KONTRAKTOR PELAKSANA :

PEKERJAAN PEMBANGUNAN /PEMELIHARAAN JALAN & JEMBATAN PT. KARYA KONSTRUKSI


PAKET : REHABILITASI MAYOR JALAN LAMBARO - BLANG BINTANG AS BUILT DRAWING KONSULTAN SUPERVISI :
PT. SEECONS JO PT. INDEC INTERNUSA
BALAI PELAKSANAAN JALAN NASIONAL I BANDA ACEH
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH II PROV. ACEH JUDUL : CROSS SECTION CORE TEAM :
(WIL. II - 01.01)
PT. ESKAPINDO MATRA

10+678 10+683 10+688

Aspal AC - WC t = 4 cm Aspal AC - WC t = 4 cm Aspal AC - WC t = 4 cm


Aspal AC - BC t = 6 cm Aspal AC - BC t = 6 cm Aspal AC - BC t = 6 cm
10 10 10

bidang persamaan bidang persamaan bidang persamaan


reference level reference level reference level
7.00 7.00 7.00
ELEVASI TANAH ASLI ELEVASI TANAH ASLI ELEVASI TANAH ASLI
9.498

9.453

9.407

9.374

9.346

9.507

9.399

9.399

9.359

9.330

9.524

9.472

9.402

9.372

9.317
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK (m) JARAK (m) JARAK (m)


1.70 1.60 1.50 2.20 1.70 1.60 1.50 2.20 1.70 1.60 1.50 2.20
DISTANCE (m) DISTANCE (m) DISTANCE (m)

10+693 10+698 10+702

Aspal AC - WC t = 4 cm Aspal AC - WC t = 4 cm Aspal AC - WC t = 4 cm


Aspal AC - BC t = 6 cm Aspal AC - BC t = 6 cm Aspal AC - BC t = 6 cm
10 10 10

bidang persamaan bidang persamaan bidang persamaan


reference level reference level reference level
7.00 7.00 7.00
ELEVASI TANAH ASLI ELEVASI TANAH ASLI ELEVASI TANAH ASLI
9.547

9.489

9.411

9.367

9.324

9.577

9.525

9.435

9.377

9.314

9.625

9.562

9.467

9.410

9.432
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK (m) JARAK (m) JARAK (m)


1.70 1.60 1.50 1.80 1.50 1.50 1.50 1.80 1.50 1.50 1.50 1.50
DISTANCE (m) DISTANCE (m) DISTANCE (m)

10+707
Aspal AC - WC t = 4 cm
Aspal AC - BC t = 6 cm

10

bidang persamaan
reference level
7.00
ELEVASI TANAH ASLI
9.609

9.605

9.515

9.447

9.377

ORIGINAL GROUND LEVEL

JARAK (m)
1.50 1.50 1.50 1.90
DISTANCE (m)

PENYEDIA JASA KONSULTAN SUPERVISI CORE TEAM WILAYAH BARAT & SELATAN PEJABAT PEMBUAT KOMITMEN 1 KEPALA SATUAN KERJA KEPALA SATUAN KERJA
PT. KARYA KONSTRUKSI PT. SEECONS JO PT. INDEC INTERNUSA PT. ESKAPINDO MATRA (KOTA B. ACEH - BATAS PIDIE DAN P. WEH) PELAKSANAAN JALAN NASIONAL WILAYAH II PROV. ACEH PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. ACEH

TAMZIL AL - KADRI, ST Ir. AMRI DARMA ALI MUNIR, ST TEUKU HERMANSYAH, ST. MT Ir. AHMAD FAIZAL, MM Ir. ZUSNAN ASRAF WAHAB, MT
DIREKTUR SITE ENGINEER TEAM LEADER NIP. 19770206 200502 1 001 NIP. 19630918 199803 1 002 NIP. 19651201 199603 1 003