JUNI

8 9 10 11 12 13 14
15 16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6 7

JULI
8 9 10 11 12 13 14
15 16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5 6

AGUSTUS
7 8 9 10 11 12 13
14 15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4 5

SEPTEMBER
6 7 8 9 10 11 12
13 14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 1 2 3 4 5

OKTOBER
6 7 8 9 10 11 12
13 14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3 4

NOPEMBER
5 6 7 8 9 10 11
12 13 14 15 16 17 18 19
20 21 22
8 JUNI - 22 NOPEM
PEKERJAAN : FEASIBILITY WADUK KR. KLUET
LOKASI : KABUPATEN ACEH SELATAN (OTSUS ACEH)
SATUAN KERJA : DINAS PENGAIRAN PEMERINTAH ACEH
TAHUN ANGGARAN : 2016
NO. & TGL. KONTRAK : KU.602.A/KONSL-PP/964/2016 / 08 JUNI 2016

BULAN
BOBOT
NO JENIS KEGIATAN JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKTOBER OKTOBER - NOPEMBER NOPEMBER KET
(%)
8-14 15-22 23-29 30-7 8-14 15-22 23-29 30-6 7-13 14-21 22-28 29-5 6-12 13-20 21-27 28-5 6-12 13-20 21-27 28-4 5-11 12-19 20-22
I KEGIATAN A : PENDAHULUAN
100.00
1 Persiapan Administrasi dan Teknis 2.02 2.02
2 Penyusun Rencana Kerja dan Rencana Mutu Kontrak (RMK) 2.76 1.38 1.38
3 Pengumpulan Data Sekunder dan Literatur 2.51 0.59 1.92
4 Survei Pendahuluan 2.07 0.69 1.38

II KEGIATAN B : SURVEY DAN IDENTIFIKASI LAPANGAN


1 Survei Topografi 5.29 0.18 1.06 1.23 0.35 0.71 0.18 1.06 0.53
2 Survei Hidrologi/Hidrometri 4.32 0.79 2.16 0.86 0.50
3 Uji Laboratorium Hidrologi 3.25 0.54 0.54 0.65 1.08 0.43
4 Penyelidikan Geologi Teknik dan Mekanika Tanah 4.94 0.82 0.82 0.49 0.82 0.49 0.66 0.33 0.49
5 Uji Laboratorium Geologi Teknik dan Mekanika Tanah 3.10 0.52 0.52 0.62 0.52 0.31 0.41 0.21
6 Survei Sosial Ekonomi, Budaya dan Lingkungan 3.34 1.73 0.56 0.22 0.84 80.00

III KEGIATAN C : ANALISIS DATA


1 Analisis dan Review Data Sekunder dan Literatur 2.38 0.56 1.82
2 Analisis Topografi dan Penggambaran 3.21 0.54 0.32 0.32 0.75 0.32 0.43 0.21 0.32
3 Analisis Hidrologi/Hidrometri 3.97 0.66 0.66 0.40 0.66 0.40 0.53 0.26 0.40
4 Analisis Geologi Teknik dan Mekanika Tanah 3.22 0.21 0.86 0.64 0.54 0.32 0.43 0.21
5 Analisis Sosial Ekonomi, Budaya dan Lingkungan 1.25 0.21 0.42 0.50 0.13

IV KEGIATAN D : DESAIN BENDUNGAN


1 Analisis Tampungan Bendungan 2.07 0.38 0.69 0.83 0.17
2 Analisis dan Studi Pemilihan Alternatif Tipe dan Tubuh Bendungan 3.89 0.26 0.52 0.78 0.65 0.91 0.52 0.26
60.00
3 Perhitungan dan Perencanaan Rinci Tubuh Bendungan Serta Bangunan 3.50 0.23 0.47 0.70 0.58 0.82 0.47 0.23
4 Pembuatan Gambar Teknis Rencana Bendungan Serta Bangunan Peleng 3.46 0.23 0.46 0.69 0.58 0.81 0.46 0.23
5 Analisis Kelayakan Teknis, Ekonomis, Lingkungan dan Sosial-Budaya 2.32 0.27 0.93 0.93 0.19
6 Perhitungan BOQ dan RAB 2.26 0.41 1.21 0.45 0.19

V KEGIATAN E : PENYUSUNAN
Laporan Rencana Mutu Kontrak LAPORAN
1 1.76 1.76
Laporan Bulanan ( 1 bk x 6.00 bln )
2 1.45 0.24 0.24 0.24 0.24 0.24 0.24
Laporan Pendahuluan
3 1.57 0.29 0.26 0.52 0.50
Draft Laporan :
4 4.1 Laporan Antara
2.33 0.43 0.39 0.78 0.74
4.2 Laporan Design Note
0.69 1.38 40.00
4.3 Laporan Akhir 2.07
2.59 0.47 0.43 1.21 0.47
Final Laporan :
5
40.00

5.1 Laporan Antara


2.53 1.27 1.27
5.2 Laporan Hidrologi
1.33 0.67 0.67
5.3 Laporan Ringkas
1.23 0.62 0.62
5.4 Laporan Design Note
1.16 0.58 0.58
5.5 Laporan Akhir (Cover Ekslusive)
2.86 0.52 0.48 0.95 0.91
5.6 Laporan Geologi/ Mekanika Tanah
1.13 0.57 0.57
5.7 Laporan Survey Sosial Ekonomi
1.23 0.62 0.62
5.8 Laporan Analisis Kelayakan Ekonomi & Analisis Lingkungan (PIL)
1.12 0.56 0.56
5.9 Laporan BOQ, RAB, Spesifikasi Teknis & Metode Kerja
1.13 0.38 0.75 20.00
5.10 Laporan Pengukuran Topografi dan Deskripsi BM & CP
1.27 0.64 0.64
5.11 Buku Data Ukur dan Perhitungan
0.71 0.36 0.36
Gambar Topografi dan Detail Desain (termasuk peta-peta) ukuran A3
6 1.22 0.61 0.61
7 Gambar Topografi danFoto
Detail Desain (termasuk peta-peta) ukuran A1 1.22 0.41 0.81
Dokumentasi / Album
8 1.04
Exernal Memory 1 TB (berisi Procecing data, Peta, Perancangan, Foto-foto 1.04
dan seluruh Laporan)
9 0.72 0.72

V KEGIATAN E : PELAKSANAAN DISKUSI


1 Diskusi Pendahulan 0.76 0.76
2 Diskusi Antara 1.12 1.12
3 Diskusi Akhir 1.32 1.32
0.00

BOBOT RENCANA 100.00 3.40 3.73 3.46 3.71 3.98 4.27 4.35 3.96 4.31 5.08 7.67 8.56 6.78 5.70 3.94 3.68 3.84 4.24 4.11 4.26 2.95 2.04 2.00
BOBOT RENCANA KUMULATIF 0.00 3.40 7.13 10.58 14.29 18.27 22.54 26.89 30.85 35.16 40.24 47.91 56.47 63.25 68.95 72.89 76.57 80.41 84.65 88.75 93.02 95.96 98.00 ###
BOBOT REALISASI
BOBOT REALISASI KUMULATIF
DEVIASI

Menyetujui, Aceh, 15 Juni 2016


Kuasa Pengguna Anggaran PT. Aditya Engineering Consultant
Kuasa Pengguna Barang Bidang Program dan Pelaporan

Ir. Amri, SP. Taufiq, SE.


NIP. 19651231 199301 1 003 Direktur
BULAN
Bulan
NO. POSISI NAMA PERSONIL JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKTOBER OKTOBER - NOPEMBER NOPEMBER Kerja
8-14 15-22 23-29 30-7 8-14 15-22 23-29 30-6 7-13 14-21 22-28 29-5 6-12 13-20 21-27 28-5 6-12 13-20 21-27 28-4 5-11 12-19 20-22

A Tenaga Ahli
1 Ketua Tim (Ahli Bendungan) DR. Ir. Maryono Bony, Dipl.WRD, M.Eng 6
Ahli Geoteknik
2 Ir. Hantoro Sugiyarno 4
3 Ahli Lingkungan Ir. Opy Kurniasari, MT 1
4 Ahli Sosial Ekonomi Mufti Zaeni, SE. 1.5
Sub Total 12.5
B Tenaga Pendukung
1 Chief Surveyor Aep Saepuloh, ST 2
2 Cost Estimator 1 Suprapto, ST. 2
3 Cost Estimator 2 Tato Kadarto, ST. 2
4 Surveyor Topografi 1 Aan Misan, A.Md. 2
5 Surveyor Topografi 2 Achlidar 2
6 Tenaga Lokal Topografi (6 orang) To Be Name 2
7 Operator CAD 1 Nendy Satria Pribadi 3
8 Operator CAD 2 Yamadi 3
9 Operator Komputer Nurbaliani, SAB. 6
Sub Total 24
Total 36.5

Menyetujui, Aceh, 15 Juni 2016


BULAN
WAKTU
NO. JENIS ALAT VOLUME JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKTOBER OKTOBER - NOPEMBER NOPEMBER
(BULAN)
8-14 15-22 23-29 30-7 8-14 15-22 23-29 30-6 7-13 14-21 22-28 29-5 6-12 13-20 21-27 28-5 6-12 13-20 21-27 28-4 5-11 12-19 20-22

A Peralatan Kantor
1 Basecamp 1 2
2 Komputer Operator 1 6
3 Komputer CAD 2 3
4 Printer A4 2 6
5 Printer A3 2 6
6 Notebook 1 6
7 Ploter 1 2
8 Scanner 1 6
9 Kamera Digital/Handycam 1 6

B Peralatan Transportasi
1 Kendaraan Kerja Roda 4 1 6
2 Kendaraan Kerja Roda 2 2 2

C Peralatan Survey Lapangan


Survey Topografi
1 Theodolite 1 2
2 Waterpass 1 2
3 BM Beton Permukaan Marmer (20 x 20 x 100 cm) bh 4
4 CP Beton Pipa PVC Diameter 3" x 100 cm) bh 4
5 Patok Kayu ls 270
6 Perlengkapan Lapangan Lainnya ls 1

Penyelidikan Geoteknik/Mektan
1 Bor Inti m 150
2 Standar Penetration Test (SPT) ttk 30
3 Undisturb Sample sampel 30
4 Corebox buah 30
5 Platform (Andang) ls 1
6 Sondir ttk 5
7 Perlengkapan Lapangan Lainnya ls 1

Menyetujui, Aceh, 15 Juni 2016


Kuasa Pengguna Anggaran PT. Aditya Engineering Consultant
Kuasa Pengguna Barang Bidang Program dan Pelaporan
BULAN
WAKTU
NO. JENIS MATERIAL VOLUME JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKTOBER OKTOBER - NOPEMBER NOPEMBER
(BULAN)
8-14 15-22 23-29 30-7 8-14 15-22 23-29 30-6 7-13 14-21 22-28 29-5 6-12 13-20 21-27 28-5 6-12 13-20 21-27 28-4 5-11 12-19 20-22

A Kegiatan Umum
1 Material Komputer & Alat Tulis Kantor Ls 6
2 Tinta Printer A4 & A3 Ls 6
3 Tinta Ploter Ls 2
4 Material Komunikasi Ls 6

B Material Transportasi
1 BBM Kendaraan Roda 2 Ls 6
Ls 2

C Material Survey Lapangan


1 Material untuk BM Ls 2
2 Material untuk CP Ls 2
3 Material untuk Patok Kayu Ls 2
4 Material Kertas Kalkir Ls 2
5 Material Kertas MM Ls 2

Menyetujui, Aceh, 15 Juni 2016


Kuasa Pengguna Anggaran PT. Aditya Engineering Consultant
Kuasa Pengguna Barang Bidang Program dan Pelaporan
PEKERJAAN : FEASIBILITY WADUK KR. KLUET
LOKASI : KABUPATEN ACEH SELATAN (OTSUS ACEH)
SATUAN KERJA : DINAS PENGAIRAN PEMERINTAH ACEH
TAHUN ANGGARAN : 2016
NO. & TGL. KONTRAK : KU.602.A/KONSL-PP/964/2016 / 08 JUNI 2016

JUMLAH HARGA BULAN KE


NO URAIAN
(Rp) I II III IV V

A. PENERIMAAN (CASH IN) + PPN Rp 758,989,000


1 Uang Muka (20%) Rp 151,797,800 Rp 151,797,800
2 Termijn I (30%) - 20% Uang Muka Rp 182,157,360 Rp 182,157,360
3 Termijn II (30%) - 30% Uang Muka Rp 182,157,360 Rp 182,157,360
4 Termijn III (40%) - 40% Uang Muka Rp 242,876,480
Rp 151,797,800 Rp 182,157,360 Rp - Rp 182,157,360 Rp -

B. PENGELUARAN (CASH OUT) Rp 45,290,000 Rp 200,740,000 Rp 229,430,000 Rp 82,640,000 Rp 85,040,000


PPN 10% Rp 4,529,000 Rp 20,074,000 Rp 22,943,000 Rp 8,264,000 Rp 8,504,000
Total Pengeluaran (Cash Out Rp 49,819,000 Rp 220,814,000 Rp 252,373,000 Rp 90,904,000 Rp 93,544,000
Rincian Cash Out 6.56 29.09 33.25 11.98 12.32

I. Biaya Langsung Personil


a. Tenaga Profesional 23,000,000 60,000,000 69,250,000 41,500,000 41,500,000
b. Tenaga Pendukung 3,000,000 29,600,000 39,600,000 25,000,000 25,000,000

II. Biaya Langsung Non Personil


a. Biaya Perjalanan 4,433,333 5,933,333 7,133,333 5,633,333 7,633,333
b. Sewa Kendaraan 1,666,667 1,666,667 1,666,667 1,666,667 1,666,667
c. Pengadaan Peralatan (Sewa/Beli) 190,000 210,000 50,000 840,000 1,240,000
d. Analisa Lapangan dan Laboratorium 5,000,000 93,830,000 102,230,000 - -
e. Biaya Komunikasi 8,000,000 9,500,000 9,500,000 8,000,000 8,000,000
Jumlah
PPN 10%
Jumlah Total
Dibulatkan

C. CASH BALANCE Rp 101,978,800 Rp 63,322,160 Rp (189,050,840) Rp (97,797,480) Rp (191,341,480)


KET
VI

Rp 242,876,480
Rp 242,876,480 Rp 758,989,000

Rp 46,850,000 689,990,000
Rp 4,685,000 68,999,000
Rp 51,535,000 758,989,000
6.79 100.00

23,000,000 258,250,000
3,000,000 125,200,000

6,433,333 37,200,000
1,666,667 10,000,000
4,750,000 7,280,000
- 201,060,000
8,000,000 51,000,000
689,990,000
68,999,000
758,989,000
758,989,000

Rp -
Jumlah
No. Posisi OB Satuan
Orang/Buah
I BIAYA LANGSUNG PERSONIL
1.1 Tenaga Ahli
1 Ketua Tim (Ahli Bendungan)
Ahli Geoteknik 1 6 Org
2 1 4 Org
3 Ahli Lingkungan 1 1 Org
4 Ahli Sosial Ekonomi 1 1.5 Org

1.2 Tenaga Teknisi


1 Chief Surveyor 1 2 Org
2 Cost Estimator 2 2 Org
3 Surveyor Topografi 2 2 Org
4 Tenaga Lokal Topografi 6 2 Org
5 Operator CAD 2 3 Org
6 Operator Komputer 1 6 Org

II BIAYA LANGSUNG NON PERSONIL


2.1 Biaya Kantor
1 Biaya Basecamp
- Sewa Base Camp 1 2
2 Biaya Komunikasi (Telp/Fax/Teleg) 6
3 Biaya Peralatan Kantor
-- Komputer
Komputer Untuk Operator
AutoCAD (sewa)(sewa) 1 6
- Printer A3 (sewa) 2 3
- Notebook (sewa) 2 6
1 6
- Ploter A1 (sewa) 1 2
- ATK & Bahan Komputer 1

2.2 Biaya Perjalanan


Mobilisasi Dinasbilisasi Tenaga Ahli
dan Demo
1 2 2

2.1 Biaya
LaporanLaporan
Rencana Mutu Kontrak
1 Laporan Bulanan 2 Bulan
( 1 bk x 6.00 b
2 Laporan Pendahuluan 6 Bulan
3 Draft Laporan : 2 Bulan
4 4.1 Laporan Antara
4.2 Laporan Design Note 1
4.3 Laporan Akhir 1 Bulan
Final Laporan : 1 Bulan
5 5.1 Laporan Antara Bulan
2 Bulan
5.2 Laporan Hidrologi
5.3 Laporan Ringkas 2 Bulan
5.4 Laporan Design Note 5 Bulan
5.5 Laporan Akhir (Cover Ekslusive) 2 set
5.6 Laporan Geologi/ Mekanika Tanah 5 LS
5.7 Laporan Survey Sosial Ekonomi 2
5.8 Laporan Analisis Kelayakan Ekonomi & Analisis Lingkungan (PIL)2
5.9 Laporan BOQ, RAB, Spesifikasi Teknis & Metode Kerja 2
5.10 Laporan Pengukuran Topografi dan Deskripsi BM & CP 5
5.11 Buku Data Ukur dan Perhitungan 2
Gambar Topografi dan Detail Desain (termasuk peta-peta) ukuran A32
6 5
7 Gambar Topografi
Dokumentasi dan Foto
/ Album Detail Desain (termasuk peta-peta) ukuran 1
8 2
Exernal Memory 1 TB (berisi Procecing data, Peta, Perancangan, Foto-foto dan seluruh Laporan)
9 1

2.1.2 BIAYA PENGUMPULAN DATA, SURVEY LAPANGAN DAN PENYELIDIKAN SDA


1. Inventarisasi
1.1. Pengumpulan & Pengumpulan
Data dan PetaData dan PetaPerencanaan
Pendukung SDA
Data-data dan peta-peta yang diperlukan untuk perencanaan 1
Data Hidrologi dan Meteorologi
Peta tata guna lahan
Data-data hasil study terdahulu
dan data pendukung lainnya
2. Biaya Pengumpulan Data Primer
2.1. Survey Topografi
Theodolite (sewa) 2
Waterpass (sewa) 2
BM Beton Permukaan Marmer (20 x 20 x 100 c 4
CP Beton Pipa PVC Diameter 3" x 100 cm) 4
Patok Kayu 270
Perlengkapan Lapangan 1 Bulan
2.2. Penyelidikan Geoteknik/Mekanikal Tanah ls
2.2.1. Biaya Survey Lapangan
a. Pemboran Int 150 Hari
b. Standar Penetraton Test (SPT) Interval 5 m 30 Ls
c. Undisturb Sample 30 Buah
d. Corebox 30 Buah
e. Platform (Andang) 1 ls
f. Sondir 5 ls
d. Mobilisasi/Demobilisasi Peralatan termasu 1 ls
2.2.2. Biaya Pekerjaan Laboratorium
a. Pengujian Index propertes ttk
- Specific gravity 30
- Unit Weight 30 Test
- Grain size analisis 30 Test
- Atterberg Limit 30 Test
b. Pengujian Engineering propertes Test
- Consolidaton 30 Test
- CU Triaxial 30
- Permeability 30
2.3. Pengambilan Sample dan Test Laboratorium Sedimen & Kualitas Air
2.3.1. Sedimentasi dasar (bed load) 6
2.3.2. Kualitas air (masing-masing sample 31 param 6

BIAYA SEWA KENDARAAN


1 Kendaraan Kerja Roda 4 (O&M serta gaji pengemudi 6
2 Kendaraan Kerja Roda 2 (O&M) 4

Jumlah
Harga Satuan I
Jumlah Biaya (Rp) Bobot (%)
(Rp) Jumlah Biaya (%)

23,000,000 138,000,000.00 20.00 23,000,000


18,500,000 74,000,000.00 10.72
18,500,000 18,500,000.00 2.68
18,500,000 27,750,000.00 4.02
258,250,000.00 37.43 23,000,000.00

7,000,000 14,000,000.00 2.03


6,000,000 24,000,000.00 3.48
5,000,000 20,000,000.00 2.90
1,600,000 19,200,000.00 2.78
5,000,000 30,000,000.00 4.35
3,000,000 18,000,000.00 2.61 3,000,000
125,200,000.00 18.15 3,000,000.00

1,500,000 3,000,000.00 0.43


1,000,000 6,000,000.00 0.87 1,000,000

600,000 3,600,000.00 0.52 600,000


600,000 3,600,000.00 0.52
350,000 4,200,000.00 0.61 700,000
800,000 4,800,000.00 0.70 800,000
2,000,000 4,000,000.00 0.58
8,000,000 8,000,000.00 1.16 1,333,333
37,200,000.00 5.39 4,433,333.33

2,500,000 10,000,000.00 1.45 1,666,667


10,000,000.00 1.45 1,666,666.67

70,000 140,000.00 0.02 140,000


50,000 300,000.00 0.04 50,000
80,000 160,000.00 0.02
- 0.00
75,000 75,000.00 0.01
75,000 75,000.00 0.01
150,000 150,000.00 0.02
- 0.00
80,000 160,000.00 0.02
80,000 160,000.00 0.02
80,000 400,000.00 0.06
80,000 160,000.00 0.02
200,000 1,000,000.00 0.14
80,000 160,000.00 0.02
80,000 160,000.00 0.02
80,000 160,000.00 0.02
80,000 400,000.00 0.06
80,000 160,000.00 0.02
80,000 160,000.00 0.02
250,000 1,250,000.00 0.18
750,000 750,000.00 0.11
150,000 300,000.00 0.04
1,000,000 1,000,000.00 0.14
7,280,000.00 1.06 190,000.00

5,000,000 5,000,000.00 0.72 5,000,000

2,000,000 4,000,000.00 0.58


1,500,000 3,000,000.00 0.43
300,000 1,200,000.00 0.17
150,000 600,000.00 0.09
3,000 810,000.00 0.12
4,000,000 4,000,000.00 0.58
- 0.00
0.00
650,000 97,500,000.00 14.13
250,000 7,500,000.00 1.09
150,000 4,500,000.00 0.65
250,000 7,500,000.00 1.09
2,000,000 2,000,000.00 0.29
1,250,000 6,250,000.00 0.91
8,000,000 8,000,000.00 1.16
- 0.00
- 0.00
65,000 1,950,000.00 0.28
65,000 1,950,000.00 0.28
65,000 1,950,000.00 0.28
65,000 1,950,000.00 0.28
- 0.00
350,000 10,500,000.00 1.52
500,000 15,000,000.00 2.17
250,000 7,500,000.00 1.09
- 0.00
500,000 3,000,000.00 0.43
900,000 5,400,000.00 0.78
201,060,000.00 29.14 5,000,000.00

8,000,000 48,000,000.00 6.96 8,000,000


750,000 3,000,000.00 0.43
51,000,000.00 7.39 8,000,000.00

689,990,000.00 100.00 45,290,000.00


II III IV V
Jumlah Biaya (%) Jumlah Biaya (%) Jumlah Biaya (%) Jumlah Biaya (%)

23,000,000 23,000,000 23,000,000 23,000,000


18,500,000 18,500,000 18,500,000 18,500,000
18,500,000
18,500,000 9,250,000
60,000,000.00 69,250,000.00 41,500,000.00 41,500,000.00

7,000,000 7,000,000
12,000,000 12,000,000
10,000,000 10,000,000
9,600,000 9,600,000
10,000,000 10,000,000 10,000,000
3,000,000 3,000,000 3,000,000 3,000,000
29,600,000.00 39,600,000.00 25,000,000.00 25,000,000.00

1,500,000 1,500,000
1,000,000 1,000,000 1,000,000 1,000,000

600,000 600,000 600,000 600,000


1,200,000 1,200,000 1,200,000
700,000 700,000 700,000 700,000
800,000 800,000 800,000 800,000
2,000,000
1,333,333 1,333,333 1,333,333 1,333,333
5,933,333.33 7,133,333.33 5,633,333.33 7,633,333.33

1,666,667 1,666,667 1,666,667 1,666,667


1,666,666.67 1,666,666.67 1,666,666.67 1,666,666.67

50,000 50,000 50,000 50,000


160,000

75,000
75,000
150,000

160,000
160,000

160,000

160,000
160,000
160,000
400,000
160,000
160,000

210,000.00 50,000.00 840,000.00 1,240,000

2,000,000 2,000,000
1,500,000 1,500,000
600,000 600,000
300,000 300,000
405,000 405,000
2,000,000 2,000,000
- -
- -
48,750,000 48,750,000
3,750,000 3,750,000
2,250,000 2,250,000
3,750,000 3,750,000
1,000,000 1,000,000
3,125,000 3,125,000
4,000,000 4,000,000
- -
- -
975,000 975,000
975,000 975,000
975,000 975,000
975,000 975,000
- -
5,250,000 5,250,000
7,500,000 7,500,000
3,750,000 3,750,000

3,000,000
5,400,000
93,830,000.00 102,230,000.00 - -

8,000,000 8,000,000 8,000,000 8,000,000


1,500,000 1,500,000
9,500,000.00 9,500,000.00 8,000,000.00 8,000,000.00

200,740,000.00 229,430,000.00 82,640,000.00 85,040,000.00


VI
Ket.
Jumlah Biaya (%)

23,000,000 138000000.00 -
74000000.00 -
18500000.00 -
27750000.00 -
23,000,000.00 258,250,000.00 -
-
-
14000000.00 -
24000000.00 -
20000000.00 -
19200000.00 -
30000000.00 -
3,000,000 18000000.00 -
3,000,000.00 125,200,000.00 -
-
-
-
0.00 -
3000000.00 -
1,000,000 6000000.00 -
0.00 -
600,000 3600000.00 -
3600000.00 -
700,000 4200000.00 -
800,000 4800000.00 -
2,000,000 4000000.00 -
1,333,333 8000000.00 -
6,433,333.33 37,200,000.00 -
-
-
1,666,667 10000000.00 -
1,666,666.67 10,000,000.00 -
-
-
140000.00 -
50,000 300000.00 -
160000.00 -
0.00 -
75000.00 -
75000.00 -
150000.00 -
0.00 -
160000.00 -
160000.00 -
400,000 400000.00 -
160000.00 -
1,000,000 1000000.00 -
160000.00 -
160000.00 -
160000.00 -
400000.00 -
160000.00 -
160000.00 -
1,250,000 1250000.00 -
750,000 750000.00 -
300,000 300000.00 -
1,000,000 1000000.00 -
4,750,000 7,280,000.00 -
-
-
-
5000000.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
4000000.00 -
3000000.00 -
1200000.00 -
600000.00 -
810000.00 -
4000000.00 -
0.00 -
0.00 -
97500000.00 -
7500000.00 -
4500000.00 -
7500000.00 -
2000000.00 -
6250000.00 -
8000000.00 -
0.00 -
0.00 -
1950000.00 -
1950000.00 -
1950000.00 -
1950000.00 -
0.00 -
10500000.00 -
15000000.00 -
7500000.00 -
0.00 -
3000000.00 -
5400000.00 -
- 201,060,000.00 -
-
-
8,000,000 48000000.00 -
3000000.00 -
8,000,000.00 51,000,000.00 -

46,850,000.00 689,990,000.00
-