CALCULO DE PARAMETROS DE DISEO

PROYECTO: LINEA DE CONDUCCION AGUA POTABLE DE PAROBAMBA

1. NUMERO DE VIVIENDAS: NV viv

2. POBLACION ACTUAL: 975 hab

3. PERIODO DE DISEO: t 20 aos

4. POBLACION DE DISEO: Pd= Pa(1+(12.2*t/1000)) 1,213 hab

5. DOTACION: D 110 l/hab/da

6. VARIACIONES DE CONSUMO: K1= 1.30


K2= 2.00

7. GASTO PROMEDIO DIARIO: QPd= (Pd*D/86,400) 1.54 l/seg

8. GASTO MAXIMO DIARIO: Qmd= K1*QPd 2.01 l/seg

9. GASTO MAXIMO HORARIO: Qmh= K2*QPd 3.09 l/seg

10. VOLUMEN DEL RESERVORIO: VR= 0.25*Qmd*86.40 43.36 m3


ASUMIMOS: 45 m3

11. TIEMPO DE ALMACENAMIENTO: Ta= (VR/(3.6*Qmd)) 6.23 horas

CALCULO DE LA LINEA DE CONDUCCION


COTA DE TERRENO COTA PIZOMETRICA
PERDIDA DE PERDIDA DE
DESNIVEL PERDIDA DE PRESION AL
MATERIAL CARGA DIAMETRO DIAMETRO CARGA
LONGITUD DEL CARGA DEL VELOCIDAD FINAL DEL
TRAMO DE LA INICIAL UNITARIA CALCULADO COMERCIAL UNITARIA INICIAL
(m) FINAL (msnm) TERRENO TRAMO Hf (m/seg) FINAL (msnm) TRAMO
TUBERIA (msnm) DISPONIBLE (pulg) (pulg) CALCULADO (msnm)
(m) (m) (m)
hf(m/m) hf(m/m)

C1-CRP1 PVC 53.00 3725.69 3680.20 45.49 0.8583 0.91 1.50 0.079 4.18 1.76 3725.69 3721.51 41.31
CRP1-C2 PVC 83.00 3680.20 3630.25 49.95 0.6018 0.98 1.50 0.079 6.55 1.76 3680.20 3673.65 43.40
C2-C3 PVC 30.00 3630.25 3618.79 11.46 0.3820 1.08 2.00 0.020 0.60 0.99 3630.25 3629.65 10.86
C3-CRP2 PVC 229.00 3618.79 3576.37 42.42 0.1852 1.25 2.00 0.020 4.62 0.99 3618.79 3614.17 37.80
CRP2-CRP3 PVC 51.00 3576.37 3532.14 44.23 0.8673 0.90 1.50 0.079 4.02 1.76 3576.37 3572.35 40.21
CRP3-CRP4 PVC 52.00 3532.14 3486.99 45.15 0.8683 0.90 1.50 0.079 4.10 1.76 3532.14 3528.04 41.05
CRP4-CRP5 PVC 75.00 3486.99 3441.75 45.24 0.6032 0.98 1.50 0.079 5.92 1.76 3486.99 3481.07 39.32
CRP5-CRP6 PVC 83.00 3441.75 3396.54 45.21 0.5447 1.00 2.00 0.020 1.67 0.99 3441.75 3440.08 43.54
CRP6-CRP7 PVC 99.00 3396.54 3348.79 47.75 0.4823 1.02 2.00 0.020 2.00 0.99 3396.54 3394.54 45.75
CRP7-A PVC 240.00 3348.79 3240.51 108.28 0.4512 1.04 2.00 0.020 4.84 0.99 3348.79 3343.95 103.44
A-B FG 51.00 3240.51 3238.65 1.86 0.0365 2.00 2.00 0.036 1.85 0.99 3343.95 3342.10 103.45
B-RES PVC 448.00 3238.65 3302.17 -63.52 -0.1418 0.00 2.00 0.020 9.03 0.99 3342.10 3333.07 30.90
CALCULO DE LA LINEA DE CONDUCCION - SIFON - SECTOR 02

TUBERIA PVC HDPE


C= 150 150

CAPTACIN Q (L/s)
CAPTACIN PALCABAMBA (01) 2.50
CAPTACIN ILLACHALLOC (02) 0.90
RENDIMIENTO TOTAL 3.40

COTA DE TERRENO PERDIDA DE PERDIDA DE PERDIDA COTA PIEZOMETRICA


DESNIVEL CAUDAL DIAMETRO DIAMETRO ESPESOR DIAMETRO
MATERIAL CARGA CARGA DE CARGA
LONGITUD DEL DEL INTERNO INTERNO DE LA EXTERIOR VELOCIDAD
TRAMO DE LA INICIAL FINAL UNITARIA UNITARIA DEL INICIAL FINAL
(m) TERRENO TRAMO CALCULADO COMERCIAL PARED COMERCIAL (m/seg)
TUBERIA (msnm) (msnm) DISPONIBLE CALCULADO TRAMO Hf (msnm) (msnm)
(m) (L/seg) (mm) (mm) (mm) (mm)
hf(m/m) hf(m/m) (m)

CAP 01 - CR 01 PVC 1035.32 3766.08 3754.12 11.96 2.50 0.0116 61.78 67.80 3.60 75.00 0.007 7.73 0.69 3766.08 3758.35
CAP 02 - CR 01 PVC 431.78 3776.08 3754.12 21.96 0.90 0.0509 30.91 43.40 2.30 48.00 0.010 4.27 0.61 3776.08 3771.81
1467.10
CUADRO RESUMEN DE TUBERAS
NOTA:
TUBERAS PVC UF - SEGN NTP ISO 4422 (CLASE 10) DIAMETRO LONG.
75 mm= 2 1/2" 1 1/2" 431.78
TUBERAS PVC SP - SEGN NTP ISO 399.002 (CLASE 10) 2 1/2" 1035.32
48mm= 1 1/2"
PRESION AL
FINAL DEL
TRAMO
(m)

4.23
17.69