346
their own transformer
TARIFF-I FOR RAILWAY
---- 102 49 292
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 174 49 290
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
TARIFF-K FOR SPECIAL CONTRACTS
a) For Government of AJ & K ---- 110 49 207
b) For supply to KESC ---- ---- ---- 347
c) Special Tariff for HVSC
---- 188 28 165
Testing Lab Rawat.
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

26
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 16. 02.2004

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1 (including FATA)
i) Up to 50 units --- 61 ---- 73
ii) For Consumption exceeding 50 units.
For First 100 Units (1-100) ---- 41 36 131
For Next 200 Units (101-300) ---- 58 36 202
For Next 700 Units (301-1000) ---- 151 36 328
Above 1000 Units ---- 188 36 415
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
a) Single Phase Connections: b) 3-Phase Connections:
Rs.45/- Rs.100/-
GENERAL SUPPLY TARIFF A-2 (including FATA)
a) For peak load requirement of up to 20 KW at 400 volts
For First 100 Units ---- 292 2 354
Above 100 Units ---- 316 2 364
b) For peak load requirement exceeding 20 KW
220 109 36 255
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase
a) Single Phase Connection Rs.150/-
Connections: Rs.300/-
INDUSTRIAL SUPPLY
TARIFFS
B-1 UP TO 40 KW (at 400
---- 181 15 267
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400 Volts)-
300 130 15 169
Normal
B-2 41-500 KW TOD (Off-peak) 300 120 15 167
B-2 41-500 KW TOD (peak) 300 198 15 238
B-3 Up to 5000 KW (at 11/33
290 129 15 165
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 115 15 124
peak)
B-3 Up to 5000 KW TOD (Peak) 290 197 15 190
B-4 For All Loads (at
280 124 15 154
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 111 15 117
peak)
B-4 For All Loads - TOD (Peak) 280 187 15 188
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty .

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No. SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

27
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 For Supply at 400 Volts
a) For consumers having peak
----- 124 36 294
load requirement of upto 20 KW
b) For consumers having peak
load requirement of above 20 220 109 36 293
KW and upto 500 KW
C-2 For supply at 11,33, kw
(For peak load requirement not 216 106 36 270
exceeding 5000 kw)
C-3 For supply at 66, 132, 220
214 104 36 266
kv
AGRICULTURE TARIFF-D
1- SCARP ---- 126 36 255
2- (I) Punjab and Sindh 82 90 36 105
2-(II) NWFP and Balochistan &
Distts. of Mianwali &
72 75 36 88
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 211 36 341
E-2-(ii) Commercial Supply ---- 394 2 454
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 236 15 311
E-2-(ii-a) Bulk Supply at 400 V
---- 176 36 357
(for all categories)
E-2-(ii-a) Bulk Supply at 11kv
---- 164 36 336
(for all categories)
E-2-(iii) Bulk Supply to Other
---- 185 36 343
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the
relevant industrial supply tariff relevant industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariff, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

28
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING TARIFF -
G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 193 36 457
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusiv ely meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 145 36 344
own transformer
2- Consumers not having their
---- 146 36 346
own transformer
TARIFF-I FOR RAILWAY
---- 102 36 292
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 174 36 290
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
TARIFF-K FOR SPECIAL CONTRACTS
a) For Government of AJ & K ---- 110 36 207
b) For supply to KESC ---- ---- ---- 334
c) Special Tariff for HVSC
---- 188 15 165
Testing Lab Rawat.
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariff, as notified vide Ministry of


Water & Power, Govt. of Pakistan Notification No.SRO-894(I)2001, dated 28-12-2001,
shall continue to remain in force.

29
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 06. 11.2001

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1 (including FATA)
i) Up to 50 units --- 61 ---- 73
ii) For Consumption exceeding 50 units.
For First 100 Units (1-100) ---- 41 44 131
For Next 200 Units (101-300) ---- 58 44 202
For Next 700 Units (301-
---- 151 44 328
1000)
Above 1000 Units ---- 188 44 415
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase
a) Single Phase Connections: Rs.45/-
Connections: Rs.100/-
GENERAL SUPPLY TARIFF A-2 (including FATA)
a) For peak load requirement of up to 20 KW at 400 volts
For First 100 Units ---- 292 10 354
Above 100 Units ---- 316 10 364
b) For peak load requirement exceeding 20 KW
220 109 44 255
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
a) Single Phase Connection b) 3-Phase Connections:
Rs.150/- Rs.300/-
INDUSTRIAL SUPPLY
TARIFFS
B-1 UP TO 40 KW (at 400
---- 181 23 267
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400
300 130 23 169
Volts)- Normal
B-2 41-500 KW TOD (Off-
300 120 23 167
peak)
B-2 41-500 KW TOD (peak) 300 198 23 238
B-3 Up to 5000 KW (at 11/33
290 129 23 165
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 115 23 124
peak)
B-3 Up to 5000 KW TOD
290 197 23 190
(Peak)
B-4 For All Loads (at
280 124 23 154
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 111 23 117
peak)
B-4 For All Loads - TOD
280 187 23 188
(Peak)
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)1999, dated 28-06-1999, and as amended vide SRO No.572(I)/2001, dated
08-08-2001, shall continue to remain in force.

30
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 For Supply at 400 Volts
a) For consumers having
peak load requirement of ----- 124 44 294
upto 20 KW
b) For consumers having
peak load requirement of
220 109 44 293
above 20 KW and upto 500
KW
C-2 For supply at 11,33, kw
(For peak load requirement 216 106 44 270
not exceeding 5000 kw)
C-3 For supply at 66, 132,
214 104 44 266
220 kv
AGRICULTURE TARIFF-D
1- SCARP ---- 126 44 255
2- (I) Punjab and Sindh 82 90 44 105
2-(II) NWFP and Balochistan
& Distts. of Mianwali &
72 75 44 88
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 211 44 341
E-2-(ii) Commercial Supply ---- 394 10 454
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 236 23 311
E-2-(ii-a) Bulk Supply at
---- 176 44 357
400 V (for all categories)
E-2-(ii-a) Bulk Supply at
---- 164 44 336
11kv (for all categories)
E-2-(iii) Bulk Supply to
---- 185 44 343
Other Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the relevant
relevant industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)99, dated 28-06-1999, and as amended vide SRO No.572(I)/2001, dated 08-
08-2001. shall continue to remain in force.

31
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING
TARIFF - G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 193 44 457
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 145 44 344
own transformer
2- Consumers not having
---- 146 44 346
their own transformer
TARIFF-I FOR RAILWAY
---- 102 44 292
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 174 44 290
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
TARIFF-K FOR SPECIAL CONTRACTS
a) For Government of AJ & K ---- 110 44 207
b) For supply to KESC ---- ---- ---- 334
c) Special Tariff for HVSC
---- 188 23 165
Testing Lab Rawat.
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide SRO No.785(I)
/ 1999, dated 28-06-1999, and as amended vide SRO No.572(I), dated 08-08-2001,
shall continue to remain in force.

32
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 08.08.2001

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1 (including FATA)
i) Up to 50 units --- 61 ---- 73
ii) For Consumption exceeding 50 units.
For First 100 Units (1-100) ---- 41 34 131
For Next 200 Units (101-300) ---- 58 34 202
For Next 700 Units (301-
---- 151 34 328
1000)
Above 1000 Units ---- 188 34 415
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
a) Single Phase Connections: b) 3-Phase Connections:
Rs.45/- Rs.100/-
GENERAL SUPPLY TARIFF A-2 (including FATA)
a) For peak load requirement of up to 20 KW at 400 volts
For First 100 Units ---- 292 0 354
Above 100 Units ---- 316 0 364
b) For peak load requirement exceeding 20 KW
220 109 34 255
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
a) Single Phase Connection b) 3-Phase Connections:
Rs.150/- Rs.300/-
INDUSTRIAL SUPPLY
TARIFFS
B-1 UP TO 40 KW (at 400
---- 181 13 267
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400
300 130 13 169
Volts)- Normal
B-2 41-500 KW TOD (Off-
300 120 13 167
peak)
B-2 41-500 KW TOD (peak) 300 198 13 238
B-3 Up to 5000 KW (at 11/33
290 129 13 165
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 115 13 124
peak)
B-3 Up to 5000 KW TOD
290 197 13 190
(Peak)
B-4 For All Loads (at
280 124 13 154
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 111 13 117
peak)
B-4 For All Loads - TOD
280 187 13 188
(Peak)
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)1999, dated 28-06-1999, as amended by this notification, shall continue to
remain in force.

33
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 For Supply at 400 Volts
a) For consumers having peak
load requirement of upto 20 ----- 124 34 294
KW
b) For consumers having peak
load requirement of above 20 220 109 34 293
KW and upto 500 KW
C-2 For supply at 11,33, kw
(For peak load requirement 216 106 34 270
not exceeding 5000 kw)
C-3 For supply at 66, 132,
214 104 34 266
220 kv
AGRICULTURE TARIFF-D
1- SCARP ---- 126 34 255
2- (I) Punjab and Sindh 82 90 34 105
2-(II) NWFP and Balochistan
& Distts. of Mianwali &
72 75 34 88
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 211 34 341
E-2-(ii) Commercial Supply ---- 394 0 454
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 236 13 311
E-2-(ii-a) Bulk Supply at 400
---- 176 34 357
V (for all categories)
E-2-(ii-a) Bulk Supply at
---- 164 34 336
11kv (for all categories)
E-2-(iii) Bulk Supply to Other
---- 185 34 343
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the relevant
relevant industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)99, dated 28-06-1999, as amended by this notification, shall continue to
remain in force.

34
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING TARIFF
-G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 193 34 457
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 145 34 344
own transformer
2- Consumers not having
---- 146 34 346
their own transformer
TARIFF-I FOR RAILWAY
---- 102 34 292
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 174 34 290
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
TARIFF-K FOR SPECIAL CONTRACTS
a) For Government of AJ & K ---- 110 34 207
b) For supply to KESC ---- ---- ---- 334
c) Special Tariff for HVSC
---- 188 23 165
Testing Lab Rawat.
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide SRO


No.785(I)/ 1999, dated 28-06-1999, as amended by this notification, shall continue to
remain in force.

35
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 27. 03.2001

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1
i) Up to 50 units --- 54 7 73
ii) For Consumption above 50 units.
For First 100 Units (1-100) ---- 68 7 131
For Next 200 Units (101-300) ---- 77 15 202
For Next 700 Units (301-1000) ---- 110 75 328
For Next 3000 Units (1001-
---- 147 75 415
4000)
Above 4000 Units. ---- 147 75 466
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase Connections:
a) Single Phase Connections:
Rs.100/- Plus Rs.25/KW for
Rs.45/-
load in excess of 5 KW
Flat Rate for FATA (Rs./Connection/Month)
90 776
GENERAL SUPPLY TARIFF A-2
For First 100 Units ---- 217 75 354
Above 100 Units ---- 241 75 364
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase
a) Single Phase Connection
Connections: Rs.300/-
Rs.150/-
Plus Rs.30/KW for load in excess of 10 KW
INDUSTRIAL SUPPLY TARIFFS
B-1 UP TO 40 KW (at 400
---- 119 75 267
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400 Volts)-
200 68 75 241
Normal
B-2 41-500 KW TOD (Off-
200 58 75 226
peak)
B-2 41-500 KW TOD (peak) 200 136 75 297
B-3 Up to 5000 KW (at 11/33
290 67 75 165
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 53 75 124
peak)
B-3 Up to 5000 KW TOD
290 135 75 190
(Peak)
B-3 HVSC Testing Lab. Rawat. ---- 126 75 165
B-4 For All Loads (at
280 62 75 154
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 49 75 117
peak)
B-4 For All Loads - TOD (Peak) 280 125 75 188
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)1999, dated 28-06-1999, remain unaltered.

36
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 (a) 400 Volts
---- 83 75 294
(Licensees/Non-Licensees)
C-1 (b) 400 Volts (Other
220 68 75 293
Consumers)
C-2 (a) 11/33 KV
---- 69 75 280
(Licensees/Non-Licensees)
C-2 (b) P.O.F. at Wah ---- 95 75 316
C-2 (c) 11/33 KV (Other
216 65 75 290
Consumers)
C-2 (d) For Supply Of Govt. of
---- 69 75 207
AJ&K
C-3 For Supply at 66,132,220
214 63 75 266
KV
AGRICULTURE TARIFF-D
1- SCARP ---- 85 75 255
2- (I) Punjab and Sindh 82 49 75 105
2-(II) NWFP and Balochistan &
Distts. of Mianwali &
72 34 75 88
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 170 75 341
E-2-(ii) Commercial Supply ---- 319 75 454
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 174 75 311
E-2-(ii-a) Bulk Supply at 400
---- 135 75 357
V (for all categories)
E-2-(ii-a) Bulk Supply at
---- 123 75 336
11kv (for all categories)
E-2-(iii) Bulk Supply to Other
---- 144 75 343
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the relevant
relevant industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)99, dated 28-06-1999, remain unaltered.

37
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING TARIFF
-G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 152 75 457
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 104 75 344
own transformer
2- Consumers not having
---- 105 75 346
their own transformer
TARIFF-I FOR RAILWAY
---- 61 75 292
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 133 75 290
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "S upply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide SRO


No.785(I)/ 1999, dated 28-06-1999, remain unaltered.

38
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 30. 12.2000

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1
i) Up to 50 units --- 54 7 73
ii) For Consumption above 50 units.
For First 100 Units (1-100) ---- 68 7 111
For Next 200 Units (101-300) ---- 77 15 182
For Next 700 Units (301-1000) ---- 110 75 308
For Next 3000 Units (1001-
---- 147 75 407
4000)
Above 4000 Units. ---- 147 75 458
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase Connections:
a) Single Phase Connections: Rs.45/- Rs.100/- Plus Rs.25/KW for
load in excess of 5 KW
Flat Rate for FATA (Rs./Connection/Month)
90 537
GENERAL SUPPLY TARIFF A-2
For First 100 Units ---- 217 75 346
Above 100 Units ---- 241 75 356
Under this tariff, there shall be minimum monthly charges at the following rates even if
no energy is consumed.
b) 3-Phase
a) Single Phase Connection Rs.150/- Connections: Rs.300/-
Plus Rs.30/KW for load in excess of 10 KW
INDUSTRIAL SUPPLY TARIFFS
B-1 UP TO 40 KW (at 400
---- 119 75 259
Volts)
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and
Rs.90/-KW for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400 Volts)-
200 68 75 233
Normal
B-2 41-500 KW TOD (Off-peak) 200 58 75 218
B-2 41-500 KW TOD (peak) 200 136 75 289
B-3 Up to 5000 KW (at 11/33
290 67 75 157
KV)-Normal
B-3 Up to 5000 KW TOD (Off-
290 53 75 116
peak)
B-3 Up to 5000 KW TOD
290 135 75 182
(Peak)
B-3 HVSC Testing Lab. Rawat. ---- 126 75 157
B-4 For All Loads (at
280 62 75 146
66/132/220KV)-Normal
B-4 For All Loads - TOD (Off-
280 49 75 109
peak)
B-4 For All Loads - TOD (Peak) 280 125 75 180
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)1999, dated 28-06-1999, remain unaltered.

39
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 (a) 400 Volts
---- 83 75 274
(Licensees/Non-Licensees)
C-1 (b) 400 Volts (Other
220 68 75 273
Consumers)
C-2 (a) 11/33 KV
---- 69 75 260
(Licensees/Non-Licensees)
C-2 (b) P.O.F. at Wah ---- 95 75 296
C-2 (c) 11/33 KV (Other
216 65 75 270
Consumers)
C-2 (d) For Supply Of Govt. of
---- 69 75 187
AJ&K
C-3 For Supply at 66,132,220
214 63 75 246
KV
AGRICULTURE TARIFF-D
1- SCARP ---- 85 75 235
2- (I) Punjab and Sindh 82 49 75 85
2-(II) NWFP and Balochistan &
Distts. of Mianwali &
72 34 75 68
Bahawalpur in Punjab and
Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 170 75 321
E-2-(ii) Commercial Supply ---- 319 75 446
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per
day subject to minimum of Rs.200/- for entire period of supply, even if no energy is
consumed.
E-2-(i) Industrial Supply ---- 174 75 303
E-2-(ii-a) Bulk Supply at 400
---- 135 75 337
V (for all categories)
E-2-(ii-a) Bulk Supply at
---- 123 75 316
11kv (for all categories)
E-2-(iii) Bulk Supply to Other
---- 144 75 323
Consumers
SEASONAL INDUSTRIAL
SUPPLY TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the 125% of the "Addl. Charges" of the relevant
relevant industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice
versa. This option can be exercised at the time of a new connection or at the beginning
of the season. Once exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-


No.785(I)99, dated 28-06-1999, remain unaltered.

40
Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING TARIFF
-G
1-UNIT CHARGES
i- For Provincial Govts. affording
exemption to WAPDA from Octori & As Per General Supply Tariff A-1
Property Tax, etc.
ii- For consumers other than
--- 152 75 449
those in G-1 (i)
2-FIXED LINE CHARGES
PER MONTH PER MILE
i) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.253/-
Street Lighting is borne by the Authority.
ii) Where the entire capital cost in laying Street
Lighting supply line which is exclusively meant for Rs.23/-
Street Lighting is borne by the Consumer.
iii) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.158/-
system is borne by the Authority
iv) Where the entire capital cost in laying Street
Lighting supply line over the existing distribution Rs.33/-
system is borne by the Authority
v) For Street Lighting supply through underground
Rate to be negotiated
cable
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their
---- 104 75 324
own transformer
2- Consumers not having their
---- 105 75 326
own transformer
TARIFF-I FOR RAILWAY
---- 61 75 272
TRACTION
TARIFF - J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 133 75 270
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide SRO


No.785(I)/ 1999, dated 28-06-1999, remain unaltered.

41
SCHEDULE OF ELECTRICITY TARIFFS OR WAPDA COMPANIES
EFFECTIVE 07.09.2000

Fixed
Energy
TARIFF CATEGORY / Charges F.A.S Addl. Surcharge
Charges
PARTICULARS Rs./ Ps/kWh Ps/kWh
Ps/KWh
Kw/Month
1 2 3 4 5
GENERAL SUPPLY TARIFF A-1
i) Up to 50 units --- 54 7 73
ii) For Consumption above 50 units.
For First 100 Units (1-100) ---- 68 7 102
For Next 200 Units (101-300) ---- 77 15 173
For Next 700 Units (301-1000) ---- 110 75 299
For Next 3000 Units (1001-4000) ---- 147 75 385
Above 4000 Units. ---- 147 75 436
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy is
consumed.
b) 3-Phase
Connections: Rs.100/-
a) Single Phase Connections: Rs.45/-
Plus Rs.25/KW for load in
excess of 5 KW
Flat Rate for FATA (Rs./Connection/Month) 90 537
GENERAL SUPPLY TARIFF A-2
For First 100 Units ---- 217 75 346
Above 100 Units ---- 241 75 356
Under this tariff, there shall be minimum monthly charges at the following rates even if no energy is
consumed.
b) 3-Phase Connections:
a) Single Phase Connection Rs.150/- Rs.300/- Plus Rs.30/KW for load in excess of
10 KW
INDUSTRIAL SUPPLY TARIFFS
B-1 UP TO 40 KW (at 400 Volts) ---- 119 75 259
There shall be minimum monthly charges of Rs.70/KW for first 20 Kilowatts of load and Rs.90/-KW
for loads between 20-40 KW even if no energy is consumed.
B-2 41-500 KW (at 400 Volts)-
200 68 75 233
Normal
B-2 41-500 KW TOD (Off-peak) 200 58 75 218
B-2 41-500 KW TOD (peak) 200 136 75 289
B-3 Up to 5000 KW (at 11/33 KV)-
Normal 290 67 75 157
B-3 Up to 5000 KW TOD (Off-peak) 290 53 75 116
B-3 Up to 5000 KW TOD (Peak) 290 135 75 182
B-3 HVSC Testing Lab. Rawat. ---- 126 75 157
B-4 For All Loads (at 66/132/220KV)-
Normal 280 62 75 146
B-4 For All Loads - TOD (Off-peak) 280 49 75 109
B-4 For All Loads - TOD (Peak) 280 125 75 180
Note:- 1 ) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply Charges" is
also leviable. "Supply Charges" include Fixed Charges, Energy Charges, F.A.S. and Low Power
Factor Penalty.

2 ) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-No.785(I)1999, dated
28-06-1999, remain unaltered.

42
Fixed Charges Energy
TARIFF CATEGORY / F.A.S Addl. Surcharge
Rs./ Charges
PARTICULARS Ps/kWh Ps/kWh
Kw/Month Ps/KWh
1 2 3 4 5
BULK SUPPLY TARIFFS
C-1 (a) 400 Volts (Licensees/Non-
---- 83 75 265
Licensees)
C-1 (b) 400 Volts (Other
220 68 75 264
Consumers)
C-2 (a) 11/33 KV (Licensees/Non-
---- 69 75 251
Licensees)
C-2 (b) P.O.F. at Wah ---- 95 75 287
C-2 (c) 11/33 KV (Other
216 65 75 261
Consumers)
C-2 (d) For Supply Of Govt. of AJ&K ---- 69 75 178
C-3 For Supply at 66,132,220 KV 214 63 75 237
AGRICULTURE TARIFF-D
1- SCARP ---- 85 75 226
2- (I) Punjab and Sindh 82 49 75 76
2-(II) NWFP and Balochistan &
Distts. of Mianwali & Bahawalpur in 72 34 75 59
Punjab and Tharparkar in Sindh
TEMPORARY SUPPLY TARIFFS
E-1-(i) Domestic Supply ---- 170 75 299
E-2-(ii) Commercial Supply ---- 319 75 446
For the above two categories, the minimum bill of the consumers shall be Rs.46/- per day subject to
minimum of Rs.200/- for entire period of supply, even if no energy is consumed.
E-2-(i) Industrial Supply ---- 174 75 303
E-2-(ii-a) Bulk Supply at 400 V (for
---- 135 75 315
all categories)
E-2-(ii-a) Bulk Supply at 11kv (for all
---- 123 75 303
categories)
E-2-(iii) Bulk Supply to Other
---- 144 75 323
Consumers
SEASONAL INDUSTRIAL SUPPLY
TARIFFS
SUPPLY CHARGES ADDITIONAL SURCHARGE
125% of the "Supply Charges" of the relevant 125% of the "Addl. Charges" of the relevant
industrial supply tariff industrial supply tariff
Note:- Tariff-F consumers will have the option to convert to Regular Tariff and vice versa. This
option can be exercised at the time of a new connection or at the beginning of the season. Once
exercised, the option shall remain in force for at least one year.

NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply Charges" is
also leviable. "Supply Charges" include Fixed Charges, Energy Charges, F.A.S. and Low Power
Factor Penalty.

2) Terms & Conditions of the Schedule of Tariffs, as notified vide SRO-No.785(I)99, dated
28-06-1999, remain unaltered.

43
Fixed
Energy Addl.
TARIFF CATEGORY / Charges F.A.S
Charges Surcharge
PARTICULARS Rs./ Ps/kWh
Ps/KWh Ps/kWh
Kw/Month
1 2 3 4 5
PUBLIC LIGHTING TARIFF -
G
1-UNIT CHARGES
i- For Provincial Govts. affording exemption
As Per General Supply Tariff A-1
to WAPDA from Octori & Property Tax, etc.
ii- For consumers other than
--- 152 75 449
those in G-1 (i)
2-FIXED LINE CHARGES PER
MONTH PER MILE
i) Where the entire capital cost in laying Street Lighting
supply line which is exclusively meant for Street Lighting Rs.253/-
is borne by the Authority.
ii) Where the entire capital cost in laying Street Lighting
supply line which is exclusively meant for Street Lighting Rs.23/-
is borne by the Consumer.
iii) Where the entire capital cost in laying Street Lighting
supply line over the existing distribution system is borne Rs.158/-
by the Authority
iv) Where the entire capital cost in laying Street Lighting
supply line over the existing distribution system is borne Rs.33/-
by the Authority
v) For Street Lighting supply through underground cable Rate to be negotiated
TARIFF-H FOR RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
1- Consumers having their own
---- 104 75 315
transformer
2- Consumers not having their
---- 105 75 317
own transformer
TARIFF-I FOR RAILWAY
---- 61 75 263
TRACTION
TARIFF J FOR CO-GENERATION CONSUMER
1- Sale of Power by WAPDA ---- 133 75 270
2-(a) Purchase of Power by
---- 103 ---- ----
WAPDA (Dec-July)
2-(b) Purchase of Power by
---- 78 ---- ----
WAPDA (Aug-Nov)
NOTE: 1) In all electricity tariffs, the "SURCHARGE" at the rate of 10.4% of "Supply
Charges" is also leviable. "Supply Charges" include Fixed Charges, Energy Charges,
F.A.S. and Low Power Factor Penalty.

2)Terms & Conditions of the Schedule of Tariffs, as notified vide SRO


No.785(I)/1999, dated 28-06-1999, remain unaltered.

44
LIST OF TARIFF CODES BEING USED BY WAPDA COMPUTER CENTRE (WCC)

Computer Tariff
S.No. Brief Description of Connections covered under the Tariff
Code Category
1 01 A-1 (a) Normal Domestic Consumers
2 02 A-1 (b) FATA Domestic Consumers
3 04 A-2 (a) Commercial / office connections up to 20 KW load
4 05 A-2 (b) Commercial / office connections above 20 KW load
Industrial up to 40 KW load where 3% of total units consumed
5 07 B-1 are to be charged at tariff A-2 and the 97% are to be charged at
B-1
Industrial up to 40 KW load where 100% units consumed are
6 08 B-1 chargeable at industrial tariff and a separate meter exists for
single phase load governed under tariff A-2
Industrial connections of loads between 41-500 KW where 1% of
7 10 B-2 total units consumed are to be charged at tariff A-2 and the 99%
are to be charged at B-2
Industrial connections of loads between 41-500 KW where 100%
8 11 B-2 units are chargeable at industrial tariff because a separate meter
exists for single phase load governed under tariff A-2
9 12 B-2-TOD Industrial from 41 - 500 KW governed by time of day tariffs
Industrial consumers taking supply at 11/33 KV (loads upto 5000
10 13 B-3
KW)
Industrial consumers taking supply at 11/33 (loads upto 5000
11 14 B-3-TOD
KW) governed by time of day tariffs
12 15 K (C) Short circuit and high voltage testing lab Rawat
13 16 B-4 Industrial consumers taking supply at 66/132/200 KA (all loads)
Industrial consumers taking supply at 66/132/220 KV (all loads)
14 17 B-4-TOD
governed by time of day tariffs
15 19 C-1 (a) Bulk supply at 400 volts (upto 20 KW load)
16 25 C-1 (b) Bulk supply at volts (above 20 KW load)
17 28 C-2 Bulk supply at 11 KV and 33 KV
18 35 K- (a) Bulk supply for AJK only
19 37 C-3 Bulk supply at 66/132/220 KV
20 46 D- (1) SCARP (Salinity control & reclamation project) Tubewells
21 49 D(2)-I Agri. Tubewells & Lift irrigation pumps (Punjab & Sindh)
22 52 D-2(II) Agri. Tubewells & Lift irrigation pumps in (NWFP & Baloch)
23 55 E-I (i) Temporary domestic supply
24 56 E-I (ii) Temporary commercial supply
25 58 E-2 (i) Temporary industrial supply
26 59 E-2 (ii-a) Temporary bulk supply at 400 volts
27 60 E-2 (ii-b) Temporary bulk supply at 11 KV
28 61 E-2 (III) Temporary bulk supply to other consumers
Street light connections of the Provincial Governments affording
29 72 G-I (i)
exemption to WAPDA from octroi and property tax etc.
30 73 G-I (ii) Street light connections other than those of G-1 above
Residential colonies attached with industrial premises having
31 76 H-1
their own transformer
Residential colonies attached with industrial premises not having
32 79 H-2
their own transformer
33 82 I Railway Traction only
34 85 J Cogeneration consumers

45
WAPDA SCHEDULE OF SECURITY DEPOSIT RATES

S.NO TARIFF CATEGORY EFFECTIVE 02.09.69 EFFECTIVE 01.11.88


General Supply Tariff A-1/A-2 Rs. 50/-
Rs. 35/-

a) For connected load up to 1-KW Rs. 60/-KW subject to


Rs. 30/KW subject to a
a minimum of Rs.
1 minimum of Rs. 35/-
b) For connected load above 1-KW 100/-
and upto and including 5-KW
Rs. 25/KW subject to a
Rs. 40/KW subject to a
minimum of Rs. 150/-
c) For connected load above 5-KW minimum of Rs. 300/-
Industrial / Agricultural &
Bulk Supply
2 Rs. 40 / KW Rs. 200 / KW
a) For connected load up to &
including 5-KW
Rs. 100/KW subject to
b) For connected load above 5-KW Rs. 30/KW subject to a
a minimum of Rs.
upto and including 20 KW minimum of Rs. 200/-
1000/-
c) For connected load above 20 Rs. 20/KW subject to a Rs. 80/KW subject to a
KW minimum of Rs. 600/- minimum of Rs. 2000/-
Double the rates Double the rates
prescribed in case of prescribed in case of
3 Seasonal Industries
regular Industrial regular Industrial
supply tariff supply tariff

Notified vide Circular No. 349-1274/GMCS/D(R&CP)/56195 dated 10.10.1988.

46
WAPDA SCHEDULE OF SECURITY DEPOSIT RATES

RATES EFFECTIVE RATES EFFECTIVE


S.NO TARIFF CATEGORY
01.07.1991 10.04.1995
Tariff A-1 (S/Phase Supply)
Rs. 200/- Rs. 240/-
1 a) Urban
Rs. 100/- Rs. 120/-
b) Rural
Tariff a-1 (3/Phase Supply)
a) upto 10 Marla plot Rs. 1000/-
2 b) Above 10 Marla to one Rs. 1500/- --
Kanal (20 Marla) plot Rs. 2000/-
c) Above one Kanal plot
Rs. 600/-
Tariff A-2 (S/Phase supply)
Rs. 500/- Rs. 300/-
a) Urban
Rs. 250/-
3 b) Rural
Rs. 3600/- plus Rs.
Rs. 3000/- 700/KW for loads
Tariff A-2 (3 Phase Supply)
above 5-KW
Rs. 200/KW Rs. 240/KW
4 Tariff B-1 Subject to a minimum Subject to a minimum
of Rs. 4000/- of Rs. 4800/-
5 Tariff B-2 Rs. 350/KW Rs. 420/KW
6 Tariff B-3 Rs. 600/KW Rs. 720/KW
7 Tariff B-4 Rs. 600/KW Rs. 720/KW
8 Tariff C-1 Rs. 200/KW Rs. 240/KW
9 Tariff C-2 Rs. 600/KW Rs. 720/KW
10 Tariff C-3 Rs. 600/KW Rs. 720/KW
11 Tariff D Rs. 5000/- Rs. 6000/-
12 Tariff D-1 Rs. 10,000/- Rs. 12,000/-
Double the rates of Double the rates of
13 Tariff F regular industrial regular industrial
connection connection
14 Tariff G Rs. 600/KW4 Rs. 720/KW
15 Tariff H Rs. 600/KW4 Rs. 720/KW
16 Tariff I Rs. 200/KW4 Rs. 240/KW
17 Tariff J Rs. 600/KW Rs. 720/KW

1. Notified vide circular No. 719-26/GMCS/Tariffs/G-226 Dated 30.06.1991.


2. Notified vide circular No. 230-85/GMCS/Tariffs/G-226 dated 10.04.1995.
3. Notified vide circular No. 818-34/GMCS/Tariffs/G-226 (III) dated 05.09.1996.
4. Notified vide circular No. 398-419/GMCS/Tariffs/G-226 (I) dated 20.06.1992 effective 01.07.1992 .

47
WAPDA SCHEDULE OF SECURITY DEPOSIT RATES

S.NO TARIFF CATEGORY RATES EFFECTIVE 01.11.1997


Tariff A-1 (S/Phase Supply)
Rs. 400/-
1 a) Urban
Rs. 200/-
b) Rural
Rs. 1500/- PLUS Rs. 400/KW for
2 Tariff A-1 (3/Phase Supply)
loads above 5 KW
Tariff A-2 (S/Phase supply) Rs. 770/-
a) Urban Rs. 390/-
3
b) Rural Rs. 4600/- PLUS Rs. 400/KW for
Tariff A-2 (3 Phase Supply) loads above 5 KW
Rs. 320/KW
4 Tariff B-1 Subject to a minimum of Rs.
6400/-
5 Tariff B-2 Rs. 550/KW
6 Tariff B-3 Rs. 910/KW
7 Tariff B-4 Rs. 930/KW
Rs. 320/KW
8 Tariff C-1 Subject to a minimum of Rs.
6400/-
9 Tariff C-2 Rs. 910/KW
10 Tariff C-3 Rs. 930/KW
11 Tariff D Rs. 8000/-
12 Tariff D-1 Rs. 16,000/-
Double the rates of regular
13 Tariff F
industrial tariff
14 Tariff G Rs. 970/KW4
15 Tariff H Rs. 920/KW4
16 Tariff I Rs. 330/KW4
17 Tariff J Rs. 910/KW

Notified vide circular No. 3147-3167/GMCS/Tariffs/G-226 (III) dated 11.10.1997.

Note-1 The new rates will be applicable for charging security deposit from:

a. All new connections (prospective consumers) who are issued demand notices on or after 01.11.1997.
b. The existing consumers where security already deposited by them has become invalid.
c. The existing consumers where there is change of owner or occupier and such owner or occupier fails to furnish
security according to the prevalent rules before getting supply in his name.
d. The existing consumers where there is alteration in connected load whether it is by the present consumer or
may have been carried out by the previous consumer without the approval of the competent authority.

Note-2 For the purpose of calculating the security deposit the traction of a kilowatt (for loads above one kilowatt)
which is equal to or more than half kilowatt shall be taken as one kilowatt and the traction which is less than half a
kilowatt shall be ignored.

Note-3 The enhanced security rates will not be applicable on the demand notices already issued upto 30 days from
date of issue of demand notice. However revised rates would be applicable if the amount of security is not
deposited within 30 days of issue of demand notice.

48

Anda mungkin juga menyukai