com
revolutionary
revolutionary energy
energy solutions
solutions energy
energy
revolutionary energy solutions energy
50 VAA ttoo110KVA
7 0V 0 KV
Batteries Charged through Solar 75 VA to10 A OFF GRID
A
A Batteries
Source forCharged through
Free Power Solar
Backup 75
0 KVA OFF GRID
OFF GRID SOLAR
A
A Source
Saves for Free
Energy
Batteries Power
Charged Backup
Coststhrough Solar O FF GRID SOLAR
OFF
A
A Source for FreeCosts
Saves Energy Power Backup OFF GRID SOLAR
A Saves Energy Costs
to 70 KW
1 KKW to 70
1 W to 70 KW ON GRID
1 KW KW ON GRID
HYBRID
ON GRID
HYBRID
HYBRID
A Low Generation Cost from Solar
A
A Low Generation
Designed CostGrid
for Indian fromConditions
Solar
A
A Designed
Can
Lowbe for Indian
paralleled
Generation forGrid
Cost fromConditions
MW Scale
Solar
A
A Can be
Remote paralleled
DesignedMonitoringfor MW Scale
for Indian Grid Conditions
A
A Remote Monitoring
Can be paralleled for MW Scale
A Remote Monitoring
W to 250 KW HYBRID
5KKW to 250 KW HYBRIDESSS
5
W to 250 KW BANK
SMART
HYBRID
5K BANK
SMART ESSS
A Smart Energy Storage & Saving Solutions
BANK
SMART ESSS
NEW A
A Smart Energy Storage
Revolutionary Solution&Works
Saving Solutions
with or without Solar
NEW LAUNC A Revolutionary
Smart Energy Solution
Storage &Works with
Saving or without Solar
Solutions
No Dependency for Peak Load on Grid
NEW LAUNCHH
A
A
A No Dependency
Revolutionary
Draw Less Power for PeakWorks
Solution
during LoadHours.
Peak on Grid
with or without Solar
LAUN Draw Less Powerfor
No Dependency during
PeakPeak
LoadHours.
on Grid
CH A
A Draw Less Power during Peak Hours.
SMART ESSS
SOLAR OFF GRID STRING CENTRAL LEAD ACID LITHIUM-ION FORESSS
SMART
PANEL
SOLAR INVERTER
OFF GRID INVERTER
STRING INVERTER
CENTRAL BATTERY
LEAD ACID BATTERY
LITHIUM-ION COMMERCIAL
FOR &
PANEL INVERTER INVERTER INVERTER BATTERY BATTERY INDUSTRIAL
SMART ESSS&
COMMERCIAL
SOLAR OFF GRID STRING CENTRAL LEAD ACID LITHIUM-ION FOR
INDUSTRIAL
PANEL INVERTER INVERTER INVERTER BATTERY BATTERY COMMERCIAL &
INDUSTRIAL
21/14A, Naraina Industrial Area, Phase-II, New Delhi-110028 www.facebook.com/Micromaxenergylimited
C ONTEN T
60
I N T E R N AT I O N A L
OWNER :
FirstSource Energy
INTERVIEW
India Private Limited
In Conversation
PLACE OF PUBLICATION : With Mr.Marc
95-C, Sampat Farms, 7th Cross Jarrault, -
Road, Bicholi Mardana Distt-Indore Managing Director,
452016, Madhya Pradesh, INDIA Lapp India Pvt.
Tel. + 91 96441 22268 Ltd.
www.EQMagPro.com
PUBLISHER :
ANAND GUPTA
PRINTER :
ANAND GUPTA
48 69
GOURAV GARG
gourav.garg@EQmag.net
ART DIRECTOR :
ANKIT PANDEY (Sahil) STRING INTERVIEW
INVERTERS With Sunil
SUBSCRIPTIONS : Dayal,
SANJAY VISHWAKARMA Improving
Business
sanjayeq89@gmail.com Commercial Head of
System CAPEX Benara
GAZALA KHAN with Longer
gazala.khan001@gmail.com Solar
Strings
Disclaimer,Limitations of Liability
While every efforts has been made to ensure the high quality and accuracy of
EQ international and all our authors research articles with the greatest of care
66 56
and attention ,we make no warranty concerning its content,and the magazine
is provided on an>> as is <<basis.EQ international contains advertising and
third party contents.EQ International is not liable for any third- party content
or error,omission or inaccuracy in any advertising material ,nor is it responsible
for the availability of external web sites or their contents
The data and information presented in this magazine is provided for informational
purpose only.neither EQ INTERNATINAL ,Its affiliates,Information providers nor
content providers shall have any liability for investment decisions based up on
or the results obtained from the information provided. Nothing contained in
this magazine should be construed as a recommendation to buy or sale any
securities. The facts and opinions stated in this magazine do not constitute an
offer on the part of EQ International for the sale or purchase of any securities,
nor any such offer intended or implied
Restriction on use
The material in this magazine is protected by international copyright and
trademark laws. You may not modify,copy,reproduce,republish,post,transmit,
or distribute any part of the magazine in any way.you may only use material for SOLAR PROJECTS
your personall,Non-Commercial use, provided you keep intact all copyright and
other proprietary notices.If you want to use material for any non-personel,non SOLAR INVERTERS Value Of Intelligent Remote
commercial purpose,you need written permission from EQ International. Monitoring With Advanced
Advanced
Data Analytics In Solar Asset
Technology
Management- What Is The
To Ensure A
Market Risk Involved On Capital
Better Harmonic
Investment Of RoofTop Solar
Suppression
Projects?
8 EQ October 2017 www.EQMagPro.com
70
68
JinkoSolar CEO
Mr. kangping
Chen Cuts to
the Chase about
Solar Technology
Development with
Discussion on BALANCE OF SYSTEM
Half-cut Cells
Accurate Measurement And Periodical
Calibration Of Pyranometer Is The Key For
The Bankability Of Solar Pv Projects
49
72 RESEARCH
Strong Chinese
Market to Push
INDIA Annual Global
Sachin Photovoltaic
Tendulkar Demand Above
and Schneider 100 Gigawatts
Electric for 2017
transform 350
households in
UP village with
74
Solar power
54
RESEARCH
Total
Corporate
73 QUARTER RESULTS
Funding in SOLAR
Global Solar PROJECTS JASolar Announces Second
Sector Comes Quarter 2017 Financial Results
Waaree
to $7.1 Billion
Energies
in First Nine
Successfully
50
Months of
completed 2.29
2017, Reports
MW Rooftop
Mercom
project for
Capital Group
Mumbai Metro
MIDDLE
EAST ASIA
POLICY & REGULATION Saudi
EQ NEWS
Pg. 08-47
PRODUCT
63
SOLAR INVERTERS
PV Top Runner Huawei Pg. 78-79
Brings New Standard For
Utility-Scale Solar In India
www.EQMagPro.com EQ October Part D 2017 9
REI 2017
W
aaree will join forces with Enphase to produce
an AC solar module (ACM) for the Indian market. The attachment of Waaree solar PV modules with
Waaree will offer its high quality and high reli- the Enphase microinverter system is a significant
ability monocrystalline solar PV modules with win for installers and customers. Not only will
Enphase Microinverters attached to the back of they enjoy the quality and performance of industry
Waarees modules. This is the first ACM partner- leading products, our AC solar modules will also be
ship that Enphase Energy has established in India.The Waaree easier and faster to install. We are delighted to be
working with Enphase Energy with its strong heritage
Enphase ACmodules will be assembled and shipped directly from
in energy technology and continued development
Waarees PV module factory,located in Suratin a 500MW state of the
of quality microinverters that suit Indias unique
art facility that is one of Indias largest PV module factories. climate and weather conditions.
Enphase Energy is the first global micro Enphase Microinverters, promoted through the
inverter technology company to partner Companys Made for India campaign, are designed
with Waaree to integrate our technology and proven to operate for decades in harsh climates
onto their solar modules, said Nathan such as Indias. Enphase offersthe most advanced
Dunn, managing director of Enphase Asia- inverter technology on the market with higher
Pacific. This is a truly exciting opportunity production, greater reliability and intelligence.
as it will allow us to extend our presence in Installers can get better performance and smarter
insights with Enphase Microinverters as they are
India with a market leader insolar modules.
simple to install, designed for flexibility and lead the
Enphase and Waaree share the same
industry with their reliability. With Enphase Micro-
philosophy of delivering solar solutions
inverters, installers can reduce their installation and
built on innovative technology and quality.
maintenance costs and bring greater value to their
Together, we will work toward delivering customers. The Waaree Enphase ACMs are now
more affordable solar power to commercial available to customers in India from any of Waarees
and residential customers in India. distribution channel partners across India.
R
EI started in 2007, provid- a 12-year product warranty and a 30-year
ing business opportunities linear performance warranty. Suitable for
for professionals in the solar agriculture and fishing projects.
energy and other related fields. STP305S-20/Wfw 5BB HyPro Mono
More than 30,000 solar energy Solar Module
industry professionals from 40
With advanced PERC technology, the cell
countries attended the exhibition, with over
achieves higher efficiency. This module has
1000 leading manufacturers, service provid-
excellent efficiency rated at 18.6%.
ers and suppliers participating. We started to cooperate with
The advanced cell technology and qualified
At the show, Suntech displayed materials lead to high resistance to PID.
Indian clients and supply PV
four signature solar modules:- modules in early 2009. India is a
STP370S-24/Vfh HyPro Mono large energy consuming country
STP330-24/Vfw 5BB Poly Solar Module Half Cell Solar Module with tremendous prospects for
This module has excellent efficiency rated Compared to normal products, the power the development of new energy
at 17.0% and the maximum 1500 V DC can output can increase 10W. This module can sources, Suntech will speed up
save total system costs. The module is certi- reduce the hot spots and minimize panel
fied to withstand 3800 Pa wind and 5400 Pa
the market layout of India and
degradation. With excellent weak light per- integrate local resources, which
snow loads. formance, it can maximize power output. will increase market reputa-
STP330-24/Vej Double Glass On Sept 21st, Suntech held a customer tion and brand influence in the
Poly Solar Module event in New Delhi, which attracted 200
domestic market.
With a glass-glass structure this module can customers. REI 2017 runs from September
extend life span. The lack of grounding re- 20 to 22. Interested parties may visit - Mr. HE Shuangquan,
Suntech at booth 10.96. President, Suntech
quirement reduces BOS costs. It also offers
V
ikram Solar was recognized as the
winner in the Solar Manufacturing This is the second time we have
category.Mr. Ivan Saha,CTO and been conferred with this award
BU Head- Solar Manufacturing, at this prestigious platform.
Vikram Solar received the award at This goes to not only show the
the ceremony that was attended by high levels of commitment we
Industry leaders & visionaries from have towards the industry, our
partners and ourselves but also
across the country.
shows there is always some
Mr. Gyanesh Chaudhary, CEO and Managing room for improvement and
Director, Vikram Solar commented, Our constant betterment. As the Indian solar
hardwork and efforts are behind our achievement industry expands rapidly and
today and we are proud to receive this recognition technology evolves, it will be
from REI, which is one of the leading platforms on MR. IVAN SAHA, important to increase focus on
energy. At Vikram Solar, we uphold the spirit of CTO and BU Head- module quality like never before
innovation in every initiative we undertake and Solar Manufacturing, and quality in anything that we
are committed towards delivering the best to our Vikram Solar do has always been of utmost
consumers in everything we do. importance.
Vikram Solars products offer highest standards of quality, reliability and performance; and the manufacturing facility has the
finest machinery and equipment imported from leading global equipment manufacturers. Prior to this the company has been
conferred with multiple prestigious awards at the ET Bengal Corporate Awards, EPC World Awards, National Excellence Awards,
Global Solar EPC Summit to just name a few.
T
he SG125HV, the worlds most powerful 1500Vdc string in-
verter rated at 125kW, is proved to work stably in full power
operation without derating at 50 degrees Celsius, maxi-
mizing the return on investment for project owners. This At a time when the 1500V technolo-
1500Vdc string inverter enables up to 5 MW power block gies will soon become the mainstream,
design.
Sungrow has provided mature solutions
Also on show is a sample model of SG2500HV, a 1500V turnkey
station, which features high efficiency, energy conservation, and the for customers in need. So far, we have
ability to adapt with severe environments like high temperature, high shipped over 121MW of 1500V turnkey sta-
humidity and high altitude, while its maximum power can still reach tions to India. We believe these products
98.8% in most of conditions. will significantly lift the power yields
Besides, Sungrow exhibits commercial string inverter SG80KTL de- and profits for our customers in India.
signed for large-scale commercial applications. It is best characterized
Professor Renxian Cao, president of Sungrow
by the maximum efficiency of 98.9% and full power operation without
derating at 50 degree Celsius. Source: SUNGROW Power Supply Co., Ltd
T
he latest solar innovation in its portfolio,
Benchmarks In the industry
DuPontTM Solamet PV20A, featured at
DuPonts highly engaging booth, 10.42
(hall 10). DuPont leaders will share their
expertise on technology advancements, Winning the prestigious REI Award for RE International
global field studies and industry trends Excellence in Materials and R&D reinforces the belief that
through participation in the 7th Quality proven, quality and reliable materials are recognized and
Roundtable and technical presentation appreciated by the solar value chain participants and we
during the REI conference. feel responsible to consistently contribute towards Indias
Recent news reports reveal poor quality solar growth, Mr. Pai added.
solar panels are flooding the Indian market
and causing significant impact on power Customer collaborations with Jupiter Solar and
generation of some solar plants. Gintech Energy are highlighted at the DuPont booth
and demonstrate how DuPontTM Solamet photovoltaic
metallization pastes have enabled improvement in
Empirical data efficiency, generation of higher power and increased
obtained from our long term return on investment.
extensive field Jupiter Solar Power Limited, winner of 2017 REI Award
studies in India and for Best Solar Cell Manufacturer, has achieved 19.2%
globally have shown multi-crystalline solar cell efficiency by using DuPontTM
high correlation of Solamet PV20X front side silver paste. Gintech Energy,
poor module performance has achieved 21.6% mono-crystalline solar cell efficiency
with the use of unproven, sub-standard by using DuPontTM Solamet PV20A front side silver
PV materials. These in turn can have paste.
significant long-term negative impact on
DuPont featured Tedlar PVF films, the
financial returns especially in the current
industry leader in backsheet material with 30+ years
context of aggressive tariffs and thin
of field proven protection. Collaborations with leading
margins, said Rajaram Pai, Marketing
module makers, including JinkoSolar and LONGi Solar,
Manager, DuPont Photovoltaics Solutions
that demonstrate the reliability enabled by DuPont
and Advanced Materials, South Asia & materials, are also displayed at the booth.
ASEAN.
DuPont technical experts are available at the booth to
recommend methods for testing backsheet weather
DuPont has been working closely with participants in the ability and share the DuPontTM MAST (Module
Indian solar market towards sensitizing and educating Accelerated Sequential Test) protocols. These protocols
them on the importance of specifying and using quality simulate actual conditions faced by the modules in the
materials in PV projects for long term performance and field. DuPont is also exhibiting panels from its extensive
safety of systems and return on investments. field testing program that reinforce why materials
matterTM for long-term durability.
T
following integration with a Fortune 500
he company launched initial investment and maintenance companys PV business, the company became
the EP-2500-HA-OD costs. To respond to the fast-growing a leader in terms of R&D, management and
central inverter. With household and commercial solar marketing in the global PV market. Cur-
1500V DC voltage, markets in India, Sineng Electric rently, Sineng Electric has completed the
maximum efficiency displayed its full range of high-effi- establishment of its local sales and service
of up to 99.02% and ciency string inverters, which were system for the Indian market. Once the
2.5MW unit integrated design, the highly acclaimed for their intelligent new modern facility goes into production
EP-2500-HA-OD helps reduce the features, safety, convenience and in Bangalore, the companys annual solar
initial investment cost and increases elegant design. inverter production capacity is expected
the income from power generation Sineng Electric also displayed its to reach 5GW. Sineng Electric is capable of
significantly. The central distributed leading low-cost and high-efficiency meeting the diversified needs of its custom-
inverter displayed at the show has energy storage system, which is ers with the industrys most complete solar
several advantages highly recog- considered the preferred energy inverter solutions.
nized by the Indian market, including storage solution for solar PV stations
Multiple MPPT, high yields and low in operation or under construction.
W
ith the establishment of dedicated local
Heraeus Photovoltaics sales team in India, Heraeus will intensify
its customer relationship and provide
opens Delhi office to serve secure supply chain to its customers, the
company said in a release here. Heraeus
A
in North Delhi. Our them the opportunity to better
n AMI rollout of this size work with Landis+Gyr on Indias first, manage and control their energy use. It gives us
and significance, com- large scale, smart meter and RF canopy at Landis+Gyr an enormous sense of pride and
prising smart meters deployment, which covers the full 510 accomplishment to be on this journey with one of
and related infrastruc- square kilometres of Tata Power-DDLs Indias most innovative utilities. From energy grid
ture, will certainly pro- area of operation, marks a significant technology, to renewable energy initiatives, and
vide the vital backbone step in our efforts to bring smart grid on to an online billing and payment system for
for Tata Power-DDLs customers to technology to India. This deployment energy consumers, Tata Power-DDL has been at
reap the benefits of the smart energy will not only empower our consumers the forefront in implementing the latest in energy
revolution. In the spirit of true part- by utilizing a two-way communication innovation in India. We look forward to supplying
nership, Landis+Gyr supported Tata system, but it will also help us to build an this important first tranche of smart meters for
Power-DDL through an initial pilot important foundation for a truly smart them, providing as it will the smart energy data
phase to gain the regulatory approval grid, featuring world class power distri- necessary to further deepen the relationship Tata
bution infrastructure. Power-DDL has with its customers.
necessary for full roll out.
EagleSun SCADA
Watching your plant.
Dashboard
S
Renegotiation of power purchase agree- inha added that the states
ments (PPAs) by states will deliver a severe are failing to realise the
blow to investments in renewable energy, overall impact of their cur-
one of the few sectors which has attracted rent bid to renegotiate PPAs
investors, but courts would certainly rule in the face of falling tariffs.
in favour of affected companies if they And people unfortunately
challenge the move, ReNew Power CEO at the state levelits not their re-
Sumant Sinha has said. sponsibility to think about these things
because they are concerned about
optimising their own state-level activi-
ties. So they are not thinking that much
Its going to about what all of this does to the over-
all national investment environment, that the courts would rule in favour
cause lasting he said. The fact that the states refuse of producers, Sinha said. Im totally
damage, to the to honour PPAs, calls for some amount confident that if I go to the courts even-
of caution in the renewable energy tually, the courts will rule in our favour.
overall renewable sector in the country, Sinha said. So Im not worried about it. The only
energy investment Renewables is one of the very few thing is, its causing all this needless
sectors in India where investments noise in the system.
environment, were coming in and now all of this With the governments plan to gen-
and not just to uncertainty that is being created, it is erate 175 GW of its electricity through
going to lead to a lot of negativity and renewable energy, ReNew plans to
renewable energy even when the government wants to consistently target 8% to10% of the
but also to overall revive its investments in renewables, new capacity added every year in the
people are going to be a lot more country. This year, the company will
investments in cautious now, about investing in the manage about 8% capacity of solar
India, sector, he said.
While the PPAs under threat are
while wind still remains a question as
there has been hardly any capacity
-Sinha told ET. close to about 1,100-1,200 MW capac- addition this year, after a record 5,400
ity, states will not have a legal back- MW of wind capacity was added in
ing if they want to rework PPAs, and 2016-17. Source: economictimes.indiatimes
T
An estimated investment of Rs the process of putting 3 GW wind ca-
he company has planned 10,000 crore would be required to pacities on the block for auction. The
to add 1 GW capacity double the capacity to 5 GW. In April, SECI is waiting for Central Electricity
this fiscal, ReNew Power ReNew Power Ventures had an- Regulatory Commissions clarification
Venture Chairman and nounced doubling its power genera- on the inter-state connectivity trading.
CEO Sumant Sinha told . tion capacity in a years time, which In the absence of evacuation facil-
It has installed generation crossed 2 GW. The company in- ity of power from these projects, the
capacity of 2.4 GW, at vested Rs 6,700 crore (USD 1 billion) developers are hesitant to go ahead.
present. to add 430 MW of solar and 626 MW Source: PTI
T
by Mr. Allen Cao, Managing Director of
he tracking systems of this 172MW
project were provided by Arctech Solar. the Arctech Solar India.
Thisproject is the largest solar tracker Arctech Solar will keep expanding its local professional team,
projectin India till now. The construction
warehouse storage capacity in India, to further match the Indian
was installed integrating linked-row hori-
market demand and provide better after-sales service for its
zontal single-axis trackers with unique
redundancy design.
clients. The largest-scale annual exhibition REI Expo was held
According to complex terrain condition in the site, in India from Sep 20th to Sep 22th. Arctech Solar brought its
Arctech Solar reinforced the tracking system by add- flagship product Arctracker Pro, with the worlds first invented
ing additional 25% dampers to ensure stability and redundancy design, going to the exhibition.
reliability of general operation.
the way to EX
T GENERAT
I
O
O
N
N
N
N
BUS BAR BUS BAR
Energy
MODULE! MODULE!
T GENERAT
EX I
O
N
BUS BAR
MODULE!
SAPPHIRE SERIES RUBI SERIES
A+
D
C
P R
&
D
Pre & Post EL Consistent Quality Cer ed by many Dedicated R & D Automa c Stringer Most Advanced Highest Grade Raw
Test for Defect and Commi ed Interna onal Lab for Con nuous Innova on & Lay up used for Automated Inline Material from
Free Modules Deliveries Laboratories in Product Design and Eciency making PV Modules Produc on Setup Renowned Suppliers
www.tuv.com
First batch of
1000 E-rickshaws
SmartE flagged
off in Gurugram
Shri Nitin Gadkari, Minister for Road Transport
and Highways, Shipping and Water Resources,
River Development and Ganga Rejuvenation
flagged off a fleet of first batch of 1000
E-rickshaws from Huda City Centre metro
Karnataka cabinet approves station in Gurugram.
e-vehicle policy
Karnataka became first state in the country to have e-vehicle policy in place
after the State Cabinet approved the Karnataka Electric Vehicle and Energy
Storage Policy recently.
T
he new policy aims to promote research and develop-
ment in electric mobility and grow the sector and offers
incentives and concessions in line with the Karnataka
Industrial Policy 2014-19 to EV manufacture sec-
tor, battery manufacturing and charging equipment
enterprises throughout the state. The policy looks at
maintaining the lead share of Karnataka as a preferred
destination for atracting investments in manufacture of
electric vehicles.
S
T
uitably, the government will make needful amendments to he E rickshaw fleet is being
building bylaws for providing mandatory charging infrastruc- operated by Treasure Vase
ture in all high rise buildings like IT Parks, Special Economic Ventures Private Limited in
Zones, Commercial Malls, and apartments. The state government partnership of Delhi Metro,
through the new policy is expected to target Rs 31,000 crore in under the SmartE brand
investment and create employment for 55,000 people. name. SmartE will provide
the last mile transport connectivity in
TB Janachandra, Minister for Law, Government of the area. The E Rickshaws have been
Karnataka, told media that the government is also manufactured in India and are fitted with
looking at making the vehicles cheaper by introduc- GPS and tracking system. SmartE has
ing a slew of attractive incentives and concessions in established strategic partnerships with
line with the states industrial policy of 2014-19. the Haryana government (HSIIDC) and
Delhi Metro Rail Corporation to launch
According to sources, the department of commerce and indus- 1000 vehicles in Gurugram and Faridabad
tries was seeking a 100% relaxation on stamp duty for manufactur- in 2017. The E-rickshaws SmartE will
ers to set up shop in the state. However, the departemnt of finance provide meaningful self-employment for
has vetoed the proposal and agreed to provide a 50% relaxation in over 1,00,000 marginalised youths, in next
stamp duties after Chief Minister Siddaramaiahs intervention. 4-5 years.
Source: egov.eletsonline
B
y the end of next In November 2016, the group announced
Volkswagen to electrify decade, VW vows
to offer at least one
its ambition to be the worlds biggest
electric carmaker by 2025, slashing
entire range by 2030 electrified version of
each of the 300 or so
30,000 jobs as it frees up cash for invest-
group models, the firm ment in research and development into
German carmaker Volkswagen doubled down on efforts new technologies.
said in a statement. The Wolfsburg-
to clean up its image tarnished by the dieselgate scandal,
based group owns a stable of 12
vowing ahead of the IAA auto industry show to electrify its Todays announcement goes
entire range by 2030. brands ranging from VW, Seat
and Skoda to Audi, Bentley and a step further, promising 80 new
Lamborghini - as well as truck and electric vehicles - 50 of them all-
bus makers MAN and Scania and electric and 30 of them hybrids
Ducati motorbikes. By 2025, the - by the middle of next decade.
company estimates that up to one And VW says it will invest some
in four of its new vehicles - 3 million USD 24 billion in developing new
per year - could be purely battery vehicles, upgrading plants, training
powered. its workforce, charging infrastruc-
ture and battery technology and
The announcement will in future production.
represent the yardstick by But the group has yet to give up
which we measure our perfor- completely on the internal com-
mance, Chief Executive Mat- bustion engine, highlighting the
thias Mueller said. Mueller was clean performance of its latest-
brought in to turn things around generation diesels and suggesting
after VW admitted in 2015 to future vehicles could be powered
manipulating regulatory emis- by renewable synthetic fuels.
Mr. Matthias Mueller, sions tests on 11 million cars
Chief Executive ,VW worldwide. Source: AFP
PV Powertech
T
cost for the infrastructure is renewable energy becomes
he government will buy going to be very competitive. viable. And thats where you see
10,000 electric sedans -Sharma said. the long-term energy players
through state-run Energy
are consolidating. We have not
Efficiency Services Ltd. RENEWABLE PUSH-
T
in its first step toward
seen any let up in investments.
he electric vehicle push ties up
making all cars electric by with the governments plan to
-Sharma said.
2030. Tata Motors Ltd. and Mahindra have a solar power capacity of
and Mahindra will supply 500 cars in There are some adjustments,
100 gigawatts by 2022. The target
the first phase. India not only needs especially in wind generation, due to
is to reduce oil imports, the biggest
to consume green, but also generate a slowdown triggered by regulatory
contributor to Indias trade deficit. ABB
green. That would require enough changes, he said.
India sees an opportunity. Currently,
electric vehicle manufacturers in the there is just 16 GW of solar power on Source: BloombergQuint
E
market for electric vehicles, a technol- as co-ordination between appointed
nergy Efficiency Services ogy which is poised to boost e-mobility agencies, monitoring and supervision,
Limited (EESL), under the in the country; through its unique busi- reporting, complaint redressal and
administration of Ministry ness model of aggregation of demand payments. These cars will be used to
of Power, Government of and bulk procurement. EESL is seek- replace the petrol and diesel cars used
India (GoI), will procure ing to leverage the immense potential by Government and its agencies over
10,000 electric vehicles of replacement of existing vehicles in a 3-4 year period. The total number of
from Tata Motors Limited. The com- the government departments for initial vehicles used by the Government and
pany was selected through an inter- demand aggregation. its agencies is estimated to be 5 lakhs.
national competitive bidding aimed at Tata Motor Limited quoted the low- As per the report published in May
increased participation. Tata Motors est price of Rs. 10.16 Lakh exclusive 2017 by Niti Aayog, making Indias
won the tender and will now supply the of GST in the competitive bidding. The passenger mobility shared, electric,
Electric Vehicles (EVs) in two phases vehicle will be provided to EESL for and connected can cut its energy
first 500 e-cars will be supplied to Rs. 11.2 Lakh which will be inclusive of demand by 64% and carbon emissions
EESL in November 2017 and the rest GST and comprehensive 5 year war- by 37% in 2030. This would result
9,500 EVs will be delivered in the ranty which is 25 % below the current in a reduction of 156 Mtoe in diesel
second phase. retail price of a similar e car with 3 and petrol consumption for that year
The tender floated by EESL is the year warranty. & at USD 52/bbl of crude, this would
worlds largest single electric vehicle EESLs EV programme is a compre- imply a net savings of roughly Rs 3.9
procurement. Three leading manufac- hensive solution to facilitate adop- lakh crore in 2030. The shift to EVs
turers Tata Motors Limited, Mahin- tion of the disruptive technology in through this programme will reduce
dra & Mahindra (M&M) and Nissan the country. Along with procurement dependence on oil imports and pro-
participated in the tender and the bids of 10,000 EVs through international mote power capacity addition in India
for TATA Motors Limited and Mahindra competitive bidding, EESL will also thereby enhancing energy security
and Mahindra (M&M) were opened. identify a service provider agency. of the country and will also lead to
EESL is driven by the objective of This agency, also appointed through reduction in GHG emissions from the
competitive bidding, will carry out transport sector.
22 EQ October 2017 www.EQMagPro.com
ELECTRIC VEHICLES
E
should be able to close the deal.
nergy Efficiency Services Tata Motors bagged the order as it quoted the lowest bid of Tata Motors might not be able to
(ESSL) had awarded Tata Rs. 10.20 Lakhs per unit, excluding goods and service tax (GST). process the entire order of 10,000
Motors a whooping Rs. The ESSL would have to pay Rs. 11.20 Lakhs for one electric car electric vehicles if Mahindra
1120 Crore order for the including GST and a comprehensive five-year warranty. decides to lower down its quoted
supply of 10,000 electric price as then it would be able to
Currently, Mahindra has a fair chance to grab the 40 percent of retail only 6,000 cars. In the first
vehicles last week. Now, phase of the procurement, EESL
it has been learnt that the state-run the total order if it matches Tatas lowest bidding. The company
will purchase 500 electric vehicles,
agency has placed an offer before the was the second lowest bidder with quote of Rs. 13 Lakhs for while the remaining order will be
rival Mahindra & Mahindra to pro- each electric vehicle. procured in a second phase.
vide 40 percent of the total order if it
We expect the
matches the bid of Tata Motors. ESSL The company was planning to bring-
had released the global tender for e-vehicles to
10,000 electric vehicles in August to
replace five lakh petrol and diesel cars
used by the government over three
to four years in the ministry of power,
coal, new and renewable energy.
start coming in
by middle of
November this
year, Kumar said.
10,000 vehicles on the road
in Delhi-NCR within
the next seven to
eight months.
Source:Autoportal
W
ith the global number of electric technology, allows a two-power vides the additional benefit of ABB
vehicles on the road rising to 2 cabinet charging system to charge Ability Connected Services,
million in 2016*, the demand for a couple of EVs simultaneously, which deliver enhanced functional-
powerful and energy efficient with up to 350 kW and 500 A, ity, including the ability to easily
vehicle charging stations is ever while dynamically optimizing the connect chargers to back offices,
increasing. available grid connection and the payment platforms or smart grids
From Stand 43, Hall 1 at the power delivery to the two vehicles. systems. More importantly, remote
Electric Vehicle Symposium and Additional power cabinets and diagnostics, repair and over-the-air
Exhibition (EVS30) in Stuttgart charge posts can be added after software updates, minimize down-
from 9-11 October, ABB will installation, delivering a cost-effec- time and keep running costs low.
showcase its newest EV charg- tive and future-proof solution for Terra HP delivers a number of
ing solution, the Terra HP, the expandable charge points that can additional benefits for consumers,
first 150-350 kW product on the grow as the EV base grows. including an intuitive, easy to use
market. To further improve perfor- touchscreen display and multiple
Ideally suited for use at highway mance, Terra HP delivers the payment options. ABB has pro-
rest stops and petrol stations, highest uptime due to redundancy vided charging solutions as part
Terra HPs ultra-high current has on power and communication, of its drive to promote sustainable
the capacity to charge both 400 V and individually cooled charging mobility since 2010 and has sold
and 800 V cars at full power. cables. Having proven its paces in more than 6,000 cloud connected
The 375 A output single power numerous commercial electric bus DC fast-chargers around the
cabinet can charge a 400 V car at field installations, the power cabi- world for passenger cars and
full 150 kW continuously. The addi- net is also extremely reliable. For commercial vehicles.
tion of Dynamic DC power sharing charging operators, Terra HP pro- Source: International Energy Agencys Global EV Outlook
T
he Niti Aayog member said we will have to use renewable solar shifted the electric vehicles programme
that at present lithium-ion energy or bio-fuels for charging of to Niti Aayog from the department of
battery is not manufactured EVs, he said. heavy industries.
in India and therefore the For setting up electric vehicles The government is aggressively try-
country has to depend on charging stations, Saraswat said, We ing to push the sales and production of
imports from Japan or China. will also have to create electric distribu- electric vehicles in the country through
However, he said the quality of tion company and also a regulatory schemes such as FAME India.
imports would be questionable. framework would have to be followed. State-run Energy Efficiency Ser-
As the end goal of EVs is to fight To develop low-cost lithium-ion vices Ltd (EESL) last month had said it
pollution, Saraswat said when the batteries in India, he said, efforts are will procure 10,000 electric cars.
country shifts to such vehicles, the being made to remodel the battery According to Piyush Goyal, who
power must be from renewable sourc- made by Indian Space Research held power portfolio till recently, India
es of energy such as solar or wind. Organisation (ISRO) so that it can be aims to become 100 per cent e-vehicle
The former DRDO chief also point- used in e-vehicles. But, it will take time nation by 2030. Union transport minis-
ed out that the country would need to to scale up production of battery made ter Nitin Gadkari has asked automobile
set up infrastructure for charging EVs. by ISRO. manufacturers in the country to go for
Even petrol pumps should be Saraswats statement assumes sig- eco-friendly alternative fuels, else he
equipped with charging stations and nificance as the cabinet secretariat has would bulldoze them.
Fortum signed a Memorandum of Understanding (MoU) with NBCC for developing electric vehicle charging infrastructure
across India. The agreement will cover all major activities in value chain from planning and designing to making investment and
operating the charging infrastructure using cloud based system. NBCC (India) Limited is a blue-chip Government of India Navratna
Enterprise under the Ministry of Urban Development.
India is one of the fastest grow- India is an important market for us. Charging
ing economies in the world. While solutions with reliable hardware and software
the rapid growth puts strain on as well as responsive customer sup-
the environment, it also opens port are crucial to the end-user
extensive opportunities. Tech- experience. We have developed
nological expertise of Finnish Fortum Charge & Drive to meet
companies can be leveraged to these demands, paving the
support the sustainable devel- way for the more widespread
opment of Indian economy and and efficient use of electric
energy sector. I am really happy vehicles, Mr. Arto Rty,
to see Finnish companies bringing Senior Vice President
in their best technology and solu- of Corporate Affairs &
tions to India, Minister Kimmo Communications, Fortum
Tiilikainen said. Corporation said.
India has currently only about 6,000 electric cars. Government of India has target to have only e-vehicles by 2030. Fortum
has ventured in India making it the first country outside Europe in the Charge & Drive space. The plans include developing
charging infrastructure along with the cloud based system (SAAS). Starting with this pilot in New Delhi, Charge & Drive
plan to roll out more than 150 charging stations over a period of next 1218 months.
Source: Fortum Corporation
J
developing higher efficiency
inkoSolars record-breaking
multi-crystalline silicon solar products. The entire manufac-
cell was manufactured on turing chain is comprised of
a high quality boron doped low-cost industrial processes
mc-Si substrate. Advanced
texturing, passivation and and will be gradually trans-
anti-LID technologies were inte- ferred into mass production.
grated into the passivated emitter rear Leveraging our high-efficiency
contact (PERC) structure to achieve
the new 22.04% world record. The solar cells, we will continue to
Dr. Jin Hao,
new world record was independently develop advanced manufactur-
Vice President
confirmed by Fraunhofer ISE Ger- ing techniques to reduce the
many and broke JinkoSolars previous JinkoSolar
record of 21.63% one year ago. cost of PV products.
B
operations in this
PV park in Andhra y integrating the Enphase IQ6
Pradesh, India.
Microinverter onto the backsheet
of its PV module, JinkoSolar
Trina Solar Limited (Trina Solar or the company), a global leader in presents residential installers with
photovoltaic (PV) modules, solutions, and services, has received a top rating a valuable proposition. The Eagle
in the latest module bankability report, published by Bloomberg New Energy AC simplifies logistics, as install-
Finance (BNEF). After having obtained the top spot among all its industry ers no longer need to stock, transport, carry,
peers in the previous 2016 report, Trina Solar has now once again been rated and install separate microinverters onto the roof,
bankable by 100% of the banks, EPCs, consultants and industry experts which significantly reduces installation time.
participating in the BNEF survey.
F
Once installed on the roof, the installer simply
or its global module bankability report, Bloomberg New pulls the microinverter into its elevated installed
Energy Finance asked banks, EPCs, independent position, which creates a 15 millimeter air gap
power producers and independent technical due dili- and ensures sufficient air-flow and cooling. The
gence firms which PV module brands they considered partnership provides a complete AC solution
bankable. Quoting from BNEFs definition, bankable for a safe solar installation. Customers can also
means the willingness of a bank to provide a non- monitor the Eagle ACs performance through
recourse loan for a project that uses a specific PV module brand. Enphases Enlighten app.
Banks typically decide whether to make a loan to a PV project if
they feel comfortable with the product quality of modules and if the We are excited to work with
manufacturer is financially healthy, so that it can honor the product Enphase on the Eagle AC, as
warranty. Respondents to this latest survey hold approximately Enphases microinverters already
15GW of financed or owned capacity in PV projects, and more than have broad appeal in the market,
100GW under inspection by technical consulting companies. said Nigel Cockroft, General
Manager of JinkoSolar (U.S.) Inc.
The Eagle AC is the logical next
This outstanding result confirms Trina step in the evolution of residen-
Solars permanent endeavor in the fields
tial solar, and we are pleased to
of product quality and reliability, top
performance, innovation and solid finan- offer it to our customers. More
cial management, said Rongfang Yin, Vice information about the Eagle AC
President of Global Sales and Marketing at can be provided at JinkoSolars
Trina Solar. We are very proud to be hold- booth #3965 during Solar Power
ing the top spot in this renowned BNEF industry International.
report, especially because this rating has come from banks,
investors and other parties deeply involved in PV project JinkoSolars scale, financial
financing. Rongfang Yin continued, It is reassuring to see strength, and manufacturing
that consistency pays off in the long run, creating trust in expertise make it an excellent
Trina Solar and leaving some premium-brand competitors partner to build an Enphase
behind in terms of bankability rating. Energized AC module,
said Badri Kothandaraman,
Enphase Chief Operating
Reflecting the confidence in Trina Solars Officer, Pairing the #1
bankability, the latest BNEF report also global module manufac-
reveals that Trina Solar holds the largest turer with the #1
volume in debt-financed projects among global microinverter
all c-Si module manufacturers, as tracked manufacturer
by the BNEF desktop, with approximately creates a winning
3GW of its modules installed in such PV combination.
power plants around the globe.
A
ccording to the agreement, for
this time, Jolywood offered 72-cell
N-type Bifacial Mono Transparent Mr. Ankur commented, N-Bifacial Product can bring over 20% additional
Modules with efficiency of 370W. It generation gain, which can highly increase the IRR of solar plant. Its not
is the first time that India has such a only a solution to lower the LCOE, but also a brand new solution can deal
great scale of application of N-type with the electricity shortage in India. Really worth trying, thats why
Bifacial Solar Products, which can bring higher Jolywood is our first choice this time.
investment return comparing to the conventional PV
products. India has become one of the most popular The cooperation with ACME is only our first step in India Market,
overseas markets for Chinese PV enterprises. With said Mr. Liu Yong. Double-side generation, zero LID, lower working
the advantageous location and abundant solar temperature, with these features, Jolywood N-pert Products
radiation resources, the Indian Market has great are very competitive for a high temperature environment
opportunities for renewable energy, including solar. such as India. We truly believe that our products can
Mr. Modi, the Prime Minister of India, gave a broader bring 10% or even more additional power for every solar
proposal about achieving 100GW solar installation plant, to lower the LCOE and also increase the IRR. We
by 2022, in order to solve the power demand of over are looking forward to having a further cooperation with
100 million people in the countryside. This bid plan ACME, working together to expand more application
could be an important catalyst for the growing of of N-pert products, not only to bring lower LCOE
Indian PV Industry. International Energy Agency and higher IRR for the investors, but also to
(IEA) reported the annual growth of electricity provide affordable energy for India Market.
demand in India Market would be increased by 5%,
meaning triple-size electricity system will be Ankur also showed, with confidence and
required by 2040. Modi showed his confidence expectation for future cooperation, that the two
in the solar energy being the key solution for power parties may have complementary advantages
consumption issue in India, and released an in power plant development.
ambitious solar plan right after he took office.
P
ROINSO, the leading global distributor, integra- Solar trackers have demonstrated a strong technological
tor and technology company in the solar market, advancement in the recent years, with power electronic playing an
has partnered with the Japanese conglomer- ever increasing role. We are excited about strengthening our posi-
ate OMRON to develop a fully integrated solar tion in the global PV market with this new product and look forward
tracking system. Leveraging significant combined to the next steps of ourlong-term strategic partnership with
experience in tracker development and power electronics, PROINSO., noted Akira Enami, Deputy General Manager at OMRON.
TURNSOLE Powered by OMRON ensures an optimised
performance focused on longevity and reliability. As the so- TURNSOLE Powered by OMRON, is fully integrated, using
lar tracker market has matured over the past decade there is world-class solar PV components (modules, inverters, BOS) with
a growing demand for fully integrated tracking solutions. horizontal single axis solar tracker at its core. TURNSOLE offers
up to 25% increase in energy production (compared to fixed struc-
ture installations), while reducing installation and maintenance
Leveraging over 10 years of tracker experience costs. With PROINSOs Qualified Installer Network offered to
customers as an added-value service, TURNSOLE Powered by
and over 2.7 GW of PV footprint, TURNSOLE has been OMRON is the ultimate plug-and-play tracking system.
developed in strategic partnership. OMRON (TSE: OMRON
Corp) the Japanese conglomerate is the world leader PROINSO recognised the benefits of setting up manufacturing
operations in India and two-years ago relocated its structures
in power electronics and #1 PV inverter manufacturer manufacturing in line with PM Narendra Modis Make in India plan.
in Japan. OMRONs expertise in power electronics was The tracker market is expected to exceed USD 7billion by 2023
with a CAGR of over 17%, so there is a tremendous opportunity in
utilised in synergy for development of the state-of-art this market segment. We are confident that our unrivalled global
control system. distribution and Qualified Installer Network coupled with strategic
partnerships will help us reach a primary position in this PV
market segment by 2020. -said Kunal Chandra, PROINSOs MD.
H
eraeus will also voltaic experts in its five R&D centers announced the goal to boost photo-
establish dedicated all around the world. Indias govern- voltaic installations from currently 12.5
resources in its engi- ment has determined the energy sector gigawatts (GW) to 100 GW by 2022.
neering and technol- as one of their main focus in the next This corresponds to the capacity of
ogy center in Singa- 15 years plan. Energy will be one of the around 100 nuclear power plants in just
pore, to better tailor driving forces for the countrys objec- over five years. Indias long term goal by
and further speed tive to build a modern industrialized 2040 is to achieve 340 GW by renew-
up customization of silver pastes for economy, to develop its rural areas and able energies; nearly four times as much
Indian cell manufacturers. Furthermore, to triple its GDP by 2035. of current global PV installations in the
Heraeus will offer its industry recog- Prime Minister Narendra Modi, whole year of 2017 (estimated 95 GW).
nized cell optimization consulting to its
Indian customers. The cell optimization
consultancy aims to provide world class
Energy production from Photovoltaic is already the cheapest way
technical expertise to Indian manufac- to produce electricity in the world and the prices will continue to
turers so that they can compete with decrease. Photovoltaics, thus offers great opportunities for India to
the best in the world and turn the Make help solving the very strong growth in energy demand. This however
In India vision to reality. requires a good and technologically leading partner for the Indian
Heraeus specializes in silver metal- solar market. Heraeus is convinced that it can be this partner, said
lization paste production and offers Andreas Liebheit, President of Heraeus Photovoltaics.
products for all solar cell architectures
and photovoltaic technologies, ranging
from n-type, black silicon and PERC
Energy demand in India is set to grow very strongly by 4.2 percent per year and thus
to double printing and knotless screen.
double until 2035. Thats faster than that of all major economies in the world. With more
Heraeus Photovoltaics holds several than 2,800 hours of sunshine annually, more than 300 sunny days a year and average 1.9
efficiency records in these technolo- kWh/m global radiation, solar power has an incredibly high potential for Indias
gies and is constantly increasing the efficiency performance.
efficiencies of its products with photo-
Source:ANI
T
he rankings are based on BNEFs
global survey to key PV stakehold- The result of this survey confirms that Jinko-
ers on which module brands used Solar is the most preferred brand by banks,
in projects are most likely to ob-
the top brand that industry players are most
tain non-recourse debt financing
willing to use in their projects, and also the
from commercial banks. Survey
respondents include banks, technical consul-
top brand that source of finances are most
tants, EPCs, and independent power producers willing to fund, said Kangping Chen, CEO of
(IPPs) from all around the world. Considering JinkoSolar. We maintained our leading posi-
product quality, long term reliability, field de- tion as the largest manufacturer of PV modules
ployment performance, and the manufacturers in the world by delivering 4.9GW module in the first
financial strength, 100% of survey respondents half of 2017 thanks to our continuous endeavors in
considered JinkoSolar as bankable. Align- quality and technology improvements. We will continue invest in
ing with JinkoSolars high bankability score, quality to assure delivery of power and performance in the field
BNEFs database also shows that projects with a higher level of product quality and reliability as we pursue
using JinkoSolars modules has secured more further growth both in established markets and emerging ones.
debt financing than any other brand since July
2015.
T
Commissioning of Rooftop he whole concept of solar installation was
to help Kaeser Compressors in energy sav-
Solar Power Plant at ings and reduce its dependency on the grid
energy, although the available roof space
A
the solar rooftop programmes. The
decision in this regard
Union Ministry of New and Renew-
was taken in a meeting
able Energy in a review meeting held
of New and Renewable
recently has considered Haryana as
Energy Department,
the leading states in the solar roof top
chaired by the Chief
programme. He said that he would
Minister Manohar Lal
soon convene a meeting of concerned
Khattar here. The CM also sanctioned
departments regarding the setting up
installation of roof-top solar power
of Solar Park with 500 MW capacity in
plants on the buildings of 110 commu-
the state.
nity health centres and equal number
The solar park is to be developed
of primary health centres.
by the SUN Haryana, a joint venture of
Directing the department to en-
Haryana State Industrial and Infra-
sure maximum utilisation of the green
structural Development Corporation
energy, Khattar asked the officials Manohar Lal Khattar, CM, Haryana
(HSIIDC) and Haryana Power Genera-
to identify blocks other than the dark
tion Corporation Limited (HPGCL).
zones and install solar water pumps the Shalawas block of Jhajjar dis-
It was informed in the meeting that
in phased manner. He directed the trict and in other 23 safe blocks in
survey of all government buildings in
department to initially install 25,000 terms of ground water exploitation in
the state has been completed for the
solar water pumps and gradually other districts. The work order for 750
installation of rooftop solar plants so
increased this number to one lakh, an pumps has already been issued by the
as to meet their power requirement
official release said. The department concerned districts for the first phase
for daily use. The department has
had requested to the Union Ministry and these pumps have been received
prepared a scheme to provide solar
of New and Renewable Energy for at sites out of which 700 pumps have
toilet lamps to the beneficiaries at a
allocation of 20,000 solar pumps to already been installed and commis-
very nominal cost of 10 per cent of
the state for the financial year 2017- sioned whereas remaining are under
the total cost by providing 90 per cent
18. In the first phase, during the year installation. During the second phase
state subsidy or funds under Corpo-
2016-17, as many as 750 solar water to be implemented in the year 2017-
rate Social Responsibility (CSR) from
pumps of two horsepower (HP) capac- 18, 2,300 systems of 2HP to 10HP
various organisations to meet the light
ity (surface and submersible) and 5HP capacity would be installed for which
requirement in the toilets constructed
(submersible) were to be installed in e-tenders have already been invited.
under Swachh Bharat Mission. Source: PTI
A
zure Power will provide across India to lower their energy
power for 25 years to bill and meet their greenhouse gas Mr. Inderpreet Wadhwa, Founder,
Ministry of Health and (GHG) emission reduction targets. Chairman and Chief Executive Officer,
Family Welfare, Gov- With over 150 MWs of high qual- Azure Power said, Azure Roof Power
ernment of India facili- ity, operating and committed solar offers tremendous value to our custom-
ties in the states and assets across 20 states, Azure Roof ers across various segments.
union territories of Delhi, Puduch- Power has one of the largest rooftop We are pleased to announce
erry, Uttar Pradesh, West Bengal portfolios in the country. Azure Roof our latest win with NVVN to
and Assam. The power will be sold Power has a well-diversified cus- electrify Ministry of Health
at a tariff range of INR 3.19 4.11 tomer base with majority portfolio and Family Welfare facili-
(~US$ 0.05- 0.06) per kWh based contracted with Government of India ties across five states. With
on location. In addition, Azure Power backed entities. Azure Roof Power this win, we have once again
qualifies for a capital incentive which customers include large commercial demonstrated our strong
is expected to result in a weighted real estate companies, a leading project development capabilities and
average levelized tariff of INR 5.29 global chain of premium hotels, dis- are delighted to make this contribution
(~US$0.08) per kWh. tribution companies in smart cities, towards the realization of our Honble
Azure Roof Power offers superior warehouses, Delhi Metro Rail Cor- Prime Ministers commitment towards
rooftop solar power solutions for poration, Indian Railways, a Delhi clean and green energy, through solar
commercial, industrial, government, water utility company and various power generation.
and institutional customers in cities Government of India Ministries.
T
he plant will have capacity to generate one
With this, Adobe furthers its commitment towards implementing megawatt (MW) power and it will help the
best practices to drive environmental sustainability. airport save around Rs 80 lakh every year
A
on its electricity cost.
dobe India, announced that its Bengaluru While laying the foundation stone for the
campus has become among the first in the solar plant, Chief Minister Shivraj Singh
state of Karnataka to meet 100 percent of its Chouhan also hoisted the national flag on the newly in-
power consumption requirements through stalled 100-feet high mast, which will remain illuminated
renewable energy. As part of this initiative, for 24-hours, in the campus of Raja Bhoj Airport.
Adobe has signed a 2.5 MW grid-scale solar Airports Authority of India (AAI) is going to install the
power purchase agreement (PPA) with CleanMax Solar to solar plant with the help of Madhya Pradesh Energy
operate off-site solar farms located in the Tumkur and Bel- Development Corporation.
lary districts of Karnataka. Covering the companys Benga-
luru campus annual energy demand, the farms will gener-
ate 3750 MWh of solar power supply per year, which will This will generate 1 MW of electricity. Use of
go directly into the electricity distribution grid and become renewable solar energy will save our environ-
a part of the pool of energy that ultimately provides power ment. This will also cut the annual electricity
across Bengaluru and other parts of the state. cost of the airport by around Rs 80 lakh,
Mr. Chouhan said while addressing the
programme. Chouhan also expressed
Commenting on the announcement, happiness over installation of 100-feet
Sanjeev Sethi, Director, Global Workplace tall mast for national flag. National flag
Solutions, Adobe India said, At Adobe signifies a sense of patriotism and self-
India, we stand committed to building respect. The tricolour reminds
workplaces that are resource-efficient us of our revolutionaries, who
and environment-conservative. Today, we sacrificed their lives for a
are excited to further our commitment to free country.
sustainability by announcing that our Bengaluru campus
C
now meets 100 percent of its power consumption require- hief Minister said that AAI Chairman Gururprasad
ments through renewable energy. The solar power gener- Mohapatra, who was present in the programme,
ated from this initiative will contribute towards cleaning up has informed him that four new flights are to be
local air and lowering emissions in the environment where launched soon from Raja Bhoj Airport.
our employees live and we do business. With this initiative, The airports in Mumbai and Delhi are overburdened.
we at Adobe are happy to play a role in ensuring that the city We have to hover around the airport in these cities to
of Bengaluru and the state of Karnataka burn less coal for get the permission for landing. But, the capacity of Raja
their local power needs, and enabling Indias goal of transi- Bhoj Airport is under utilised.
tioning to renewable energy.
Chouhan said I was informed by AAI
chairman that four flights are going to be
W
ith over 5,200 employees in India, Adobe
started soon from here.All the facilities
has implemented a wide range of activities to are available to develop the airports at
further its sustainability charter. The com- Bhopal and Indore as international air-
panys three campuses across Bengaluru and Noida ports. We have all the facilities required
have been certified as Gold Leadership in Energy & for an international airport at Bhopal
Environmental Design (LEED) buildings by U.S. Green and Indore. State government is ready to
Building Council. extend every possible support. I spoke to Mr. Gururprasad
AAI chairman and will also talk to the Mohapatra,
T
o ensure environment-friendly transportation minister (civil aviation) to start interna- Chairman, AAI
facilities for employees, Adobe has also imple- tional flights from Bhopal and Indore.
mented green fleet of electric cars across its
campuses. The company has also adopted several
Madhya Pradesh Energy Development Corp.
green practices across its campuses including imple- chairman Vijendra Singh Sisodiya later
mentation of LED lighting, use of reusable beverage told PTI that electricity used in almost
cups, and following a waste reduction policy. Adobes entire outer part of the airport would
sustainability practices have helped the company come from these solar panels. The work
reduce water and power consumption year on year, of installing the solar panels would be
despite fast expanding operations in India and steady completed within next three months.
growth in employee headcount. Source: PTI
A
group of senior directors from
banks and financial services
companies, including Sayandev
Chakravartti, Aditya Sharma,
Nisha Pillai and Mayur Bhat,
also participated in the round.
O
orjan was founded in November It already has operations in Mumbai, Pune, Bangalore, and
2014 by IIT Bombay alumni Roli Chennai and claims to have completed around 70 projects till
Gupta and Gautam Das. Prior to date. Oorjan estimates revenues for FY2017-18 at Rs 15 crore.
starting up, Gupta worked as business US-based Globevestor operates a hybrid of micro-funds and an
development manager at US-based solar online platform to invest in startups in the US and India. In past
products manufacturer AREVA Solar, three years, Globevestor has made 32 early-stage investments
while Das earlier worked at Citibank. across diverse sectors, of which 21 are based in India. Some
The company said it will use the funds of its investments include self-drive car rental startup Zoomcar,
to scale operations, augment sales ef- ed-tech firm Flintobox, test preparation platform OnlineTyari,
forts, and further build its technology financial products marketplace Rubique Finance, and ed-tech
advantage. startup Springboard to name a few.
The renewable energy space in India has witnessed a lot of ac-
tivity. In July this year, Warburg Pincus had invested up to $100
million (Rs 645 crore) in Mumbai-based rooftop solar projects
developer CleanMax Enviro Energy Solutions Pvt. Ltd.
In March, Oriano Solar, a Mumbai-based startup that special-
ises in turnkey solar solutions, raised Series A funding worth $3
million (around Rs 20 crore) from the Samridhi Fund, which is
managed by SIDBI Venture Capital Ltd, a wholly-owned subsid-
iary of Small Industries Development Bank of India (SIDBI).
International Finance Corporation, the World Banks private-sec-
tor investment arm, has emerged as a large investor in the space.
Last year, it had invested $125 million in Hero Future Energies.
The current fundraise will enable In May this year, IFC said it plans to invest $40 million (Rs 260
us to invest in making the customer crore) in Tata Cleantech Pvt. Ltd. It has also previously provided
experience seamless. Were building debt funding to solar energy service provider Azure Power and
a core technology moat across lead Actis-backed renewable energy platform Ostro Energy.
generation, pre-sales experience, Some of the worlds biggest pension funds, including Canada
smart CRM and engagement, as well Pension Plan Investment Board and Caisse de dpt et place-
as in leveraging solar data at scale, ment du Qubec, are also scouting for deals in Indias solar
IIT Bombay alumni Roli Gupta said in power sector.
the statement.
Source: vccircle
M
GCL and MYSUN partner to YSUN, Indias leading roof-
top solar platform focused
I
ndian Renewable Energy Development Agency
T
Limited (IREDA), a government company, raised
Rs 19.5 billion (USD 300 million) through a five- he new products will help in utility PV
year Green rupee-denominated bond, offering an cost reductions. These products are
annualised coupon of 7.125 per cent, SGX said in equipped with Passivated Emitter Rear
a press release. Contact Technology (PERC) cells
IREDA was established in 1987 as a Non- providing high module area efficiency
Banking Financial Institution and is a Mini Ratna upto 19.05% (for 60 cells) & upto
(Category I) Government of India Enterprise 18.45% (for 72 cells).
under the administrative control of Ministry of New
and Renewable Energy (MNRE). Mr. Ivan Saha, CTO and BU Head Solar
To date, it has financed more than 2,380 Manufacturing, Vikram Solar Limited, stated
renewable energy projects in India. The new modules are suitable
for operation under higher system
voltage upto 1500 V. They are
IREDA is fully committed to helping achieve Indian constructed with high efficiency
Governments vision of 175 GW renewable energy PERC cells, having extremely Low
capacity by 2022, said Kuljit Singh Popli, Chairman & Light-Induced Degradation and
Managing Director at IREDA. The Green lower temperature coefficients
Masala Bond is a significant milestone for leading to higher energy yield, compared to
IREDA in this regard, as we embark on the other modules. The new monocrystalline mod-
next phase of renewable and sustainable ules are conditioned to withstand 2400 Pascal
energy led expansion, said Singh. This is Wind load, 5400 Pascal Snow load and Dynam-
another step towards our Honourable ic Wind load, making them the best option even
for harsh geographical conditions. Tests have
Prime Ministers (Modi) commitment
revealed that SOMERA line can offer 5 10%
to the Paris agreement on Climate Change. The higher energy generation output than that of
overwhelming response to the issue is a testament to any industry average polycrystalline modules.
the confidence of global investors in IREDA and the
Indian renewable sector in general. SOMERA Grand Series (72 cell modules ranging
from 340 to 365Wp) and SOMERA Prime Series
(60 cell modules ranging from 280-310Wp) are
products available for the Indian market. SOMERA
With this new listing, 75 percent of listed Grand Ultima Silver Series (72 cell modules rang-
Masala bonds by Indian issuers are now listed ing from 340 to 365Wp), SOMERA Ultima Silver
Series and SOMERA Ultima All Black Series (60
on SGX. Today, more than 80 per cent of listed cell modules ranging from 280-310Wp) will soon be
offshore bonds by Indian issuers are listed on available for the international market.
SGX, raising about USD 66 billion.
Source: PTI Source: dnaindia
T
he NCDs have a 7-year tenor and are invested into
parency and provides resources to
Mytrah Energy (India) Private Limited (approximately underpin our future growth."
USD 150 million, unlisted NCDs) and Mytrah Ujjwal - Mr. Ravi Kailas
Chairman, Mytrah Energy Ltd.
Power Private Limited (approximately USD 127 million,
NCDs listed on the BSE). The proceeds will be used
to replace existing investments from IDFC Alternatives
Limited, AION Capital, Merrill Lynch and Goldman
Sachs, with part of the facility also providing growth
capital to the Company.
Adani Enterprises to
I
n a statement, the company said the IREDA loan will be used
demerge renewable to lend to renewable energy and energy efficiency projects.
The Reliance Commercial Finance is a subsidiary of Reli-
power business ance Capital while IREDA is a central public sector under
taking under Ministry of New and Renewable Energy.
Adani Enterprises on Saturday said that it will
demerge the Renewable Power Undertaking
Reliance Commercial
into Adani Green Energy Limited (AGEL). Finance Limited is According to the company
T
already a strong statement, Reliance Com-
he company said that the known name in mercial Finance has funded
move will result in listing of the renewable wind and solar energy sec-
AGEL on the BSE and the energy funding space, tors of more than 1,800 MW.
National Stock Exchange especially related to solar and The company also provides
of India. According to wind energy. Our partnership financial assistance for
a company statement, with IREDA opens new opportuni- developing infrastructure
the scheme will simplify the business ties for us to create solutions for and other projects targeted
structure providing the shareholders of renewable power sector, Devang towards the government
AEL direct shareholding in AGEL. Mody, Executive Director and CEO, initiatives on renewable
Reliance Commercial Finance was energy.
Transaction is expected to quoted as saying in the statement.
unlock the value of renewable
power undertaking currently
embedded in the value of AEL With the funding we are confident that RCFL (Reliance
by eliminating holding company Commercial Finance) will provide solutions and help fill any
discount and providing financial gaps in financing the Renewable Energy sector, Mr. K.S. Popli,
flexibility for raising capital for Chairman & Managing Director, IREDA, was quoted as saying
sustainable growth of renewable in the statement.
energy business, the statement
said. Source: IANS
T
he Joint Declaration was formally exchanged by Andrew
McDowell, EIB Vice President and India at the 14th India The ISA is a global grouping of 121
European Union summit. The ceremony was attended by countries and financial institutions
Narendra Modi, Prime Minister of India, Donald Tusk, Presi- established to harness solar energy. It
dent of the European Council and Jean-Claude Juncker, was jointly launched by Indian Prime
President of the European Commission, and other senior Minister Modi and French President
political representatives from India and the European Union. Hollande at the COP 21 Paris climate
conference.
Expected record EIB support for
Global cooperation is essential to tackle renewable energy investment across
climate change and closer cooperation India. The EIB also confirmed than an
between the International Solar Alliance expected EUR 800 million backing for
and the European Investment Bank will small scale renewable energy projects
mobilise international climate finance and across India had already been signed
improve sharing of technical experience. and approved in 2017, representing the
This new agreement reflects our shared EIBs largest ever support for energy
commitment to successful implementa- investment in Asia. This includes
tion of the Paris Climate Agreement and renewable energy financing in partner-
ensuring that solar rich economies can ship with the Indian Renewable Energy
harness solar power to increase the supply Development Agency (IREDA) and the
of affordable clean energy. said McDowell, India Infrastructure Finance Company
European Investment Bank Vice President. approved earlier this year.
U Bank Approved
nder the agreement the EIB, one of the worlds largest lenders
T
for renewables energy and the worlds largest international public he EIB is currently finalising a new EUR
bank, will work with the International Solar Alliance to mobilize 200 million credit line to provide ad-
financing for development and deployment of affordable solar energy in ditional financing for renewable energy
ISA member countries. projects across India in cooperation with
Yes Bank. Solar schemes are expected to
represent the largest renewable energy sector
Closer cooperation between the European Investment Bank backed by the programme. This first renew-
and the International Solar Alliance demonstrates the shared able energy partnership with a private bank in
commitment of Europe and India to tackle climate change. Solar India is expected to be finalised in the coming
power has huge potential to provide affordable and clean months. The European Investment Bank is
energy in solar rich countries. Working with international one of the worlds largest financiers of climate
financial institutions is crucial to mobilize climate finance action and over the last 5 years provided more
and share technical expertise. The EIBs unique experience of than EUR 21 billion for renewable energy in-
successfully supporting renewable energy expansion around the world will vestment worldwide, including EUR 2.5 billion
enhance the efforts of the ISA in the years ahead. said H.E. Upendra Tripathy, in photovoltaic and concentrated solar power
Interim Director General of the International Solar Alliance. projects.
Background information
T he European Investment Bank (EIB) is the long-term lending institution of the European Union owned by its Member
States. It makes long-term finance available for sound investment in order to contribute towards EU policy goals.
Source: eib.org
P
opli described the listing as a step towards Prime Minis- financing movement, develop-
ter Narendra Modis commitment to the Paris agreement ing innovative products and
on Climate Change. The overwhelming response to
the issue is a testament to the confidence of global services in partnership with our
investors in IREDA and the Indian renewable sector customers.
in general, he said. IREDA, a state-owned non-banking
financial institution, has a remit to promote, develop and ex-
tend financial assistance for renewable energy and energy
efficiency conservation projects in India. The company pro-
vides financing for hydro, wind and solar energy projects,
new and emerging technologies and for bio energy sectors.
A
dvancements in technology and a drop in the price of solar and The London Stock
wind energy have set India on the course to not only achieve its
renewables target, but exceed it, he noted. The new green bond
Exchange is the largest,
is certified by Climate Bonds Initiative, an international, investor-focused and greenest, in Europe
not-for-profit, which helps build robust and transparent assurance and has helped position
frameworks around green bond investment. It marks the fourth green Britain as a world-leader
bond by an Indian issuer to be issued on London Stock Exchange. Axis in green finance, said
Bank and NTPC joined in 2016, raising respectively USD 500 million Jo Johnson, UK Minister
and USD 300 million equivalent. In June this year, the Rural Electrifica- of State for Universities,
tion Corporation (REC) raised USD 450 million. London Stock Exchange
claims to be the largest Masala Bond centre globally, with 42 bonds
Science, Research and
listed in total with an equivalent value of over USD 6 billion. Innovation.
Source: PTI
Energy storage capacity to triple by 2030, if countries double the share of renewables in the worlds energy system . The cost of battery storage
for stationary applications could fall by up to 66 per cent by 2030, according to a new report published today by the International Renewable
Energy Agency (IRENA). The falling price of batteries could stimulate 17-fold growth of installed battery storage, opening up a number of new
commercial and economic opportunities, the report highlights.
L
aunched during the
Innovation for Cool Earth The growth of lithium-ion battery use in electric vehicles and
Forum in Tokyo, Japan, across the transport sector over the next 10 to 15 years is an
IRENAs Electricity Stor- important synergy that will help drive down battery costs for sta-
age and Renewables: tionary storage applications, said Dolf Gielen, Director of the IRENA
Costs and Markets to 2030 Innovation and Technology Centre and an author of the report. The
assessment of electricity storage in trend towards electrified mobility will also open up opportunities
stationary applications also found that for electric vehicles to provide vehicle-to-grid services, helping feed
global storage capacity could triple if a virtuous circle of renewable energy and storage integration. Stor-
countries double the share of renew- age technology will deliver service flexibility to the grid and elec-
ables in the energy system. tricity storage to small-scale rooftop solar applications in markets
where commercial and residential electricity rates are high, and grid
feed-in remuneration is declining, concluded Mr. Gielen.
T
oshiba Corporation
(TOKYO:6502), an
industry leader in lithi-
um-ion battery technol-
ogy, today announced
the development of its
next-generation SCiB, which uses
a new material to double the capacity deposition during ultra-rapid recharg- and its rapid recharging, have made
of the battery anode. The new battery ing or recharging in cold conditions important contributions to enhancing
offers high- energy density and the a cause of battery degradation and the convenience and promoting the
ultra-rapid recharging required for internal short circuiting. spread of EV.
automotive applications, and will give Toshibas current SCiB employs Building on this heritage, Toshiba
a compact electric vehicle (EV) with a a lithium titanium oxide anode, and is has developed a proprietary method
drive range of 320km*1 after only six known for excellent operating charac- for synthesizing and disarranging
minutes of ultra-rapid recharging teristics in respect of safety, long life crystals of titanium niobium oxide and
three times the distance possible with and rapid charging. It has found wide storing lithium ions more efficiently
current lithium-ion batteries. use in vehicles and industrial and in the crystal structure. The anode of
Toshiba launched the SCiB as a infrastructure applications, including the next-generation SCiB realized
safe, long-life, fast charging lithium- automobiles, buses, railroad cars, through this approach has double
ion battery in 2008. Since then, the elevators and power plants. The times the capacity of the anode of
company has constantly refined the high energy density of the battery, current lithium-ion batteries.
technology and improved real-world
performance. For its next-generation
SCiB, Toshiba has developed a ti-
We are very excited by the potential of the new titanium
tanium niobium oxide anode material niobium oxide anode and the next-generation SCiB, said Dr.
that has double the lithium storage Osamu Hori, Director of Corporate Research & Development
capacity by volume of the graphite- Center at Toshiba Corporation. Rather than an incremental
based anodes generally used in improvement, this is a game changing advance that will make
lithium-ion batteries. a significant difference to the range and performance of
The new battery also offers EV. We will continue to improve the batterys performance
high energy density and ultra-rapid
recharging characteristics, and its
and aim to put the next-generation SCiB into practical
titanium niobium oxide anode is much application in fiscal year 2019.
less likely to experience lithium metal
Rigorous testing of a 50Ah prototype of the new battery Toshiba will continue to develop higher energy
has confirmed that it retains the long life cycle, low-tem- density batteries that extend the range of EVs
perature operation, excellent safety and rapid recharg- and support ultra-rapid recharging, and aims to
ing characteristics of the current SCiB. The energy commercialize the next-generation SCiB in
density by volume of battery is twice that of the current fiscal year 2019.
SCiB. The next-generation SCiB maintains over Part of the research work on the next-generation
90% of its initial capacity after being put through 5,000 SCiBTM was subsidized by Japans New
charge/discharge cycles, and ultra-rapid recharging can Energy and Industrial Technology Development
be done in cold conditions, with temperatures as low as Organization (NEDO).
minus 10oC, in only ten minutes.
*1 A compact EV
with a 32 kWh next
generation SCiB in Toshiba says this new anode material, titanium
niobium oxide achieves double the capacity of
JC08 test cycle the anode of current lithium-ion batteries.
Enerparc Energy Constructed This is the first solar power plant project
5.5 MWp Solar Power Plant for for Technique in India and its commissioning
validates the commitment and position of
Technique Solaire towards development of
Technique Solaire inaugurated solar energy in India said Manu Bishnoi
Director, Technique Solaire, India.
by French Ambassador
T
he project with its own set of challenges
including stringent time line for completion
of 31st March and 2.6Kms of underground
transmission line till substation, was engi-
neered, constructed and commissioned in
record time of 2 months, by Enerparc team
in India. The 5.5 MW plant with modules mounted on
seasonal tilt type structures, covering an area of approx.
25 acres will generate 9 million units of energy annually
and help in reduction of 6000 tons of CO2 emission.
With completion of this project
Enerparc has again demonstrated
its strong project development,
The Ambassador of France to India H E Mr. Alexandre Ziegler inaugurated a engineering and timely execution
5.5MWp Solar Power plant at village Maheshwari in state of Uttarakhand. qualities, coupled with high standards
The power plant which was commissioned in March this year was awarded of workmanship said Amit Barve Vice
to JLTM Energy India Private Limited, an Indian subsidiary of French company President, Business Development at
Technique Solaire under the UREDA with UPCL as the power off-taker. Enerparc Energy.
H
areon Solar
Technology
Company Limited Dr. Jie Zhang, CEO of Hareon International
(SSE: 600401), said India is one of the world leaders in
one of Chinas the renewable energy revolution, and we
largest solar are proud to collaborate with our trusted
energy companies, and ReNew partner Renew Power. With the successful
commissioning of the Dichipally Project,
Power Ventures Pvt. Ltd. (ReNew
Hareons PV power plant investments
Power), Indias leading renew-
outside China have exceeded 600 MW,
able energy Independent Power across 9 countries, in four continents. We
Producer, announced the com- look forward to expanding our global col-
missioning of their 172 MW (143 laboration with ReNew Power in this very
MWAC) solar project in Dichipally, dynamic industry.
Telangana, India.
The 172 MW solar power plant
is spread over approximately 1100
Speaking on the occasion, Dr. Rubin Sidhu, Director of Hareon
acres of land, and is connected
Parag Sharma, Chief Operating Solar India added The successful
to the Dichipally substation in Officer, ReNew Power said, We
Telangana via a 220 kV transmis- commissioning of this 172 MW solar
are pleased to strengthen our
sion line. Hareon Solar supplied leadership position in the state project is another step forward
more than 520,000 high efficiency of Telangana and contribute to in our fight against pollution and
multi-crystalline silicon solar its mission to tap into its solar climate change. Hareon Solar is proud to
modules for this project and the potential. The Dichipally solar be a part of the clean energy revolution in India.
energy generated from this proj- farm was commissioned in
ect, will be sold under a 25-year partnership with Hareon Solar
power purchase agreement (PPA) and is the largest solar plant in ReNew Power and Hareon Solar have collabo-
to the Northern Power Distribu- Telangana. The successful com-
tion Company of Telangana. This missioning of this project will rated to jointly develop, build and operate solar
project is the largest joint-venture go a long way to enhance our projects of approximately 300 MW generation
project between Hareon Solar and already successful relationship
with Hareon Solar, one of our capacity over the last two years in Adoni,
ReNew Power and was commis-
sioned ahead of schedule. valued partners since 2015. Cumbum, Mandamarri, and now in Dichipally.
W
Essel Infraprojects commissions ith this move, the
company has
Such move is also in tune with the governments target of generating 100 GW power
through solar projects by the end of the year 2022.
Now Read on
Tablet & Smartphone
www.EQMagPro.com
Ingeteam to supply 1.17GWp of inverters highlighted the fact that this contract
is yet another example of Ingeteams
O
Scope of supply For this project,
nce inaugurated, this inverters due to the fact that they Ingeteam is to supply:- 201 power
will be the largest PV combine two power blocks with a com- stations with a power output of 4,660
project in the world to be mon AC busbar, facilitating the direct kWac. Each fitted with all the neces-
constructed in a single connection with the medium voltage sary equipment to inject medium
generating power plant. transformer. The solution provided in voltage power: dual PV inverters,
Spain. September 12, power station format comprises two LV/MV transformer, medium voltage
2017. Ingeteam Power Technology has dual inverters together with the other switchgear, auxiliary services trans-
been awarded the supply contract for devices required for low to medium former, UPS and low voltage switch-
the worlds largest photovoltaic plant, voltage conversion. Namely the LV/MV gear.- 402 dual photovoltaic inverters,
being built by Sterling and Wilson, transformer together with an enclosure each with a rated power output of
one of the leading global solar EPC housing the medium voltage cells, 2,330 kW, pertaining to the 1,000 Vdc
companies. The Sweihan PV project, auxiliary services transformer, low INGECON SUN PowerMax B Series
which is to be constructed in Abu voltage switchgear, UPS and a cooling family.- Commissioning of the system.-
Dhabi (United Arab Emirates), is to system with air conditioning. The solu- Service level agreement, guarantee-
have an installed power of 1,177.36 tion developed by Ingeteam, known as ing a 99% operational availability of
MW. Once inaugurated, this will be the Inverter Station, incorporates two the equipment supplied by Ingeteam
the largest PV project in the world to 2.33 MW photovoltaic inverters for the during the first two years of the plant
be constructed in a single generat- supply of 4.66 MW. These new dual in- operation.
ing power plant.The energy produced verters are suitable for outdoor instal- Ingeteam Ingeteam is a leading
is to be purchased by ADWEC (Abu lation, being specifically designed to company specialising in the design of
Dhabi Water & Electricity Company), withstand extreme climate conditions, power and control electronics (fre-
the Emirates electricity company, a such as those present at Sweihan in quency converters, process automa-
subsidiary of ADWEA (Abu Dhabi Abu Dhabi.Moreover, Ingeteam has tion and control systems), electric
Water & Electricity Authority), for sub- purchased a chamber to conduct dust machines (generators and motors),
sequent transmission, distribution and and sand tests in accordance with the electrical engineering and generating
trading.The consortium of companies IEC 60068-2-68 international stan- plants. To date, Ingeteam has supplied
responsible for the development and dard. This chamber makes it possible 46 GW in power converters for renew-
operation of the Sweihan PV project, to conduct additional tests, such as able energy plants and is amongst the
awarded the engineering and con- the inverter response to sandstorms, TOP 10 companies dedicated to the
struction work to the Indian company which are extremely common at sites operation and maintenance of renew-
Sterling & Wilson, which then selected of this type. It has been used to check able plants, with a portfolio of more
Ingeteams technology for this project. the correct operation of the inverter, than 10 GW.The company operates in
Therefore, in early 2018, Ingeteam as well as the efficiency of its sand all continents, and has a headcount
will start to supply its new 1,000 Vdc trap system to prevent the ingress of of 3,900 employees around the world.
INGECON SUN PowerMax B series particles into the inverter, while collect- Ingeteam invests 5% of its annual
central inverters, capable of deliver- ing the grains of sand and facilitating turnover in R&D, which is the back-
ing a power output of up to 2,330 their subsequent removal. Thanks to bone of the companys business
kW. These units are known as dual this system, Ingeteams PV inverters activity.
W
ith an efficiency
of almost 100
percent, the IEC- Equipped with state- of
certified prod- the art technology, the
uct can withstand dust and product is a viable op-
heavy rains. It can work at a
low voltage of 80 to 450 volts tion not only for com-
in DC and 150 to 280 volts mercial establishments
in AC and would generate but also for home- own-
solar power even during low
periods of sunshine. ers if their state has
The inverter can be an active net-metering
connected to GSM remote equipped with an LCD screen policy and pays a good
monitoring application which that helps to regulate moni-
enables a customer to tors with input and output price to residents for Kunwer Sachdev
monitor the system from any- voltage units of electricity. feeding excess solar Managing Director
where in the world. Besides, The inverter ranges between Su-Kam
the customer can keep a Rs. 52000 and Rs. 86000
electricity back to the
record of up to 25 years. It is depending upon the capacity. grid.
The battery-less system saves a customer from the hassle of regular maintenance. The product
can also be connected to a bi-directional metre that enables the user to monitor units of electricity
being fed back into the grid if there is an active net-metering policy in his state. Source: news.webindia123
G
rowatt New Energy Tech-
nology Co. Ltd., global Together, Tigos Flex Mlpe Technology
manufacturer of high effi-
ciency solar inverters, today Enables The Following Features:
announced its partnership with Tigo,
pioneer of the smart modular Flex
MLPE platform, to bring its first suite Fully integrated monitoring (For US model) Unified
of Smart Inverters to the solar mar- online platform reports all components with alert
ket. Tigos Cloud Connect Advanced and fleet management on demand from multiple
(CCA) datalogger powers Growatt geographies, anytime.
inverters(US model) to work compatibly Greater installation savings (For US model) BOS UL-listed Rapid Shutdown compliancy Tigos
with all Smart Modules. Growatt now of- costs are lowered by installing only one component on certification covers tier 1 module manufacturers for
fers 48 Smart Inverters with a range of the ground with monitoring included. both NEC 2014 & 2017 690.12 requirements.
1kW to 60kW for both commercial and
residential markets. Tigo recently vali- Scalability for residential & commercial Installers Compatibility with ALL Smart PV Modules Custom-
dated operational compliance between can choose from 48 Smart inverter types ranging ers can choose any Smart modules from more than
all TS4 Platform covers and these 48 from 1kW to 60kW for any design site. 30 international distributors.
Growatt Smart inverters.
As commercial PV systems are becoming increasingly prevalent in India, the competition is increasing in terms of
the system RoI. One method to improve system RoI is to decrease the CAPEX/upfront costs of the system. Since
modules and inverters are decreasing in price, BoS costs, which make up about 10% of commercial rooftop costs,
have been identified as the next optionfor decreasing these CAPEX/upfront costs.
F
or instance, an array of disadvantages and limitations, such as solution, can increase string length to a
120 modules will typically higher component costs,more difficult total of 60 modules in this example.
be installed in 4 strings sourcing, safety concerns, electrical Increasing string length is not the only
of 30 modules, and the codes, equipment availability, and impact that inverter selection has. In fact
homerun cables could unknown effects to modules, such as PID. it reaches far past this. Approximately
be around 335 feet for each array. In Additionally, working at 1500 V requires 25-30% of total costs of commercial
addition, a fuse combiner box would special, non-standard testing equipment systems originate from inverter selection.
be needed to connect all of the strings. (megger, iv-curve, etc.), which is also In terms of upfront expenses, inverter
Installing strings that are twice as long, more expensive and harder to source. selection impacts EBoS, inverter, and
would reduce the number of strings Furthermore, higher voltage systems labor costs. But in terms of ongoing
and therefore the amount of required pose higher safety risks and added costs, the inverter also impacts operation
cables and eliminate the need for a fuse complexity as in most countries they and maintenance activities. Systems that
combiner box. Because of the potential require specially qualified electricians and have reduced maximum modulevoltage
for cost savings, the industry has begun special regulatory approvals. require module-level power electronics,
the race towards enabling longer strings.
Understanding that longer strings can Lior Handelsman, VP of Marketing and Product Strategy,
improve the bottom line of the system founded SolarEdge in 2006 and currently serves as our
is only half the battle. Knowing how Vice President, Marketing and Product Strategy where he
to technically increase string length is responsible for SolarEdges marketing activities, product
is much more complicated. There management and business development. Prior to founding
are two standard ways for increasing SolarEdge, Mr. Handelsman spent 11 years at the Electronics
string length. The first way to increase Research Department (ERD), one of Israels national labs,
string length is to reduce the maximum which is tasked with developing innovative and complex
operating voltage of each module. systems. At the ERD he held several positions including
This is done by using certain types of research and development power electronics engineer, head
module-level electronics. An example of of the ERDs power electronics group and manager of several
this would be a 72-cell (280-watt peak), large-scale development projects and he was a branch head
with 45 open circuit voltage. A traditional in his last position at the ERD. Mr. Handelsman holds a B.S.
system with 1000V would allow for in Electrical Engineering (cum laude) and an MBA from the
Technion, Israels Institute of Technology in Haifa.
22 modules in a string. However a
system with a reduced maximum panel
voltage of 35 would allow for a string A completely different way to reach so high-resolution monitoring is
of 28 modules. It is important to note longer strings is with fixed-string voltage. available, even though the strings do not
that reducing panel voltage does not Fixed voltage mode is an advanced benefit from a significant gain in length.
necessarily mean clipping of power. operating mode for string inverters. It On the other hand, 1500V systems
While this is a 30% increase in string requires power optimizers to match which have a better improvement in
length, the commercial market needs a current level drawn from the inverter, string length, still use a standard inverter
more competitive solution. while the inverter maintains string without module-level management or
The second way to increase string voltage at optimal voltage for DC/ power electronics. This is why the fixed-
length is to change the current code and AC conversion regardless of string string voltage inverter system is the best
increase inverter input voltage to 1500v, length or temperature. This means that of both worlds it offers longer strings
which is a new direction that is currently string length is no longer governed and module-level management and
being introduced to the market. This by voltage, but by power. And in fact, monitoring. This not only helps to reduce
higher voltage allows for strings up to it allows for 100% longer strings than O&M costs, but also increase system
50% longer than strings of 1000Vdc. In standard string inverters, while also uptime and energy yield, thus further
order to implement this, components of keeping the voltage below 1000. Using increasing revenue.
the system all need to comply with 1500 the same components as mentioned in So, while 1500V systems are a new
V, such as the modules, inverters, cabling, the previous example, a 1500V inverter technology that the market is betting on
and connectors. could allow up to 45 modules. This is to offer longer strings, a smarter choice
While longer strings offer an important a 15 panel increase over a traditional is fixed-string voltage inverter systems
advantage for commercial systems, this 1000V system. However, a fixed- that have already been field proven.
specific direction suffers from numerous string voltage system, like SolarEdges
W
to the extension of the Investment Tax
ith Chinas contribution, According to EnergyTrend, Chinas Credit, and the countrys annual PV
the annual global distributed system installations demand is projected to fall by about
PV demand is also (including those related to the PV 15% from the 2016 level. For now, the
projected to cross Poverty Alleviation Project) are expected outlook of the U.S market for 2018 is
the 100-gigawatt to come to 22 gigawatts this year. The very uncertain because the countrys
mark for the first time in 2017, coming countrys total installed capacity for International Trade Commission may
to a 100.4 gigawatts. Compared with 2017 is estimated around 48 gigawatts, affirm Sunivas petition and recommend
2016, this years global PV demand will while its cumulative installed capacity is relief from all solar imports under
advance by about 26%. As the Chinese projected to reach 125.42 gigawatts by Section 201 of the 1974 Trade Act.
government continues to support its the end of the year. Annual PV demand in the U.S. for 2018
domestic solar sector, the annual global This July, Chinas National Energy could range from a low of 5.5 gigawatts
PV demand is expected to top 100 Administration revised the countrys to a high of around 10 gigawatts.
gigawatts through to 2019. Booming installed capacity target under the 13th India has formally surpassed Japan
China to represent nearly half of the Five-Year Plan, earmarked a total of as the worlds third largest market this
2017 global market. 86.5 gigawatts for the period from 2017 year and is expected to see steady
to 2020. Though the Five-Year Plan increases in its annual PV demand.
EnergyTrend Analyst Rhea Tsao is mainly to support the building of While Japan has dropped to the fourth
pointed out that Chinas PV ground-mounted PV plants, distributed place in the regional market ranking, the
demand for this year has been PV systems, including those under the changes in its FIT scheme will keep its
far ahead of expectations. PV Poverty Alleviation Project, have PV demand stable. Under the revised
The countrys cumulative grid- also benefitted in terms of subsidy and FIT scheme, which took effect at the
connected system installations grid connection precedence. Hence, the start of Japans fiscal year of 2017 (April
for the first eight outlook is bright for Chinas distributed 2017), PV projects must complete grid
months of 2017 PV system market, with annual demand connection before the end of the fiscal
is estimated to reaching the 15-gigawatt level from 2019 in order to be eligible for FIT. There
have reached 2018 to 2020. By the end of 2020, are currently around 20 gigawatts of
39 gigawatts. Chinas cumulative installed capacity is projects around Japan that need to be
Going forward, forecast to total around 250 gigawatts. connected to the grid within these three
the Chinese fiscal years.
Annual PV demand in the U.S. to
market during
this years retreat 15% this year, but Sunivas Tsao added that China has made
remaining four petition is generating uncertainty-driven Asia the priority focus of the solar
months will be demand industry. Furthermore, the PV supply
influenced by the completion of The strong Chinese market will chain has gained significantly this
projects related to the second propel the global annual PV demand year on account of the strong Chinese
phase of the Top Runner Program to 100.4 gigawatts this year a new demand and the uncertainty resulted
and the first phase of the PV historical high. EnergyTrends ranking from Sunivas petition. For the remainder
Poverty Alleviation Project, said of the top regional markets by the of 2017, the solar market will enter its
Tsao. At the same time, the share in the global demand shows least active period in the third quarter.
market is also being affected that China will remain the leader. U.S. Stock-up activities will slow down a bit
by rumors that the Chinese follows in second place with its annual from the end of September to the middle
government will cut feed-in tariff demand reaching 12.5 gigawatts this of October. Nonetheless, demand
(FIT) rates for distributed PV systems year. Indias annual demand for 2017 is across the supply chain will generally
at the start of 2018. This prospect estimated around 10 gigawatts, making be above average despite the seasonal
will likely trigger another wave of headwinds to the end of the year.
the country the third largest market.
urgency to complete installations
in the short term. Japan is expected to take fourth place Source:EnergyTrends
$50
Billion
program to diversify the oil
producers domestic energy
supplies away from fossil fuels.
T
he energy ministry said Abu Dhabis
Masdar and Electricite de France There is great pressure in
SA bid to supply power from a the Middle East to come
300-megawatt photovoltaic plant up with an impressive
for as little as 6.69736 halalas a headline number, and
kilowatt hour, or 1.79 cents, accord- these are becoming
ing to a webcast of the bid-opening increasingly divorced
ceremony on Tuesday in Riyadh. If
awarded, that would beat the previ-
from the reality of
ous record for a solar project in Abu payments.
Dhabi for 2.42 cents a kilowatt-hour. - Jenny Chase,
Saudi Arabia and its neighbors Chief Solar Analyst
are among Middle Eastern oil for BNEF in Zurich
producers looking to renewables to
feed growing domestic consumption
thats soaking up crude theyd rather SOLAR LAGGARDS
export to generate income.
T
While the offers submitted are he Middle East, rich in oil and natural gas, is trailing most other
remarkably low, the actual cost of regions in developing renewables such as solar and wind. Gov-
power coming from the projects ernments from the United Arab Emirates to Iran and Saudi Ara-
may be inflated by terms within the bia have spent the past two years sketching out incentive programs
contracts that arent yet published, and regulatory changes needed to jump-start their clean-energy
according to Bloomberg New En- industries, which remain a fraction of the scale built up in places like
ergy Finance in Zurich. Japan and Germany where energy is scarce.
P
rices for solar projects in the Middle East have set successive
records with first Dubai and then Abu Dhabi coming in with all-
time low power pricing. A combination of improving and less
Saudi Arabias price may reflect a costly technology, free land earmarked for the plants, connections to
base rate paid at periods of peak the national power grid and favorable financing have helped cut the
costs.
demand or a price that applies
only for part of the projects life.
T
he large size of the projects being offered has also played a
key role, as developers have been able to bid lower prices for
It also could include a payment electricity because of anticipated economies of scale.
to the winning developer, land
grants or other incentives to get
the solar industry started in Saudi Saudi Arabias renewable energy
Arabia. I dont think this is possible program is part of a broader project
as an all-in price of electricity to wean the economy from its
from a 2019 PV project, particu- reliance on oil exports.
larly given the rising cost of debt The government is
in Saudi Arabia, Chase said. seeking to build new
industries such as
E
ven so, the announcement petrochemicals,
is a milestone in Saudi Ara-
bias nascent solar program. manufacturing
The country that gets less than 1
percent of its power from renew-
and tourism.
ables currently plans to develop
30 solar and wind projects over
the next 10 years.
Officials at the ministrys
Renewable Energy Project Devel-
opment Office will review all the
bids presented before awarding
a power-purchase contract, ac-
cording to the webcast. It plans
to make a final decision on who
will build the solar plant at Sakaka
in the countrys north in January,
according to an emailed statement
from the office.
FIRST AWARD
State crude giant Saudi
T
he plant will be the first awarded Arabian Oil Co., known as
under the renewables program, which Saudi Aramco, is preparing
targets 9,500 megawatts of electricity
generation capacity using solar and wind by
to sell a stake of about 5
2030. The project is set to start producing percent in an initial public
power by June 2019, according to the bid. offering that Crown Prince
Mohammed bin Salman
S
audi power-plant developer ACWA
Power made the second-lowest bid
has said could value the
at 8.7815 halalas per kilowatt-hour, company at about $2 trillion
and a group led by Marubeni Corp. made and provide cash to help
the third-lowest bid. Masdar, officially named diversify the economy.
Abu Dhabi Future Energy Co., and EDF are
already partners in an 800-megawatt project Source: Bloomberg
in Dubai.
PM launches Pradhan Mantri Sahaj Bijli Har Ghar Yojana Saubhagya. The Prime Minister Shri Narendra
Modi has launched a new scheme Pradhan Mantri Sahaj Bijli Har Ghar Yojana Saubhagya to ensure
electrification of all willing households in the country in rural as well as urban areas.
T
he total outlay of the project is Rs. using Socio Economic and Caste
16, 320 crore while the Gross Bud- Census (SECC) 2011 data.How-
getary Support (GBS) is Rs. 12,320 ever, un-electrified households not
crore. The outlay for the rural house- covered under the SECC data would
holds is Rs. 14,025 crore while the also be provided electricity connec-
GBS is Rs. 10,587.50 crore. For tions under the scheme on payment
the urban households the outlay is of Rs. 500 which shall be recovered
Rs. 2,295 crore while GBS is Rs. by DISCOMs in 10 instalments
1,732.50 crore. The Government of through electricity bill.
India will provide largely funds for The solar power packs of 200
the Scheme to all States/UTs. to 300 Wp with battery bank for
The States and Union Territories un-electrified households located
are required to complete the works in remote and inaccessible areas,
of household electrification by the comprises of Five LED lights, One
31st of December 2018. DC fan, One DC power plug. It also
The beneficiaries for free electric- includes the Repair and Mainte-
ity connections would be identified nance (R&M) for 5 years.
I
lighting purposes n this context he mentioned the Pradhan Mantri Sahaj Bijli
(b) Improvement education Har Ghar Yojana, which would provide power connections to
services all the estimated four crore households which currently did
(c) Better health services not have a power connection. The outlay for this scheme would
(d) Enhanced connectiv- be over Rs. 16000 crore. These connections would be provided
ity through radio, television, free of cost, the Prime Minister said. Speaking to the accompani-
mobiles, etc. ment of a presentation, the Prime Minister recounted how he
(e) Increased economic activi- had set a target of electrifying over 18000 unelectrified villages
ties and jobs within 1000 days. He said less than 3000 villages are now left to
(f) Improved quality of life be electrified. He explained how coal shortages have become a
especially for women thing of the past, and capacity addition in power generation has
exceeded targets.The Prime Minister also spoke of an increase
in renewable power installed capacity, towards the target of 175
F
or easy & accelerated imple- GW by 2022. He mentioned how the power tariff in the case of
mentation of the Scheme , renewable energy has been reduced significantly. A consider-
able increase has also been made in transmission lines. The
modern technology shall be
Prime Minister mentioned how the UDAY scheme has brought
used for household survey by using
down losses of power distribution companies, describing it as an
Mobile App. Beneficiaries shall be
example of cooperative, competitive federalism.
identified and their application for
electricity connection along with
applicant photograph and identity
proof shall be registered on spot.
The Gram Panchayat/Public Explaining the impact of economies of scale in the UJALA
institutions in the rural areas may be scheme, the Prime Minister said that the cost of LED bulbs has
authorised to collect application forms come down significantly. The Prime Minister said that New
along with complete documentation, India will require an energy framework that works on the
distribute bills and collect revenue in
principle of equity, efficiency and sustainability. He said the
consultation with the Panchayat Raj
Institutions and Urban Local Bodies. change in work culture in the Union Government is strength-
The Rural Electrification Corporation ening the energy sector. This in turn, will positively impact the
Limited (REC) will remain the nodal work culture of the entire country, he added.
agency for the operationalisation of
the scheme throughout the country.
PM launches Pradhan Mantri
Saubhagya Yojana; dedicates
Deendayal Urja Bhawan to the
nation.
T
otal corporate funding (including venture
capital funding, public market and debt
financing) in the first nine months (9M) of
2017 was slightly lower compared to the
same period in 2016, with about $7.1 billion
raised compared to the $7.5 billion raised
in 9M 2016. There were 143 deals in 9M of
2017 compared to 125 deals in the same period of 2016.
Looking at just Q3 2017 data, Mercom found that cor-
porate funding in the solar sector grew 74 percent com-
pared to Q2 2017, with $2.4 billion raised in 45 deals. In
Q2 2017, $1.4 billion was raised in 37 deals. Year-over-
year (YoY), funding in Q3 2017 was about 19 percent
lower compared to the $3 billion raised in Q3 2016.
Global VC funding (venture capital, private equity, and
corporate venture capital) for the solar sector in 9M 2017
rose a slight seven percent to $985 million from $925 mil-
lion raised during the same period in 2016, largely due to Debt financing activity
a strong first quarter in 2017.
In Q3 2017, VC funding for the solar sector doubled
outside of the United
with $269 million raised in 23 deals compared to $128 States helped bump up
million raised in the same number of deals during Q2
2017. Most of the VC funding raised in Q3 2017 (72 corporate funding in the
percent) went to solar downstream companies with $193
million in 13 deals.
third quarter as financing
The Top VC deal in the third quarter of 2017 was the activity in the United States
$100 million raised by Indian rooftop installer CleanMax
Solar. It was followed by the $56 million raised by Singa- was muted ahead of the
pores Sunseap Group, the $21 million secured by Sol Suniva anti-dumping case
Voltaics, and Ampts $15 million. Ubiquitous Energy also
raised $15 million. A total of 35 investors participated in decision, commented Raj
solar funding in the third quarter of 2017.
Solar public market funding was approximately 12
Prabhu, CEO of Mercom
percent lower compared to the first nine months of 2016, Capital Group.
with $1 billion raised in 9M 2017 compared to $1.2 billion
raised during the same period of 2016. Public market
financing fell significantly in Q3 2017 with just $79 million
in four deals, down from $473 million raised in six deals
in Q2 2017.
D
uring the first nine months of 2017, debt fi-
nancing activity accounted for $5.1 billion in
51 deals, which was almost six percent low-
er compared to the first nine months of 2016, when
$5.4 billion was raised in 55 deals. In Q3 2017, an-
nounced debt financing rose steeply to $2.1 billion
in 18 deals compared to the $798 million raised in
eight deals during the second quarter of 2017.
I
n the top debt deals, Greenko Energy Holdings
raised $1 billion in green bonds in two separate
deals, $650 million and $350 million. Cypress
Creek Renewables also received $450 million from
Temasek.
A
nnounced large-scale project funding in
9M 2017 crossed the $10 billion mark, with
$10.2 billion raised for the development of
117 projects. For the third quarter of 2017 alone,
announced large-scale project funding came in at
more than $2.8 billion in 36 deals.
A
nnounced residential and commercial solar
funds totaled $2.2 billion in 9M 2017, which
was lower by almost 35 percent when com-
pared to the $3.4 billion raised during the same
period of 2016.
T
he first nine months of 2017 saw a total of 58
solar M&A transactions, compared to the 48
transactions seen in the same period (9M) of
2016. There were 18 solar M&A transactions in Q3
2017, up from 11 solar M&A transactions seen in
the preceding quarter (Q2 2017) and equal to the
number of transactions (18) posted in Q3 2016. Of
the 18 total transactions in Q3 2017, 13 involved
solar downstream companies, three involved
PV manufacturers, and there was one transac-
tion each by a BOS company and an Equipment
provider.
T
here were 161 large-scale project acquisi-
tions in first nine months of 2017 aggregat-
ing over 14.6 GW, compared to 145 project
acquisitions totaling just 7.1 GW during the same
period of 2016.
S
imilar to Q2 2017, investment firms and
funds were the most active acquirers in Q3
2017, with 26 projects for over 2 GW, fol-
lowed by project developers with 16 transactions
totaling over 1.1 GW.
Investors and project developers should be clear about the Levelized Cost of Electricity
(LCOE), this would represent the average cost of generating energy over the life cycle
of a project. At a conceptual level, it is calculated as the net present value of the total
costs over a projects life cycle, divided by the total amount of energy produced over the
life cycle. It enables comparison of the cost of energy across different technologies, par-
ticularly when capital cost, scale, and project life differ.
F
rom state wise tariffs for com-
mercial consumers across various
states, its evident that solar tariffs
are almost at parity level with
commercial tariff across most
states. Also, Utilities have been
opposing indirectly on more installations,
since this would have direct financial and
operational impact. Led to paying-out for sur-
plus power fed to the grid and maintaining &
balancing the grid becomes complex. GOI is
working on the analyzing the following areas
like Grid Integration and Regulatory view,
Review of Electricity Tariffs DISCOM wise,
Operating Layouts, State wise Load Profiling,
PV Cost and Design, Market Potential of EPC
players, Cost of Energy and Grid Parity, Sup-
ply Infrastructure, Environmental and Social
Impacts to achieve the goal.
I
and asset management excellence to meet the demands in the market. nverter manufacturer front end
software, which provides real-time
information, but does not log all the
events, alarms and other maintenance
issues. In such cases, there is very little
documentation which can help the O&M
personnel to identify, diagnose and trace
the problems.
Solar-Log is providing a value-added
service called Solar-Log Web4u with a
dedicated support team, where the plants
are being monitored very closely on all
available component level. Failures are
detected with minimum down time and
notified to the field service team, followed
by a brief explanation on the failure with
the indicated problem of the asset. Pin-
pointing the device failure, along with part
Why we need to look forward on Asset management failed would help the field tech to carry
maturity? And what solution Solar-Log offers exact spare which is required to fix the is-
sue with minimum time. More importantly
through remote monitoring and asset management? the monitoring team would log all events,
F
site characteristics, outages with actual
ixed price O&M contracts are common in the industry, especially failure, root cause analysis, resolution
during the first five years of a plants life, were equipment and comments from field services are docu-
workmanship warranties are in place. Using Pay-per-use plan and mented in a ticket, for current & future
fixed O&M contracts would be tough to manage, since the price escala- reference to analyze the performance of
tion of managing the assets become highly expensive when standard the system.
warranties expire. Thus, costs associated with repair, replacement, and We did a case study with a sample of
maintenance of issues become the plant owner/investors financial re- 100 projects in our fleet during this year,
sponsibility. The below listed balls would tell you which position you are were we could find the actual failure area
managing your assets. for system outages, with the number of
events associated with revenue loss.
Solar-Log provides technical assistance, advices on key insertions defining the O&M
scope, contracts and Asset management solutions as some of them listed below to move
the system to Asset management excellence to meet out the needs
Service-level agreements (SLA) at a site, based on system design and would be sent to the utility companies
Define specify compliance timeframes modeled plant behavior which can be on how much KW is impacted due to
to detect and respond to failures to variable, were Force Majeure events that based on that the power source
resolve issues. Based on plant condi- and warranty defects are accounted. can be adjusted.
tions, equipment type and issue sever- We need to make sure that proper Spare Parts Inventory Manage-
ity level. Site Maintenance(SM), Preventive ment- General practice is plant owners
Availability or uptime guarantees Maintenance(PM) and Corrective typically buy a range of equipment
The percentage of time that a system Maintenance(CM) done time to time as spares, either kept on site or at a near-
must be fully able to produce electric- per contracts. We could define check by warehouse, to ensure a high level of
ity. Availability guarantees are typically list on all site activity based on contract plant uptime. However, the number and
set at 97-99% per year. This involves also track what is done and what is not type of spares maintained and the as-
a time-based and reliability-centric done. This could be availed with the sociated budgets allocated vary based
method for collecting data on equip- tracking the site day to day events this on plant size, geographic location, con-
ment performance A best suggested play key role in increasing the yield tractual issues, and management phi-
practice to approach this with real Feed-In Management - We are losophy. Say, fuses, contacts, SCBs,
time data by considering mean time to in touch with multiple DISCOMS on wiring, inverter parts (circuit boards,
detect and mean time for restoration the feed in management side to the filters, fans, etc.), disconnect switches,
to obtain availability guarantees. Given grid. What it brings up is, depending and modules as typically considered to
that plant availability is tied to design, upon the location, the demand will be be the most critical spares to have on
workmanship, and equipment reliabil- calculated with the availability of power, hand. These items can immediately be
ity, associated guarantees. This would this would tell us how much energy we utilized to mitigate common nuisance
be validated with the history of failure would require on hourly basis through- and more serious unplanned plant is-
events and with ground reality in ad- out the day. This is a biggest plus to the sues. which is the critical part in O&M
dressing things. utilities and project developers to avoid scope, because this could increase or
unwanted shutdowns or power limita- decrease the cost of the O&M as well
tions. Also controlling can be done from as the working capital requirement. It is
What role did PM, SM and CM in
the inverter level or from a load dis- also essential for the timely completion
plant performance ratio and yield
patch center depending upon the load. of the several types of maintenance.
guarantees Plant performance is
In case of any Forced majeure events Depending upon the failure rates and
based on the amount of energy deliv-
or unexpected inverter failures a notice spare usage, we could define Inven-
ered as per measured solar irradiation
In Exclusive
Tamil Nadu. We take pride in being
amongst the top performer when it
comes to reliability and performance,
especially in terms of reduced cable
lossin the DC side.
Mr.Marc Jarrault
Marc: Renewable energy like solar
has huge potential to produce clean
and green energy to satisfy the ever-
rising energy demand of the country.
The geographical location stands to
benefit India; hence it has tremendous
- Managing Director, scope of generating solar energy at a
Lapp India Pvt. Ltd. low cost and throughout the year. The
deployment of solar power ensures
in providing clean energy reducing
EQ: How much BOS have you dependency on fossil fuels, thereby
supplied to India till now, reducing CO2 emissionsand put less
what is the target/expectation pressure on non-renewable resources.
in 2016-17 However, non-renewable resource still
Marc: Lapp has been a driving force has tocontinueto meet the base load
for innovation in the photovoltaic requirement.
(PV) industry. For over ten years, The current government too has set
the company has been successfully ambitious target of having 100 GW of
developing cabling & connectivity solar energy capacities by 2022.Hence,
solutions for photovoltaic systems. We we believe solar will become a crucial
have regularly brought in efficiency component of Indias energy portfolio in
in transmissionwith our intelligent the next decade, which presents huge
innovations. Since 2012, Lapp India opportunities for both local and foreign
has catered to over 4 GW of grid players to collaborate and explore
connected PV projects with an array of possibilities of commercial and technical
highly efficient and reliable products relationships.
like PV cables, connector, splitters and We are also contributing to help add
other accessories. For this financial value to our customers in this space.
year (Oct 16-Sept 17), we hope to We have had the privilege of partnering
cater over 1 GW of PV projects. At forbig projects with organizations like
present, we cater to about 25 % of NTPC, NLC, MAHAGENCO, Renew,
the total 13GW of installed grid- Today Energy, WANEEP, Solairedirect,
connected PV base in India. Welspun Energy and SunEdison. For
EQ: Kindly enlighten our some of these projects, we have either
readers on the performance supplied our products, mostly PV
of your BOS in India cables, directly or partnered with the
leading EPCs such as Sterling Wilson,
in various geographic ABB, TATA, Schneider &Waaree.
locations, customer
Amongst our noteworthy projects,
feedback. Lapp has successfully supplied TUV
Marc: Lapp India offers certified Water Proof PV cables (one
weather-, abrasion- and UV- of our recent innovation), for a 100kW
resistant photovoltaic cables Floating PV installation at the NTPC
and has supplied close to plant in Kayamkulam, Kerala. This
40,000kms cables in India. project holds tremendous potential for
So far, we have offered our NTPC where they have access to large
cables and accessories still water bodies. Thisis NTPCs first of
to large PV projects its kind &largest in India. This project
in locations like was undertaken in collaboration with
Rajasthan, Gujarat, CIPET (Central Institute of Plastics
Madhya Pradesh, Engineering & Technology) Chennai.
Karnataka, The project called for a reliable solution
Telangana, wherein the cable had to be in constant
Andhra contact with water and our certified
Pradesh water proof PV cable proved to be the
and ideal choice in this situation.
EQ: Please describe in brief where Fender specialized in cables for advantage of advanced support from
about your company, directors, alarm and fire protection systems. This U.I. Lapp (parent company) in terms of
facilitated us to expand and venture into technical expertise, resources as well as
promoters, investors, its vision & newer segment and sector. Along with R&D requirements. Lapp is synonymous
mission acquisitions, we have also ventured into with Innovation and we believe in
Marc: Lapp Group is a Stuttgart-based markets outside Germany. India is the developing innovative cable technologies
ambitious family company that has 2nd largest market where we are growing that play an important role in addressing
evolved into a global player and a at double digit. Apart from India we also customer and industry challenges.
market leader in cable and connection see China as the crucial market as it is Lapp India strives to develop cabling
technology.The Lapp company was a manufacturing hub and market in US products and solutions that help and
founded by Ursula Ida and Oskar Lapp has also proved to be fruitful for us. For assist industries in creating innovative
in 1957. Lapps initiation was as a every market, we look at customizing products. We put our products to a test in
small start-up and in less than 50 years the production to meet customer our laboratory and test facility to ensure
they have evolved as a global player. requirements and application demand. they meet the high expectations of the
The name Lapp not only stands for
innovation, strength and quality, but
also for continuity. The motto of Andreas EQ: What are your plans for India, your view on the GOI
Lapp, a member of the family and now
in the Board of Directors of Lapp Group
target of 100GW Solar Power by 2022
has always been to reliably connect the Marc: Current Government has put renewable energy at the top of its agenda,
world with high quality and technologically seeking to reduce Indias overwhelming dependence on coal-fueled electricity.
superior products. The third generation As renewable sources have the obvious advantage of being cost-competitive
of Lapp family has now taken on compared to fossil fuel-based generation, they also help in lowering carbon
responsibilities of the company with footprint. India has set a target of 175 GW of renewable energy capacity by
Matthias Lapp taking over the position 2022, which includes 100 GW of solar power, 60 GW of wind power, 10 GW of
of Chief Executive Officer (CEO) of biomass-fired power and 5 GW of small hydro power. Our vision is to become
management for Latin America, Europe, the preferred partner for cable and connection technology for our customers
the Middle East, Africa and U.I. Lapp across all segments of the industry. We at Lapp India currently enjoy a market
GmbH. Till date our vision has not just share of 25% in grid connected PV projects and aim to further increase our
been about developing and producing penetration in solar market. To achieve long-term sustained growth,we will
innovative products and solutions but continue to cater to different industry segments by offering superior product
to promote cooperation and enabling experience including new technologies.
relations with our employees, suppliers
and customers. Lapp envisions the future
and is already manufacturing tailor-made EQ: What are your plans for customer. The demanding requirements
products for renewable energy, Industry Manufacturing set up in India, for these systems mean that a tailored
4.0 and electric mobility. the opportunities and challenges solution is needed for every application.
EQ: What is the size of in manufacturing in India We thoroughly test even the first
samples, and the customer can therefore
your company in terms of Marc: We have two dedicated
be confident that the solution is the right
manufacturing capacities, manufacturing plants in India Bangalore
one with the danger of costly downtimes
growth chart, future expansion and Bhopal. Our total investment in these
of production equipment reduced to a
plans, revenues, shipments, two manufacturing units amounts to 5
minimum.
Million Euros. About 60% of products
ASPs, financial figures, sold in India is manufactured in India. EQ: What are the top markets
Marc: The Lapp Group has remained With this we are able to offer customized for your company in the past,
in continuous family ownership since it designs for some of the PV projects. present and future
was founded. In the 2015/16 business Additionally, we are geared up to meet
year, it generated consolidated revenue Marc: Lapp Group had foreseen
the other signal & AC cable requirements potential of the Indian market in terms
of 901.5 million euros. Lapp currently which are part of the e-BOS. Market in
employs approximately 3,440 people of rapid growth in infrastructure and
India is challenging as it is price sensitive industrialization in the year 1996. India
across the world, has 18 production sites and demands world class technologies at
and over 40 sales companies. It also has always been a key focus for us owing
affordable pricing. To meet this challenge, to the promising growth opportunities
works in cooperation with around 100 we are starting to manufacture more and
foreign representatives. With our many of the country.Lapp India is the second
more products in India with an exception largest company of the Lapp Group; the
competent consultation teams around of some specialized products.Another
the globe we ensure comprehensive milestone set here in terms of business
important challenge is the transportation and the success garnered in retaining
service in every continent. We believe infrastructure. It is critical that as a
in driving growth for the company not the position in the market has proved to
country we lay more focus on developing be an example for other Lapp companies
only by increasing our customer base road and rail infrastructurewhich is the
but also by acquiring new companies located worldwide. Other than India,
key to ensure faster movement of goods. China too is a critical market as it is the
to meet our customer requirements
and address new segments. Last year EQ: What is your emphasis on hub of manufacturing. The Chinese
in October we happily announced the R&D in this segment? market has several OEMs which are
acquisition of companies like CEAM and Marc: We have a R&D center at key customers for cable a connection
Fender. CEAM was a leading European Stuttgart, Germany. When it comes to technology.For solar, Asian markets
manufactures of data cable for Industrial R&D and Innovation, Lapp India has the including India, show a huge market
Ethernet and fieldbus network systems potential.
T
he development of key
technologies such as the
Internet of things (IoT),
cloud computing, and
big data is accelerating
the convergence of the
digital world and the real
world. The smart society where people
and people, people and things, and
things and things are all-connected is
blossoming. Huawei has been committed
to building the cloud-pipe-device architec-
ture for the smart society and to enabling
and promoting the development of the
smart society. In the renewable energy
industry, Huawei Smart PV Solution that
combines the digital information technol-
ogy, Internet technology, and PV technol-
ogy has been widely used in the large-
scale ground-mounted PV plants in the
Uttar Pradesh and Madhya Pradesh, and
has become the industrial mainstream.
By now, Huawei Smart PV Solution has
2 GW installed capacity in India.
O
n this exhibition,
T
Huawei intro-
duces the next he brand new 65KTL smart string
generation utility-scale inverter uses the efficient multi-
ground 1100 V Fusion- topology technology. The maximum
Solar Smart PV Solution efficiency can achieve 99.0%, leading
which further simplifies the industry. By teaming up with indus-
the system, reduces try partners, Huawei integrates multiple
the system investment advanced intelligent technologies, includ-
and O&M cost, and ing PID recovery at night, smart tracker
improves the system convergence, smart box-type transformer,
security and reliability. Smart I-V Curve Diagnosis, smart O&M,
The solution inherits the smart component (optimizer), and dedicated
outstanding fuse-free, self-adjustable cable connection design. These technologies
natural cooling, and decrease the line loss on the entire PV array, continuously increase the energy yields,
PLCC technology. and reduce the O&M cost and initial investment.
W
ith openness,
collaboration,
and shared
success in mind, Hua-
wei will remain custom-
er-centered. Huawei will
cooperate with partners
to forge more innova-
tive and competitive
W
ith the Smart I-V Curve Diagnosis technology, the PV plant is scanned remotely, solutions and promote
and therefore faulty PV strings are precisely located and the root causes are the sustainable develop-
figured out. This technology helps avoid the waste on the journey to PV plants ment of the PV industry
and greatly save O&M time and cost. This technology can also be used to evaluate the PV in India.
plant health and produce early warnings for risks, which is good to problem discovery and
preventive maintenance, prevents the PV plant from becoming subhealthy, and ensures the
long-term high energy yields of the PV plant.
T
ata BlueScope Steel an-
nounces the launch of its
indigenous brand ILIOS Mr. Riten Choudhury,
a Solar Module Mounting
Solution to cater, to the
Managing Director,
increasing demand of the Tata BlueScope Steel said,
renewable energy sector in Solar segment is poised for
India. With ILIOS, TBSL would be ad- an exponential growth in
dressing the demand for quality products the near future. It is
under its flagship brand LYSAGHT, for both essential for us to provide
roof and ground mounting solutions. optimised and high quality
ILIOS comes with a wide range of
sectional dimensions and thicknesses; mak-
solutions for bridging the
ing it suitable for every requirement. These demand supply gap.
customized mounting structures are manu- With ILIOS, we aim to
factured from cold rolled Zn-Al/Zn coated offer customised solutions
steel that offers high corrosion resistance, suitable for every
weight optimization and quick installation. customers requirement.
The high strength steel ensures better load
bearing capacity and longer spans.
A
control a wide range of current harmonic wave. To
s we know, in an electric power system, non-linear electric ensure the stability, the control bandwidth of the
load will lead to harmonic voltage and currents. Harmonic inverter is normally around 1/10 of its switching
in the power grid are a frequent cause of power quality frequency. The switching frequency of string in-
problems. It will increase the current and heating in the connect- verter (16 kHz) is much higher than that of central
ed devices and conductors, and also produce harmonic voltage inverter (3 kHz for two-level topology inverter, 9
drop in the grid short-circuit resistance, so as to influence the kHz for three-level topology inverter). The broader
voltage wave shape. The bigger the absolute value of harmonic the control width, the better to control lower-order
current, the greater its influence to grid voltage distortion.Reduc- harmonic wave.
tion of current and voltage harmonics is considered desirable. (3) The high frequency part in the current out of
Total harmonic distortion, or THD is a common measurement of the bandwidth should be filtered by the inverter
the level of harmonic distortion present in power systems. THD can filter. Normally, the string inverter will use LCL fil-
be related to either current harmonics or voltage harmonics, and it ter featured with strong derating capability of high
is defined as the ratio of total harmonics to the value at fundamental frequency harmonic wave and little influenced by
frequency times 100%: on-grid resistance. Central inverters use LC filter
instead to cut down the cost, which will influence
the performance.
(4) In one PV array, multiple string inverters are at
different distances to the step-up transformer, so
the line resistance will be different. The line resis-
tance can equivalently change the LC inductance
in LCL filter and the different filter parameter
will change the phase of harmonic wave. When
Where Vn is the RMS voltage of Nth harmonic, In is the RMS multiple inverters are parallel connected, the har-
current of the Nth harmonic, and n=1 is the fundamental frequency. monic wave can be cancelled because of different
According to IEC61727 standard, total harmonic current distor- phase so as to reduce the total harmonic wave.
tion shall be less than 5% at rated inverter output. And in the solar Except the passive harmonic wave cancellation,
industry major inverter vendor will claim in their data sheet that Huawei develops active filter mode which can
THD<3%. actively reduce the harmonic wave for a smarter
grid adaption.
H
Test Time 2017/8/23 Test Object 5MW Block uawei communication network
(116 Pcs Inverters)
and energy equipment are used
Test Item Current Harmonic COD 10th Jun. 2017 in more than 170 counties and
Test device Electric Quality Analyzer- Current probe i430-FLEXI-TF regions, serving over one-third of the
Fluke 435-II worlds population. Huawei continuously
innovates and accumulates experience
Test Result The THD does not exceed the threshold. The inverters comply in system solutions, circuit topology,
with standard IEC 61727. control algorithms, and structural
design, and has realized the perfect
The test results are shown as the chart below: integration of digital information technol-
ogy and power electronic technology.
As the representative of cross-domain
integration, Huawei builds the smart
PV solution that features higher yields,
smart O&M, safe & reliable with the
innovative ideology of simple, full digital,
and global automatic operation. PV
plants have no redundant systems, like
inverter rooms and DC solar junction
boxes (SJBs), or vulnerable compo-
nents, such as fuses and external fans,
so that the delivery of simplified and
standard solutions is achieved. All the
components are able to adapt to vari-
ous harsh environments, including high
The power load ratio during the test period are shown as below: temperature, high humidity, dusty wind,
salt mist and high altitude. Zero-touch
maintenance for 25 years, guarantee
the reliable operation, as well as simpler
construction and O&M help PV plant
owners and operators maximize their
ROI. Huawei string inverters adopt
innovative algorithms and HiSilicon-
developed chip technologies and can
actively adapt to power grid changes
by leveraging its advantages including
high-speed processing capability, high
sampling and control frequency, and
The field test curve shows that inverter THD i is <2%, much lower than control algorithms such as an advanced
IEC61727 standard. harmonic suppression algorithm, along
with the with high control bandwidth,
excellent LCL filter performance. It is
worth mentioning that the SUN2000 can
intelligently adapt to various power grids
even in parallel mode, and can smooth
the total harmonic along with the pro-
duced power that will be exported to the
power grid. Compared with other central
and string inverters that do not support
the intelligent algorithm, Huawei string
inverters better adapt to the various
harsh working conditions of different
power grids all over the world, help PV
plants obtain better grid-connection per-
formance, and better improve the grid
stability and security.
The success of this test well proves
the leadership of Huawei string inverter
and smart PV solution.A PV plant with
Huawei string inverters is grid friendly
and a long-term stable performance.
In Exclusive Talk
the grid-connected net-metered project
not only meets the energy needs of the
schools but also is a source of revenue
A
ccurate solar radiation measure- to suit the customer needs.
ment for the solar PV industry When selecting a sensor suite, it is
and for scientific research study important to consider the required ac-
is a major challenge to understand curacy to achieve the required objec-
the available resource and how well a tives of the monitoring system, which
solar plant is performing, from pre- may depend on size or other criteria.
The energy needs of the construction prospecting and bank- Most PV plants use Global Horizontal
world are constantly ability, to the day-to-day operation and Irradaince (GHI) and/or Plane of Ar-
changing, and as new decision making of the plant during its ray (POA) Irradiance along with other
lifetime. parameters to calculate performance
technologies have be- ratio, power loss, or to validate the his-
At MeaTech (Measurement Technol-
come available, solar ogies) Solutions LLP, we are focused torical satellite or modelled data sets..
energy has become the on providing professional, friendly, Pyranometers, which are sensors
most popular form of and reliable service in the supply of used in measuring solar irradiance,
high quality equipment, services and have different accuracy and specifica-
new energy production.
consultancy or advice to clients in the tion classes, as defined by Interna-
In India, solar energy has solar industry and beyond, invcluding tional Standards (such as the ISO). It
become a fast developing environmental data, laser scanning, is important to understand the various
industry. The Jawaharlal mining solutions, alignment solutions, classes and what is best suited for a
Nehru National Solar surveying solutions and wind LIDAR site. The main objective of the user for
applications. selecting any of the ISO standard Py-
Mission (JNNSM), an ranometer for the Solar power system
initiative of the Govern- Site Prospecting and is to ensure the accuracy of their data.
ment of India and Indian Operation Monitoring: MeaTech Solutions, as a proud part-
ner of Kipp&Zonen (www.kippzonen.
A
State Governments, has
ccurate solar measurements com) for Solar Radiation products and
targeted generating 100 start with initial site prospect- Campbell Scientific,Canada (www.
GW of the countrys ing. This process involves using campbellsci.ca) for data acquisition
national power through a combination of satellite and ground and Meteorological measurements,
solar sources by the year based data, in order to choose the offers turnkey monitoring solutions for
best location for a solar site. Instru- any PV monitoring plant size.
2022. mentation selection along with well
Pyranometer
ed pyranometer calibrations
for clients locally in India,
Calibration:
MeaTech Solutions has teamed up
with Kipp & Zonen and Campbell
Scientific Canada to install and
Kipp & Zonen, the worlds operate the Indian Calibration
leading manufacturer of radi- Facility for Radiometers (INCFR)
ometers, recommends their in Gurugram. The Pyranometer
solar radiation instruments calibrations are performed accord-
that are operating in the field ing to ISO 9847 Std, which is an
to be calibrated at regular internationally recognized stan-
intervals, ideally every two dard related to the calibration of
years. After a two-year period field pyranometers.
in the field, the sensitivity A special team from MeaTech
of an instrument is slightly Solutions has been trained and
altered due to prolonged authorised by Kipp & Zonen to
exposure to the sun, and that operate the facility.
can cause some deviation in In addition to the calibration will allow Indian clients to calibrate
the sensors measurement service, MeaTech Solutions is also their Kipp & Zonen radiometers
properties. Pyranometer offering additional local services in order to perform more accu-
calibration to an international to clients, which may include on rate and reliable measurements
standard addresses this is- site field replacement of sensors, without the expense or downtime
sue, and ensures the data is spare sensors for swapping, or that comes with shipping sensors
reliable and intercomparable, providing a historical database of to foreign calibration facilities. The
guaranteeing its quality for past calibrations for client equip- increased efficiency, decreased
both the Indian solar industry ment tracking purposes. cost, and a higher level of service
and for international scientific The joint initiative of Kipp the facility brings will make the
research on solar radiation. & Zonen, Campbell Scientific INCFR an indispensable resource
Canada and MeaTech Solutions to Indian clients.
Electric transform 350 households dulkar, said, Our goal through Spreading Happiness is
to help citizens who are faced with the challenges of ac-
cess, affordability and reliability of power supply. Our
in UP village with Solar power foundations work in Badagaon gives me the confidence
to push ahead and seek to empower more citizens to
enjoy brighter lives. If all of us can come together to
create meaningful impact in the livelihood of the vil-
Spreading Happiness InDiya Foundation lights up lagers still facing these issues and enhance the quality
Badagaon in Barabanki, UP, through solar home lighting of life of communities, it is well worth the effort.
systems to support livelihood and local industry.
S
Sharing his views on the impact in Badagaon, Anil
Chaudhry, Country President and Managing Director,
preading Happiness be done in terms of reducing Schneider Electric India said, We believe access to en-
InDiya Foundation the energy and carbon intensity ergy is a fundamental human right. We are working at
(SHIF) a collabora- of our economy. Prime Minis- multiple levels to tackle the energy challenge. On one
hand, we are developing suitable products and solutions
tion between cricket- ter Narendra Modis scheme, and on the other we are investing in vocational training
ing icon Sachin Saubhagya, aims to supply of the youth to ensure the steady supply of technical
Tendulkar and electricity to all households by resources for the deployment in the remote areas. It
Schneider Electric December 2018, by providing is a matter of pride and immense satisfaction that our
India, the global specialist in free connections to the poor and solar solution has helped transform 350 households in
energy management and auto- at very low cost to others. This is Badagaon with safe reliable and sustainable power.
mation, today announced that it a reiteration of the governments
has empowered 350 households commitment to energy access for Spreading Happiness initiative of Spreading
in Badagaon, Barabanki, in the the households which are off the Happiness InDiya Foundation makes available solar
state of Uttar Pradesh with 350 grid. Spreading Happiness InDiya based on-demand, clean, bright and affordable
solar home lighting systems. Foundation is completely aligned electricity which can provide support to the
Spreading Happiness InDiya to the requirements of the nation livelihood of many artisans at Badagaon who are
Foundation is committed to pro- and is committed to support engaged in the traditional handicraft work of
viding energy autonomy to rural Governments push for access to zardozi and handloom weaving. The LED-based
India through renewable energy energy for all. The work in Bad- lighting system provided by Spreading Happiness
and spreading happiness by pro- agaon is one of a model, along InDiya Foundation provides a backup of 6-10 hours
viding access to energy. Spread- with others, which will be followed for indoor use and can illuminate a room of 12 feet X
ing Happiness InDiya Foundation in many more villages, Spreading 12 feet. Prior to this, the Spreading Happiness initia-
is committed to providing electric- Happiness initiative has provided tive has completed projects in, Maharashtra, Karna-
ity to around 25,000 households solar based lighting systems to taka, Odisha, West Bengal, Rajasthan, Arunachal
in the country. The Government over 16000 households since Pradesh and J & K, which have impacted more than
of India has a vision to provide its inception and is committed to 16000 households till date.
power for all by 2022. There is reach to 25,000 households
a significant scale of work to by 2020.
W
Waaree Energies Limited successfully aaree Modules are installed across all the roofs
completed solar rooftop across all 12 of all the metro stations. The entire rooftop solar
stations of Mumbai Metro. This project power generating system has installed capac-
ity of 2.29 MW which is around 30% of Mumbai
was very critical as it is a public utility Metros total power usage. This project will pow-
and heavily crowded all the time. Even erall Mumbai Metro stations with Waaree Solar
though the chances of accidents were PV modules. This will also result in the savings
very high, Waaree Energies completed of carbon emission of approximate 2700 tons
the project with high quality and per annum.
Zero accidents.
All shipment and financial figures refer to the Total shipments were 2,389.2 MW, well above
quarter ended June 30, 2017, unless otherwise the guidance of 1,550 to 1,650 MW. This is
specified. All year over year or y/y compari- mainly due to stronger than expected pull-in or-
sons are against the quarter ended June 30, ders from the China market. External shipments
2016. All sequential comparisons are against of 2,314.7 MW increased 88.3% year over year
the quarter ended March 31, 2017. and 68.3% sequentially.
One Year 12 Editions + 1 EQ Solar Map of India Current Price Rs.2400 Discount 10%
Two Years 24 Editions + 2 EQ Solar Map of India Current Price Rs.4800 Discount 20%
Three Years 36 Editions + 3 EQ Solar Map of India Current Price Rs.7200 Discount 30%
Four Years 48 Editions + 4 EQ Solar Map of India Current Price Rs.9600 Discount 40%
Five Years 60 Editions + 5 EQ Solar Map of India Current Price Rs.12000 Discount 50%
Offer is for Limited Time and Bank Account Details for Cheques/Demand Draft
Limited Number of Subscriptions Direct Payment/Deposit can be couriered to the
on First Come First Serve Basis. following address
Beneficiary First Source Energy India Pvt Ltd
Address : 95C Sampat Farms,
HURRY...SUBSCRIBE NOW. Bank Name Bank Of India
Bank Address At - Bicholi Mardana Branch,
Village Barda, Post Ali,
Indore-452001 (M.P) NDIA
7th Cross Road, Bicholi Mardana,
Indore 452 016 (M.P.) India
Subscription Price Includes Account No. 882920110000386
Swift Code BKIDINBBPAL
Shipping in India. IFSC Code BKID0008829
MICR Code 452013002 Online Payment by Cred-
Payment Can be it/Debit Card at
Beneficiary First Source Energy India Pvt Ltd
Done by PayTM Bank Name HDFC BANK
Bank Address Shop No.9,10,11, Shehnai 2, Kana
dia Road, Indore-452016 (M.P)
PAYTM Numbers INDIA
Account No. 50200011285202
Swift Code HDFCINBB
+91 986244496 IFSC Code HDFC0001772
MICR Code 452240008 saumya.gupta@eqmag.net
INGETEAM LAUNCHES
set go into production in October 2017.
Its key advantage over other char-
gers on the market is its reliability
CHARGING STATION
One). The Trio model is compatible
with all three existing charging stan-
dards, CHAdeMO, CCS and AC, the
Duo model includes CHAdeMO and
CCS, while the One model only in-
Ingeteam is finalizing the launch of cludes CCS.
To date, Ingeteam has supplied the
INGEREV RAPID 50, the companys market with more than 2,300 chargers
latest multi-standard rapid charge from the INGEREV range, includ-
ing AC slow chargers and DC rapid
model for the INGEREV electric chargers, installed in countries such
as Spain, Italy, South Africa, France,
vehicle product range. Mexico, Turkey, Scotland and Austra-
lia.
POWER INVERTER
er at any time in order to maintain the grid voltage
in the specified tolerance range a key contribu-
tion to grid management. To date, no other manu-
facturer is taking this approach using a stand-alone
(NOT ONLY) FOR reactive-power inverter, which can reduce the load
on the solar inverters and prevent yield losses in
the solar power plant. When there is a lot of sun-
PV SYSTEMS
shine, solar parks feed large amounts of energy into
the grid; when there is less sunshine, they naturally
feed in considerably less and grid impedance can
fluctuate accordingly. One useful means of com-
pensating for the resulting fluctuations in the grid is
The blueplanet 50.0 to provide what is known as reactive power. This is
where the new blueplanet 50.0 TL3 RPonly comes
TL3 RPonly from KACO in: this AC-coupled inverter from KACO new energy
enables operators of solar power plants, or trans-
new energy serves yield port networks, to provide the necessary amount of
reactive power correction, by day or by night. The
protection in solar parks and correction value applied at the grid connection point
is the crucial factor. This is where the park control
system reads the measured reactive power. If the
grid management. measured value deviates from the set-point which
can be set to any value between 100% active and
100% reactive the blueplanet 50.0 TL3 RPonly
inverter or inverters will be requested to supply re-
active power to the extent that is required to arrive
at the target value once more. Since fluctuations in
the grid can result from a range of causes, the ap-
plication goes beyond solar parks: the blueplanet
50.0 TL3 RPonly can therefore also be used for
reactive power compensation in industrial or other
large consumer sites.
Reactive power is defined using the phase off-
set between current and voltage, and is given as
the cosine of the angle difference: if the current and
voltage are completely in phase (phase angle Phi
= 0 degrees), the cosine of Phi is 1, i.e. 100 per
cent active power and 0 per cent reactive power
is supplied. In contrast, if the current and voltage
curves are completely offset (phase angle Phi = 90
degrees), the cosine of Phi has a value 0, so 100
per cent reactive power is supplied to the grid.
As a phase-shifting device, the blueplanet
50.0 TL3 RPonly can supply any value of reactive
power between 0 and 100 per cent, current leading
or lagging. The power is not given in watts (W) or
volt-amperes (VA) but in var. As its name suggests,
the inverter can supply up to 50 kvar.
By using the RPonly as a purely reactive-power
inverter, solar inverters do not have to reduce their
own active power in order to match the grid reactive
power. Instead, they can continue to feed in sole-
ly active power, protecting the park operator from
yield losses.
The blueplanet 50.0 TL3 RPonly can be used in
new and existing plants, wherever reactive power
is required in grid management, perfectly comple-
menting solar inverters from KACO new energy or
other manufacturers.
Country:---------------------------------------------------------------------------------
RISEN ENERGY........................................................................41
PAYMENT SWELECT.................................................................................09
Mail this coup on to: FirstSource Energy India Pvt. Ltd. Subscription Department.
95 C, Sampat Farms, Bicholi Mardana Distt-Indore 452016
Tel. + 91 96441 22268 9
"
www.EQMagPro.com EQ October Part D 2017 83
84 EQ October 2017 www.EQMagPro.com
www.EQMagPro.com EQ October Part D 2017 85