ASME Section IX

1. A complete record consist of this all essential variables of the welding data used to weld
A. Procedurs Qualification Reports
B. Welding Performance Qualification Record
C. Procedurs Qualification Record
D. Welding Procedure Specification
2. According to these code, change of the following welding variable in procedure shall be
considered essential for any welding process, except
A. P No.
B. F Number
C. Groove design
D. All of the above
E. None of the above
3. When a welder have pass in the tee fillet test, with 3/8 in thickness, he shall allow to
welds:
A. Any thickness material, fillet in any size
B. Minimum diameter 73 mm OD
C. Same thickness of test coupon
D. All of the above
E. None of the above
4. Procedure Qualification Record shall be prepared by manufacturer or contractor, which is
defined as follows:
A. As a record of variables to be recorded during the welding of the test coupon
B. The PQR shall document all essential and supplementary essential variable if required
C. Several WPS may be prepared from the data on single PQR
D. All of the above
5. Elongated slag shall be considered unacceptable when
A. Less than 3.2 mm for t 10 mm
B. > 19 mm for t > 57 mm
C. Less than 1/3 t for t > 10 mm to 57 mm
D. None of the above
6. Which of the following statement are correct:
A. S number are assigned for material use by ASME B31
B. P number are assigned for material under ASTM
C. P number is the same with S number
D. None of the above
E. A,B and C correct answer
7. The welder is qualified by a single welded groove weld test coupon with backing, mean
he is qualified for:
A. Full penentration weld without backing
B. Partial penetration groove weld
C. None of the above
D. A and B are correct answer
8. When a procedure using combination processes, the thickness of test coupon shall be:
A. Minimum 3/8 in
B. Minimum 13 mm
C. Minimum 3/4 in
D. Any thickness
E. None of the above
9. A new WPS with GMAW welding process shall be made when the manufacturer use on
the:
A. Welding of A 516 Gr 70 to A240 Grade 3161
B. Change shielding gas and added or deletion of shielding gas
C. Change to thickness greater than test qualified
D. Change welding progression from uphill to downhill or vice versa
E. All of the above
10. Range qualification of a welders who have been tested by 6 G position with pipe NPS 6
Sch 80 is:
A. NPS 3/4 to unlimited
B. NPS 2 to unlimited and max. thickness approx.22.0 mm in all position
C. diameter tested or 4 whichever is greater
D. none of the above
11. When the test procedure using plate 9/16 in thickness in 1 G procedure, according to
these code the WPS

12. The exposed surfaces of each nick break shall shown


A. Complete join penetration and fusion
B. at least inchi sound metal
C. slag inclusion over 3/8 inchi
D. the tensile strength of the specimen
25. When destructive testing pipe with a diameter less than or equal to 1-5/16 inchi
A. radiography must be used
B. the entire pipe should be used for bend testing
C. one full pipe section specimen may be substituted for the root bend and nick break
specimen
D. pipe of this diameter may not be destructive tested
26. A welder who have successfully passed in the qualification test on the butt weld and
branch connection requirements on pipe < 12.75 in diameter shall be qualified:
A. flat, horizontal, vertical and overhead
B. all position, any thickness and pipe 12.75 in OD
C. all position, any joints design and fitting 12.75 in OD
D. all of the above
27. The welding may be done by which of the following processes
A. SMAW
B. GTAW
C. GMAW
D. All of the above

AWS D1.1

28. A WPS with ABS Grade EH 36 shall be qualified for:


A. any material listed on the group 1 or equivalent
B. any material listed on the group II
C. both of the above
D. any material designated by ASTM
29. A welding procedure is being performed on pipe 3 inchi schedule 160, what is minimum
thickness and diameter allowed to weld?
A. dia and minimum thickness is 1/8
B. minimum diameter 3 and minimum thickness is T/2
C. as welded and 4.8 mm
D. none of the above
30. All of the welding processes below shall be deemed as prequalified for use without
performing WPS qualification test except:
A. SMAW
B. FCAW
C. GMAW-S short circuiting transfer
D. none of the above
31. A welder who has successfully completed qualification on plate 1 G position must be
requalified if:
A. the diameter of pipe or tubing to be welded more than 24
B. the diameter of pipe or tubing to be welded less or equal than 24
C. a change to 2G position
D. both a and b above
32. Which of the following changes will be considered an essential variables for SMAW ?
A. increase of electrode diameter by 0.8 mm
B. change of base metal group number
C. increase heat input by 10%
D. A and C above
33. If radiographis test in lieu of mechanical test of welder qualification test using pipes the
minimum image shall
A. 100% for welded test pipe 4 inches (all entire circumfences)
B. examined one half of the weld perimeter selected for welded test pipe 4 inches
C. 100% for welded test pipe 4 inches (all entire circumfences)
D. all of the above except A
34. The WPS which has been approved by the company using 6 pipe sch.80 in 1G position
shall following condition except:
A. fillet weld in any thickness, diameter in flat position only
B. PJP weld in any thickness and diameter downhand position
C. minimum thickness 3.0 mm
D. none of the above
35. Maximum root opening variation for automatic of machine welding (SAW, GMAW, dan
FCAW) may not exceed than
A. 2.6 mm
B. 1/8 inch
C. 3.0 mm, if > 3.0 mm shall be locally corrected prior to automatic or machine welding
D. b and C above
36.
37. Reference number of welding process for symbolic representation of Manual Metal Arc
Welding is:
A. 111
B. 121
C. 131
D. 141
38. Refer to sketch, welding position:
A. PA
B. PC
C. PG
D. PE
39. When radiographic testing is used, then additional bend or fracture tests are mandatory
for MMA welding processes:
A. TRUE
B. FALSE
40. The acceptance requirements for imperfections found by test methods shall be assessed in
accordance with EN/ISO 5871 excessive metal, excessive convexity, excessive thickness
and excessive penetration, shall meet the requirement of:
A. Level A
B. Level B
C. Level C
ISO 15609-1 ; ISO 15614-1 / EN 288-3
41. The welding procedure test for arc welding of steel for butt joint in plate full of
penetration weld shall have minimum plate lengths
A. 250mm
B. 300mm
C. 350mm
D. 500mm
42. Ultrasonic testing for welding procedure test for arc welding steel for butt joint in plate
full of penetration weld shall not be used plate thickness
A. Less than 8mm
B. Less than 10mm
C. Less than 12mm
D. Less than 19mm
43. Acceptance level for slag type imperfection shall meet the requirement of ISO 5817/EN
25817
A. Quality level B
B. Quality level C
C. Quality level D
D. All of the above
44. Qualification given for plate in PA position also qualified for pipes when the outside
diameter is greater than
A. 600mm
B. 500mm
C. 150mm
D. 50mm
45. Qualification given for pipe diameter 50mm is qualified for pipes outside diameter equal
to or greater than
A. 25mm
B. 50mm
C. 100mm