PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
1.00 ACTIVIDADES PROVISIONALES
1.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS GLB 1.00 1.00
1.02 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00
1.03 EQUIPOS DE PROTECCION INDIVIDUAL UND 60.00 60.00
CERCO PERIMETRICO METALICO PROV. H=2.4M + MONT. Y DESMONT.
1.04 M 84.00 84.00
CONCERTINA SUP.
1.05 ALMACEN Y OFICINA M2 1.00 AREA= 100.00 100.00
1..06 SS HH P/PERSONAL UND 3.00 3.00
1.07 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION GLB 1.00 1.00
2.00 ACTIVIDADES PRELIMINARES
2.01 TRANSPORTE DE EQUIPO , MATERIALES Y HERRAMIENTAS UND 1.00 1.00
2.02 LIMPIEZA PERMANENTE Y FINAL DE ZONA DE TRABAJO GLB 1.00 1.00
2.03 DESMONTAJE Y MONTAJE DE REJA METALICA 10 M2 EST 2.00 2.00
3.00 SERVICIO DE EXPLANACIONES GENERALES
3.01 ACTIVIDADES PRELIMINARES
3.01.01 TRAZO Y REPLANTEO M2 1.00 66.16 67.79 4,484.99 4,484.99
3.02 MOVIMIENTO DE TIERRAS
3.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO EN TALLERES M3 4,304.12
AREA EJE 08= 56.49 1.00 10.00 558.30
AREA EJE 09= 55.17 1.00 15.00 877.80
AREA EJE 10= 61.87 1.00 17.50 1,156.84
AREA EJE 11= 70.34 1.00 12.50 813.06
AREA EJE 11= 34.75 1.00 2.20 90.89
AREA EJE 12= 59.75 1.00 15.00 807.23
AREA EJE 13= 47.88 1.00

3.02.02 RELLENO COMPACTADO CON EQUIPO AL 95% P.M. M3 435.48


AREA EJE 08= 10.74 1.00 10.00 94.85
AREA EJE 09= 8.23 1.00 15.00 107.78
AREA EJE 10= 6.14 1.00 17.50 67.46
AREA EJE 11= 1.57 1.00 12.50 44.50
AREA EJE 11= 6.23 1.00 2.20 16.12
AREA EJE 12= 5.55 1.00 15.00 104.78
AREA EJE 13= 8.42 1.00

3.02.03 DISPOSICION FINAL DE MATERIAL EXCEDENTE M3 4,642.37


FACTOR ESPONJ.

CORTE 1.00 VOL= 4,304.12 1.20 5,164.94


RELLENO -1.00 VOL= 435.48 1.20 -522.57
4.00 ADECUACION DE TALLER DE CARPINTERIA
4.01 ACTIVIDADES PRELIMINARES
4.01.01 TRAZO Y REPLANTEO M2 1.00 59.85 27.00 1,615.95 1,615.95
4.02 MOVIMIENTO DE TIERRAS
4.02.01 ZANJADO A MANO EN TERRENO NORMAL M3 468.06
EJE K Z-1: 2.00 2.10 2.10 1.50 13.23
Z-4: 6.00 1.00 1.00 1.50 9.00
ZANJA 1.00 16.30 0.50 1.40 11.41
EJE J Z-1: 2.00 2.10 2.10 1.50 13.23
Z-4: 6.00 1.00 1.00 1.50 9.00
ZANJA 1.00 16.30 0.50 1.40 11.41
EJE I Z-2: 2.00 2.30 6.00 1.50 41.40
EJE G Z-2: 2.00 2.30 2.30 1.50 15.87
EJE F Z-2: 2.00 2.30 2.30 2.50 26.45
EJE E Z-2: 2.00 2.30 2.30 1.90 20.10
EJE D Z-2: 2.00 2.30 2.30 1.50 15.87
EJE C Z-2: 2.00 2.30 2.30 1.50 15.87
EJE B Z-1: 2.00 2.10 2.10 1.50 13.23
Z-4: 5.00 1.00 1.00 1.50 7.50
ZANJA 1.00 17.32 0.50 1.40 12.12
EJE 9 1.00 25.00 6.00 1.40 210.00
1.00 2.70 0.50 1.80 2.43
EJE 16 1.00 25.00 0.50 1.40 17.50
1.00 2.70 0.50 1.80 2.43
4.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO M3 70.26
EJE K Z-1: 2.00 1.70 1.50 0.80 4.08
Z-4: 6.00 0.75 0.75 0.80 2.70
13.30 0.35 0.35 1.63
3.00 0.35 0.35 0.37
EJE J Z-1: 2.00 1.70 1.50 0.80 4.08
Z-4: 6.00 0.75 0.75 0.80 2.70
1.00 13.30 0.35 0.35 1.63
1.00 3.00 0.35 0.35 0.37
EJE I Z-2: 2.00 1.90 1.70 0.80 5.17
EJE G Z-2: 2.00 1.90 1.70 0.80 5.17
EJE F Z-2: 2.00 1.90 1.70 1.80 11.63
EJE E Z-2: 2.00 1.90 1.70 0.80 5.17
EJE D Z-2: 2.00 1.90 1.70 0.80 5.17
EJE C Z-2: 2.00 1.90 1.70 0.80 5.17
EJE B Z-1: 2.00 1.70 1.50 0.80 4.08
Z-4: 5.00 0.75 0.75 0.80 2.25
1.00 17.32 0.35 0.35 2.12
EJE 9 1.00 25.00 0.35 0.35 3.06
1.00 2.70 0.35 0.35 0.33
EJE 16 1.00 25.00 0.35 0.35 3.06
1.00 2.70 0.35 0.35 0.33
4.02.03 DISPOSICION FINAL DE MATERIAL EXCEDENTE DE ZANJA M3 477.36
FACTOR ESPONJ.

CORTE 1.00 VOL= 468.06 1.20 561.67


RELLENO -1.00 VOL= 70.26 1.20 -84.31
4.02.04 AFIRMADO MANUAL E=10 CM AREA = 376.25 376.25
4.03 CONCRETO SIMPLE
4.03.01 FALSO PISO DE 4" CONCRETO 1:8 C:H M2 AREA = 1,180.68 1,180.68
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
4.03.02 SOLADO 1:12 C:H E=4" M2 120.51
EJE K Z-1: 2.00 2.10 2.10 8.82
Z-4: 6.00 1.00 1.00 6.00
EJE J Z-1: 2.00 2.10 2.10 8.82
Z-4: 6.00 1.00 1.00 6.00
EJE I Z-2: 2.00 2.30 2.30 10.58
EJE G Z-2: 2.00 2.30 2.30 10.58
EJE F Z-2: 2.00 2.30 2.30 10.58
EJE E Z-2: 2.00 2.30 2.30 10.58
EJE D Z-2: 2.00 2.30 2.30 10.58
EJE C Z-2: 2.00 2.30 2.30 10.58
EJE B Z-1: 2.00 2.10 2.10 8.82
Z-4: 5.00 1.00 1.00 5.00
SOLADO PARA RAMPA 1.00 2.30 5.90 13.57
4.03.03 SUBCIMIENTO, MEZCLA 1:!2 CEMENTO : HORMIGON 30% DE P.G. M3 28.01
EJE J 1.00 14.90 0.50 0.40 2.98
1.00 7.40 0.50 0.40 1.48
EJE 10 1.00 5.85 0.50 0.40 1.17
EJE 11 1.00 11.20 0.50 0.40 2.24
EJE 12 1.00 5.85 0.50 0.40 1.17
EJE 13 1.00 5.85 0.50 0.40 1.17
EJE B 1.00 17.32 0.50 0.40 3.46
EJE K 1.00 16.30 0.50 0.40 3.26
EJE 9 1.00 27.70 0.50 0.40 5.54
EJE 16 1.00 27.70 0.50 0.40 5.54

4.03.04 CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO HORMIGON 30% DE P.G. M3 49.02
EJE J 1.00 14.90 0.50 0.70 5.22
1.00 7.40 0.50 0.70 2.59
EJE 10 1.00 5.85 0.50 0.70 2.05
EJE 11 1.00 11.20 0.50 0.70 3.92
EJE 12 1.00 5.85 0.50 0.70 2.05
EJE 13 1.00 5.85 0.50 0.70 2.05
EJE B 1.00 17.32 0.50 0.70 6.06
EJE K 1.00 16.30 0.50 0.70 5.71
EJE 9 1.00 27.70 0.50 0.70 9.70
EJE 16 1.00 27.70 0.50 0.70 9.70
4.03.05 SOBRECIMIENTO MEZCLA 1:8 CEMENTO: HORMIGON + 25% P.M. M3 4.92
EJE J 1.00 14.90 0.15 0.70 1.56
1.00 7.40 0.15 0.30 0.33
EJE 10 1.00 5.85 0.15 0.70 0.61
EJE 11 1.00 11.20 0.15 0.70 1.18
EJE 12 1.00 5.85 0.15 0.70 0.61
EJE 13 1.00 5.85 0.15 0.70 0.61
4.03.06 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO M2 65.55
EJE J 2.00 14.90 0.70 20.86
2.00 7.40 0.30 4.44
EJE 10 2.00 5.85 0.70 8.19
EJE 11 2.00 11.20 0.70 15.68
EJE 12 2.00 5.85 0.70 8.19
EJE 13 2.00 5.85 0.70 8.19
4.03.07 GRADAS CONCRETO F'C= 140 KG/CM + 30% PG M3 3.00 AREA= 0.83 2.49
4.04 CONCRETO ARMADO
4.04.01 CIMIENTOS
4.04.01.01 ZAPATAS, CONCRETO F'C= 210 KG/CM2 M3 69.45
EJE K Z-1: 2.00 2.10 2.10 0.60 5.29
Z-4: 6.00 1.00 1.00 0.60 3.60
EJE J Z-2: 2.00 2.30 2.30 0.60 6.35
Z-4: 6.00 1.00 1.00 0.60 3.60
EJE I Z-2: 2.00 2.30 2.30 0.60 6.35
EJE G Z-2: 2.00 2.30 2.30 0.60 6.35
EJE F Z-2: 2.00 2.30 2.30 1.00 10.58
EJE E Z-2: 2.00 2.30 2.30 0.60 6.35
EJE D Z-2: 2.00 2.30 2.30 0.60 6.35
EJE C Z-2: 2.00 2.30 2.30 0.60 6.35
EJE B Z-1: 2.00 2.10 2.10 0.60 5.29
Z-4: 5.00 1.00 1.00 0.60 3.00
4.04.01.02 ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 1,962.23
NDE VARILLAS PESO (KG) = 5/8"

EJE K Z-1: 2.00 2.15 26.00 1.55 173.29


Z-4: 6.00 1.05 12.00 1.02 77.11
EJE J Z-1: 2.00 2.15 26.00 1.55 173.29
Z-4: 6.00 1.05 12.00 1.02 77.11
EJE I Z-2: 2.00 2.35 28.00 1.55 203.98
EJE G Z-2: 2.00 2.35 28.00 1.55 203.98
EJE F Z-2: 2.00 2.35 28.00 1.55 203.98
EJE E Z-2: 2.00 2.35 28.00 1.55 203.98
EJE D Z-2: 2.00 2.35 28.00 1.55 203.98
EJE C Z-2: 2.00 2.35 28.00 1.55 203.98
EJE B Z-1: 2.00 2.15 26.00 1.55 173.29
Z-4: 5.00 1.05 12.00 1.02 64.26
4.04.01.03 ZAPATAS, ENCOFRADO Y DESENCOFRADO M2 14.78
Z-1: 1.00 2.10 0.60 1.26
EJE K Z-4: 1.00 1.00 0.60 0.60
EJE J Z-1: 1.00 2.10 0.60 1.26
Z-4: 1.00 1.00 0.60 0.60
EJE I Z-2: 1.00 2.30 0.60 1.38
EJE G Z-2: 1.00 2.30 0.60 1.38
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE F Z-2: 1.00 2.30 0.60 1.38
EJE E Z-2: 1.00 2.30 1.00 2.30
EJE D Z-2: 1.00 2.30 0.60 1.38
EJE C Z-2: 1.00 2.30 0.60 1.38
EJE B Z-1: 1.00 2.10 0.60 1.26
Z-4: 1.00 1.00 0.60 0.60
4.04.02 SOBRECIMIENTO ARMADO
4.04.02.01 SOBRECIMIENTO ARMADO CONCRETO F'C= 175 KG/CM2 M3 12.92
EJE B 1.00 22.02 0.15 0.70 2.31
EJE 9 1.00 40.20 0.15 0.70 4.22
EJE 16 1.00 40.20 0.15 0.70 4.22
EJE K 1.00 18.74 0.15 0.70 1.97
1.00 3.00 0.15 0.45 0.20
4.04.02.02 SOBRECIMIENTO, ACERO DE REFUERZO FY=4200 KG/CM2 KG 892.12
ACERO TRANSVERSAL NDE VARILLAS PESO (KG) = 3/8" 432.30
EJE B 1.00 22.02 6.00 0.56 73.99
EJE 9 1.00 35.20 6.00 0.56 118.27
1.00 5.00 9.00 0.56 25.20
EJE 16 1.00 35.20 6.00 0.56 118.27
1.00 5.00 9.00 0.56 25.20
EJE K 1.00 18.74 6.00 0.56 62.97
1.00 3.00 5.00 0.56 8.40
ACERO VERTICAL NDE VARILLAS PESO (KG) = 3/8" 459.83
EJE B 1.00 1.60 88.00 0.56 78.85
EJE 9 1.00 1.60 140.00 0.56 125.44
1.00 2.40 20.00 0.56 26.88
EJE 16 1.00 1.60 140.00 0.56 125.44
1.00 2.40 20.00 0.56 26.88
EJE K 1.00 1.60 75.00 0.56 67.20
1.00 1.36 12.00 0.56 9.14
4.04.02.03 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2 172.32
EJE B 2.00 22.02 0.70 30.83
EJE 9 2.00 40.20 0.70 56.28
EJE 16 2.00 40.20 0.70 56.28
EJE K 2.00 18.74 0.70 26.24
2.00 3.00 0.45 2.70
4.04.03 COLUMNAS
4.04.03.01 COLUMNAS, CONCRETO F'C= 210 KG/CM2 M3 28.73
EJE K C-2 2.00 0.60 0.40 4.95 2.38
C-3 6.00 0.25 0.15 3.70 0.83
C-4 2.00 0.25 0.25 4.95 0.62
EJE J C-2 2.00 0.60 0.40 4.95 2.38
C-3 6.00 0.25 0.15 3.70 0.83
C-4 2.00 0.25 0.25 4.95 0.62
EJE I C-2 2.00 0.60 0.40 4.95 2.38
EJE H C-2 2.00 0.60 0.40 4.95 2.38
EJE G C-2 2.00 0.60 0.40 4.95 2.38
EJE F C-2 2.00 0.60 0.40 4.95 2.38
EJE E C-2 2.00 0.60 0.40 4.95 2.38
EJE D C-2 2.00 0.60 0.40 4.95 2.38
EJE C C-2 2.00 0.60 0.40 4.95 2.38
EJE 9 C-3 16.00 0.25 0.15 3.70 2.22
EJE 16 C-3 16.00 0.25 0.15 3.70 2.22
4.04.03.02 COLUMNAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 3,668.05
ACERO LONGITUDINAL NDE VARILLAS PESO (KG) 2,510.11
EJE K C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
C-3 PESO (KG) = 3/8" 6.00 4.05 4.00 0.560 54.43
C-4 PESO (KG) = 1/2" 2.00 6.00 4.00 0.994 47.71
EJE J C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
C-3 PESO (KG) = 3/8" 6.00 4.05 4.00 0.560 54.43
C-4 PESO (KG) = 1/2" 2.00 6.00 4.00 0.994 47.71
EJE I C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE H C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE G C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE F C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE E C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE D C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE C C-2 PESO (KG) = 5/8" 2.00 6.00 12.00 1.550 223.20
EJE 9 C-3 PESO (KG) = 3/8" 14.00 4.05 4.00 0.560 127.01
C-3 PESO (KG) = 3/8" 2.00 4.80 4.00 0.560 21.50
EJE 16 C-3 PESO (KG) = 3/8" 14.00 4.05 4.00 0.560 127.01
C-3 PESO (KG) = 3/8" 2.00 4.80 4.00 0.560 21.50
ESTRIBOS NDE VARILLAS PESO (KG) 1,157.94
EJE K C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
C-3 PESO (KG) =1/4" 6.00 0.70 18.00 0.25 18.90
C-4 PESO (KG) = 1/4" 2.00 0.90 35.00 0.25 15.75
EJE J C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
C-3 PESO (KG) =1/4" 6.00 0.70 18.00 0.25 18.90
C-4 PESO (KG) = 1/4" 2.00 0.90 35.00 0.25 15.75
EJE I C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE H C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE G C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE F C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE E C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE D C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE C C-2 PESO (KG) = 3/8" 2.00 2.80 35.00 0.56 109.76
EJE 9 C-3 PESO (KG) =1/4" 14.00 0.70 18.00 0.25 44.10
C-3 PESO (KG) =1/4" 2.00 0.70 18.00 0.25 6.30
EJE 16 C-3 PESO (KG) =1/4" 14.00 0.70 18.00 0.25 44.10
C-3 PESO (KG) =1/4" 2.00 0.70 18.00 0.25 6.30
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
4.04.03.03 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 419.68
EJE K C-2 4.00 0.60 0.40 4.95 39.60
C-3 2.00 0.25 0.15 3.70 5.92
C-4 4.00 0.25 0.25 4.95 19.80
EJE J C-2 4.00 0.60 0.40 4.95 39.60
C-3 2.00 0.25 0.15 3.70 5.92
C-4 4.00 0.25 0.25 4.95 19.80
EJE I C-2 4.00 0.60 0.40 4.95 39.60
EJE H C-2 4.00 0.60 0.40 4.95 39.60
EJE G C-2 4.00 0.60 0.40 4.95 39.60
EJE F C-2 4.00 0.60 0.40 4.95 39.60
EJE E C-2 4.00 0.60 0.40 4.95 39.60
EJE D C-2 4.00 0.60 0.40 4.95 39.60
EJE C C-2 4.00 0.60 0.40 4.95 39.60
EJE 9 C-3 2.00 0.25 0.15 3.70 5.92
EJE 16 C-3 2.00 0.25 0.15 3.70 5.92
4.04.04 VIGAS
4.04.04.01 VIGAS, CONCRETO F'C= 210 KG/CM2 M3 20.77
EJE B 1.00 25.00 0.25 0.50 3.13
EJE 9 1.00 48.65 0.25 0.50 6.08
EJE 16 1.00 48.50 0.25 0.50 6.06
EJE J 1.00 22.00 0.25 0.50 2.75
EJE K 1.00 22.00 0.25 0.50 2.75
4.04.04.02 VIGAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 2,398.62
ACERO LONGITUDINAL N DE VARILLAS PESO (KG) = 3/4"

EJE B 1.00 28.60 4.00 2.235 255.68 1,669.10


EJE 9 1.00 53.45 4.00 2.235 477.84
EJE 16 1.00 53.45 4.00 2.235 477.84
EJE J 1.00 25.60 4.00 2.235 228.86
EJE K 1.00 25.60 4.00 2.235 228.86
ACERO TRANSVERSAL LONG. DE VARILLA N DE VARILLAS PESO (KG) = 3/8" 729.52
EJE B 1.00 1.18 180.00 0.56 118.94
EJE 9 1.00 1.18 320.00 0.56 211.46
EJE 16 1.00 1.18 320.00 0.56 211.46
EJE J 1.00 1.18 142.00 0.56 93.83
EJE K 1.00 1.18 142.00 0.56 93.83
4.04.04.03 VIGAS, ENCOFRADO Y DESENCOFRADO M2 182.77
EJE B 1.00 25.00 0.25 0.50 27.50
EJE 9 1.00 48.65 0.25 0.50 53.52
EJE 16 1.00 48.50 0.25 0.50 53.35
EJE J 1.00 22.00 0.25 0.50 24.20
EJE K 1.00 22.00 0.25 0.50 24.20
4.04.05 PARAPETOS
4.04.05.01 PARAPETOS, CONCRETO F'C= 175 KG/CM2 M3 4.23
EJE F 1.00 4.23 0.15 1.30 0.82
1.00 2.30 0.15 1.15 0.40
1.00 10.25 0.15 1.30 2.00
1.00 1.30 0.15 1.30 0.25
1.00 3.00 0.15 1.30 0.59
1.00 1.00 0.15 1.15 0.17
1.00 2.30 0.15 0.65 0.22
4.04.05.02 PARAPETOS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 287.59
ACERO LONGITUDINAL LONG. DE VARILLAS N DE VARILLAS PESO (KG) = 1/2" 193.87
EJE F 1.00 2.00 16.92 0.99 33.64
1.00 2.00 9.20 0.99 18.29
1.00 2.00 41.00 0.99 81.51
1.00 2.00 5.20 0.99 10.34
1.00 2.00 12.00 0.99 23.86
1.00 2.00 4.00 0.99 7.95
1.00 2.00 9.20 0.99 18.29
ACERO TRANSVERSAL LONG. DE VARILLAS N DE VARILLAS PESO (KG) = 3/8" 93.72
1.00 4.23 7.00 0.56 16.58
1.00 2.30 6.00 0.56 7.73
1.00 10.25 7.00 0.56 40.18
1.00 1.30 7.00 0.56 5.10
1.00 3.00 7.00 0.56 11.76
1.00 1.00 6.00 0.56 3.36
1.00 2.30 7.00 0.56 9.02
4.04.05.03 PARAPETOS, ENCOFRADO Y DESENCOFRADO M2 18.53
EJE F 2.00 4.23 1.30 11.00
2.00 2.30 1.15 5.29
2.00 10.25 1.30 26.65
2.00 1.30 1.30 3.38
2.00 3.00 1.30 7.80
2.00 1.00 1.15 2.30
2.00 2.30 0.65 2.99
4.04.06 RAMPAS
4.04.06.01 RAMPAS, CONCRETO F'C= 175 KG/CM2 1.09
1.00 AREA= 0.87 0.50 0.44
1.00 AREA= 0.76 0.50 0.38
1.00 AREA= 0.23 0.50 0.12
1.00 AREA= 0.32 0.50 0.16

4.04.06.02 RAMPAS, ACERO DE REFUERZO FY= 4200 KG/CM2 39.50


ACERO LONGITUDINAL
LONG DE LA
N DE VARILLAS PESO (KG) = 3/8" 25.50
VARILLA
1.00 3.75 3.00 0.56 6.30
1.00 1.29 3.00 0.56 2.17
1.00 6.43 3.00 0.56 10.80
1.00 2.78 4.00 0.56 6.23
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
ACERO TRANSVERSAL
LONG DE LA
N DE VARILLAS PESO (KG) = 3/8" 14.00
VARILLA
1.00 0.50 9.00 0.56 2.52
1.00 0.50 16.00 0.56 4.48
1.00 0.50 5.00 0.56 1.40
1.00 1.00 10.00 0.56 5.60
4.05 ALBAILERIA
4.05.01 MURO LAD. KK. MAQ T IV SOGA, MEZC. C:A 1:5 JUNTA 1.5 CM M2 427.62
MURO PERIMETRICO DEL TALLER 299.11
EJE 9 1.00 40.20 3.50 140.70
-1.00 40.20 1.45 -58.29
EJE B 1.00 22.02 3.50 77.07
-1.00 22.02 0.25 -5.51
EJE 16 1.00 40.20 3.50 140.70
-1.00 40.20 1.45 -58.29
EJE K 1.00 19.30 3.50 67.55
-1.00 19.30 0.25 -4.83
MUROS DE TABIQUERIA 128.51
EJE J 1.00 16.95 3.50 59.33
-1.00 1.00 3.50 -3.50
-1.00 2.00 3.50 -7.00
-1.00 16.95 0.25 -4.24
EJE 10 1.00 6.08 3.50 21.28
-1.00 6.08 0.25 -1.52
EJE 11 1.00 5.58 3.50 19.53
-1.00 5.58 0.25 -1.40
EJE 12 1.00 7.51 3.50 26.29
-1.00 7.51 0.25 -1.88
1.00 1.20 3.50 4.20
-1.00 1.20 0.60 -0.72
EJE 13 1.00 5.58 3.50 19.53
-1.00 5.58 0.25 -1.40
4.05.02 MURO LAD. KK. MAQ T IV CANTO, MEZC. C:A 1:5 JUNTA 1.5 CM M2 14.60
EJE 9 entre J-K 1.00 7.30 2.00 14.60 14.60
4.05.03 JUNTA DE TECKNOPOR E=1" M 144.00
36.00 4.00 144.00 144.00
4.06 ESTRUCTURAS METALICAS Y COBERTURAS
4.06.01 ACERO ASTM A 36 PARA TIJERALES KG 10.00 11,619.54
TIJERAL 1,161.95
ESPESOR 3" x 3" x 1/4" 2.00 27.34 PESO (Kg/m)= 7.292 398.73
2 1/2" x 2 1/2" x 1/4" 2.00 42.60 PESO (Kg/m)= 6.101 519.81
2" x 2" x 1/4" 2.00 6.00 PESO (Kg/m)= 4.747 56.96
1 1/2" x 1 1/2" x 3/16" 2.00 34.80 PESO (Kg/m)= 2.679 186.46
4.06.02 ANCLAJE METALICO DE APOYO T-1 UND 20.00 20
4.06.03 ACERO ASTM A 36 PARA VIGUETAS 3082.128
ESPESOR 1" x 1/8" 2.00 5.80 PESO (Kg/m)= 1.107 12.84
BRIDA INF. 1/2" 1.00 5.80 PESO (Kg/m)= 1.020 5.92
DIAG. 1/2" 1.00 8.59 PESO (Kg/m)= 1.020 8.76
27.52
N DE VIGUETAS 112.00 PESO (Kg/m)= 27.52
4.06.04 COBERTURA METALICA TIPO TR-4 ALUZINC E=0.6 mm M2 1,373.84
2.00 13.67 50.25 1,373.84 1,373.84
4.06.05 CUMBRERA METALICA 0.5 mm M 1.00 50.15 50.15
4.06.06 BARANDA CO TUBO DE Fo Go, PASAMANO M 1.00 51.70 51.70
4.06.07 COBERTURA DE PLANCHA TERMOACUSTICA E= 0.4 mm INC. ACCESORIOS M2 1.00 AREA = 80.46 80.46
4.06.08 MONTAJE DE ACERO ASTM A 36 P/TIJERAL KG 1.00 14,701.67 14,701.67
4.07 PISOS Y PAVIMENTOS
4.07.01 PISOS DE CONCRETO
4.07.01.01 CONTRAPISO 40 MM BASE 3 CM MEZC 1:5 ACAB. 1 CM PASTA 1:2 M2 1.00 AREA= 21.42 21.42
4.07.01.02 PISO 5 CM BASE 4 CM MEZC. 1:5 ACAB. 1 CM PASTA 1:2 M4 1.00 AREA= 1,163.80 1,163.80
4.07.02 CERAMICO
4.07.02.01 PISO DE LOSETA CERAMICA ANTIDESLIZANTE 0.30 X 0.30 M COLOR M2 1.00 AREA= 21.42 21.42
4.07.03 VEREDA DE CONCRETO
4.07.03.01 VEREDA CONCRETO F'C=175 KG/CM2 M3 1.00 AREA= 124.30 124.30 124.30
4.07.04 PATIOS
4.07.04.01 LOSA DE CONCRETO F'C= 175 KG/CM2 E=15 cm M2 1.00 AREA = 251.95 251.95 251.95
4.08 REVOQUES Y REVESTIMIENTO
4.08.01 TARRAJEO RAYADO PRIMARIO M2 132.60
EJE 12 entre J-K 2.00 6.54 1.20 15.70
EJE K entre 9-10 2.00 10.00 1.20 24.00
6.00 0.60 1.20 4.32
2.00 3.58 1.20 8.59
6.00 4.10 1.80 44.28
2.00 4.30 1.80 15.48
4.00 0.60 0.20 0.48
2.00 0.60 0.10 0.12
4.00 3.05 0.40 4.88
2.00 3.05 0.10 0.61
4.00 2.85 0.50 5.70
4.00 2.65 0.50 5.30
4.00 2.85 0.10 1.14
4.00 0.50 0.50 1.00
4.00 0.40 0.50 0.80
4.00 0.50 0.10 0.20
4.08.02 TARRAJEO DE COLUMNAS M2 155.05
EJE B 1.00 6.10 3.50 21.35
EJE C 1.00 3.40 3.50 11.90
EJE D 1.00 3.40 3.50 11.90
EJE E 1.00 3.40 3.50 11.90
EJE F 1.00 3.40 3.50 11.90
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE G 1.00 3.40 3.50 11.90
EJE H 1.00 3.40 3.50 11.90
EJE I 1.00 3.40 3.50 11.90
EJE J 1.00 7.30 3.50 25.55
EJE K 1.00 7.10 3.50 24.85
4.08.03 TARRAJEO ARISTAS DE COLUMNAS M 241.50
EJE B 14.00 3.50 49.00
EJE C 4.00 3.50 14.00
EJE D 4.00 3.50 14.00
EJE E 4.00 3.50 14.00
EJE F 4.00 3.50 14.00
EJE G 4.00 3.50 14.00
EJE H 4.00 3.50 14.00
EJE I 4.00 3.50 14.00
EJE J 15.00 3.50 52.50
EJE K 12.00 3.50 42.00
4.08.04 TARRAJEO VIGAS C:A 1:5 E=1.5 CM M2 208.10
EJE 9 2.00 48.65 0.50 48.65
1.00 48.65 0.25 12.16
-1.00 4.00 0.25 -1.00
EJE B 2.00 25.00 0.50 25.00
1.00 25.00 0.25 6.25
-1.00 1.95 0.25 -0.49
EJE 16 2.00 48.65 0.50 48.65
1.00 48.65 0.25 12.16
-1.00 4.00 0.25 -1.00
EJE J 2.00 25.00 0.50 25.00
1.00 25.00 0.25 6.25
-1.00 2.20 0.25 -0.55
EJE K 2.00 22.00 0.50 22.00
1.00 22.00 0.25 5.50
-1.00 1.95 0.25 -0.49
4.08.05 TARRAJEO ARISTA DE VIGAS M 169.30
EJE 9 1.00 48.65 48.65
EJE B 1.00 25.00 25.00
EJE 16 1.00 48.65 48.65
EJE J 1.00 25.00 25.00
EJE K 1.00 22.00 22.00
4.08.06 REVESTIMIENTO DE GRADAS INC. CANTONERA DE ALUMINIO M2 1.00 AREA= 2.33 3.00 6.99 6.99
4.08.07 TARRAJEO MUROS EXTERIORES (INC. ARRIOSTRES Y SIMILARES) M2 496.80
EJE 9 1.00 48.65 4.00 194.60
-1.00 40.20 1.00 -40.20
EJE B 1.00 25.00 4.00 100.00
EJE 16 1.00 48.65 4.00 194.60
-1.00 40.20 1.00 -40.20
EJE K 1.00 22.00 4.00 88.00
4.08.08 TARRAJEO MUROS INTERIORES (INC. ARRIOSTRES Y SIMILARES) M2 868.82
EJE 9 1.00 47.95 3.50 167.83
1.00 1.95 1.20 2.34
1.00 3.50 1.20 4.20
1.00 10.35 1.80 18.63
1.00 40.20 0.15 6.03
EJE B 1.00 26.20 3.50 91.70
EJE 16 1.00 47.95 3.50 167.83
1.00 6.90 3.50 24.15
-1.00 5.00 1.00 -5.00
1.00 40.20 0.15 6.03
EJE K 1.00 22.00 3.50 77.00
1.00 1.65 1.70 2.81
1.00 1.70 1.20 2.04
1.00 16.55 3.50 57.93
EJE J 2.00 13.90 3.50 97.30
EJE 10 1.00 5.85 3.50 20.48
1.00 5.85 1.70 9.95
EJE 11 2.00 5.85 3.50 40.95
EJE 12 1.00 10.20 3.50 35.70
1.00 5.85 3.50 20.48
EJE 13 1.00 5.85 3.50 20.48
4.09 CARPINTERIA DE MADERA
4.09.01 P-1 PUERTA DE TRIPLAY 4 mm - 0.70 x 2.70 m UND 1.00 1.00
4.09.02 P-2 PUERTA DE TRIPLAY 4 mm - 1.00 x 2.70 m UND 1.00 1.00
4.09.03 P-3 PUERTA DE TRIPLAY 4 mm - 0.90 x 2.70 m UND 1.00 1.00
4.09.04 P-4 PUERTA DE TRIPLAY 4 mm - 0.60 x 1.6 m ALFEIZER H=0.20 m UND 4.00 4.00
4.09.05 VIGAS DE MADERA P2 1.00 389
4.10 CARPINTERIA METALICA
4.10.01 R-8 PUERTA DE REJA METALICA Y BARROTES 5/8" 3.00 x 2.60 M UND 1.00 1.00
4.10.02 R-7 PUERTA DE REJA METALICA Y BARROTES 5/8" 3.00 x 3.00 M UND 1.00 1.00
R-11 PUERTA DE REJA METALICA LISA E=1/8" C/MIRILLA DE 0.25 x 0.20 - (2.00 x 2.00
4.10.03 UND 2.00
2.60)
R-12 PUERTA DE REJA METALICA LISA E=1/8" C/MIRILLA DE 0.25 x 0.20 - (0.90 x 1.00
4.10.04 UND 1.00
2.60)
4.10.05 V-1 VENTANA DE MALLA METALICA COCADA 2" x 2" (5.50 x 1.00 m) UND 8.00 8.00
4.10.06 V-2 VENTANA DE MALLA METALICA COCADA 2" x 2" (5.55 x 1.00 m) UND 8.00 8.00
4.10.07 V-3 VENTANA DE MALLA METALICA COCADA 1" x 1" (1.20 x 0.50 m) UND 1.00 1.00
4.11 PINTURA
4.11.01 PINTURA LATEX EN INTERIORES 2 MANOS BASE IMPRIMANTE M2 1,133.93
EJE 9 1.00 4.95 1.70 8.42 1,133.93
1.00 1.95 2.30 4.49
1.00 47.95 3.50 167.83
-1.00 40.20 1.00 -40.20
-1.00 7.25 0.25 -1.81
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
1.00 48.65 4.00 194.60
1.00 48.65 0.50 24.33
1.00 48.65 0.25 12.16
1.00 40.20 0.15 6.03
EJE B 1.00 26.20 3.50 91.70
1.00 25.00 4.00 100.00
1.00 25.00 0.50 12.50
1.00 25.00 0.25 6.25
-1.00 3.20 0.25 -0.80
EJE 16 1.00 48.65 3.50 170.28
-1.00 40.20 1.00 -40.20
1.00 47.95 3.50 167.83
1.00 6.90 3.50 24.15
-1.00 5.00 1.00 -5.00
1.00 40.20 0.15 6.03
2.00 48.65 0.50 48.65
1.00 48.65 0.25 12.16
-1.00 7.25 0.25 -1.81
EJE K 1.00 22.00 3.50 77.00
1.00 1.65 1.70 2.81
1.00 1.70 1.20 2.04
1.00 16.55 3.50 57.93
2.00 22.00 0.50 22.00
1.00 22.00 0.25 5.50
-1.00 3.60 0.25 -0.90

4.11.02 PINTURA LATEX EN EXTERIORES 2 MANOS BASE IMPRIMANTE M2 496.80


EJE 9 1.00 48.65 4.00 194.60 496.80
-1.00 40.20 1.00 -40.20
EJE B 1.00 25.00 4.00 100.00
EJE 16 1.00 48.65 4.00 194.60
-1.00 40.20 1.00 -40.20
EJE K 1.00 22.00 4.00 88.00
4.12 ZOCALOS Y CONTRAZOCALOS
4.12.01 ZOCALO DE LOSETA CERAMICA 30 X 30 CM M2 55.76
EJE 9 1.00 1.95 1.20 2.34
1.00 4.55 1.80 8.19
EJE J 1.00 1.72 1.20 2.06
EJE J entre 9-10 1.00 3.50 1.20 4.20
3.00 3.20 1.80 17.28
1.00 2.85 1.80 5.13
EJE K 1.00 1.80 1.20 2.16
EJE 10 1.00 7.05 1.20 8.46
EJE 12 entre J-K 1.00 4.95 1.20 5.94
4.12.02 CONTRAZOCALO DE CEMENTO C:A 1:5, E=0.02, H=30 CM M 159.00
EJE 9 1.00 49.65 49.65
EJE B 1.00 25.00 25.00
EJE 16 1.00 49.65 49.65
EJE K 1.00 22.00 22.00
EJE 12 1.00 6.35 6.35
EJE 13 1.00 6.35 6.35
4.12.03 CONTRAZOCALO DE CEMENTO C:A 1:5, E=0.02, H=15 CM M 268.64
EJE 9 1.00 48.72 48.72
EJE B 1.00 26.20 26.20
EJE 16 1.00 48.27 48.27
EJE K 1.00 18.65 18.65
EJE J 1.00 29.98 29.98
EJE 10 1.00 6.00 6.00
EJE 11 1.00 11.75 11.75
EJE 12 1.00 7.97 7.97
EJE F 1.00 71.10 71.10
5.00 ADECUACION DE TALLER DE TELARES
5.01 ACTIVIDADES PRELIMINARES
5.01.01 TRAZO Y REPLANTEO M2 1.00 AREA= 1,216.25 1,216.25
5.02 MOVIMIENTO DE TIERRAS
5.02.01 ZANJADO MANUAL EN TERRENO NORMAL M3 535.98
EJE B Z-1 4.00 2.10 2.10 1.50 26.46
ZANJA 1.00 18.10 0.60 1.40 15.20
EJE C Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
V.C. 1.00 16.70 0.30 1.30 6.51
EJE D Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
V.C. 1.00 16.70 0.30 1.30 6.51
EJE E Z-2 2.00 2.30 2.30 1.90 20.10
Z-3 2.00 2.70 2.70 1.90 27.70
V.C. 1.00 16.70 0.30 1.70 8.52
EJE F Z-2 2.00 2.30 2.30 2.50 26.45
Z-3 2.00 2.70 2.70 2.50 36.45
V.C. 1.00 16.70 0.30 2.20 11.02
EJE G Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
V.C. 1.00 16.70 0.30 1.30 6.51
EJE H Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
V.C. 1.00 16.70 0.30 1.30 6.51
EJE I Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
V.C. 1.00 16.70 0.30 1.30 6.51
EJE J Z-2 2.00 2.30 2.30 1.50 15.87
Z-3 2.00 2.70 2.70 1.50 21.87
Z-4 4.00 1.00 1.00 1.50 6.00
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
ZANJA 1.00 12.70 0.60 1.40 10.67
EJE K Z-1 4.00 2.10 2.10 1.50 26.46
Z-4 4.00 1.00 1.00 1.50 6.00
ZANJA 1.00 14.30 0.60 1.40 12.01
EJE 2 ZANJA 1.00 25.00 0.60 1.40 21.00
ZANJA 1.00 2.70 0.60 1.80 2.92
EJE 3 ZANJA 1.00 5.00 0.60 1.40 4.20
EJE 4 ZANJA 1.00 1.15 0.60 1.40 0.97
EJE 4' ZANJA 1.00 7.29 0.60 1.40 6.12
EJE 5 ZANJA 1.00 5.05 0.60 1.40 4.24
EJE 6' ZANJA 1.00 5.33 0.60 1.40 4.48
5.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO SELECIONADO M3 191.38
EJE B Z-1 2.00 1.70 1.50 0.80 4.08
Z-2 2.00 1.70 1.70 0.80 4.62
ZANJA 1.00 18.10 0.18 0.30 0.98
EJE C Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE D Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE E Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE F Z-2 2.00 1.90 1.70 1.80 11.63
Z-3 2.00 2.30 2.30 1.80 19.04
V.C. 1.00 16.70 0.30 1.00 5.01
EJE G Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE H Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE I Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
V.C. 1.00 16.70 0.30 0.60 3.01
EJE J Z-2 2.00 1.90 1.70 0.80 5.17
Z-3 2.00 2.30 2.30 0.80 8.46
Z-4 4.00 0.75 0.75 0.80 1.80
ZANJA 1.00 12.70 0.35 0.60 2.67
EJE K Z-1 4.00 1.70 1.50 0.80 8.16
Z-4 4.00 0.75 0.75 0.80 1.80
ZANJA 1.00 12.70 0.35 0.60 2.67
EJE 2 ZANJA 1.00 25.00 0.35 0.30 2.63
ZANJA 1.00 2.70 0.18 0.30 0.15
EJE 7 ZANJA 1.00 25.00 0.35 0.30 2.63
ZANJA 1.00 2.70 0.18 0.30 0.15
EJE 3 ZANJA 1.00 5.00 0.35 0.30 0.53
EJE 5 ZANJA 1.00 5.00 0.35 0.30 0.53
EJE 4 V.C. 1.00 20.95 0.30 0.60 3.77
EJE 6 V.C. 1.00 20.95 0.30 0.60 3.77
EJE 4' ZANJA 1.00 7.29 0.35 0.30 0.77
EJE 6' ZANJA 1.00 5.33 0.35 0.30 0.56
5.02.03 DISPOSICION FINAL DE MATERIAL EXCEDENTE M3 413.52
FACTOR ESPONJ.

CORTE 1.00 VOL= 535.98 1.20 643.17


RELLENO -1.00 VOL= 191.38 1.20 -229.65
5.02.04 AFIRMADO MANUAL E=10 CM 1.00 AREA= 441.70 441.70
5.03 CONCRETO SIMPLE
5.03.01 SOLADO 1:12 C:H E=4" M2 246.56
EJE B Z-1 4.00 2.10 2.10 17.64
EJE C Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE D Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE E Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE F Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE G Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE H Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE I Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
EJE J Z-2 2.00 2.30 2.30 10.58
Z-3 2.00 2.70 2.70 14.58
Z-4 4.00 1.00 1.00 4.00
EJE K Z-1 4.00 2.10 2.10 17.64
Z-4 4.00 1.00 1.00 4.00
EJE 4 Z-4 2.00 1.00 1.00 2.00
5.03.02 FALSO PISO DE 4" CONCRETO 1:8 C:H M2 1.00 AREA= 1,317.56 1,360.38
1.00 AREA= 42.82
5.03.03 SOBRECIMIENTO MEZCLA 1:8 CEMENTO: HORMIGON + 25% P.M. M3 12.13
EJE J 1.00 14.30 0.15 1.80 3.86
1.00 5.00 0.15 1.40 1.05
EJE 3 1.00 5.85 0.15 1.80 1.58
EJE 4 1.00 1.15 0.15 1.80 0.31
EJE 4' 1.00 7.70 0.15 1.80 2.08
EJE 5 1.00 5.85 0.15 1.80 1.58
EJE 6' 1.00 6.18 0.15 1.80 1.67
5.03.04 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO M2 57.44
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE J 2.00 14.30 0.70 20.02
EJE 3 2.00 5.85 0.70 8.19
EJE 4 2.00 1.15 0.70 1.61
EJE 4' 2.00 7.70 0.70 10.78
EJE 5 2.00 5.85 0.70 8.19
EJE 6' 2.00 6.18 0.70 8.65
5.03.05 GRADAS CONCRETO F'C=140 KG/CM2 M3 1.00 3.00 AREA= 0.83 2.49
5.04 CONCRETO ARMADO
5.04.01 CIMIENTOS
5.04.01.01 ZAPATAS, CONCRETO F'C= 210 KG/CM2 M3 158.00
EJE B Z-1 4.00 2.10 2.10 0.60 10.58
EJE C Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE D Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE E Z-2 2.00 2.30 2.30 1.00 10.58
Z-3 2.00 2.70 2.70 1.00 14.58
EJE F Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE G Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE H Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE I Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
EJE J Z-2 2.00 2.30 2.30 0.60 6.35
Z-3 2.00 2.70 2.70 0.60 8.75
Z-4 4.00 1.00 1.00 0.60 2.40
EJE K Z-1 4.00 2.10 2.10 0.60 10.58
Z-4 4.00 1.00 1.00 0.60 2.40
EJE 4 Z-4 2.00 1.00 1.00 0.60 1.20
5.04.01.02 ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 3,723.56
NDE VARILLAS PESO (KG) = 5/8"

EJE B Z-1 4.00 2.15 20.00 1.55 266.94


EJE C Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE D Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE E Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE F Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE G Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE H Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE I Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
EJE J Z-2 2.00 2.35 22.00 1.55 160.48
Z-3 2.00 2.75 26.00 1.55 221.94
Z-4 4.00 1.05 8.00 1.55 52.15
EJE K Z-1 4.00 2.15 20.00 1.55 266.94
Z-4 4.00 1.05 8.00 1.55 52.15
EJE 4 Z-4 2.00 1.05 8.00 1.55 26.07
5.04.01.03 ZAPATAS, ENCOFRADO Y DESENCOFRADO M2 30.32
EJE B Z-1 1.00 2.10 0.60 1.26
EJE C Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE D Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE E Z-2 1.00 2.30 1.00 2.30
Z-3 1.00 2.70 1.00 2.70
EJE F Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE G Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE H Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE I Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
EJE J Z-2 1.00 2.30 0.60 1.38
Z-3 1.00 2.70 0.60 1.62
Z-4 1.00 1.00 0.60 0.60
EJE K Z-1 1.00 2.10 0.60 1.26
Z-4 1.00 1.00 0.60 0.60
EJE 4 Z-4 1.00 1.00 0.60 0.60
5.04.02 VIGAS DE CIMENTACION
5.04.02.01 VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 M3 49.01
EJE C 1.00 24.90 0.30 0.70 5.23
EJE D 1.00 24.90 0.30 0.70 5.23
EJE E 1.00 24.90 0.30 0.70 5.23
EJE G 1.00 24.90 0.30 0.70 5.23
EJE H 1.00 24.90 0.30 0.70 5.23
EJE I 1.00 24.90 0.30 0.70 5.23
EJE 4 1.00 36.30 0.30 0.60 6.53
1.00 6.35 0.30 1.20 2.29
EJE 6 1.00 36.30 0.30 0.60 6.53
1.00 6.35 0.30 1.20 2.29
5.04.02.02 VIGAS DE CIMENTACION, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 6,519.01
ACERO LONGITUDINAL PESO (KG) = 5/8" 4,683.69
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE C 2.00 160.27 1.552 497.48
EJE D 2.00 160.27 1.552 497.48
EJE E 2.00 160.27 1.552 497.48
EJE G 2.00 160.27 1.552 497.48
EJE H 2.00 160.27 1.552 497.48
EJE I 2.00 160.27 1.552 497.48
EJE 4 2.00 224.70 1.552 697.47
2.00 48.95 1.552 151.94
EJE 6 2.00 224.70 1.552 697.47
2.00 48.95 1.552 151.94
ACERO TRANSVERSAL N DE ESTRIBOS PESO (KG) = 3/8" 1,835.32
EJE C 1.00 1.95 181.00 0.56 197.65
EJE D 1.00 1.91 181.00 0.56 193.60
EJE E 1.00 1.95 181.00 0.56 197.65
EJE G 1.00 1.95 181.00 0.56 197.65
EJE H 1.00 1.95 181.00 0.56 197.65
EJE I 1.00 1.95 181.00 0.56 197.65
EJE 4 1.00 1.75 253.00 0.56 247.94
1.00 3.35 42.00 0.56 78.79
EJE 6 1.00 1.75 253.00 0.56 247.94
1.00 3.35 42.00 0.56 78.79
5.04.02.03 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO M2 248.62
EJE C 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE D 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE E 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE G 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE H 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE I 2.00 16.70 0.70 23.38
2.00 6.30 0.20 2.52
EJE 4 2.00 21.55 0.70 30.17
15.60 0.20 3.12
2.00 5.55 1.20 13.32
EJE 6 2.00 21.55 0.70 30.17
15.60 0.20 3.12
2.00 5.55 1.20 13.32
5.04.03 SOBRECIMIENTO ARMADO
5.04.03.01 SOBRECIMIENTO ARMADO CONCRETO F'C= 175 KG/CM2 M3 12.92
EJE B 1.00 22.02 0.15 0.70 2.31
EJE 9 1.00 40.20 0.15 0.70 4.22
EJE 16 1.00 40.20 0.15 0.70 4.22
EJE K 1.00 18.74 0.15 0.70 1.97
1.00 3.00 0.15 0.45 0.20
5.04.03.02 SOBRECIMIENTO, ACERO DE REFUERZO FY=4200 KG/CM2 KG 892.12
ACERO TRANSVERSAL NDE VARILLAS PESO (KG) = 3/8" 432.30
EJE B 1.00 22.02 6.00 0.56 73.99
EJE 9 1.00 35.20 6.00 0.56 118.27
1.00 5.00 9.00 0.56 25.20
EJE 16 1.00 35.20 6.00 0.56 118.27
1.00 5.00 9.00 0.56 25.20
EJE K 1.00 18.74 6.00 0.56 62.97
1.00 3.00 5.00 0.56 8.40
ACERO VERTICAL NDE VARILLAS PESO (KG) = 3/8" 459.83
EJE B 1.00 1.60 88.00 0.56 78.85
EJE 9 1.00 1.60 140.00 0.56 125.44
1.00 2.40 20.00 0.56 26.88
EJE 16 1.00 1.60 140.00 0.56 125.44
1.00 2.40 20.00 0.56 26.88
EJE K 1.00 1.60 75.00 0.56 67.20
1.00 1.36 12.00 0.56 9.14
5.04.03.03 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2 172.32
EJE B 2.00 22.02 0.70 30.83
EJE 9 2.00 40.20 0.70 56.28
EJE 16 2.00 40.20 0.70 56.28
EJE K 2.00 18.74 0.70 26.24
2.00 3.00 0.45 2.70
5.04.04 COLUMNAS
5.04.04.01 COLUMNAS, CONCRETO F'C= 210 KG/CM2 M3 166.71
PRIMER PISO 52.62
EJE B C-1 2.00 0.40 0.40 4.70 1.50
C-2 2.00 0.60 0.40 4.70 2.26
C-3 6.00 0.25 0.15 4.70 1.06
EJE C C-1 2.00 0.40 0.40 4.70 1.50
C-2 2.00 0.60 0.40 4.70 2.26
EJE D C-1 2.00 0.40 0.40 4.70 1.50
C-2 2.00 0.60 0.40 4.70 2.26
EJE E C-1 2.00 0.40 0.40 4.70 1.50
C-2 2.00 0.60 0.40 4.70 2.26
EJE F C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
EJE G C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
EJE H C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
EJE I C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE J C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
C-4 4.00 0.25 0.25 5.70 1.43
EJE K C-1 2.00 0.40 0.40 5.70 1.82
C-2 2.00 0.60 0.40 5.70 2.74
C-4 4.00 0.25 0.25 5.70 1.43
EJE 2 C-3 9.00 0.25 0.15 5.70 1.92
C-3 7.00 0.25 0.15 4.70 1.23
EJE 7 C-3 9.00 0.25 0.15 5.70 1.92
C-3 7.00 0.25 0.15 4.70 1.23
SEGUNDO PISO 114.08
EJE B C-1 2.00 0.40 0.40 3.50 1.12
C-2 2.00 0.60 0.40 3.50 1.68
C-3 6.00 0.25 0.15 3.50 0.79
EJE C C-2 2.00 0.60 0.40 3.50 1.68
EJE D C-2 2.00 0.60 0.40 3.50 1.68
EJE E C-2 2.00 0.60 0.40 3.50 1.68
EJE F C-2 2.00 0.60 0.40 3.50 1.68
EJE G C-2 2.00 0.60 0.40 3.50 1.68
EJE H C-2 2.00 0.60 0.40 3.50 1.68
EJE I C-2 2.00 0.60 0.40 3.50 1.68
EJE J C-2 2.00 0.60 0.40 3.50 1.68
C-2 2.00 0.60 0.40 3.50 1.68
C-4 4.00 0.25 0.25 3.50 0.88
EJE K C-1 2.00 0.40 0.40 3.50 1.12
C-2 2.00 0.60 0.40 3.50 1.68
C-4 4.00 0.25 25.00 3.50 87.50
EJE 2 C-3 16.00 0.25 0.15 3.50 2.10
EJE 7 C-3 16.00 0.25 0.15 3.50 2.10
5.04.04.02 COLUMNAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 10,406.16
PRIMER PISO 7,052.70
ACERO LONGITUDINAL LONG. DE VARILLA N DE VARILAS PESO (KG) 4,605.77
EJE B C-1 PESO (KG) = 5/8" 2.00 5.78 8.00 1.550 143.34
C-2 PESO (KG) = 5/8" 2.00 5.78 12.00 1.550 215.02
C-3 PESO (KG) = 3/8" 6.00 4.18 4.00 0.560 56.18
EJE C C-1 PESO (KG) = 5/8" 2.00 5.78 8.00 1.550 143.34
C-2 PESO (KG) = 5/8" 2.00 5.78 12.00 1.550 215.02
EJE D C-1 PESO (KG) = 5/8" 2.00 5.78 8.00 1.550 143.34
C-2 PESO (KG) = 5/8" 2.00 5.78 12.00 1.550 215.02
EJE E C-1 PESO (KG) = 5/8" 2.00 6.18 8.00 1.550 153.26
C-2 PESO (KG) = 5/8" 2.00 6.18 12.00 1.550 229.90
EJE F C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
EJE G C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
EJE H C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
EJE I C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
EJE J C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
C-4 PESO (KG) = 1/2" 6.00 6.78 4.00 0.99 161.74
EJE K C-1 PESO (KG) = 5/8" 2.00 6.78 8.00 1.550 168.14
C-2 PESO (KG) = 5/8" 2.00 6.78 12.00 1.550 252.22
C-4 PESO (KG) = 1/2" 4.00 6.78 4.00 0.99 107.83
EJE 2 C-3 PESO (KG) = 3/8" 9.00 4.18 4.00 0.560 84.27
C-3 PESO (KG) = 3/8" 7.00 4.18 4.00 0.560 65.54
EJE 7 C-3 PESO (KG) = 3/8" 9.00 4.18 4.00 0.560 84.27
C-3 PESO (KG) = 3/8" 7.00 4.18 4.00 0.560 65.54
ACERO TRANSVERSAL LONG. DE VARILLA N DE VARILAS PESO (KG) 2,446.93
EJE B C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.560 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.560 103.49
C-3 PESO (KG) = 1/4" 6.00 0.70 33.00 0.25 34.65
EJE C C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.560 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.560 103.49
EJE D C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.560 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.560 103.49
EJE E C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.560 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.560 103.49
EJE F C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
EJE G C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
EJE H C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
EJE I C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
EJE J C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
C-4 PESO (KG) = 1/4" 6.00 0.90 37.00 0.25 49.95
EJE K C-1 PESO (KG) = 3/8" 2.00 2.76 37.00 0.560 114.37
C-2 PESO (KG) = 3/8" 2.00 2.80 37.00 0.560 116.03
C-4 PESO (KG) = 1/4" 4.00 0.90 37.00 0.25 33.30
EJE 2 C-3 PESO (KG) = 1/4" 9.00 0.70 24.00 0.25 37.80
C-3 PESO (KG) = 1/4" 7.00 0.70 20.00 0.25 24.50
EJE 7 C-3 PESO (KG) = 1/4" 9.00 0.70 24.00 0.25 37.80
C-3 PESO (KG) = 1/4" 7.00 0.70 20.00 0.25 24.50
SEGUNDO PISO 3,353.46
ACERO LONGITUDINAL LONG. DE VARILLA N DE VARILAS PESO (KG) 1,871.80
EJE B C-1 PESO (KG) = 5/8" 2.00 3.50 8.00 1.550 86.80
C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
C-3 PESO (KG) = 3/8" 6.00 2.00 4.00 0.56 26.88
EJE C C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE D C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE E C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE F C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE G C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE H C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE I C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
EJE J C-1 PESO (KG) = 5/8" 2.00 3.50 8.00 1.550 86.80
C-2 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
C-4 PESO (KG) = 1/2" 6.00 3.50 4.00 0.994 83.50
EJE K C-1 PESO (KG) = 5/8" 2.00 3.50 12.00 1.550 130.20
C-2 PESO (KG) = 5/8" 2.00 3.50 8.00 1.550 86.80
C-4 PESO (KG) = 1/2" 4.00 3.50 4.00 0.994 55.66
EJE 2 C-3 PESO (KG) = 3/8" 16.00 2.00 4.00 0.56 71.68
EJE 7 C-3 PESO (KG) = 3/8" 16.00 2.00 4.00 0.56 71.68
ACERO TRANSVERSAL LONG. DE VARILLA N DE VARILAS PESO (KG) 1,481.66
EJE B C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.56 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
C-3 PESO (KG) = 1/4" 6.00 0.70 10.00 0.25 10.50
EJE C C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE D C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE E C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE F C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE G C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE H C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE I C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
EJE J C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.56 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
C-4 PESO (KG) = 1/4" 6.00 0.90 33.00 0.25 44.55
EJE K C-1 PESO (KG) = 3/8" 2.00 2.76 33.00 0.56 102.01
C-2 PESO (KG) = 3/8" 2.00 2.80 33.00 0.56 103.49
C-4 PESO (KG) = 1/4" 4.00 0.90 33.00 0.25 29.70
EJE 2 C-3 PESO (KG) = 1/4" 16.00 0.70 10.00 0.25 28.00
EJE 7 C-3 PESO (KG) = 1/4" 16.00 0.70 10.00 0.25 28.00
5.04.04.03 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 1,659.00
PRIMER PISO 693.20
EJE B C-1 4.00 0.40 0.40 3.50 22.40
C-2 4.00 0.60 0.40 3.50 28.00
C-3 2.00 0.25 0.15 2.25 3.60
EJE C C-1 4.00 0.40 0.40 3.50 22.40
C-2 4.00 0.60 0.40 3.50 28.00
EJE D C-1 4.00 0.40 0.40 3.50 22.40
C-2 4.00 0.60 0.40 3.50 28.00
EJE E C-1 4.00 0.40 0.40 3.50 22.40
C-2 4.00 0.60 0.40 3.50 28.00
EJE F C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
EJE G C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
EJE H C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
EJE I C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
EJE J C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
C-4 4.00 0.25 0.25 4.50 18.00
EJE K C-1 4.00 0.40 0.40 4.50 28.80
C-2 4.00 0.60 0.40 4.50 36.00
C-4 4.00 0.25 0.25 4.50 18.00
EJE 2 C-3 9.00 0.25 0.15 2.25 16.20
C-3 7.00 0.25 0.15 3.25 18.20
EJE 7 C-3 9.00 0.25 0.15 2.25 16.20
C-3 7.00 0.25 0.15 2.25 12.60
SEGUNDO PISO 965.80
EJE B C-1 2.00 0.40 0.40 3.50 11.20
C-2 2.00 0.60 0.40 3.50 14.00
C-3 6.00 0.25 0.15 2.25 10.80
EJE C C-2 2.00 0.60 0.40 3.50 14.00
EJE D C-2 2.00 0.60 0.40 3.50 14.00
EJE E C-2 2.00 0.60 0.40 3.50 14.00
EJE F C-2 2.00 0.60 0.40 3.50 14.00
EJE G C-2 2.00 0.60 0.40 3.50 14.00
EJE H C-2 2.00 0.60 0.40 3.50 14.00
EJE I C-2 2.00 0.60 0.40 3.50 14.00
EJE J C-2 2.00 0.60 0.40 3.50 14.00
C-2 2.00 0.60 0.40 3.50 14.00
C-4 4.00 0.25 0.25 3.50 14.00
EJE K C-1 2.00 0.40 0.40 3.50 11.20
C-2 2.00 0.60 0.40 3.50 14.00
C-4 4.00 0.25 25.00 3.50 707.00
EJE 2 C-3 16.00 0.25 0.15 2.25 28.80
EJE 7 C-3 16.00 0.25 0.15 2.25 28.80
5.04.05 VIGAS
5.04.05.01 VIGAS, CONCRETO F'C= 210 KG/CM2 M3 129.95
PRIMER PISO 83.35
EJE B V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE C V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE D V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE E V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE F V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE G V.P. - 1 1.00 0.30 0.70 25.00 5.25
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE H V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE I V.P. - 1 1.00 0.30 0.70 25.00 5.25
EJE J V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE K V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE 2 V.P. - 4 1.00 0.25 0.50 48.65 6.08
EJE 7 V.P. - 4 1.00 0.25 0.50 48.65 6.08
EJE 4 V.P. - 3 1.00 0.25 0.50 42.30 5.29
EJE 3 V.A. - 5 1.00 0.25 0.25 5.80 0.36
V.P. - 4 1.00 0.25 0.50 2.40 0.30
EJE 4' V.P. - 4 1.00 0.25 0.50 2.40 0.30
V.A. - 5 2.00 0.25 0.25 2.20 0.28
EJE 6 V.P. - 6 1.00 0.25 0.50 48.65 6.08
EJE 6' V.P. - 6 1.00 0.25 0.50 48.65 6.08
SEGUNDO PISO 46.60
EJE B V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE J V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE K V.P. - 2 1.00 0.30 0.70 25.00 5.25
EJE 2 V.P. - 4 1.00 0.25 0.50 48.65 6.08
EJE 7 V.P. - 4 1.00 0.25 0.50 48.65 6.08
EJE 4 V.P. - 3 1.00 0.25 0.50 42.30 5.29
EJE 3 V.A. - 5 1.00 0.25 0.25 5.80 0.36
V.P. - 4 1.00 0.25 0.50 2.40 0.30
EJE 4' V.P. - 4 1.00 0.25 0.50 2.40 0.30
V.A. - 5 2.00 0.25 0.25 2.20 0.28
EJE 6 V.P. - 6 1.00 0.25 0.50 48.65 6.08
EJE 6' V.P. - 6 1.00 0.25 0.50 48.65 6.08
5.04.05.02 VIGAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 10,025.42
PRIMER PISO 7,759.33
ACERO LONGITUDINAL N DE VARILLAS PESO (KG) = 3/4" 4,759.66
EJE B V.P. - 2 1.00 25.60 4.00 2.235 228.86
1.00 2.40 2.00 2.235 10.73
EJE C V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE D V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE E V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE F V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE G V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE H V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE I V.P. - 1 1.00 25.60 4.00 2.235 228.86
1.00 4.80 2.00 2.235 21.46
EJE J V.P. - 2 1.00 25.60 4.00 2.235 228.86
1.00 2.40 2.00 2.235 10.73
EJE K V.P. - 2 1.00 25.60 4.00 2.235 228.86
1.00 2.40 2.00 2.235 10.73
EJE 2 V.P. - 4 1.00 25.60 4.00 2.235 228.86
EJE 7 V.P. - 4 1.00 25.60 4.00 2.235 228.86
EJE 4 V.P. - 3 1.00 25.60 4.00 2.235 228.86
EJE 3 V.A. - 5 1.00 25.60 4.00 2.235 228.86
V.P. - 4 1.00 25.60 4.00 2.235 228.86
EJE 4' V.P. - 4 1.00 25.60 4.00 2.235 228.86
V.A. - 5 2.00 25.60 4.00 2.235 457.73
EJE 6 V.P. - 6 1.00 25.60 4.00 2.235 228.86
EJE 6' V.P. - 6 1.00 25.60 4.00 2.235 228.86
ACERO TRANSVERSAL N DE VARILLAS PESO (KG) = 3/8" 2,999.67
EJE B V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE C V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE D V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE E V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE F V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE G V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE H V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE I V.P. - 1 1.00 1.92 163.00 0.56 175.26
EJE J V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE K V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE 2 V.P. - 4 1.00 1.42 368.00 0.56 292.63
EJE 7 V.P. - 4 1.00 1.42 368.00 0.56 292.63
EJE 4 V.P. - 3 1.00 1.42 322.00 0.56 256.05
V.A. - 5 1.00 0.70 51.00 0.56 19.99
EJE 3 V.A. - 5 1.00 0.70 51.00 0.56 19.99
EJE 4' V.P. - 4 1.00 1.42 46.00 0.56 36.58
EJE 6 V.P. - 6 1.00 1.42 368.00 0.56 292.63
EJE 6' V.P. - 6 1.00 1.42 46.00 0.56 36.58
SEGUNDO PISO 2,266.09
ACERO LONGITUDINAL 1,155.05
EJE B V.P. - 2 1.00 25.60 4.00 2.235 228.86
EJE J V.P. - 2 1.00 25.60 4.00 2.235 228.86
1.00 2.40 2.00 2.235 10.73
EJE K V.P. - 2 1.00 25.60 4.00 2.235 228.86
EJE 2 V.P. - 4 1.00 25.60 4.00 2.235 228.86
EJE 7 V.P. - 4 1.00 25.60 4.00 2.235 228.86
ACERO TRANSVERSAL 1,111.04
EJE B V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE J V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE K V.P. - 2 1.00 1.92 163.00 0.56 175.26
EJE 2 V.P. - 4 1.00 1.42 368.00 0.56 292.63
EJE 7 V.P. - 4 1.00 1.42 368.00 0.56 292.63
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
5.04.05.03 VIGAS, ENCOFRADO Y DESENCOFRADO M2 1,045.09
PRIMER PISO 658.17
EJE B V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE C V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE D V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE E V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE F V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE G V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE H V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE I V.P. - 1 2.00 0.30 0.70 25.00 38.75
EJE J V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE K V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE 2 V.P. - 4 2.00 0.25 0.50 48.65 53.52
EJE 7 V.P. - 4 2.00 0.25 0.50 48.65 53.52
EJE 4 V.P. - 3 2.00 0.25 0.50 42.30 46.53
EJE 3 V.A. - 5 2.00 0.25 0.25 5.80 3.48
V.P. - 4 2.00 0.25 0.50 2.40 2.64
EJE 4' V.P. - 4 2.00 0.25 0.50 2.40 2.64
V.A. - 5 2.00 0.25 0.25 2.20 1.32
EJE 6 V.P. - 6 2.00 0.25 0.50 48.65 53.52
EJE 6' V.P. - 6 2.00 0.25 0.50 48.65 53.52
SEGUNDO PISO 386.92
EJE B V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE J V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE K V.P. - 2 2.00 0.30 0.70 25.00 38.75
EJE 2 V.P. - 4 2.00 0.25 0.50 48.65 53.52
EJE 7 V.P. - 4 2.00 0.25 0.50 48.65 53.52
EJE 4 V.P. - 3 2.00 0.25 0.50 42.30 46.53
EJE 3 V.A. - 5 2.00 0.25 0.25 5.80 3.48
V.P. - 4 2.00 0.25 0.50 2.40 2.64
EJE 4' V.P. - 4 2.00 0.25 0.50 2.40 2.64
V.A. - 5 2.00 0.25 0.25 2.20 1.32
EJE 6 V.P. - 6 2.00 0.25 0.50 48.65 53.52
EJE 6' V.P. - 6 2.00 0.25 0.50 48.65 53.52
5.04.06 LOSAS
5.04.06.01 LOSAS, CONCRETO F'C= 210 KG/CM2 M3 120.30
LOSA 1.00 AREA TOTAL= 1,069.33 0.05 53.47
VIGUETA 2.50 0.10 0.25 66.83
5.04.06.02 LOSAS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 7,367.14
ACERO DE VIGUETA PESO (KG) = 1/2" 4,736.61
57.00 41.80 0.994 2,368.30
14.00 41.80 0.994 581.69
11.00 41.80 0.994 457.04
32.00 41.80 0.994 1,329.57

ACERO DE TEMP. PESO (KG) = 1/4" 1,960.79


84.00 24.00 0.25 504.00
81.00 25.00 0.25 506.25
81.00 6.00 0.25 121.50
21.00 24.00 0.25 126.00
60.00 4.80 0.25 72.00
16.00 17.65 0.25 70.60
81.00 13.75 0.25 278.44
47.00 24.00 0.25 282.00
AMARRES 1.00 334.87 334.87
DESPERDICIO 1.00 334.87 334.87
5.04.06.03 LADRILLO HUECO DE 15X30X30 8.00 AREA TOTAL= 1,069.33 8,554.64 8,556.00
5.04.06.04 LOSAS, ENCOFRADO Y DESENCOFRADO M2 1.00 AREA TOTAL= 1,069.33 1,069.33 1,069.33
5.04.05 PARAPETOS
5.04.05.01 PARAPETOS, CONCRETO F'C= 175 KG/CM2 M3 4.23
EJE F 1.00 4.23 0.15 1.30 0.82
1.00 2.30 0.15 1.15 0.40
1.00 10.25 0.15 1.30 2.00
1.00 1.30 0.15 1.30 0.25
1.00 3.00 0.15 1.30 0.59
1.00 1.00 0.15 1.15 0.17
1.00 2.30 0.15 0.65 0.22
5.04.05.02 PARAPETOS, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 287.59
ACERO LONGITUDINAL LONG. DE VARILLAS N DE VARILLAS PESO (KG) = 1/2" 193.87
EJE F 1.00 2.00 16.92 0.99 33.64
1.00 2.00 9.20 0.99 18.29
1.00 2.00 41.00 0.99 81.51
1.00 2.00 5.20 0.99 10.34
1.00 2.00 12.00 0.99 23.86
1.00 2.00 4.00 0.99 7.95
1.00 2.00 9.20 0.99 18.29
ACERO TRANSVERSAL LONG. DE VARILLAS N DE VARILLAS PESO (KG) = 3/8" 93.72
1.00 4.23 7.00 0.56 16.58
1.00 2.30 6.00 0.56 7.73
1.00 10.25 7.00 0.56 40.18
1.00 1.30 7.00 0.56 5.10
1.00 3.00 7.00 0.56 11.76
1.00 1.00 6.00 0.56 3.36
1.00 2.30 7.00 0.56 9.02
5.04.05.03 PARAPETOS, ENCOFRADO Y DESENCOFRADO M2 18.53
EJE F 2.00 4.23 1.30 11.00
2.00 2.30 1.15 5.29
2.00 10.25 1.30 26.65
2.00 1.30 1.30 3.38
2.00 3.00 1.30 7.80
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
2.00 1.00 1.15 2.30
2.00 2.30 0.65 2.99
5.04.06 RAMPAS
5.04.06.01 RAMPAS, CONCRETO F'C= 175 KG/CM2 1.09
1.00 AREA= 0.87 0.50 0.44
1.00 AREA= 0.76 0.50 0.38
1.00 AREA= 0.23 0.50 0.12
1.00 AREA= 0.32 0.50 0.16

5.04.06.02 RAMPAS, ACERO DE REFUERZO FY= 4200 KG/CM2 39.50


ACERO LONGITUDINAL
LONG DE LA
N DE VARILLAS PESO (KG) = 3/8" 25.50
VARILLA
1.00 3.75 3.00 0.56 6.30
1.00 1.29 3.00 0.56 2.17
1.00 6.43 3.00 0.56 10.80
1.00 2.78 4.00 0.56 6.23
ACERO TRANSVERSAL
LONG DE LA
N DE VARILLAS PESO (KG) = 3/8" 14.00
VARILLA
1.00 0.50 9.00 0.56 2.52
1.00 0.50 16.00 0.56 4.48
1.00 0.50 5.00 0.56 1.40
1.00 1.00 10.00 0.56 5.60
5.05 ALBAILERIA
5.05.01 MURO LAD. KK. MAQ T IV SOGA, MEZC. C:A 1:5 JUNTA 1.5 CM M2 911.78
PRIMER PISO 493.83
MURO PERIMETRICO
EJE 2 2.00 5.00 4.50 45.00
2.00 5.05 4.50 45.45
-2.00 5.00 1.70 -17.00
-2.00 5.05 1.70 -17.17
2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.70 -17.00
-2.00 5.05 1.70 -17.17
EJE B 1.00 21.35 3.50 74.73
-1.00 21.35 0.50 -10.68
EJE 7 2.00 5.00 4.50 45.00
2.00 5.05 4.50 45.45
-2.00 5.00 1.70 -17.00
-2.00 5.05 1.70 -17.17
2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.70 -17.00
-2.00 5.05 1.70 -17.17
EJE K 1.00 19.00 4.50 85.50
-1.00 19.00 0.50 -9.50
MUROS DE TABIQUERIA
EJE 3 1.00 4.85 4.50 21.83
-1.00 4.85 0.50 -2.43
EJE 4 1.00 3.45 4.50 15.53
-1.00 3.45 0.50 -1.73
EJE 4' 1.00 3.05 4.50 13.73
-1.00 3.05 0.50 -1.53
-1.00 1.10 0.40 -0.44
EJE 4' entre J-K 1.00 4.15 4.50 18.68
-1.00 4.15 0.50 -2.08
EJE 5 1.00 5.85 4.50 26.33
-1.00 5.85 0.50 -2.93
EJE 6' 1.00 6.35 4.50 28.58
-1.00 6.35 0.50 -3.18
EJE J 1.00 15.00 4.50 67.50
-1.00 15.00 0.60 -9.00
SEGUNDO PISO 417.95
MURO PERIMETRICO
EJE 2 2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.45 -14.50
-2.00 5.05 1.45 -14.65
2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.45 -14.50
-2.00 5.05 1.45 -14.65
EJE B 1.00 21.35 3.50 74.73
-1.00 21.35 0.50 -10.68
EJE 7 2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.45 -14.50
-2.00 5.05 1.45 -14.65
2.00 5.00 3.50 35.00
2.00 5.05 3.50 35.35
-2.00 5.00 1.45 -14.50
-2.00 5.05 1.45 -14.65
EJE K 1.00 19.00 3.50 66.50
-1.00 19.00 0.50 -9.50
MUROS DE TABIQUERIA
EJE 3 1.00 3.50 3.50 12.25
-1.00 3.50 0.25 -0.88
EJE 4 1.00 3.50 3.50 12.25
-1.00 3.50 0.25 -0.88
EJE J entre 4-4' 1.00 4.00 3.50 14.00
-1.00 4.00 0.25 -1.00
EJE 4' 1.00 3.25 3.50 11.38
-1.00 3.25 0.25 -0.81
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
-1.00 1.20 0.40 -0.48
EJE 5 1.00 5.85 3.50 20.48
-1.00 5.85 0.25 -1.46
EJE 6' 1.00 6.15 3.50 21.53
-1.00 6.15 0.25 -1.54
EJE J 1.00 15.00 3.50 52.50
-1.00 15.00 0.35 -5.25
5.05.02 MURO LAD. KK. MAQ T IV CANTO, MEZC. C:A 1:5 JUNTA 1.5 CM 29.44
PRIM. Y SEG. PISO 29.44
EJE J entre 6-7 2.00 1.40 2.00 5.60
6.00 1.80 2.00 21.60
2.00 0.50 2.00 2.00
2.00 0.60 0.20 0.24
5.05.04 JUNTA DE TECKNOPOR E=1" M 314.00
PRIMER PISO 167.00
EJE 2 9.00 4.50 40.50
8.00 3.50 28.00
EJE B 6.00 3.50 21.00
EJE 7 9.00 4.50 40.50
8.00 3.50 28.00
EJE K 2.00 4.50 9.00
SEGUNDO PISO 147.00
EJE 2 17.00 3.50 59.50
EJE B 6.00 3.50 21.00
EJE 7 17.00 3.50 59.50
EJE K 2.00 3.50 7.00
5.06 ESTRUCTURAS METALICAS Y COBERTURAS
5.06.01 ACERO ASTM A 36 PARA TIJERALES KG 10.00 11,619.54
TIJERAL 1,161.95
ESPESOR 3" x 3" x 1/4" 2.00 27.34 PESO (Kg/m)= 7.292 398.73
2 1/2" x 2 1/2" x 1/4" 2.00 42.60 PESO (Kg/m)= 6.101 519.81
2" x 2" x 1/4" 2.00 6.00 PESO (Kg/m)= 4.747 56.96
1 1/2" x 1 1/2" x 3/16" 2.00 34.80 PESO (Kg/m)= 2.679 186.46
5.06.02 ANCLAJE METALICO DE APOYO T-1 UND 20.00 20
5.06.03 ACERO ASTM A 36 PARA VIGUETAS 3082.128
ESPESOR 1" x 1/8" 2.00 5.80 PESO (Kg/m)= 1.107 12.84
BRIDA INF. 1/2" 1.00 5.80 PESO (Kg/m)= 1.020 5.92
DIAG. 1/2" 1.00 8.59 PESO (Kg/m)= 1.020 8.76
27.52
N DE VIGUETAS 112.00 PESO (Kg/m)= 27.52
5.06.04 COBERTURA METALICA TIPO TR-4 ALUZINC E=0.6 mm M2 1,373.84
2.00 13.67 50.25 1,373.84 1,373.84
5.06.05 CUMBRERA METALICA 0.5 mm M 1.00 50.15 50.15
5.06.06 BARANDA CO TUBO DE Fo Go, PASAMANO M 1.00 51.50 51.50
5.06.07 COBERTURA DE PLANCHA TERMOACUSTICA E= 0.4 mm INC. ACCESORIOS M2 1.00 AREA = 80.46 80.46
5.06.08 MONTAJE DE ACERO ASTM A 36 P/TIJERAL KG 1.00 14,701.67 14,701.67
5.07 PISOS Y PAVIMENTOS
5.07.01 PISOS DE CONCRETO
5.07.01.01 CONTRAPISO 40 MM BASE 3 CM MEZC 1:5 ACAB. 1 CM PASTA 1:2 M2 2.00 AREA= 21.42 42.84
5.07.01.02 PISO 5 CM BASE 4 CM MEZC. 1:5 ACAB. 1 CM PASTA 1:2 M2 2.00 AREA= 1,163.80 2,327.60
5.07.02 CERAMICO
5.07.02.01 PISO DE LOSETA CERAMICA ANTIDESLIZANTE 0.30 X 0.30 M COLOR M2 2.00 AREA= 21.42 42.84
5.07.03 VEREDA DE CONCRETO
5.07.03.01 VEREDA CONCRETO F'C=175 KG/CM2 M3 1.00 AREA= 124.30 124.30 124.30
5.07.04 PATIOS
5.07.04.01 LOSA DE CONCRETO F'C= 175 KG/CM2 E=15 cm M2 1.00 AREA = 317.40 317.40 317.40
5.08 REVOQUES Y REVESTIMIENTO
5.08.01 TARRAJEO RAYADO O PRIMARIO M2 132.60
PRIM. Y SEG. PISO 132.60
EJE K entre 4-4' 2.00 6.54 1.20 15.70
EJE K entre 6'-7 2.00 10.00 1.20 24.00
6.00 0.60 1.20 4.32
2.00 3.58 1.20 8.59
6.00 4.10 1.80 44.28
2.00 4.30 1.80 15.48
4.00 0.60 0.20 0.48
2.00 0.60 0.10 0.12
4.00 3.05 0.40 4.88
2.00 3.05 0.10 0.61
4.00 2.85 0.50 5.70
4.00 2.65 0.50 5.30
4.00 2.85 0.10 1.14
4.00 0.50 0.50 1.00
4.00 0.40 0.50 0.80
4.00 0.50 0.10 0.20
5.08.02 TARRAJEO DE COLUMNAS M2 353.25
PRIMER PISO 234.00
EJE B 1.00 5.20 3.00 15.60
EJE C 1.00 6.60 3.00 19.80
EJE D 1.00 6.60 3.00 19.80
EJE E 1.00 6.60 3.00 19.80
EJE F 1.00 4.90 4.00 19.60
EJE G 1.00 4.90 4.00 19.60
EJE H 1.00 6.60 4.00 26.40
EJE I 1.00 6.60 4.00 26.40
EJE J 1.00 7.90 4.00 31.60
EJE K 1.00 8.20 4.00 32.80
EJE 4 1.00 0.65 4.00 2.60
SEGUNDO PISO 119.25
EJE B 1.00 2.60 3.00 7.80
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE C 1.00 3.40 3.00 10.20
EJE D 1.00 3.40 3.00 10.20
EJE E 1.00 3.40 3.00 10.20
EJE F 1.00 1.70 3.00 5.10
EJE G 1.00 1.70 3.00 5.10
EJE H 1.00 3.40 3.00 10.20
EJE I 1.00 3.40 3.00 10.20
EJE J 1.00 7.90 3.00 23.70
EJE K 1.00 8.20 3.00 24.60
EJE 4 1.00 0.65 3.00 1.95
5.08.03 TARRAJEO ARISTA DE COLUMNAS M 684.00
PRIMER PISO 468.00
EJE B 8.00 3.00 24.00
EJE C 12.00 3.00 36.00
EJE D 12.00 3.00 36.00
EJE E 12.00 3.00 36.00
EJE F 12.00 4.00 48.00
EJE G 12.00 4.00 48.00
EJE H 12.00 4.00 48.00
EJE I 12.00 4.00 48.00
EJE J 16.00 4.00 64.00
EJE K 16.00 4.00 64.00
EJE 4 4.00 4.00 16.00
SEGUNDO PISO 216.00
EJE B 8.00 3.00 24.00
EJE C 4.00 3.00 12.00
EJE D 4.00 3.00 12.00
EJE E 4.00 3.00 12.00
EJE F 4.00 3.00 12.00
EJE G 4.00 3.00 12.00
EJE H 4.00 3.00 12.00
EJE I 4.00 3.00 12.00
EJE J 16.00 3.00 48.00
EJE K 16.00 3.00 48.00
EJE 4 4.00 3.00 12.00
5.08.04 TARRAJEO DE VIGAS M2 753.93
PRIMER PISO 467.94
EJE 2 1.00 48.65 0.95 46.22
EJE 7 1.00 48.65 0.95 46.22
EJE B 1.00 25.00 0.85 21.25
EJE K 1.00 22.00 0.85 18.70
1.00 3.00 0.95 2.85
EJE C 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE D 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE E 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE F 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE G 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE H 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE I 1.00 24.50 1.10 26.95
-2.00 0.40 0.30 -0.24
EJE J 1.00 24.50 1.05 25.73
-4.00 0.25 0.25 -0.25
-2.00 0.40 0.30 -0.24
EJE 4 1.00 45.55 1.20 54.66
-1.00 4.05 0.25 -1.01
EJE 3 1.00 5.75 1.05 6.04
EJE 6 1.00 45.55 1.20 54.66
EJE 4' 1.00 2.49 0.75 1.87
1.00 2.75 0.60 1.65
2.00 2.20 0.60 2.64
SEGUNDO PISO 285.99
EJE 2 1.00 48.65 1.00 48.65
EJE 7 1.00 48.65 1.00 48.65
EJE B 1.00 25.00 0.85 21.25
EJE K 1.00 22.00 0.85 18.70
1.00 3.00 1.00 3.00
EJE J 1.00 24.50 1.05 25.73
-4.00 0.25 0.25 -0.25
-2.00 0.40 0.30 -0.24
EJE 4 1.00 45.55 1.20 54.66
-1.00 4.05 0.25 -1.01
EJE 3 1.00 5.75 1.05 6.04
EJE 6 1.00 45.55 1.20 54.66
EJE 4' 1.00 2.49 0.75 1.87
1.00 2.75 0.60 1.65
2.00 2.20 0.60 2.64
5.08.05 TARRAJEO ARISTA DE VIGAS M 825.96
PRIMER PISO 626.80
EJE B 1.00 25.00 25.00
EJE C 2.00 25.00 50.00
EJE D 2.00 25.00 50.00
EJE E 2.00 25.00 50.00
EJE F 2.00 25.00 50.00
EJE G 2.00 25.00 50.00
EJE H 2.00 25.00 50.00
EJE I 2.00 25.00 50.00
EJE J 1.00 25.00 25.00
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE K 1.00 25.00 25.00
EJE 2 1.00 44.65 44.65
EJE 3 1.00 5.80 5.80
EJE 4 1.00 44.65 44.65
EJE 4' 1.00 5.80 5.80
EJE 5 1.00 5.80 5.80
EJE 6 1.00 44.65 44.65
JE 6' 1.00 5.80 5.80
EJE 7 1.00 44.65 44.65
SEGUNDO PISO 199.16
EJE B 1.00 25.00 25.00
EJE J 1.00 25.00 25.00
EJE K 1.00 25.00 25.00
EJE 2 1.00 44.68 44.68
EJE 3 1.00 5.80 5.80
EJE 4 1.00 5.80 5.80
EJE 4' 1.00 5.80 5.80
EJE 5 1.00 5.80 5.80
EJE 6 1.00 5.80 5.80
JE 6' 1.00 5.80 5.80
EJE 7 1.00 44.68 44.68
5.08.06 REVESTIMIENTO DE GRADAS INC CANTONERA DE ALUMINIO M2 1.00 AREA= 2.33 3.00 6.99 6.99
5.08.07 TARRAJEO DE MUROS EXTERIORES 525.60
PRIMER PISO 335.90
EJE 2 1.00 11.85 4.50 53.33
1.00 11.85 3.50 41.48
-1.00 20.10 1.00 -20.10
EJE 7 1.00 11.85 4.50 53.33
1.00 11.85 3.50 41.48
-1.00 20.10 1.00 -20.10
EJE B 1.00 25.00 3.50 87.50
EJE K 2.00 11.00 4.50 99.00
SEGUNDO PISO 189.70
EJE 2 1.00 11.85 3.50 41.48
1.00 11.85 3.50 41.48
-1.00 20.10 3.50 -70.35
EJE 7 1.00 11.85 3.50 41.48
1.00 11.85 3.50 41.48
-1.00 20.10 3.50 -70.35
EJE B 1.00 25.00 3.50 87.50
EJE K 2.00 11.00 3.50 77.00
5.08.08 TARRAJEO DE MUROS INTERIORES M2 1,611.31
PRIMER PISO 809.89
EJE 2 1.00 22.20 4.00 88.80
-1.00 22.20 1.00 -22.20
1.00 22.20 3.00 66.60
-1.00 22.20 1.00 -22.20
EJE 7 1.00 22.20 4.00 88.80
-1.00 22.20 1.00 -22.20
1.00 22.20 3.00 66.60
-1.00 22.20 1.00 -22.20
EJE B 1.00 23.00 3.00 69.00
EJE K 1.00 7.80 4.00 31.20
1.00 8.15 4.00 32.60
EJE J 2.00 29.55 4.00 236.40
EJE 6' 1.00 10.54 2.80 29.51
EJE 7 1.00 2.08 2.80 5.82
1.00 1.50 0.80 1.20
4.00 0.60 0.80 1.92
3.00 4.10 0.20 2.46
1.00 4.30 0.20 0.86
EJE 3 1.00 9.90 4.00 39.60
EJE 4 1.00 7.66 4.00 30.64
EJE 4' 1.00 5.25 4.00 21.00
EJE 4' entre J-K 1.00 6.90 4.00 27.60
EJE 5 1.00 12.20 4.00 48.80
PARAPETO 1.00 9.27 9.27
SEGUNDO PISO 801.42
EJE 2 1.00 23.65 3.00 70.95
-1.00 20.10 1.00 -20.10
1.00 22.20 3.00 66.60
-1.00 20.10 1.00 -20.10
EJE 7 1.00 23.65 3.00 70.95
-1.00 20.10 1.00 -20.10
1.00 22.20 3.00 66.60
-1.00 20.10 1.00 -20.10
1.00 20.10 0.15 3.02
EJE B 1.00 26.20 3.00 78.60
1.00 25.00 3.00 75.00
EJE K 1.00 47.50 3.00 142.50
1.00 2.65 1.80 4.77
EJE 3 1.00 12.60 3.00 37.80
EJE 4 1.00 9.10 3.00 27.30
EJE 4' 1.00 15.50 3.00 46.50
EJE 5 1.00 12.50 3.00 37.50
EJE 6' 1.00 13.30 3.00 39.90
EJE J 1.00 34.55 3.00 103.65
EJE 7 1.00 2.08 1.80 3.74
1.00 1.50 0.80 1.20
4.00 0.60 0.80 1.92
3.00 4.10 0.20 2.46
1.00 4.30 0.20 0.86
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
5.08.09 TARRAJEO DE CIELO RASO C/MORTERO C:A 1:5 E=1.5 CM M2 1.00 AREA= 1,069.33 1,069.33
5.09 CARPINTERIA DE MADERA
5.09.01 P-1 PUERTA DE TRIPLAY 4 MM - 0.70 x 2.70 M UND 2.00 2.00
5.09.02 P-2 PUERTA DE TRIPLAY 4 MM - 1.00 x 2.70 M UND 2.00 2.00
5.09.04 P-4 PUERTA DE TRIPLAY 4 MM - 0.60 x 1.60 M, ALFEIZER H=0.20 UND 8.00 8.00
5.10 CARPINTERIA METALICA
R-7 PUERTAA DE MALLA METALICA PLASTIFICADA N8 COCADA 2" x 2" - 3.00 x
5.10.01 UND 1.00 1.00
3.00
5.10.02 R-8 PUERTA METALICA Y BARROTES 5/8" 3.00 x 2.60 m UND 1.00 1.00
5.10.03 R-9 PUERTA METALICA Y BARROTES 5/8" 2.00 x 2.60 m UND 2.00 2.00
5.10.04 R-10 PUERTA METALICA Y BARROTES 5/8" 1.00 x 2.60 m UND 4.00 4.00
R-12 PUERTA DE PLANCHA METALICA LISA E=1/8" C/MIRILLA DE 0.25x0.20 -
5.10.05 UND 2.00 2.00
(0.90 - 2.6)
5.10.06 V-1 VENTANA DE MALLA METALICA COCADA 2" x 2" (5.50 x 1.00m) UND 16.00 16.00
5.10.07 V-2 VENTANA DE MALLA METALICA COCADA 2" x 2" (5.55 x 1.00m) UND 16.00 16.00
5.10.08 V-3 VENTANA DE MALLA METALICA COCADA 1" x 1" (1.20 x 0.50m) UND 2.00 2.00
5.11 PINTURA
5.11.01 PINTURA LATEX EN INTERIORES 2 MANOS BASE IMPRIMANTE M2 1,934.04
PRIMER PISO 916.13
EJE 2 1.00 27.60 4.50 124.20
1.00 27.75 3.50 97.13
1.00 45.50 0.10 4.55
-1.00 40.20 1.00 -40.20
EJE B 1.00 25.50 3.50 89.25
1.00 23.00 0.15 3.45
EJE 7 1.00 19.92 4.50 89.64
1.00 4.85 1.70 8.25
1.00 1.03 2.30 2.37
1.00 26.15 3.15 82.37
-1.00 40.20 1.00 -40.20
EJE K 1.00 16.45 4.50 74.03
1.00 1.90 3.30 6.27
1.00 0.85 2.70 2.30
1.00 20.80 0.15 3.12
1.00 3.00 1.20 3.60
EJE J 1.00 29.55 4.00 118.20
EJE 6' 1.00 10.54 2.80 29.51
EJE 7 1.00 2.08 2.80 5.82
1.00 1.50 0.80 1.20
4.00 0.60 0.80 1.92
3.00 4.10 0.20 2.46
1.00 4.30 0.20 0.86
EJE 3 1.00 9.90 4.00 39.60
EJE 4 1.00 7.66 4.00 30.64
EJE 4' 1.00 5.25 4.00 21.00
EJE 4' entre J-K 1.00 6.90 4.00 27.60
EJE 5 1.00 12.20 4.00 48.80
COLUMNAS 7.00 1.60 4.00 44.80
7.00 1.60 3.00 33.60
SEGUNDO PISO 1,017.91
EJE 2 1.00 23.65 3.00 70.95
-1.00 20.10 1.00 -20.10
1.00 22.20 3.00 66.60
-1.00 20.10 1.00 -20.10
1.00 24.30 3.00 72.90
-1.00 20.10 1.00 -20.10
1.00 23.88 3.00 71.64
-1.00 20.10 1.00 -20.10
16.00 0.15 1.00 2.40
1.00 20.10 0.15 3.02
EJE 7 1.00 23.65 3.00 70.95
-1.00 20.10 1.00 -20.10
1.00 22.20 3.00 66.60
-1.00 20.10 1.00 -20.10
1.00 24.30 3.00 72.90
-1.00 20.10 1.00 -20.10
1.00 23.88 3.00 71.64
-1.00 20.10 1.00 -20.10
16.00 0.15 1.00 2.40
1.00 20.10 0.15 3.02
EJE B 1.00 26.20 3.00 78.60
1.00 25.00 3.00 75.00
EJE K 1.00 47.50 3.00 142.50
1.00 2.65 1.80 4.77
EJE 3 1.00 12.60 3.00 37.80
EJE 4 1.00 9.10 3.00 27.30
EJE 4' 1.00 15.50 3.00 46.50
EJE 5 1.00 12.50 3.00 37.50
EJE 6' 1.00 13.30 3.00 39.90
EJE J 1.00 34.55 3.00 103.65
EJE 7 1.00 2.08 1.80 3.74
1.00 1.50 0.80 1.20
4.00 0.60 0.80 1.92
3.00 4.10 0.20 2.46
1.00 4.30 0.20 0.86
5.11.02 PINTURA LATEX EN EXTERIORES 2 MANOS BASE IMPRIMANTE M2 1,057.38
PRIMER PISO 585.40
EJE 2 1.00 24.30 4.75 115.43
1.00 24.30 3.75 91.13
-1.00 40.20 1.00 -40.20
EJE B 1.00 25.00 3.75 93.75
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
EJE 7 1.00 24.30 4.75 115.43
1.00 24.30 3.75 91.13
EJE K 1.00 25.00 4.75 118.75
SEGUNDO PISO 471.98
EJE 2 1.00 48.65 3.75 182.44
-1.00 40.20 1.00 -40.20
EJE B 1.00 25.00 3.75 93.75
EJE 7 1.00 48.65 3.75 182.44
-1.00 40.20 1.00 -40.20
EJE K 1.00 25.00 3.75 93.75
5.14 ZOCALOS Y CONTRAZOCALOS
5.14.01 ZOCALO DE LOSETA CERAMICA 30 X 30 CM M2 52.94
EJE K 1.00 4.08 1.20 4.90
1.00 0.85 1.80 1.53
EJE 4 1.00 1.43 1.20 1.72
EJE 4' 1.00 2.88 1.20 3.46
EJE J 1.00 1.73 1.20 2.08
EJE 6' 1.00 7.05 1.20 8.46
EJE 7 1.00 2.15 1.20 2.58
1.00 4.55 1.80 8.19
EJE J entre 6'-7 1.00 3.50 1.20 4.20
1.00 8.80 1.80 15.84
5.14.02 CONTRAZOCALO DE CEMENTO C:A 1:5, E=0.02, H=30 CM M 158.00
PRIMER PISO 158.00
EJE 9 1.00 49.65 49.65
EJE B 1.00 25.00 25.00
EJE 16 1.00 49.65 49.65
EJE K 1.00 22.00 22.00
EJE 4' 1.00 5.35 5.35
EJE 5 1.00 6.35 6.35
5.14.03 CONTRAZOCALO DE CEMENTO C:A 1:5, E=0.02, H=15 CM 531.69
PRIMER PISO 310.52
EJE 2 1.00 54.15 54.15
EJE B 1.00 26.20 26.20
EJE 7 1.00 47.35 47.35
EJE K 1.00 16.65 16.65
EJE J 1.00 34.38 34.38
EJE 3 1.00 10.27 10.27
EJE 4 1.00 7.37 7.37
EJE 4' 1.00 3.65 3.65
7.00 1.60 11.20
EJE 4 entre J-K 1.00 5.30 5.30
EJE 5 1.00 5.85 5.85
EJE 6 1.00 5.85 5.85
7.00 1.60 11.20
EJE F 1.00 71.10 71.10
SEGUNDO PISO 221.17
EJE 2 1.00 54.15 54.15
EJE B 1.00 26.20 26.20
EJE 7 1.00 47.35 47.35
EJE K 1.00 16.65 16.65
EJE J 1.00 34.38 34.38
EJE 3 1.00 12.23 12.23
EJE 4 1.00 6.80 6.80
EJE 4' 1.00 5.58 5.58
EJE 5 1.00 12.25 12.25
EJE 6' 1.00 5.58 5.58
5.15 ESCALERA DE CONCRETO
5.15.01 TRAZO Y REPLANTEO M2 1.00 AREA= 15.74 15.74
5.15.02 ESCALERA, CONCRETO F'C= 210 KG/CM2 M3 6.59
1.00 AREA= 1.40 1.85 2.59
1.00 AREA= 0.99 1.80 1.78
1.00 AREA= 1.23 1.80 2.21
5.15.03 ESCALERA, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 342.22
ACERO LONGITUDINAL LONG. DE VARILLA N DE VARILLAS PESO (KG) = 1/2" 221.30
1.00 9.50 8.00 0.994 75.54
1.00 8.36 8.00 0.994 66.48
1.00 9.97 8.00 0.994 79.28
ACERO TRANSVERSAL LONG. DE VARILLA N DE VARILLAS PESO (KG) = 1/2" 120.92
1.00 1.85 21.00 0.994 38.62
1.00 1.80 19.00 0.994 33.99
1.00 1.80 27.00 0.994 48.31
5.15.04 ESCALERA, ENCOFRADO Y DESENCOFRADO M2 7.24
2.00 AREA= 1.40 2.80
2.00 AREA= 0.99 1.98
2.00 AREA= 1.23 2.46
5.15.05 TARRAJEO FONDO DE ESCALERA MORTERO 1:5 M2 25.48
1.00 4.53 1.85 8.38
1.00 4.79 1.80 8.62
1.00 4.71 1.80 8.48
5.15.06 TARRAJEO EN GRADAS DE ESCALERA M2 25.62
10.00 0.30 1.85 0.17 8.70
10.00 0.30 1.80 0.17 8.46
10.00 0.30 1.80 0.17 8.46
5.15.07 CANTONERA DE ALUMINIO DE 1 1/2" E=1/8" C/ANCLAJE M 30.00 1.80 54.00 54.00
6.00 ADECUACION DE MUROS DE CONTENCION
6.01 MUROS DE CONCRETO
6.01.01 SOLADO 1:12 C:H E=4" M2 184.36
2.00 24.00 1.20 57.60
1.00 47.80 1.65 78.87
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
1.00 12.65 3.05 38.58
1.00 3.65 2.55 9.31
6.01.02 CIMIENTO CORRIDO 1:10+30%PG M3 29.40
CIMIENTO CORRIDO 2.00 32.67 0.50 0.90 29.40
MURO INTERMEDIO 1.00 9.88 0.50 0.90 4.45
6.01.02 ZAPATA CONCRETO F'C= 210 KG/CM2 (CEMENTO PORTLAND TIPO V) M3 111.95

ZAPATA 1.00 24.00 1.20 0.40 11.52


ZAPATA 1.00 21.40 1.20 0.40 10.27
ZAPATA 1.00 13.63 1.20 0.40 6.54
ZAPATA 1.00 47.80 1.65 0.60 47.32

DESCANSO DE RAMPA 1.00 2.92 5.00 0.90 13.14


MURO DE CONTENCION 1.00 12.65 3.05 0.60 23.15
6.01.03 ZAPATA ACERO DE REFUERZO FY= 4200 KG/CM2 KG 1,479.69
LONG DE LA
N DE VARILLAS PESO (KG) = 3/8"
VARILLA
2.00 32.67 3.00 0.56 109.77
LONG DE LA
N DE VARILLAS PESO (KG) = 1/2"
VARILLA
2.00 1.26 120.00 0.99 300.59
1.00 24.00 8.00 0.99 190.08
1.00 21.40 8.00 0.99 169.49
2.00 12.65 12.00 0.99 300.56
LONG DE LA
VARILLA
N DE VARILLAS PESO (KG) = 5/8" 0.00
2.00 2.00 66.00 1.55 409.20
6.01.04 ZAPATA ENCOFRADO Y DESENCOFRADO M2 350.92
2.00 32.67 1.80 117.61
2.00 24.00 0.80 38.40
2.00 21.40 0.90 38.52
2.00 13.63 0.90 24.53
2.00 47.80 0.90 86.04
2.00 9.88 0.90 17.78
2.00 2.92 0.90 5.26
2.00 12.65 0.90 22.77
MURO DE CONTENCION, CONCRETO F'C= 210 KG/CM2 (CEMENTO PORTLAND
6.01.05 M3 108.09
TIPO V)
TRAMO 1 2.00 8.70 0.15 0.70 1.83
TRAMO 2 2.00 3.00 0.15 0.95 0.86
TRAMO 3 2.00 3.00 0.15 1.20 1.08
TRAMO 4 2.00 3.00 0.15 1.45 1.31
TRAMO 5 2.00 3.00 0.15 1.70 1.53
TRAMO 6 2.00 3.00 0.15 1.95 1.76
TRAMO 7 2.00 3.00 0.15 2.20 1.98
TRAMO 8 2.00 3.00 0.15 2.45 2.21
TRAMO 9 2.00 3.00 0.15 2.70 2.43
TRAMO 10 2.00 3.00 0.20 2.95 3.54
-2.00 3.00 0.05 0.40 -0.12
TRAMO 11 2.00 3.00 0.20 3.20 3.84
-2.00 3.00 0.05 0.40 -0.12
TRAMO 12 2.00 3.00 0.20 3.35 4.02
-2.00 3.00 0.05 0.40 -0.12
TRAMO 13 2.00 3.00 0.20 3.70 4.44
-2.00 3.00 0.05 0.40 -0.12
TRAMO 14 2.00 3.00 0.20 3.94 4.73
-2.00 3.00 0.05 0.40 -0.12
TRAMO 15 2.00 3.00 0.20 4.20 5.04
-2.00 3.00 0.05 0.40 -0.12
TRAMO 16 1.00 3.00 0.20 4.45 2.67
1.00 3.85 0.20 4.45 3.43
-2.00 3.00 0.05 0.40 -0.12
TRAMO 17 1.00 3.65 0.20 4.70 3.43
-2.00 3.00 0.05 0.40 -0.12
MURO DE CONTENCION 1.00 12.65 AREA= 1.40 17.71
1.00 1.20 AREA= 1.40 1.68
1.00 9.88 0.15 1.90 2.82
1.00 2.92 0.15 1.70 0.74
1.00 47.15 AREA= 0.74 34.89
1.00 1.50 AREA= 0.74 1.11
6.01.06 ACERO DE REFUERZO FY= 4200 KG/CM2 KG 8,578.41
LONG DE LA
ACERO LONGITUDINAL VARILLA
N DE VARILLAS PESO (KG) = 3/8" 6,682.26
TRAMO 1 2.00 1.75 36.00 0.56 70.56
TRAMO 2 2.00 2.00 14.00 0.56 31.36
TRAMO 3 2.00 2.25 14.00 0.56 35.28
TRAMO 4 2.00 2.50 14.00 0.56 39.20
TRAMO 5 2.00 2.75 14.00 0.56 43.12
TRAMO 6 2.00 3.00 14.00 0.56 47.04
TRAMO 7 2.00 3.25 14.00 0.56 50.96
TRAMO 8 2.00 3.50 14.00 0.56 54.88
TRAMO 9 2.00 3.75 14.00 0.56 58.80
TRAMO 10 2.00 4.00 14.00 0.56 62.72
MURO INTERMEDIO 1.00 2.95 41.00 0.56 67.73
LONG DE LA
N DE VARILLAS PESO (KG) = 1/2"
VARILLA
TRAMO 11 2.00 5.16 14.00 1.02 147.31
TRAMO 12 2.00 1.13 14.00 1.02 32.16
TRAMO 13 2.00 5.37 14.00 1.02 153.48
TRAMO 14 2.00 1.13 14.00 1.02 32.16
TRAMO 15 2.00 5.88 14.00 1.02 167.88
TRAMO 16 2.00 1.13 14.00 1.02 32.16
2.00 6.22 18.00 1.02 228.53
TRAMO 17 2.00 1.13 16.00 1.02 36.75
PLANILLA DE METRADOS

SERVICIO DE MANTENIMIENTO Y ACONDICIONAMIENTO DE LOS TALLERES PRODUCTIVOS EN EL EP CUSCO


Lugar: EP. CUSCO VARONES
Fecha: ABRIL-2017
Metrado
cantid (b)
ITEM DESCRIPCION UND (a) Long (c) Altura Parcial Total
ad Ancho
MURO DE CONTENCION 2.00 6.35 44.00 1.02 569.98
1.00 19.06 159.00 1.02 3,091.15
LONG DE LA
N DE VARILLAS PESO (KG) = 5/8"
VARILLA
1.00 3.25 44.00 1.55 221.65
1.00 2.95 41.00 1.55 187.47
1.00 4.95 159.00 1.55 1,219.93
LONG DE LA
ACERO HORIZONTAL VARILLA
N DE VARILLAS PESO (KG) = 3/8" 1,896.15
TRAMO 1 2.00 8.70 6.00 0.56 58.46
TRAMO 2 2.00 3.00 7.00 0.56 23.52
TRAMO 3 2.00 3.00 8.00 0.56 26.88
TRAMO 4 2.00 3.00 9.00 0.56 30.24
TRAMO 5 2.00 3.00 10.00 0.56 33.60
TRAMO 6 2.00 3.00 11.00 0.56 36.96
TRAMO 7 2.00 3.00 12.00 0.56 40.32
TRAMO 8 2.00 3.00 13.00 0.56 43.68
TRAMO 9 2.00 3.00 14.00 0.56 47.04
TRAMO 10 2.00 3.00 15.00 0.56 50.40
TRAMO 11 2.00 3.00 28.00 0.56 94.08
TRAMO 12 2.00 3.00 30.00 0.56 100.80
TRAMO 13 2.00 3.00 32.00 0.56 107.52
TRAMO 14 2.00 3.00 34.00 0.56 114.24
TRAMO 15 2.00 3.00 36.00 0.56 120.96
TRAMO 16 1.00 3.00 38.00 0.56 63.84
TRAMO 17 1.00 3.65 38.00 0.56 77.67
MURO DE CONTENCION 1.00 12.65 26.00 0.56 184.18
MURO INTERMEDIO 1.00 9.88 11.00 0.56 60.86
1.00 47.15 22.00 0.56 580.89
6.01.07 MURO DE CONTENCION, ENCOFRADO Y DESENCOFRADO M2 539.01
TRAMO 1 4.00 8.70 0.70 24.36
TRAMO 2 4.00 3.00 0.95 11.40
TRAMO 3 4.00 3.00 1.20 14.40
TRAMO 4 4.00 3.00 1.45 17.40
TRAMO 5 4.00 3.00 1.70 20.40
TRAMO 6 4.00 3.00 1.95 23.40
TRAMO 7 4.00 3.00 2.20 26.40
TRAMO 8 4.00 3.00 2.45 29.40
TRAMO 9 4.00 3.00 2.70 32.40
TRAMO 10 4.00 3.00 2.95 35.40
TRAMO 11 4.00 3.00 0.40 4.80
TRAMO 12 4.00 3.00 3.20 38.40
TRAMO 13 4.00 3.00 0.40 4.80
TRAMO 14 4.00 3.00 3.35 40.20
TRAMO 15 4.00 3.00 0.40 4.80
TRAMO 16 2.00 3.00 3.70 22.20
2.00 3.00 4.70 28.20
TRAMO 17 2.00 3.00 0.40 2.40
MURO DE CONTENCION 2.00 12.65 1.40 35.42
2.00 1.20 1.40 3.36
2.00 9.88 1.90 37.54
2.00 2.92 1.70 9.93
2.00 47.15 0.74 69.78
2.00 1.50 0.74 2.22
7.00 AREAS VERDES
7.01 SEMBRIO DE GRASS KIKUYO O GRAMA GRUESA POR MECHONES M2 1.00 AREA= 518.00 518.00 518.00
8.00 RAMPAS DE ACCESO
8.01 ACTIVIDADES PRELIMINARES
8.01.01 TRAZO Y REPLANTEO M2 1.00 AREA= 689.50 689.50 689.50
8.02 ADECUACION DE RAMPA
8.02.01 RAMPA CONCRETO F'C= 175 KG/CM2 M3 32.22
1.00 AREA= 140.00 0.15 21.00
1.00 AREA= 62.50 0.15 9.38
1.00 AREA= 12.28 0.15 1.84
8.02.02 RAMPA, ACERO DE REFUERZO FY= 4200 KG/CM2 KG 1,782.77
LONG DE LA
ACERO LONGITUDINAL N DE VARILLAS PESO (KG) = 3/8"
VARILLA
1.00 3.00 188.00 0.56 315.84
1.00 3.00 50.00 0.56 84.00
1.00 3.00 42.00 0.56 70.56
LONG DE LA
ACERO HORIZONTAL N DE VARILLAS PESO (KG) = 3/8"
VARILLA
1.00 56.00 9.00 0.56 282.24
1.00 12.50 9.00 0.56 63.00
1.00 15.00 9.00 0.56 75.60
PATIOS
AFIRMADO MANUAL E=10.00 CM M2 1.00 AREA= 440.87 440.87 440.87
LOSA DE CONCRETO F'C=175 KG/CM2 E=15 CM ACAB. 1:2 C:A, BRUADO M2 1.00 AREA= 440.87 440.87 440.87
GRADAS
GRADAS, CONCRETO F'C=140 KG/CM2 + 30% PG M3 1.00 11.00 AREA= 0.89 9.79 9.79
9.00 REJAS METALICAS Y CONCEERTINAS
9.01 REJAS METALICAS
9.01.01 REJAS METALICAS EN TRAMO HORIZONTAL
9.01.01.01 CERCO DE MALLA PLASTIF. N8 COCADA 2" X 2" M 1.00 353.55 353.55 353.55
9.02 CONCERTINA
SUM. E INSTALACION CONCERTINA DE ACERO INOX. DE LANCETA LARGA
9.02.01 M 1.00 536.00 536.00 536.00
D=24" Y E=33 CM SOBRE PUERTA PM-4