8 9 10 11 12 13 14
15 16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6 7
JULI
8 9 10 11 12 13 14
15 16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5 6
AGUSTUS
7 8 9 10 11 12 13
14 15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4 5
SEPTEMBER
6 7 8 9 10 11 12
13 14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 1 2 3 4 5
OKTOBER
6 7 8 9 10 11 12
13 14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3 4
NOPEMBER
5 6 7 8 9 10 11
12 13 14 15 16 17 18 19
20 21 22
8 JUNI - 22 NOPEM
PEKERJAAN : FEASIBILITY WADUK KR. KLUET
LOKASI : KABUPATEN ACEH SELATAN (OTSUS ACEH)
SATUAN KERJA : DINAS PENGAIRAN PEMERINTAH ACEH
TAHUN ANGGARAN : 2016
NO. & TGL. KONTRAK : KU.602.A/KONSL-PP/964/2016 / 08 JUNI 2016
BULAN
BOBOT
NO JENIS KEGIATAN JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKTOBER OKTOBER - NOPEMBER NOPEMBER KET
(%)
8-14 15-22 23-29 30-7 8-14 15-22 23-29 30-6 7-13 14-21 22-28 29-5 6-12 13-20 21-27 28-5 6-12 13-20 21-27 28-4 5-11 12-19 20-22
I KEGIATAN A : PENDAHULUAN
100.00
1 Persiapan Administrasi dan Teknis 2.02 2.02
2 Penyusun Rencana Kerja dan Rencana Mutu Kontrak (RMK) 2.76 1.38 1.38
3 Pengumpulan Data Sekunder dan Literatur 2.51 0.59 1.92
4 Survei Pendahuluan 2.07 0.69 1.38
V KEGIATAN E : PENYUSUNAN
Laporan Rencana Mutu Kontrak LAPORAN
1 1.76 1.76
Laporan Bulanan ( 1 bk x 6.00 bln )
2 1.45 0.24 0.24 0.24 0.24 0.24 0.24
Laporan Pendahuluan
3 1.57 0.29 0.26 0.52 0.50
Draft Laporan :
4 4.1 Laporan Antara
2.33 0.43 0.39 0.78 0.74
4.2 Laporan Design Note
0.69 1.38 40.00
4.3 Laporan Akhir 2.07
2.59 0.47 0.43 1.21 0.47
Final Laporan :
5
40.00
BOBOT RENCANA 100.00 3.40 3.73 3.46 3.71 3.98 4.27 4.35 3.96 4.31 5.08 7.67 8.56 6.78 5.70 3.94 3.68 3.84 4.24 4.11 4.26 2.95 2.04 2.00
BOBOT RENCANA KUMULATIF 0.00 3.40 7.13 10.58 14.29 18.27 22.54 26.89 30.85 35.16 40.24 47.91 56.47 63.25 68.95 72.89 76.57 80.41 84.65 88.75 93.02 95.96 98.00 ###
BOBOT REALISASI
BOBOT REALISASI KUMULATIF
DEVIASI
A Tenaga Ahli
1 Ketua Tim (Ahli Bendungan) DR. Ir. Maryono Bony, Dipl.WRD, M.Eng 6
Ahli Geoteknik
2 Ir. Hantoro Sugiyarno 4
3 Ahli Lingkungan Ir. Opy Kurniasari, MT 1
4 Ahli Sosial Ekonomi Mufti Zaeni, SE. 1.5
Sub Total 12.5
B Tenaga Pendukung
1 Chief Surveyor Aep Saepuloh, ST 2
2 Cost Estimator 1 Suprapto, ST. 2
3 Cost Estimator 2 Tato Kadarto, ST. 2
4 Surveyor Topografi 1 Aan Misan, A.Md. 2
5 Surveyor Topografi 2 Achlidar 2
6 Tenaga Lokal Topografi (6 orang) To Be Name 2
7 Operator CAD 1 Nendy Satria Pribadi 3
8 Operator CAD 2 Yamadi 3
9 Operator Komputer Nurbaliani, SAB. 6
Sub Total 24
Total 36.5
A Peralatan Kantor
1 Basecamp 1 2
2 Komputer Operator 1 6
3 Komputer CAD 2 3
4 Printer A4 2 6
5 Printer A3 2 6
6 Notebook 1 6
7 Ploter 1 2
8 Scanner 1 6
9 Kamera Digital/Handycam 1 6
B Peralatan Transportasi
1 Kendaraan Kerja Roda 4 1 6
2 Kendaraan Kerja Roda 2 2 2
Penyelidikan Geoteknik/Mektan
1 Bor Inti m 150
2 Standar Penetration Test (SPT) ttk 30
3 Undisturb Sample sampel 30
4 Corebox buah 30
5 Platform (Andang) ls 1
6 Sondir ttk 5
7 Perlengkapan Lapangan Lainnya ls 1
A Kegiatan Umum
1 Material Komputer & Alat Tulis Kantor Ls 6
2 Tinta Printer A4 & A3 Ls 6
3 Tinta Ploter Ls 2
4 Material Komunikasi Ls 6
B Material Transportasi
1 BBM Kendaraan Roda 2 Ls 6
Ls 2
Rp 242,876,480
Rp 242,876,480 Rp 758,989,000
Rp 46,850,000 689,990,000
Rp 4,685,000 68,999,000
Rp 51,535,000 758,989,000
6.79 100.00
23,000,000 258,250,000
3,000,000 125,200,000
6,433,333 37,200,000
1,666,667 10,000,000
4,750,000 7,280,000
- 201,060,000
8,000,000 51,000,000
689,990,000
68,999,000
758,989,000
758,989,000
Rp -
Jumlah
No. Posisi OB Satuan
Orang/Buah
I BIAYA LANGSUNG PERSONIL
1.1 Tenaga Ahli
1 Ketua Tim (Ahli Bendungan)
Ahli Geoteknik 1 6 Org
2 1 4 Org
3 Ahli Lingkungan 1 1 Org
4 Ahli Sosial Ekonomi 1 1.5 Org
2.1 Biaya
LaporanLaporan
Rencana Mutu Kontrak
1 Laporan Bulanan 2 Bulan
( 1 bk x 6.00 b
2 Laporan Pendahuluan 6 Bulan
3 Draft Laporan : 2 Bulan
4 4.1 Laporan Antara
4.2 Laporan Design Note 1
4.3 Laporan Akhir 1 Bulan
Final Laporan : 1 Bulan
5 5.1 Laporan Antara Bulan
2 Bulan
5.2 Laporan Hidrologi
5.3 Laporan Ringkas 2 Bulan
5.4 Laporan Design Note 5 Bulan
5.5 Laporan Akhir (Cover Ekslusive) 2 set
5.6 Laporan Geologi/ Mekanika Tanah 5 LS
5.7 Laporan Survey Sosial Ekonomi 2
5.8 Laporan Analisis Kelayakan Ekonomi & Analisis Lingkungan (PIL)2
5.9 Laporan BOQ, RAB, Spesifikasi Teknis & Metode Kerja 2
5.10 Laporan Pengukuran Topografi dan Deskripsi BM & CP 5
5.11 Buku Data Ukur dan Perhitungan 2
Gambar Topografi dan Detail Desain (termasuk peta-peta) ukuran A32
6 5
7 Gambar Topografi
Dokumentasi dan Foto
/ Album Detail Desain (termasuk peta-peta) ukuran 1
8 2
Exernal Memory 1 TB (berisi Procecing data, Peta, Perancangan, Foto-foto dan seluruh Laporan)
9 1
Jumlah
Harga Satuan I
Jumlah Biaya (Rp) Bobot (%)
(Rp) Jumlah Biaya (%)
7,000,000 7,000,000
12,000,000 12,000,000
10,000,000 10,000,000
9,600,000 9,600,000
10,000,000 10,000,000 10,000,000
3,000,000 3,000,000 3,000,000 3,000,000
29,600,000.00 39,600,000.00 25,000,000.00 25,000,000.00
1,500,000 1,500,000
1,000,000 1,000,000 1,000,000 1,000,000
75,000
75,000
150,000
160,000
160,000
160,000
160,000
160,000
160,000
400,000
160,000
160,000
2,000,000 2,000,000
1,500,000 1,500,000
600,000 600,000
300,000 300,000
405,000 405,000
2,000,000 2,000,000
- -
- -
48,750,000 48,750,000
3,750,000 3,750,000
2,250,000 2,250,000
3,750,000 3,750,000
1,000,000 1,000,000
3,125,000 3,125,000
4,000,000 4,000,000
- -
- -
975,000 975,000
975,000 975,000
975,000 975,000
975,000 975,000
- -
5,250,000 5,250,000
7,500,000 7,500,000
3,750,000 3,750,000
3,000,000
5,400,000
93,830,000.00 102,230,000.00 - -
23,000,000 138000000.00 -
74000000.00 -
18500000.00 -
27750000.00 -
23,000,000.00 258,250,000.00 -
-
-
14000000.00 -
24000000.00 -
20000000.00 -
19200000.00 -
30000000.00 -
3,000,000 18000000.00 -
3,000,000.00 125,200,000.00 -
-
-
-
0.00 -
3000000.00 -
1,000,000 6000000.00 -
0.00 -
600,000 3600000.00 -
3600000.00 -
700,000 4200000.00 -
800,000 4800000.00 -
2,000,000 4000000.00 -
1,333,333 8000000.00 -
6,433,333.33 37,200,000.00 -
-
-
1,666,667 10000000.00 -
1,666,666.67 10,000,000.00 -
-
-
140000.00 -
50,000 300000.00 -
160000.00 -
0.00 -
75000.00 -
75000.00 -
150000.00 -
0.00 -
160000.00 -
160000.00 -
400,000 400000.00 -
160000.00 -
1,000,000 1000000.00 -
160000.00 -
160000.00 -
160000.00 -
400000.00 -
160000.00 -
160000.00 -
1,250,000 1250000.00 -
750,000 750000.00 -
300,000 300000.00 -
1,000,000 1000000.00 -
4,750,000 7,280,000.00 -
-
-
-
5000000.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
4000000.00 -
3000000.00 -
1200000.00 -
600000.00 -
810000.00 -
4000000.00 -
0.00 -
0.00 -
97500000.00 -
7500000.00 -
4500000.00 -
7500000.00 -
2000000.00 -
6250000.00 -
8000000.00 -
0.00 -
0.00 -
1950000.00 -
1950000.00 -
1950000.00 -
1950000.00 -
0.00 -
10500000.00 -
15000000.00 -
7500000.00 -
0.00 -
3000000.00 -
5400000.00 -
- 201,060,000.00 -
-
-
8,000,000 48000000.00 -
3000000.00 -
8,000,000.00 51,000,000.00 -
46,850,000.00 689,990,000.00
-